27691_0053 SR 144 _ Oak Level Road Compact R.pdf
PDF 2 MB Posted
- Attached to
- SR 144/Oak Level Road Roundabout
- Solicitation number
- PE-77523-NONST-2025-000000036
- Issued by
- Brooks County, Georgia
About this file
This document is the Contract Documents and Technical Specifications for the SR 144/Oak Level Road Compact Roundabout project, prepared for the Bryan County Board of Commissioners. The project consists of the construction of a single lane compact roundabout at the intersection of SR 144 and Oak Level Road in Bryan County, Georgia, including adjustments to the approaches. Sealed bids for the project will be received by the Bryan County Engineering Department until 2:00 PM on Tuesday, September 24, 2024. A pre-bid conference will not be held, but all questions must be submitted in writing by September 16, 2024, with an addendum addressing the questions issued on September 18, 2024. The work is to be substantially completed within 180 days and fully completed within 210 days after the contract times commence.
The bid must be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. The successful bidder will be required to provide performance and payment bonds, each in an amount equal to 100% of the contract price. The owner reserves the right to reject any or all bids. The contract documents include the standard EJCDC General and Supplementary Conditions, as well as detailed technical specifications and drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
AND
TECHNICAL SPECIFICATIONS
FOR
SR 144/OAK LEVEL
COMPACT ROAD ROUNDABOUT
PREPARED FOR:
BRYAN COUNTY BOARD
OF COMMISSIONERS
J–27691.0053
AUGUST 2024
thomasandhutton.com thomasandhutton.com thomasandhutton.com thomasandhutton.com
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \0002– Contents.DOC
TABLE OF CONTENTS
PAGE NUMBERS
CONTRACT DOCUMENTS
00021 Invitation to Bid 00021–1 – 00021–2
00110 Instructions to Bidders 00110–1 – 00110–8
00313 Bid Form 00313–1 – 00313–5
00411 Bid Bond 00411–1 – 00411–2
00506 Standard Form of Agreement Between Owner and Contractor 00506–1 – 00506–7
00611 Performance Bond 00611–1 – 00611–6
00621 Payment Bond 00621–1 – 00621–6
00631 Notice of Award 00631–1 – 00631–2
00641 Notice to Proceed 00641–1 – 00641–2
00700 General Conditions 00700–1 – 00700–62
00710 Special Conditions 00710–1 – 00710–6
00815 Supplementary Conditions 00815–1 – 00815–5
01011 Summary of Work 01011–1 – 01011–2
01025 Measurement and Payment 01025–1 – 01025–2
01300 Submittals 01300–1 – 01300–6
01400 Quality Control 01400–1 – 01400–4
01410 Testing Services 01410–1 – 01410–4
01702 Contract Closeout 01702–1 – 01702–4
01730 Operation and Maintenance 01730–1 – 01730–4
01740 Warranties 01740–1 – 01740–2
01741 Bonds 01741–1 – 01741–2
TECHNICAL PROVISIONS
All technical specifications and details shall be in accordance with 2021 Georgia Department of
Transportation specifications.
00021–1 z:\27691\27691.0053\Documents\Construction\Bid\Specifications\00021 – Invitation to Bid.doc
DOCUMENT 00021
INVITATION TO BID
Legal Notice
1. Sealed proposals for SR 144/Oak Level Road Roundabout owned by Bryan County Board of
Commissioners will be received by Bryan County Engineering at 66 Captain Matthew Freeman
Drive, Richmond Hill, GA 31324 until 2:00 PM on Tuesday, September 24, 2024, at which time they will be publicly opened.
2. The project consists of the following generally described work:
SR 144/Oak Level Road Roundabout
The project consists of improvements at the intersection of SR 144 and Oak Level Road in
Bryan County, Georgia. The work includes the construction of a single lane compact roundabout at the intersection and adjustments to the approaches to accommodate the roundabout.
3. Plans and Specifications are open to inspection digitally or may be obtained from Thomas &
Hutton Engineering Co., 50 Park of Commerce, Savannah, Georgia 31405 upon payment of
$50.00 (half size) or $100.00 (full size) plus a pdf copy. The contractor may request a PDF copy only upon payment of $25.00. The payment is non–refundable. Contact Karen Smulski at Thomas &
Hutton via phone at 912–721–4051 or email smulski.k@tandh.com to request copies.
4. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than
10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability."
Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney–in–fact to bind the surety and certified to include the date of the bond.
5. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes it would not be in the best interest of the Project to make an award to Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
6. A pre–bid conference will not be held. All questions shall be submitted in writing to the Engineer by Monday, September 16, 2024, at 5 PM. An addendum addressing all questions and comments received by the question deadline will be issued via electronic mail by the end of business on
Wednesday, September 18, 2024.
ENGINEER OWNER
Thomas & Hutton Bryan County Board of Commissioners
Attn: Doyle Kelley, P.E. Attn: Kirk Croasmun, P.E.
50 Park of Commerce Way 66 Captain Matthew Freeman Drive
Savannah, GA 31405 Richmond Hill, GA 31324
Phone: 912–721–4160 Phone: 912-756–7953
Email: kelley.d@tandh.com Email: kcroasmun@bryan-county.org
Bryan County Board of Commissioners, Owner
END OF INVITATION TO BID
00110–1
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications\00110 – Instructions to Bidders.DOC
DOCUMENT 00110
INSTRUCTIONS TO BIDDERS
INTENTION: It is intended the Instructions to Bidders, General Conditions, Supplementary
Conditions, Technical Specifications and Construction Drawings shall cover the complete work to which they relate.
ARTICLE 1 DEFINED TERMS: In addition to the terms defined in the General Conditions, (EJCDC C–700) (2007), additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.
1.1. Bidder – One who submits a Bid directly to Owner as distinct from a sub– bidder, who submits a bid to a Bidder.
1.2. Successful Bidder – The lowest, responsible, and responsive Bidder to whom Owner (based on Owner's evaluation as hereinafter provided) makes an award.
1.3. Bid – A complete and properly signed offer to execute work for the prices stipulated in Bid Form and submitted in accordance with the Bidding
Documents.
1.4. Addenda – Graphic or written documents issued by Engineer prior to the opening of Bids issued to clarify, revise, add to, or delete information in the original bidding documents or in previous addenda.
ARTICLE 2 BID FORM: All Bids must be made upon the Bid Forms hereto annexed and shall state the amount bid for each item shown, and all bids must be for materials and work called for in the specifications. Deposits for plans and specifications are not refundable.
2.1 The Bid Form is included with the Bidding Documents; additional copies may be obtained from Engineer.
2.2 All blanks on the Bid Form must be completed by printing in black ink or by typewriter.
2.3 Bids by corporations must be executed in the corporate name by the president or a vice–president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
2.4 All names must be typed or printed in black ink below the signature.
2.5 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form.)
00110–2
2.6 The address and telephone number for communications regarding the Bid must be shown.
ARTICLE 3 QUALIFICATIONS OF BIDDERS:
3.1 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five days after Bid opening upon Owner’s request detailed written evidence such as financial data, previous experience, present commitments, and other such data as may be necessary to assist Owner in determining Contractor’s qualifications.
3.2 Each Bid must contain evidence of Contractor’s authority to conduct business in the state where the Work is to be performed. State Contractor license number, if applicable, must also be shown on the Bid Form.
ARTICLE 4 COPIES OF BIDDING DOCUMENTS:
4.1 Complete sets of Bidding Documents must be used in preparing Bids;
neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding
4.2 Owner and Engineer in making copies of Bidding Documents available for a non–refundable deposit do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 5 EXAMINATION OF BIDDING DOCUMENTS, OTHER DATA, AND SITE:
5.1 It is the responsibility of each Bidder before submitting a bid:
5.1.1 To examine and study thoroughly the Bidding Documents and other related data identified in the Bidding Documents;
5.1.2 To visit the work site to ascertain by inspection pertinent local conditions such as location, character and accessibility of the site including existing surface and subsurface conditions in the work area; availability of facilities, location and character of existing work within or adjacent thereto, labor conditions, etc.
5.1.3 To become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work;
5.1.4 To obtain and carefully study (or assume responsibility for doing so) all addition or supplementary examination investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface, an Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance or the
Work or which relate any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly
00110–3 required of the bidding documents, and safety precautions and programs incident thereto;
5.1.5 To study and carefully correlate Bidder's knowledge and observations with the Bidding Documents and such other related data; and
5.1.6 To promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the
Bidding Documents and such other related documents;
5.1.7 to agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies or data are necessary for the determination of its Bid for performance of the
Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
5.1.8 To become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the
Work as indicated in the Bidding Documents;
5.1.9 To determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
5.2 The Owner shall make available to all prospective bidders, previous to receipt of bids, information that it may have as to sub–soil conditions and surface topography at the work site. Such information shall be given as the best factual information available without being considered as a representation of the Owner.
