1-Exist HighSchool-site Studies 10 2024 (2).pdf
PDF 512 KB Posted
- Solicitation number
- SSSD 2025-09-17 MP RFP
- Issued by
- Summit County, Utah
About this file
The document is a series of site study diagrams for South Summit High School, dated 09 Oct 20234, featuring five different site layout variations. Each site study map shows the high school's campus layout, including the main school building, a football field and track, multiple parking areas, and surrounding streets. The diagrams consistently display a parking structure with 325-367 stalls, faculty and student parking zones, parent and bus drop-off areas, and proximity to a seminary property on Center Street.
The site studies explore different configurations of traffic flow, parking placement, and building orientation while maintaining consistent core elements. Site Study 01 shows 30 stalls for parent drop-off, while subsequent studies expand this area and adjust parking allocations. Each map includes a football field and track with a circular running track, positioned consistently on the right side of the school building. The studies appear to be part of a planning process to optimize the school's site design, potentially for a new construction or renovation project, with careful consideration given to traffic management, parking capacity, and campus accessibility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exist HighSchool-site Studies 10 2024 High School Site 01
| Exist HighSchool-site Studies 10 2024 High School Site 02 |
| Exist HighSchool-site Studies 10 2024 High School Site 03 |
| Exist HighSchool-site Studies 10 2024 High School Site 04 |
| Exist HighSchool-site Studies 10 2024 High School Site 05 |
File details come from the government source that posted it. Updated .