2935215_CDRL1_REPORT.pdf
PDF 224 KB Posted
- Attached to
- Defensive Management System, Counter Measures Federal contract opportunity
- Solicitation number
- FA811920R0011
About this file
This is a solicitation for the overhaul of a receiver processor to return it to serviceable condition for the B-2 Defensive Management System. The solicitation requests the overhaul of the NSN 5865-01-461-0044NR receiver processor to make it serviceable without limitation for distribution to all customers. The Air Force Sustainment Center of the Air Force Materiel Command is the issuing agency. Offerors must respond by the dates specified with pricing and plans to meet the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| APBSUPL.pdf | ||
| DID 80441C.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| GFP .xlsx | XLSX spreadsheet | |
| DID 80501.pdf | ||
| DID 80368A.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| DID B1634C.pdf | ||
| DID 81832.pdf | ||
| DID 80639D.pdf | ||
| DID 81249B.pdf | ||
| DID 81995.pdf | ||
| DID 80711A.pdf | ||
| DID 81373.pdf | ||
| DID 80798C.pdf | ||
| DID 82128.pdf | ||
| FA811920R0011.pdf | ||
| PWS 2 March.pdf | ||
| DID 81250B.pdf | ||
| DID 81656B.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAV AF) End Item and Government Furnished Material (GFM) Reporting
3. SUBTITLE
CAV AF GFM
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
DAILY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
1. The contractor shall report End Item and GFM transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID and/or Contract Repair PWS. This information will be reviewed, by the applicable Contract Monitor, to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only; an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND any subcontractor locations.
3. Training will be provided by the 848 SCMG/SRM, (405) 736-7171.
4. This DD Form 1423 applies to end item repair and GFM CAV AF reporting type contract.
5. It is imperative the CAV AF Proof of Shipment reporting actions are accomplished by the Contractor.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within one business day of End Item maintenance and/or GFM supply occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor User's Guide.
Block 11: Data shall be current within one business day of last End Item maintenance and/or GFM supply occurrence and reflect an accurate representation/status of all assets at a contractor for repair.
Block 12: Date of first submission shall be within one business day following End Item maintenance and/or GFM supply occurrence after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Within one business day of each End Item maintenance and/or GFM supply occurrence.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
Page 1 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
PREVIOUS EDITION MAY BE USED.
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
Manual Report - Ref Block 11, 12, and 13:
Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, IAW DI- PSSS-81995, providing TABLE I for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
Contractor shall report on production, providing TABLE I for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
Reports will continue to be forwarded unless terminated by the 424 SCMS/GUME Production Management Specialist (PMS). The report following the final reporting period on contract will be annotated "Final Report".
Complete address for distribution:
424 SCMS/GUME
3001 Staff Drive, Annex 4, Suite 1AC1 96B Tinker AFB, OK 73145-3033
Commercial phone number: (405) 582-6834 Email preferred: Natalie.McGuireBarry@us.af.mil
Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).
DID Requirements are NOT tailored.
Delivery CANNOT be deferred.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks,etc. for each repair, The report shall be provided within 5 business days of the previous month's last calendar date.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 2 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contract Government Furnished Material (GFM) Requisition and Inventory Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-82128
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 MAY 2018DATE:
DID DI-MGMT-82128, Contract Government Furnished Material (GFM) Requisition and Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.
Contractor shall provide a breakout of all GFM inventory within the report by contract and delivery order, including a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. Table data shall represent the GFM data elements as indicated in the Authority named in Block 4.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
Block 11. Data shall be current as of the last date of the reporting period (end of month).
Block 12. The first report should be submitted within five (5) business days after the close of the first reporting period (previous month's last calendar date).
Block 13. Subsequent reports shall be submitted within five (5) business days of the close of the reporting period (previous month's last calendar date).
The contractor inventory property control management system data records shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 3 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 22 MAY 2018DATE:
DI-MGMT-80441C, Government Property Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.
Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year's time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report should include all AF Government Furnished Property in possession of the Contractor.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
Report shall contain the following columns/data fields:
A: Contract Number B: CAGE Code C: Item Name/Description D: Manufacturer Name E: Manufacturer Part Number (if applicable) F: Material Control Number (if applicable) G: Serial Number (if applicable) H: National Stock Number (NSN) I: Quantity J: Unit of Measure K: Unit Acquisition Cost L: Location M: Sub Location N: Unique Item Identifier O: Type of Government Property - i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) P: Classification of Government Property- (i.e,, Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling (ST) Q: Posting Reference R: Date of Transaction S: Date Placed in Service T: Date of Last Physical Inventory U: Condition Code
Block 10. This report will be provided annually. Reporting Period is one year.
Block 11. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period (If period of performance begins on 13 September 17, first annual reporting period ends 12 September 18). If requested outside of an annual cadence, the data shall be current as of the date requested.
Blocks 12 and 13. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
Page 4 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Calibration Certification/Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-QCIC-80798C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
Blk 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 424 SCMS/GUEA.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
Block 10: Upon ACO request.
Support equipment calibration requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work performed. The Contractor shall ensure SE calibration is maintained throughout performace of this contract. Upon request, the Contractor shall provide certification documents to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Before and after calibration data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration.
i. Traceability to the National Institute of Standards and Technology
Contractor Format Acceptable
Delivery CANNOT Be Deferred
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
Page 5 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
ECP (-04)
4. AUTHORITY
DI-SESS-80639D
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
Block 8: The Government will have 10 days after receipt for approval or disapproval. The contractor shall have 5 days after receipt of the Government comments to resubmit.
Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors, Critical Technology. Other requests shall be referred to 424 SCMS/GUEA.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DODD5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
Block 12. - First submittal due upon first occurrence.
Block 13. - Subsequent submittals for each occurrence.
All submission shall be provided as an electronically editable, machine-readable Comma Separated Values (CSV) text file with alphanumeric fields enclosed in double quotation marks made available via electronic-mail.
Contract Format Acceptable
Delivery Cannot Be Deferred
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145 Attention : Cognizant Engineer
0 1 0
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145 Attention: Cognizant PMS
0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 6 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
N/A
4. AUTHORITY
DI-MISC-80711A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
Block 10: 30 day after receipt of order.
Block 11 & 12: Submitted to government upon completion of contract.
Contractor format is acceptable. Reports shall be provided in Microsoft Office compatible format via electronic media or email.
Electronic versions shall be submitted via email.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 7 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Bill Of Materials (BOM) for Logistics and Supply Chain Risk Management
3. SUBTITLE
BOM for DMSMS (-04)
4. AUTHORITY
DI-PSSS-81656B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 424 SCMS/GUEA.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
Block 11: To be determined
Block 12: To be determined
Block 13: To be determined
Block 14A: All digital submissions shall be made via electronic mail.
Contractor format is acceptable.
DID Requirements are not tailored.
Delivery cannot be deferred.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 8 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
N/A (-04)
4. AUTHORITY
DI-MGMT-80368A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Blk 4: Contractor format is acceptable. The contract number, CDRL number, document name, date of submission and document number shall appear on the first page of deliverable.
Blk 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 424 SCMS/GUME.
Control Warning Notice: Warning-This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, as amended, Title 50, USC, App 240 I Et Seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified/Limited documents: destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blks 10, 11, 12 & 13: The report shall be delivered, inspected and accepted at destination via electronic format monthly;
no later than 5 calendar days after the conclusion of each month.
Blk 14: Deliveries shall be submitted as web accessible documents.
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Cognizant PMS
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 9 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Contractor's Corrective Action Plan
3. SUBTITLE
N/A (-04)
4. AUTHORITY
DI-MGMT-80501
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 424 SCMS/GUEA.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
Block 10. Frequency: Upon ACO request.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
Block 14A: All submission shall be provided as an electronically editable, machine-readable Comma Separated Values (CSV) text file with alphanumeric fields enclosed in double quotation marks made available via electronic-mail.
