3-2. Section C - Bid Tabulation (fillable).pdf
PDF 213 KB Posted
- Attached to
- Boulder County 28th Street Charging Stations
- Solicitation number
- BID-310-26
- Issued by
- Boulder County, Colorado
About this file
This is a bid tabulation form for Boulder County, Colorado, soliciting bids for ChargePoint electric vehicle charging stations and delivery services. The project requires three distinct items: three ChargePoint Dual-port CT4000 public charging stations, three ChargePoint Dual-port CP6000 fleet charging stations, and one ChargePoint Dual-port EXPP/PL2000 DC fast-charger system for the 28th Street Charging Stations project. Boulder County will handle all installation through its internal electricians, with bidders responsible only for supplying the equipment and delivery. The bid tabulation form requires vendors to provide unit costs and total amounts for each item, including associated cloud plans, warranties, and other related services.
Bidders must submit pricing for material only and pricing with shipping included, along with lead time for equipment delivery to the project site and shipping costs. Product submittals for all charging station equipment are required with the bid. The form provides designated spaces for bidders to itemize costs and calculate a total bid amount. All questions regarding the Boulder County procurement process should be directed to procurement@bouldercounty.gov, and bidders are directed to the Boulder County submittal instructions and Americans with Disabilities Act and Equal Opportunity Notice for additional requirements and compliance information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C: Bid Tabulation Item #1: Three (3) ChargePoint Dual-port CT4000 Public Charging Stations
Quantity Item Description Unit Cost Amount/Total
(eg. ChargePoint Part/Model#/Description) $_________ $_________
(eg. ChargePoint 5-year Cloud Plan, Warranty, etc) $_________ $_________
Item #1 Total $_________
Item #2: Three (3) ChargePoint Dual-port CP6000 Fleet Charging Stations Quantity Item Description Unit Cost Amount/Total
(eg. ChargePoint Part/Model#/Description) $_________ $_________
(eg. ChargePoint 5-year Cloud Plan, Warranty, etc) $_________ $_________
Item #2 Total $_________
Item #3: ChargePoint Dual-port EXPP/PL2000 DC Fast-charger system Quantity Item Description Unit Cost Amount/Total
(eg. ChargePoint Part/Model#/Description) $__________ $_________
(eg. ChargePoint 5-year Cloud Plan, Warranty, etc) $__________ $_________
Item #3 Total $_________
BID TOTAL $ (Material Only) ____________
In addition to itemized costs, please provide the following information with the BID:
1. Lead time for equipment delivery to project site
2. Shipping costs
3. Provide product submittals for charging station equipment
BID TOTAL $ (Shipping Included) ____________
Lead time for equipment delivery to project site:
| undefined: |
| undefined_2: |
| undefined_3: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| undefined_7: |
| undefined_8: |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| BID TOTAL Material Only: |
| BID TOTAL Shipping Included: |
| Lead time for equipment delivery to project site: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
File details come from the government source that posted it. Updated .