5.3 The submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article 5, that without exception, the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the
Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 6 OMITTED
ARTICLE 7 INTERPRETATIONS AND ADDENDA:
7.1 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer. The person submitting the request shall do so in writing and be responsible for its prompt delivery. Interpretations or clarifications considered necessary by Engineer in response to such
00110–4 questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents.
Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by formal written
Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 BID SECURITY:
8.1 Each Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent of Bidder's maximum Bid price and in the form of a certified or bank check or a Bid Bond (on form attached, if a form is prescribed) issued by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five times the contract price as listed in the most current publication of
"Best's Key Rating Guide Property Liability."
8.2 The Bid security of Successful Bidder will be retained until such Bidder has executed the Agreement, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within fifteen days after the Notice of Award, Owner may annul the Notice of
Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of the seventh day after the Effective Date of the Agreement or the ninety–first day after the Bid opening, whereupon Bid security furnished by such bidders will be returned. Bid security with Bids that are not competitive will be returned within seven days after the Bid opening.
ARTICLE 9 CONTRACT COMPLETION TIME: The number of days within which, or by which the
Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement. Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 10 SUBSTITUTE AND “OR–EQUAL” ITEMS:
10.1 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, or those substitutes or
“or–equal” materials and equipment approved by ENGINEER and identified by Addendum. The materials and equipment described in the
Bidding Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or equal” item. No item of material or equipment will be considered by ENGINEER as a substitute or “or equal” unless written request for approval has been submitted by
Bidder and has been received by ENGINEER at least 15 days prior to the date for receipt of Bids. Each such request shall conform to requirements of paragraph 6.05 of the General Conditions. The burden of proof of the
00110–5 merit of the proposed item is upon Bidder. ENGINEER’s decision of approval or disapproval of a proposed item will be final. If ENGINEER approves any proposed item, such approval will be set forth in an
Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 11 SUBCONTRACTORS, SUPPLIERS, AND OTHERS:
11.1 Each bid must be accompanied by a list of Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER or ENGINEER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
11.2 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contact to the next lowest Bidder proposing to use acceptable Subcontractors, Suppliers, individuals, or entities.
Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions.
11.3 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection.
ARTICLE 12 SUBMITTAL OF BIDS: Bids shall be submitted at the time and place indicated in the
Invitation to Bid and shall be enclosed in a sealed opaque envelope, marked with the project title, and name and address of Bidder, and accompanied by the
Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. Contractor license number(s) shall be written on the face of the bid envelope.
Each Bidder is responsible for seeing their Bid is received by the Owner not later than the advertised time set for the opening of Bids.
ARTICLE 13 MODIFICATION AND WITHDRAWAL OF BIDS:
13.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of bids.
00110–6
13.2 If, within twenty–four hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner there was a material and substantial mistake in the preparation of its Bid, Bidder may withdraw its
Bid and the Bid security will be returned. Thereafter, Bidder will be disqualified from further bidding on the Work to be provided.
ARTICLE 14 OPENING OF BIDS: Bids will be opened and (unless obviously non–responsive) read aloud publicly at the place where Bids are to be submitted. An abstract of the amount of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids.
ARTICLE 15 ACCEPTANCE OF BIDS: Bids may not be withdrawn (except as noted in
Paragraph 13) after the time set for the opening of Bids. Bids will remain subject to acceptance for 90 days after the day of the Bid opening, but the Owner may, in its sole discretion, release any Bid and return the Bid security prior to expiration of the acceptance period.
ARTICLE 16 AWARD OF CONTRACT:
16.1 Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if
Owner believes it would not be in the best interest of the Project to make an award to a Bidder, whether because the Bid is not responsive, or the
Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
16.2 Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the
Successful Bidder. Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Discrepancies between words and figures will be resolved in favor of the words.
16.3 In evaluating Bids, Owner will consider the qualification of Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the
Bid Form or prior to the Notice of Award.