Contractor Format Acceptable
Delivery Cannot Be Deferred
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 10 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
N/A (-04)
4. AUTHORITY
DI-ADMN-81249B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
BLOCK 9: DISTRIBUTION STATEMENT "D" DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND DOD CONTRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE. OTHER
REQUESTS FOR A COPY OF THIS DOCUMENT SHALL BE REFERRED TO 424 SCMS/GUEA.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
THE ABOVE DISTRIBUTION STATEMENT AND WARNING NOTICE SHALL BE DISPLAYED OR AFFIXED
TO THE DATA IN A CONSPICUOUS POSITION.
BLOCK 11: TO BE DETERMINED
BLOCK 12: ONCE MEETING/REVIEWS ARE SCHEDULED. CONTRACTOR TO PROVIDE AGENDA WITHIN 5
DAYS OF EVENT.
BLOCK 13: TO BE DETERMINED
BLOCK 14: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA SECURE ELETRONIC MAIL.
DATA SHALL BE SUBMITTED IN ELECTRONIC FORMAT, IN MICROSOFT ® OFFICE PRODUCT SUITE AND/OR ADOBE ® ACROBAT PORTABLE DOCUMENT FORMAT (PDF) OR DELIVERED AS HARD COPIES
TO THE PCO.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 11 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
N/A (-04)
4. AUTHORITY
DI-ADMN-81373
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
MTHLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
Block 9 DISTRIBUTION STATEMENT REQUIRED: Distribution Statement A: Approved for public release;
distribution is unlimited. Controlling DoD office is 848 SCMG/424 GUEA.
Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.
Blk 11: TO BE DETERMINED
Blk 12: ONCE MEETINGS/REVIEWS ARE SCHEDULED, CONTRACTOR TO PROVIDE PRESENTATION
MATERIAL WITHIN 5 DAYS OF EVENT.
Blk 13: TO BE DETERMINED
Blk 14: Deliveries shall be submitted as web accessible documents.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 12 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
N/A (-04)
4. AUTHORITY
DI-ADMN-81250B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Block 7: All inspection and acceptance shall be at destination via electronic format.
BLOCK 9: DISTRIBUTION STATEMENT "D" DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND DOD CONTRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE
DETERMINED. OTHER REQUESTS FOR A COPY OF THIS DOCUMENT SHALL BE REFERRED TO 424
SCMS/GUEA.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
THE ABOVE DISTRIBUTION STATEMENT AND WARNING NOTICE SHALL BE DISPLAYED OR AFFIXED
TO THE DATA IN A CONSPICUOUS POSITION.
BLOCK 10: TO BE DETERMINED
BLOCK 11: TO BE DETERMINED
BLOCK 12: ONCE MEETINGS/REVIEWS ARE SCHEDULED, CONTRACTOR TO PROVIDE PRESENTATION
MATERIAL WITHIN 5 DAYS OF EVENT.
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA SECURE ELECTRONIC MAIL.
DATA SHALL BE SUBMMITTED IN ELECTRONIC FORMAT, IN MICROSOFT ® OFFICE PRODUCT SUITE AND/OR ADOBE ® ACROBAT PORTABLE DOCUMENT FORMAT (PDF) OR DELIVERED AS HARD COPIES
TO THE PCO.
Contractor Format Acceptable
DID Requirements not tailored.
Delivery cannot be deferred.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention: Cognizant PMS
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 13 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan (CPP)
3. SUBTITLE
CPP (-04)
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 DEC 2019DATE:
Blk 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 424 SCMS/GUEA.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
The plan shall be delivered in electronic PDF format via electronic format no later than 90 calendar days after contract award. (Procuring Activity : FA8119)
Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).
DID Requirements are NOT tailored.
Delivery CANNOT be deferred.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145-3041 Attention : Cognizant Engineer
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 14 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAV AF) End Item and Government Furnished Material (GFM) Reporting
3. SUBTITLE
CAV AF GFM
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
DAILY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
1. The contractor shall report End Item and GFM transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID and/or Contract Repair PWS. This information will be reviewed, by the applicable Contract Monitor, to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only; an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND any subcontractor locations.
3. Training will be provided by the 848 SCMG/SRM, (405) 736-7171.
4. This DD Form 1423 applies to end item repair and GFM CAV AF reporting type contract.
5. It is imperative the CAV AF Proof of Shipment reporting actions are accomplished by the Contractor.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within one business day of End Item maintenance and/or GFM supply occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor User's Guide.
Block 11: Data shall be current within one business day of last End Item maintenance and/or GFM supply occurrence and reflect an accurate representation/status of all assets at a contractor for repair.
Block 12: Date of first submission shall be within one business day following End Item maintenance and/or GFM supply occurrence after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Within one business day of each End Item maintenance and/or GFM supply occurrence.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 15 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
Manual Report - Ref Block 11, 12, and 13:
Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, IAW DI- PSSS-81995, providing TABLE I for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
Contractor shall report on production, providing TABLE I for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
Reports will continue to be forwarded unless terminated by the 424 SCMS/GUME Production Management Specialist (PMS). The report following the final reporting period on contract will be annotated "Final Report".
Complete address for distribution:
424 SCMS/GUME
3001 Staff Drive, Annex 4, Suite 1AC1 96B Tinker AFB, OK 73145-3033
Commercial phone number: (405) 582-6834 Email preferred: Natalie.McGuireBarry@us.af.mil
Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).
DID Requirements are NOT tailored.
Delivery CANNOT be deferred.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks,etc. for each repair, The report shall be provided within 5 business days of the previous month's last calendar date.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 16 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Contract Government Furnished Material (GFM) Requisition and Inventory Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-82128
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 02 MAY 2018DATE:
DID DI-MGMT-82128, Contract Government Furnished Material (GFM) Requisition and Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.
Contractor shall provide a breakout of all GFM inventory within the report by contract and delivery order, including a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. Table data shall represent the GFM data elements as indicated in the Authority named in Block 4.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
Block 11. Data shall be current as of the last date of the reporting period (end of month).
Block 12. The first report should be submitted within five (5) business days after the close of the first reporting period (previous month's last calendar date).
Block 13. Subsequent reports shall be submitted within five (5) business days of the close of the reporting period (previous month's last calendar date).
The contractor inventory property control management system data records shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility; shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location.
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
Page 17 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 22 MAY 2018DATE:
DI-MGMT-80441C, Government Property Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.
Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year's time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report should include all AF Government Furnished Property in possession of the Contractor.
The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.
Report shall contain the following columns/data fields:
A: Contract Number B: CAGE Code C: Item Name/Description D: Manufacturer Name E: Manufacturer Part Number (if applicable) F: Material Control Number (if applicable) G: Serial Number (if applicable) H: National Stock Number (NSN) I: Quantity J: Unit of Measure K: Unit Acquisition Cost L: Location M: Sub Location N: Unique Item Identifier O: Type of Government Property - i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) P: Classification of Government Property- (i.e,, Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling (ST) Q: Posting Reference R: Date of Transaction S: Date Placed in Service T: Date of Last Physical Inventory U: Condition Code
Block 10. This report will be provided annually. Reporting Period is one year.
Block 11. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period (If period of performance begins on 13 September 17, first annual reporting period ends 12 September 18). If requested outside of an annual cadence, the data shall be current as of the date requested.
Blocks 12 and 13. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
424 SCMS/GUME 0 1 0
0 1 015. TOTAL
Page 18 of 28DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2020
COORDINATORS:
Barry, Natalie P 424 SCMS / GUME 405-582-6834 / 852-6834 03 DEC 2019
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
03 DEC 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
03 DEC 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Multiple Items
E. CONTRACT / PR NO.
FD20301602832
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
Calibration Certification/Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-QCIC-80798C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
424 SCMS/GUME
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 MAY 2018DATE:
Blk 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .