3-1. Scope of Work.pdf
PDF 141 KB Posted
- Attached to
- Elevator Services for BCHA
- Solicitation number
- SOQ-291-26
- Issued by
- Boulder County, Colorado
About this file
This Scope of Work document outlines the requirements for the Boulder County Housing Authority (BCHA) elevator services contract in Colorado. The vendor selected will be responsible for providing comprehensive elevator maintenance, inspection, testing, repair, and related services for elevator systems located at BCHA properties. The scope requires the vendor to supply all labor, supervision, tools, materials, equipment, transportation, and incidentals necessary to maintain elevators in safe and proper operating condition. All work must comply with manufacturer recommendations, applicable ANSI/ASME standards, and all governing codes and regulations. The document establishes the foundational service requirements and performance standards that qualified vendors must meet to provide these essential facility maintenance services.
The document does not specify pricing terms, set-asides, incumbent information, contract term details, renewal options, or specific funding amounts in the Scope of Work section itself. These financial and contractual terms would typically be addressed in supplementary procurement documents, including the formal Request for Qualifications (RFQ) or Request for Proposal (RFP). Interested vendors should refer to the additional procurement documentation and contact procurement@bouldercounty.gov for complete information regarding submittal deadlines, evaluation criteria, and other essential contracting details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
A. Scope of Work
1. Elevator Equipment Maintenance
a) Contractor will maintain the entire elevator equipment, on the terms and conditions subsequently set forth. Contractor will use Factory Certified personnel or equivalent, directly employed and supervised by the Contractor. Personnel will be qualified to keep the equipment properly adjusted and will use all reasonable care to maintain the elevators in proper and safe operating condition.
b) In compliance with the Preventative Maintenance Schedule, Contractor will adjust, clean, lubricate, furnish lubricants, and when conditions warrant repair or replacement; including but not limited to, worn Gears, Thrusts, Bearings, Communicators, Rotating Elements, Coils, Contracts, Registers, Magnet Frame and other mechanical parts. These replacement parts shall be original equipment manufacturer (OEM) parts or the equivalent. Any repair in excess of $250.00 will require a separate written estimate to be submitted for approval by BCHA.
c) Contractor will keep the Guide Rails properly lubricated, secured and aligned at all times except where roller guides are used, and when necessary, renew guide shoe gibes or guide rollers, in order to assure smooth and quiet operation.
d) Contractor will periodically examine all safety devices and governors, and equalize the tension on all hoisting ropes. All safety tests required by the ANSI A17.1 - 981 and A17.1A - 1981 and/or required by these specifications shall be performed ANNUALLY.
e) All elevators are in buildings which contain emergency electrical systems, requiring ANSI/AMES testing per 1000.6. It is the bidder’s responsibility to identify any other one time (less frequent than annual) tests, replacements and/or repairs needed by BCHA at this time;
include identification of said items/tests and price separately.
f) Contractor will renew all wire ropes as often as necessary to maintain an adequate factor or safety, and repair and/or replace conductor cables.
g) All lubricants used by the Contractor will be as specified by the manufacturer of the equipment.
h) Contractor will also examine, lubricate, adjust, repair and/or replace the following equipment:
• Interlocks
• Car and Hatch Door Operators
• Car and Hatch Door Hangers
• Door Closers
• Signal System
i) The following items of elevator equipment are not included in this contract:
• Hoistway Enclosure
• Hoistway Door Panels
• Interior Finish of Cab
• Frames and Sills
• Car Door (Finish)
• Power Switches and Feeder to Controller
2) Maintenance Operations Checklist: Contractor will follow the checklist of inspection and maintenance operations in carrying out performance of this contract. This checklist constitutes the minimum of operations to be provided. The contractor must recognize that additional services may be required in order to comply with performance evaluation requirements.
The contractor is required to submit a part list and cost data to BCHA.
1. Ride each car, check operation of car and hatch doors, acceleration, deceleration, floor stops and brake action. Make corrections as necessary.
2. Inspect and wipe clean all motors, machines and generators.
3. Inspect controllers, selector, selector drives and governors.
4. Clean and adjust all controller and selector contacts. Renew worn contacts and/or shunts where necessary. Check sequence of operations.
5. Wipe clean all motor, generator, and exciter communicators, clean, and check brushes and brush holders. Renew or reset brushes if necessary.
6. Clean and lubricate direction and accelerating switches.
7. Inspect brake operations. Check shoe to brake pulley clearance and adjust as required for proper operation. Clean pulley if necessary.