The Owner will also consider whether the Bidder involved:
a) Maintains a permanent place of business;
b) Has adequate plant and equipment to do the work properly and expeditiously;
c) Has suitable financial status to meet obligations incidental to the work;
d) Has appropriate technical experience.
16.4. Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those
00110–7 portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the
Supplementary Conditions. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.
16.5. Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the
Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.
16.6. If the contract is to be awarded, it will be awarded to the Bidder whose evaluation by Owner indicates the award will be in the best interest of the
Project.
16.7. If the contract is to be awarded, Owner will give Successful Bidder a
Notice of Award within 90 days after the day of the Bid opening.
ARTICLE 17 MODIFICATIONS OF QUANTITIES: If the lowest bona fide Bid exceeds the money available for the Work, the Owner reserves the right to delete enough of the Work to bring the cost within the available funds. The Owner also reserves the right to delete whichever items or portions of items considered to be in the best interest of the Owner.
ARTICLE 18 CONTRACT SECURITY: The General Conditions and Supplementary Conditions set forth Owner’s requirements as to performance and payment bonds. When the
Successful Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required performance and payment bonds.
ARTICLE 19 SIGNING THE AGREEMENT: When the Owner gives a Notice of Award to the
Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within 30 days thereafter, Contractor shall sign and deliver the required counterparts of the Agreement and attached documents to Owner with the required Bonds. Within 15 days thereafter, Owner shall deliver one fully signed counterpart to Contractor.
ARTICLE 20 LAWS AND REGULATIONS: The Contractor shall comply with local, District, County, State, and Federal laws applicable to the work.
The Contractor shall comply with the Department of Labor Safety and Health
Regulations for Construction promulgated under the Occupational Safety and
Health Act of 1970 as amended through January 1, 2004 (PL 91–596) and under
Section 107 of the Contract Work and Safety Standards Act (PL) 91–54). The regulations are administered by the Department of Labor and the Contractor shall allow access to the project to personnel from this Department.
00110–8
ARTICLE 21 CONTRACTOR'S AND SUBCONTRACTOR'S INSURANCE: Contractor shall not commence work under this contract until obtaining all the insurance required by the Supplementary Conditions.
ARTICLE 22 TERMINATION OF CONTRACT: If the Owner is made to stop construction of the work because of an order from a Court or State Department, the contract shall be terminated. Payment will be made for work completed and a proration of the work underway, materials stored, and for the overhead and profit of the completed work and work underway. Payment will not be made for anticipated profit and overhead on work not completed or underway.
END OF SECTION 00110
00313 – 1
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC
DOCUMENT 00313
BID FORM
PROJECT IDENTIFICATION: SR 144/OAK LEVEL ROAD COMPACT ROUNDABOUT
CONTRACT IDENTIFICATION
AND NUMBER: J –27691.0053
THIS BID IS SUBMITTED TO: Thomas & Hutton
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening, or for such longer period of time BIDDER may agree to in writing upon request of OWNER.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
a. BIDDER has examined and carefully studied the Plans and Specifications for the work and contractual documents relative thereto, and has read all Technical
Provisions, Supplementary Conditions, and General Conditions, furnished prior to the opening of Bids, and can fulfill the requirements of the work to be performed.
b. BIDDER further acknowledges hereby receipt of the following Addenda:
ADDENDUM NO. DATE
c. BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions possibly affecting cost, progress, performance and furnishing of the Work;
d. BIDDER is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations possibly affecting cost, progress, performance and furnishing of the
Work.
e. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structure at or contiguous to the site
(except underground Facilities) have been identified in the Supplementary
Conditions. BIDDER acknowledges such reports and drawings are not Contract
Documents and may not be complete for BIDDER’s purposes. BIDDER
00313 – 2 acknowledges OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the
Work in accordance with the times, price and other terms and conditions of the
Bidding Documents.
f. BIDDER is aware of the general nature of Work to be performed by Owner and others at the site relating to Work for which this Bid is submitted as indicated in the
Bidding Documents.
g. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the
Bidding Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
h. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies BIDDER has discovered in the Bidding Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
i. This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s):
00313 – 3
SR 144/OAK LEVEL ROAD ROUNDABOUT
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
ROADWAY CONSTRUCTION
150-1000 Traffic Control 1 ls $ –
151-1000 Mobilization 1 ls $ –
163-0232 Temporary Grassing 4 ac $ –
163-0240 Mulch 35 tn $ –
163-0301 Construct and Remove Construction
Exits 2 ea $ –
165-0010 Maintenance of Temporary Silt Fence, Type A 2,225 lf $ –
171-0010 Temporary Silt Fence, Type A 2,225 lf $ –
210-0100 Grading Complete 1 ls $ –
310-5060 Gr Aggr Base Crs, 6 Inch, Incl Material 100 sy $ –
310-5080 Gr Aggr Base Crs, 8 Inch, Incl Material 2,200 sy $ –
402-1812 Recycled Asph Conc Leveling, Inc
Bitum Matl & H Lime 250 tn $ –
402-3121
Recycled Asph Conc 25 mm
Superpave, GP 1 or 2 , Incl Bitum Matl &
H Lime (3")
400 tn $ –
402-3130
Recycled Asph Conc 12.5 mm
Superpave, GP 2 Only, Incl Polymer-
Modified Bitum Matl & H Lime (1.5")
500 tn $ –
402-3190
Recycled Asph Conc 19 mm
Superpave, GP 1 or 2, Incl Bitum Matl &
H Lime (2")
300 tn $ –
413-0750 Tack Coat 200 gl $ –
429-1000 Rumble Strips 6 ea $ –
432-0206 Mill Asph Conc Pvmt, 1.5" in Depth (As
Required) 700 sy $ –
439-0022 Plain PC Conc Pvmt, CL 3 Conc, 10 Inch
Thk 300 sy $ –
441-5008 Concrete Header Curb, 6 In, TP 7 140 lf $ –
441-5025 Concrete Header Curb, 4 In, TP 9 230 lf $ –
456-2015 Indentation Rumble Strips-Ground-in-
Place (Skip)
0.41 glm $ –
456-2025 Indentation Centerline Rumble Strips-
Ground-in-Place (Continuous)
0.16 glm $ –
634-1200 Right Of Way Markers 13 ea $ –
636-1033 Highway Signs, TP1 Matl, Refl Sheeting, TP9
500 sf $ –
636-1036 Highway Signs, TP1 Matl, Refl Sheeting, TP11
25 sf $ –
636-2070 Galv Steel Posts, TP7 445 lf $ –
636-2080 Galv Steel Posts, TP8 135 lf $ –
636-3010 Ground-Mounted Breakaway Sign 8 ea $ –
00313 – 4
SR 144/OAK LEVEL ROAD ROUNDABOUT
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
Support
643-8200 Barrier Fence (Orange), 4FT 100 LF $ –
653-0120 Thermoplastic Pvmt Marking, Arrow, TP 2 4 ea $ –
653-0296 Thermoplastic Pvmt Marking, Word, TP
4 ea $ –
TOTAL PROJECT $
TOTAL BID:
Dollars
Unit Prices have been computed in accordance with paragraph 11.03.C of the General
Conditions.
BIDDER acknowledges estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities determined as provided, determined as provided in the Contract Documents.
5. BIDDER agrees the Work will be substantially complete within 180 calendar days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the
General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 210 calendar days after the date when the Contract Times commence to run.
6. BIDDER accepts provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within times specified in the Agreement.
7. The following documents are attached to and made a condition of this Bid:
a. Required Bid Security in the form of 10 percent of the Bid Total Price.
8. The undersigned further agrees in case of failure on his/her part to execute the said contract and the Bond within 30 consecutive calendar days after written notice being given of the award of the contract, the check or bid bond accompanying this bid, and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the check or bid bond accompanying this proposal shall be returned to the undersigned.
9. Communications concerning this Bid shall be addressed to:
Doyle D. Kelley, P.E.
Thomas & Hutton
50 Park of Commerce Way
Savannah, GA 31405
(912)721–4160
Kelley.d@tandh.com
00313 – 5
10. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions of Instructions.
SUBMITTED 2024.
CONTRACTOR'S NAME
ADDRESS:
BY:
State Contractor License No.
