3--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo LIB125639 Draper Library HVAC Replacement - CONST
Solicitation number
SLCo LIB125639 Draper Library HVAC Replacement - CONST
Issued by
Utah

About this file

This document is a Schedule of Values spreadsheet for the LIB125639 Draper Library HVAC Replacement project in Utah, prepared for a state and local construction contract opportunity. The project involves removing existing split systems and installing a chiller and 4-pipe air handling units (AHUs) according to construction documents. The spreadsheet provides a structured template for bidders to itemize costs across different project divisions, including base bid and potential alternates, with designated columns for Payment & Performance Bond, Insurance & Builder's Risk, and General Conditions.

The Schedule of Values appears to be a blank template requiring completion by the bidding company, with placeholders for entering specific cost breakdowns for various project components. While no specific pricing is filled in, the document indicates that total bid amounts must match entries in the Online Solicitation System (OSS). The spreadsheet suggests multiple bidding options with base bid and three alternate scenarios, allowing flexibility in project scope and potential cost variations. No specific funding sources or set-asides are explicitly detailed in this document, which serves primarily as a financial structuring tool for the HVAC replacement project at the Draper Library.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: LIB125639 Draper Library HVAC Replacement
Divisions of WorkBase BidAlternate 1Alternate 2Alternate 3
(Specify entire work scope; examples are listed below)Alternate 1Alternate BAlternate CTotal
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance & Builder's Risk$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________

Sheet2

Sheet3

File details come from the government source that posted it. Updated .