8. Clean hoistway pits and inspect equipment in them. Sump pumps are not part of this specification.
9. Inspect working parts of all governors for proper operation.
10. Inspect all door operating equipment, including motor brushes, communicators, belts or chains, contacts, drive vanes and blocks. Clean, lubricate, adjust or replace as necessary.
11. Check retiring cam operation, and make necessary adjustments or corrections.
12. Examine all wire ropes and fastenings, check and adjust rope tension.
13. Examine traveling cables for wear and position.
14. Examine counterweight and compensation ropes. Check and adjust compensation ropes.
Clean compensation and counterweight.
15. Inspect door monitoring equipment and safety edge units. Clean, lubricate, adjust or repair as necessary.
16. Lubricate selector drive screws and guides and clean contacts if necessary.
17. Clean and lubricate automatic slow down and stopping switches on top of cars.
18. Clean car position indicators, adjust if necessary.
19. Inspect, clean and lubricate car guides (unless roller guides are used).
20. Check car fan motors for proper operation.
21. Inspect drive and secondary sheaves, clean if required.
22. Check bearings for proper operation and wear.
23. Examine machine gear teeth for cutting or noise.
24. While riding on top of cars, physically check condition and operation of door locking equipment.
25. Perform electrical test of door interlock circuits.
26. Examine door locks and door closer equipment. Clean door channels.
27. Examine car and counterweight guide shoe and fastenings.
28. Renew gibes or rollers when necessary. Lubricate sliding guide shoes.
29. Remove car station cover, blow out, clean or lubricate switches and buttons.
30. Examine, clean with proper solution, and repair as necessary communicators, brushes and brush holders of all small control motors and regulators.
31. Thoroughly examine and clean starter and control panels.
32. Check, clean and adjust operation of slow down on limit switches. Examine all parts of governor and safety for proper operations. Clean and adjust.
33. Examine, clean and oil if necessary the buffers. Perform “hand test” of plunger return.
34. Blow out and vacuum controller motors and M.G. Sets.
35. Drain machine gear oil, seal any oil leaks, examine gear teeth, refill with fresh oil.
36. Overhaul machine brake, including disassembly, cleaning, replacement of worn components, reassembly and readjustment.
37. Clean and lubricate hatch door hanger tracks and door arms.
38. Examine car and counterweight wire hoist ropes and governor ropes for wear and condition. Rerope if necessary.
39. Clean rails, hatch walls, car top, pit, overhead sheaves and beams. Check bracket bolts for tightness.
40. Perform annual no load safety test.
41. Perform ANSI A17.1 1000.2-3-4-6 safety test as applicable (contract speed, full load).
3) Performance Requirements: It is the intention of this specification that elevator equipment be maintained so as to preserve the operating characteristics in line with the original design.
Should designated authority find through his own investigation or that of his representatives that these standards are not being maintain, the Contractor shall be given twenty-four (24) hours’ notice to restore the performance to the required level. Failure by the Contractor to restore the performance to the required level within a forty-eight (48) hour period shall constitute sufficient cause for termination of the contract by reason of default, at the option of BCHA.
The following performance levels of the original design shall be maintained at all times:
a) Contact speed of all elevators, dumbwaiters and escalators shall be maintained, and brake to brake flight times shall be maintained as originally installed.
b) Leveling accuracy of all elevators shall be maintained at all times.
c) Opening and closing times of all hoistway and car doors shall be maintained within limits of ANSI A17.1, ANSI A17.1 - 1981, ANSI A17.1a - 1981, ANSI/ASME A17.1 - 1981 codes, yet assuring minimum standing time at each floor.
d) Door reversals on all elevators equipped with mechanical safety shoes shall always be initiated within the stroke of the shoe. Light ray devices shall be operable at all times under normal operation.
e) Variable car and hall door open times shall be maintained in accordance with original specifications. Deviations from this will not be permitted.
f) Elevators operating under Group Supervisory Systems shall operate at all times in accordance with design specifications as originally installed. The Contractor shall be required to periodically test these systems and submit to BCHA test data indicating performance levels of system and proof that variable and fixed features are operating properly and all circuits and time settings are properly adjusted.
4) Availability of Rotating Elements: To further ensure a minimum shutdown time, the
Contractor shall have available and on the job site within forty-eight (48) hours, for replacement purposes under this Contract, at least one (1) armature and one (1) set of motor field coils for each type of generator, drive motor, gearless machine or exciter which is included in the equipment covered by this Contract. In addition, Contractor shall have available and on job site within forty-eight (48) hours for replacement purposes at least one
(1) of each type of door control motor included in the equipment covered by this contract. It is the understanding of BCHA that at times, the contractor is at the mercy of outside influences that may determine part or parts availability. The Contractor will in these cases provide a best estimate for repair completion.
5) Additional Provisions:
a) Contractor shall not be under any obligation hereunder to make any renewals or repairs except those incidentals to the operation of the machinery.
b) The price herein named contemplates routine service work to be done during regular working hours on regular working days of the trades involved.
If overtime work is requested by BCHA covering routine service work, examinations or repairs at times other than regular working hours 8:00 a.m. to 5:00 p.m., Monday through Friday, the Contractor will absorb the hours worked at single time rates, and BCHA will compensate the Contractor for overtime bonus hours only at the Contractor’s usual overtime rate.
6) Labor: Contractor will provide the necessary hours required:
a) for the monthly routine cleaning, inspection and adjusting service
b) for tuning and adjusting of control systems and other maintenance such as hatch cleaning, safety tests, governor tests, etc. to ensure the equipment is in good operating condition at all times.
This time does not include hours consumed in emergency callbacks either during regular working hours or after regular working hours, nor does it include hours used for major maintenance repairs.
7) The Contractor shall be responsible for screening, hiring, training and directing all his personnel. BCHA will require a background/security check for all personnel assigned to each building and for each new employee working under the BCHA Elevator Maintenance Contract. Copies of all background checks for each employee will be provided to the BCHA Maintenance Manager prior to assignment at a BCHA location. A prior criminal record involving theft or felony conviction will disallow an individual from working in a BCHA building.
8) Contractor will be responsible for payment to BCHA for any keys which are lost. In addition, the Maintenance Manager reserves the right to require that a building be entirely or partially re-keyed at the Contractor’s , if in the opinion of the Maintenance Manager, the security of the building has been compromised.
9) No Fumes Clause
a) The use of any product which causes fumes or irritants to permeate through or into the building and would cause a reasonable person physical distress or discomfort, such that it would be necessary to vacate users of the building, is strictly prohibited during business hours. Violators will be subject to $5,000.00 per day fine for noncompliance.
Any exceptions to this will require written approval from BCHA’s Representative. The Contractor and BCHA acknowledge and agree that the liquidated damages specified herein are reasonable in amount and are not disproportionate to anticipated actual damages. BCHA shall have the right to deduct liquidated damages from any amount due or that may become due to the Contractor, or to collect such liquidated damages from the Contractor or its surety.
10) Scheduling of Work
a) All work must be scheduled in advance with BCHA’s Representative. No work will be allowed on site unless scheduling has been approved. Damages resulting from unscheduled work, including compensation for but not limited to loss of work time of BCHA employees, physical damage to the building and any other corrective measures required will be the responsibility of Contractor.
b) The Contractor shall perform the required annual safety inspection no more than sixty
(60) days prior to the scheduled State inspection conducted with PEI. Scheduling shall be coordinated with the BCHA inspector following contract award.
c) Overtime rates shall apply only to emergency service calls authorized and initiated between the hours of 4:00 PM and 7:30 AM MST, Monday through Friday or Saturday/Sunday/Holidays. Any work performed outside of these authorized conditions shall be billed at the standard hourly rate unless otherwise approved by
BCHA.
Invoicing Requirements
A. Invoices should be submitted to the Boulder County Housing Authority as follows.
• Monthly/Annual Services – BCHAPurchasing@bouldercounty.gov
• Emergency/One Time Services – BCHAinvoices@bouldercounty.gov
B. Invoices must be submitted within 30 days of completion of the mutually agreed upon services. Invoices may not be submitted prior to the completion of any services.
C. All proposals and invoices must be as detailed as possible. At a minimum, they should include the following: requestor name, job name, work order number, invoice number, invoice date, detailed description of work/services, breakdown of costs both labor quantity (hours), labor rate, total labor cost, materials quantity, materials unit price, equipment costs/charges (hour), and materials/equipment markups (OHP).
Payment
A. Payment will not be made until services rendered meet the approval of the Authority.
B. The Authority will follow-up with the Contractor within 15 days of receipt of an invoice should there be any questioned or unsupported costs.
C. Every reasonable attempt will be made by the Authority to provide payment to vendors within 30 days of receipt of an acceptable invoice. The Authority shall not pay any late fees.
mailto:BCHAPurchasing@bouldercounty.gov mailto:BCHAinvoices@bouldercounty.gov
| Invoicing Requirements |
| Payment |
File details come from the government source that posted it. Updated .