00411–1
PENAL SUM FORM
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications\ 00411 – Bid Bond.DOC
DOCUMENT 00411
BID BOND
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
Bryan County Board of Commissioners
66 Captain Matthew Freeman Drive
Richmond Hill, GA 31324
BID
BID DUE DATE: _____
PROJECT: SR 144/OAK LEVEL ROAD COMPACT ROUNDABOUT______
BOND
BOND NUMBER: _______________________________ DATE: ___ __________________________
(Not later than Bid Due Date)
PENAL SUM: ____10% of bid___________________________________________________________________________
IN WITNESS, WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
BIDDER SURETY
________ (Seal) _____ (Seal)
Bidder's Name and Corporate Seal Surety's Name and Corporate Seal
By: _________________________________ By: _______________________________
Signature and Title Signature and Title
(Attach Power of Attorney)
Attest: ______________________________ Attest:_____________________________
Signature and Title Signature and Title
Note: (1) Above addresses are to be used for giving required notice.
(2) Any singular reference to Bidder, Surety, Owner, or other party shall be considered plural where applicable.
00411–2
PENAL SUM FORM
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of
Bidder to deliver within the time required by the
Bidding Documents the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder's bid and Bidder
delivers within the time required by the
Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed
Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding
Documents and Contract Document, or
3.2 All bids are rejected by Owner, or
3.3 Owner fails to issue a notice of award to
Bidder within the time specified in the Bidding
Documents (or any extension thereof agreed to in writing by bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof.)
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of and any and all defenses based on arising out of any time extension to issue notice of award agreed to in writing by
Owner and Bidder, provided that the time for issuing notice of award including extensions shall not in the aggregate exceed 120 days from Bid
Due Date without Surety's written consent.
6. No suit or action shall be commenced under this
Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety, and in no case later than one year after Bid Due Date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the
Project is located.
8. Notice required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States
Registered or Certified Mail, return receipt requested, postage pre–paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of the Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this
Bond that is not in conflict therewith shall continue in full force and effect.
11. The term "bid" as used herein includes a bid, offer or proposal as applicable.
00506–1
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications\ 00506 – Standard Agreement.doc
DOCUMENT 00506
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
THIS AGREEMENT is dated as of the day of in the year 2024 by and between
BRYAN COUNTY BOARD OF COMMISSIONERS (hereinafter called OWNER) and
____________________ (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
The scope of this work is for the construction of the Bryan County’s Belfast Keller-School Access
Roundabouts Plan project which may be generally described as the following:
SR 144/Oak Level Road Compact Roundabout
The project consists of improvements at the intersection of SR 144 and Oak Level
Road in Bryan County, Georgia. The work includes the construction of a single lane compact roundabout at the intersection and adjustments to the approaches to accommodate the roundabout.
ARTICLE 2 ENGINEER
The Project has been designed by Thomas & Hutton Engineering Co. who is hereinafter called
ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 3 CONTRACT TIMES
All time limits for Substantial Completion and completion and readiness for final payment as stated in the Contract Documents are of essence to the Contract.
3.1 The Work will be substantially completed within 180 days after the date when the
Contract Times commence to run as provided in paragraph 2.03 of the General
Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 210 days after the date when the Contract Times commence to run. Included in the contract times are 15 days for rain delay. Time delays due to rain in excess of the above days shall be reported by the Contractor to the Engineer in writing, monthly, with each pay request.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize time is of the essence for this Agreement and OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof
00506–2 allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree to liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay
OWNER One Thousand and 00/100 Dollars ($1,000.00) for each day expiring after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR, shall pay OWNER
One Thousand and 00/100 Dollars ($1,000.00) for each day expiring after the time specified in paragraph 3.1 for completion and readiness for final payment.
ARTICLE 4 CONTRACT PRICE
4.1 UNIT PRICE WORK
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds of the amounts determined for all Unit
Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of item as indicated in the
CONTRACTOR'S UNIT PRICE BID (attached hereto as an exhibit), said amount being:
As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.07 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03C of the General Conditions.
ARTICLE 5 PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by ENGINEER as provided in the General
Conditions.
5.1 Progress Payments; Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the 25th day of each month during performance of the Work as provided in paragraphs 5.1.1., 5.1.1.2. and 5.2. below.
All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions (and in the case of Unit Price Work based on the number of units completed) as provided in the General
Requirements.
5.1.1 For Cost of Work: Progress payments on account of the Cost of the Work will be made:
5.1.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less
00506–3 such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.02 of the General
Conditions.
90% of the Work completed (with the balance being retainage). If
Work has been 50% completed as determined by ENGINEER, and if the character and progress of the Work have been satisfactory to
OWNER and ENGINEER, OWNER, on recommendation of ENGINEER, may determine as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed.
90% of Cost of the Work (with the balance being retainage) applicable to materials and equipment not incorporated in the
Work (but delivered, suitably stored, and accompanied by documentation satisfactory to OWNER as provided in paragraph
14.02.A.1 of the General Conditions).
5.1.1.2 Upon Substantial Completion, in an amount sufficient to increase the total payments to CONTRACTOR to 95% of the Cost of the
Work, (with the balance being retainage), less such amounts as
ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.
ARTICLE 6 INTEREST
All moneys not paid within thirty (30) days of the due date as provided in Article 14 of the General
Conditions, shall bear interest at the rate of 6 percent annually or the minimum required by law at the place of the Project, whichever is greater.
ARTICLE 7 CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:
7.1 CONTRACTOR has examined and carefully studied the Contract Documents
(including the Addenda indicated in Article 8 hereinafter) and the other related data identified in the Bidding Documents.
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions possibly affecting cost, progress, performance or furnishing of the Work.
00506–4
7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations possibly affecting cost, progress, performance and furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the
Supplementary Conditions as provided in the General Conditions. CONTRACTOR acknowledges such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges
OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract
Documents with respect to Underground Facilities at or contiguous to the site.
CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract
Times and in accordance with the other terms and conditions of the Contract
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site relating to the Work as indicated in the Contract
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the
Work.
ARTICLE 8 CONTRACT DOCUMENTS
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 Invitation to Bid (Pages 00021–1 to 00021–2, inclusive)
8.2 Instructions to Bidders (pages 00110–1 to 00110–8, inclusive)
8.3 Bid Form (pages 00313–1 to 00313–5, inclusive)
00506–5
8.4 Bid Bond (pages 00411–1 to 00411–2, inclusive)
8.5 Standard Form of Agreement Between Owner and Contractor (pages 00506–1 to
00506–7, inclusive)
8.6 Performance Bond (pages 00611–1 to 00611–6. Inclusive)
8.7 Payment Bond (pages 00621–1 to 00621–6, inclusive)
8.8 Notice of Award (pages 00631–1 to 00631–2, inclusive)
8.9 Notice to Proceed (pages 00641–1 to 00641–2, inclusive)
8.10 General Conditions (pages 1 to 62, inclusive)
8.11 Special Conditions (pages 00710–1 to 00710–6, inclusive)
8.12 Supplementary Conditions (pages 00815–1 to 00815–5, inclusive)
8.13 Summary of Work (pages 01011–1 to 01011–2, inclusive)
8.14 Measurement and Payment (pages 01025–1 to 01025–2, inclusive)
8.15 Submittals (pages 01300–1 to 01300–6, inclusive)
8.16 Quality Control (pages 01400–1 to 01400–4, inclusive)
8.17 Testing Services (pages 01410–1 to 01410–4, inclusive)
8.18 Contract Closeout (pages 01702–1 to 01702–4, inclusive)
8.19 Operations and Maintenance (pages 01730–1 to 1730–4, inclusive)
8.20 Warranties (pages 01740–1 to 01740–2, inclusive)
8.21 Bonds (pages 01741–1 to 1741–2, inclusive)
8.22 All technical specifications and details shall be in accordance with Georgia
Department of Transportation standards unless otherwise noted. Water and gas technical specifications and details shall follow Bryan County standards.
8.23 Drawings are broken up into plan sections as shown below:
Section Description Job No.
1 Cover Drawing 27691.0053
2 Index 27691.0053
4 General Notes 27691.0053
5 Typical Sections 27691.0053
11 Construction Layout 27691.0053
13 Mainline Plan 27691.0053
00506–6
Section Description Job No.
15 Mainline Profile 27691.0053
18 Special Grading 27691.0053
24 Utility Plans 27691.0053
26 Signing and Marking Plan 27691.0053
38 Special Construction Details 27691.0053
50 ESPCP Cover Plan 27691.0053
51 ESPCP General Notes 27691.0053
53 ESPCP Drainage Area Map 27691.0053
54 BMP Location Details 27691.0053
55 Watershed Map Site Monitoring Plan 27691.0053
8.24 Addenda _________ inclusive.
There are no Contract Documents other than those listed above in this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .