27691_0053 Addendum_3.pdf
PDF 567 KB Posted
- Attached to
- SR 144/Oak Level Road Roundabout
- Solicitation number
- PE-77523-NONST-2025-000000036
- Issued by
- Brooks County, Georgia
About this file
This document is an Addendum to an Invitation to Bid for the SR 144/Oak Level Road Compact Roundabout project owned by the Bryan County Board of Commissioners in Georgia. The project involves the construction of a single lane compact roundabout at the intersection of SR 144 and Oak Level Road, as well as adjustments to the approaches to accommodate the roundabout. The Addendum updates the Bid Form and Invitation to Bid, and revises certain plan sheets. Sealed proposals are due by 11:00 AM on Tuesday, September 24, 2024, at which time they will be publicly opened. A pre-bid conference will not be held, but all questions must be submitted in writing by September 16, 2024, with an addendum addressing the questions to be issued by September 19, 2024.
The Bid Form requires bidders to provide unit prices for various construction items, with the total bid amount to be submitted. Bid security in the form of a bid bond or certified check for 10% of the base bid is required. The successful bidder will be required to provide performance and payment bonds each in the amount of 100% of the contract price. The Owner reserves the right to reject any or all bids. The work is to be substantially complete within 180 calendar days and fully complete within 210 calendar days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SR144 / OAK LEVEL ROAD COMPACT ROUNDABOUT
PREPARED FOR:
BRYAN COUNTY BOARD OF COMMISSIONERS
T&H PROJECT NO.
J–27691.0053
ADDENDUM NO. 3 September 19, 2024
GENERAL
This Addendum has been issued on behalf of Bryan County Board of Commissioners. The following information should be considered by prospective bidders in preparation of their proposals and is hereby incorporated into the Proposal Documents. Bidders shall be responsible for acknowledging receipt of this addendum in the Bid Form, Document 00313. Failure to do so will result in the proposal being considered non responsive.
PART II – CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
The Proposal Documents shall be changed in the following respects:
SECTION 00313 – Bid Form
1. Section 00313 has been revised to add Addendum No. 3.
2. Delete and replace with the attached Section 00313 – “Bid Form”.
3. Bidder must use the enclosed form. NO OTHER FORM SHALL BE ACCEPTED.
4. Section 00021 has been revised to update the date of the final addendum.
5. Delete and replace with the attached Section 00021 – “Invitation to Bid”.
PART III – DRAWINGS
1. The plan sheets have been updated. Sheet 04-0001 has been revised to add clarity to note
36. Delete and replace corresponding plan sheets with the attached.
• Sheet 04-0001
THOMAS & HUTTON
Doyle Kelley, P.E.
Project Manager
End of ADDENDUM NO. 3
00021–1 z:\27691\27691.0053\Documents\Construction\Bid\Specifications\00021 – Invitation to Bid.doc Revised per Addendum #3 dated 09.19.2024
DOCUMENT 00021
INVITATION TO BID
Legal Notice
1. Sealed proposals for SR 144/Oak Level Road Roundabout owned by Bryan County Board of
Commissioners will be received by Community Development (Attn: Kirk Croasmun) at 66 Captain
Matthew Freeman Drive, Richmond Hill, GA 31324 until 11:00 AM on Tuesday, September 24, 2024, at which time they will be publicly opened.
2. The project consists of the following generally described work:
SR 144/Oak Level Road Roundabout
The project consists of improvements at the intersection of SR 144 and Oak Level Road in
Bryan County, Georgia. The work includes the construction of a single lane compact roundabout at the intersection and adjustments to the approaches to accommodate the roundabout.
3. Plans and Specifications are open to inspection digitally or may be obtained from Thomas &
Hutton Engineering Co., 50 Park of Commerce, Savannah, Georgia 31405 upon payment of
$50.00 (half size) or $100.00 (full size) plus a pdf copy. The contractor may request a PDF copy only upon payment of $25.00. The payment is non–refundable. Contact Karen Smulski at Thomas &
Hutton via email smulski.k@tandh.com to request copies.
4. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than
10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability."
Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney–in–fact to bind the surety and certified to include the date of the bond.
5. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes it would not be in the best interest of the Project to make an award to Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
6. A pre–bid conference will not be held. All questions shall be submitted in writing to the Engineer by Monday, September 16, 2024, at 5 PM. An addendum addressing all questions and comments received by the question deadline will be issued via electronic mail by the end of business on
Thursday, September 19, 2024.
ENGINEER OWNER
Thomas & Hutton Bryan County Board of Commissioners
Attn: Doyle Kelley, P.E. Attn: Kirk Croasmun, P.E.
50 Park of Commerce Way 66 Captain Matthew Freeman Drive
Savannah, GA 31405 Richmond Hill, GA 31324
Phone: 912–721–4160 Phone: 912-756–7953
Email: kelley.d@tandh.com Email: kcroasmun@bryan-county.org
Bryan County Board of Commissioners, Owner
END OF INVITATION TO BID
00313 – 1
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 09.19.2024
DOCUMENT 00313
BID FORM
PROJECT IDENTIFICATION: SR 144/OAK LEVEL ROAD COMPACT ROUNDABOUT
CONTRACT IDENTIFICATION
AND NUMBER: J –27691.0053
THIS BID IS SUBMITTED TO: Thomas & Hutton
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening, or for such longer period of time BIDDER may agree to in writing upon request of OWNER.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
a. BIDDER has examined and carefully studied the Plans and Specifications for the work and contractual documents relative thereto, and has read all Technical
Provisions, Supplementary Conditions, and General Conditions, furnished prior to the opening of Bids, and can fulfill the requirements of the work to be performed.
b. BIDDER further acknowledges hereby receipt of the following Addenda:
ADDENDUM NO. DATE
1 September 11, 2024
2 September 18,2024
3 September 19,2024
c. BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions possibly affecting cost, progress, performance and furnishing of the Work;
d. BIDDER is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations possibly affecting cost, progress, performance and furnishing of the
Work.
e. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structure at or contiguous to the site
(except underground Facilities) have been identified in the Supplementary
00313 – 2
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 09.19.2024
Conditions. BIDDER acknowledges such reports and drawings are not Contract
Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the
Work in accordance with the times, price and other terms and conditions of the
Bidding Documents.
f. BIDDER is aware of the general nature of Work to be performed by Owner and others at the site relating to Work for which this Bid is submitted as indicated in the
Bidding Documents.
g. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the
Bidding Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
h. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies BIDDER has discovered in the Bidding Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
i. This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s):
00313 – 3
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 09.19.2024
SR 144/OAK LEVEL ROAD ROUNDABOUT
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
ROADWAY CONSTRUCTION
150-1000 Traffic Control 1 ls $ –
151-1000 Mobilization 1 ls $ –
163-0232 Temporary Grassing 4 ac $ –
163-0240 Mulch 35 tn $ –
163-0301 Construct and Remove Construction Exits 2 ea $ –
165-0010 Maintenance of Temporary Silt Fence, Type
A 2,225 lf $ –
167-1000 Water Quality Monitoring and Sampling 8 ea $ –
167-1500 Water Quality Inspections 6 mo $ –
171-0010 Temporary Silt Fence, Type A 2,225 lf $ –
205-0001 Unclassified Excavation 60 cy $ –
210-0100 Grading Complete 1 ls $ –
310-5060 Gr Aggr Base Crs, 6 Inch, Incl Material 300 sy $ –
310-5080 Gr Aggr Base Crs, 8 Inch, Incl Material 2,200 sy $ –
402-1812 Recycled Asph Conc Leveling, Inc Bitum
Matl & H Lime 650 tn $ –
402-3121 Recycled Asph Conc 25 mm Superpave, GP 1 or 2 , Incl Bitum Matl & H Lime (3") 400 tn $ –
402-3130
Recycled Asph Conc 12.5 mm Superpave, GP 2 Only, Incl Polymer-Modified Bitum
Matl & H Lime (1.5")
550 tn $ –
402-3190 Recycled Asph Conc 19 mm Superpave, GP 1 or 2, Incl Bitum Matl & H Lime (2") 300 tn $ –
413-0750 Tack Coat 1,100 gl $ –
429-1000 Rumble Strips 6 ea $ –
432-5010 Mill Asph Conc Pvmt, Variable Depth (As
Required) 700 sy $ –
439-0014 Plain PC Conc Pvmt, CL 3 Conc, 6 Inch Thk 320 sy $ –
441-0748 Concrete Median, 6 In 90 sy $ –
446-1100 Pvmt Reinf Fabric Strips, Tp 2, 18 Inch Width 1,500 lf $ –
456-2015 Indentation Rumble Strips-Ground-in-Place
(Skip)
0.41 glm $ –
456-2025 Indentation Centerline Rumble Strips-
Ground-in-Place (Continuous)
0.16 glm $ –
611-8140 Adjust Water Valve Box to Grade 1.00 ea $ –
634-1200 Right Of Way Markers 13 ea $ –
636-1033 Highway Signs, TP1 Matl, Refl Sheeting, TP9 110 sf $ –
636-1036 Highway Signs, TP1 Matl, Refl Sheeting, TP11 120 sf $ –
636-1041 Highway Signs, TP2 Matl, Refl Sheeting, TP9 50 sf $ –
636-1077 Highway Signs, Alum Extruded Panels, Refl
Sheeting, TP 9 280 sf $ –
00313 – 4
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 09.19.2024
SR 144/OAK LEVEL ROAD ROUNDABOUT
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
636-2070 Galv Steel Posts, TP7 280 lf $ –
636-2080 Galv Steel Posts, TP8 500 lf $ –
636-2090 Galv Steel Posts, TP9 170 lf $ –
636-3010 Ground-Mounted Breakaway Sign Support 25 ea $ –
643-8200 Barrier Fence (Orange), 4FT 100 LF $ –
653-0120 Thermoplastic Pvmt Marking, Arrow, TP 2 4 ea $ –
653-0296 Thermoplastic Pvmt Marking, Word, TP 15 4 ea $ –
653-1906 Thermoplastic Solid Traf Stripe, 6 In, White 2,400 lf $ –
653-2602 Thermoplastic Solid Traf Stripe, 6 In, Yellow 3,800 lf $ –
653-4830 Thermoplastic Skip Traf Stripe, 18 In, White 140 glf $ –
653-6006 Thermoplastic Traf Striping, Yellow 400 sy $ –
700-6910 Permanent Grassing 2.00 ac $ –
700-7000 Agricultural Lime 6.00 tn $ –
700-8000 Fertilizer Mixed Grade 2.00 tn $ –
700-8100 Fertilizer Nitrogen Content 100 lb $ –
999-5200 Detectable Warning Surface 180 sf $ –
1000-0001 Qwik Kurb System 1 ls $ –
1000-0002 Landscaping 1 ls $ –
1000-0003 Lighting 1 ls $ –
TOTAL PROJECT $
TOTAL BID:
Dollars
Unit Prices have been computed in accordance with paragraph 11.03.C of the General
Conditions.
BIDDER acknowledges estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities determined as provided, determined as provided in the Contract Documents.
5. BIDDER agrees the Work will be substantially complete within 180 calendar days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the
General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 210 calendar days after the date when the Contract Times commence to run.
6. BIDDER accepts provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within times specified in the Agreement.
7. The following documents are attached to and made a condition of this Bid:
00313 – 5
Z:\27691\27691.0053\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 09.19.2024
a. Required Bid Security in the form of 10 percent of the Bid Total Price.
8. The undersigned further agrees in case of failure on his/her part to execute the said contract and the Bond within 30 consecutive calendar days after written notice being given of the award of the contract, the check or bid bond accompanying this bid, and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the check or bid bond accompanying this proposal shall be returned to the undersigned.
9. Communications concerning this Bid shall be addressed to:
Doyle D. Kelley, P.E.
Thomas & Hutton
50 Park of Commerce Way
Savannah, GA 31405
(912)721–4160
Kelley.d@tandh.com
10. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions of Instructions.
SUBMITTED 2024.
CONTRACTOR'S NAME
ADDRESS:
BY:
State Contractor License No.
UTILITY OWNER SERVICE
BRYAN COUNTY WATER
BRYAN COUNTY SEWER
ATLANTA GAS LIGHT NATURAL GAS
CLEARWAVE FIBER FIBER
COASTAL ELECTRIC POWER
COMCAST FIBER
CONCRETE - DRIVEWAY CONRETE, 8 IN THICK
GRADED AGGREGATE BASE 6 IN
CONC. 19 MM SUPERPAVE, GP1 OR 2 INCL BITUM MATL & H LIME,
GP2 ONLY, INCL BITUM MATL & H LIME, 220 LB,SY RECYCLED ASPHALT
ASPHALT - 165 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
COMMERCIAL:
CONCRETE - DRIVEWAY CONCRETE, 6 IN THICK
GP2 ONLY, INCL BITUM MATL & H LIME, GRADED AGGREGATE BASE 6 IN
ASPHALT - 15 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
RESIDENTIAL:
CONSTRUCTED USING:
AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED. DRIVES SHALL BE
THE ENGINEER PRIOR TO MAKING ANY REVISIONS TO LOCATION, WIDTH,
AVAILABLE DATA: THE CONTRACTOR SHALL OBTAIN THE APPROVAL FROM
PLANS. EXISTING DRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST
DRIVES SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE IN THE
AT THE THROAT UNLESS NOTED OTHERWISE IN THE PLANS. COMMERCIAL
EARTH/GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE
FOR ASHPALT, CONCRETE FOR CONCRETE, AND ASPHALT FOR
GREATER. ALL DRIVEWAYS SHALL BE REPLACED AS FOLLOWS ASHPALT
BACK TO THE TIE IN POINT OR REQUIRED RIGHT OF WAY, WHICHEVER IS
41. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED
THE COST OF THE CONCRETE PAY ITEM.
40. THE INSIGNIA RED #30152 COLOR USED IS TO BE INCLUDED IN
CONTROL.
MESSAGE SIGNS IS TO BE INCLUDED IN THE OVERALL BID FOR TRAFFIC
CHANGEABLE MESSAGE SIGNS. THE COST OF THE PORTABLE CHANGEABLE
THE TRAVELING PUBLIC OF THE UPCOMING CHANGE USING PORTABLE
CONTRACTOR SHALL INFORM GDOT (AT ROUNDABOUTS@DOT.GA.GOV) AND
39. TWO (2) WEEKS PRIOR TO OPENING OF THE ROUNDABOUTS, THE
PAID FOR UNDER THE BID ITEM "LANDSCAPING".
TRANSPORTATION STANDARDS AND DETAIL RA-1. THIS WORK SHALL BE
38. ROUNDABOUT LANDSCAPING SHALL FOLLOW GEORGIA DEPARTMENT OF
HARMED DURING CONSTRUCTION IN ANY WAY.
BALL OF THE TREE. TREES MARKED FOR PRESERVATION ARE NOT TO BE
ACTIVITIES WITHIN THE DRIP LINE IN ORDER TO PROTECT THE ROOT
EXERCISE CARE WHEN CONDUCTING CONSTRUCTION OR DEMOLITION
ORANGE BARRIER FENCE AS SHOWN IN THE PLANS. THE CONTRACTOR WILL
37. TREES MARKED FOR PRESERVATION ARE TO BE MARKED OFF WITH
COOPERATIVE WHEN INSTALLING LIGHTING ON THE PROJECT.
36. CONTRACTOR SHALL COORDINATE WITH COASTAL ELECTRIC
COORDINATED WITH BRYAN COUNTY AND GDOT DISTRICT 5.
FROM 4:30P.M. TO 6:00P.M. ALL LANE CLOSURES ARE TO BE
35. LANE CLOSURES ARE PROHIBITED FROM 7:00A.M. TO 8:30A.M., AND
CLOSURES WITH THE ENGINEER, BRYAN COUNTY, AND GDOT COORDINATOR.
THE LUMP SUM BID FOR TRAFFIC CONTROL. COORDINATE PROJECT LANE
INCLUDE ANY TEMPORARY PAVEMENT REQUIRED TO STAGE THE JOB IN
IN LUMP SUM BID FOR TRAFFIC CONTROL. THE CONTRACTOR SHALL
MATERIALS (INCLUDING POTENTIAL ROAD DETOURS) SHALL BE INCLUDED
FROM GDOT, PRIOR TO CONSTRUCTION. ALL SIGNS AND NECESSARY
TO BRYAN COUNTY AND THE ENGINEER FOR APPROVAL, WITH CONCURENCE
34. CONSTRACTOR SHALL SUBMIT TRAFFIC CONTROL AND STAGING PLANS
COUNTY AND THE ENGINEER IMMEDIATELY.
SHOWN ON THE CONSTRUCTION PLANS, CONTRACTOR SHALL NOTIFY BRYAN
33. IF ANY UTILITIES ARE LOCATED IN THE FIELD THAT ARE NOT
CONTROL.
OF THE JOB SHALL BE INCLUDED IN THE LUMP SUM BID FOR TRAFFIC
32. ANY TEMORARY PAVING REQUIRED TO FACILITATE THE CONSTRUCTION
CONSTRUCTION.
ANY POTENTIAL UNSUITABLE MATERIAL BE ENCOUNTERED DURING
31. CONTRACTOR SHALL NOTIFY BRYAN COUNTY AND ENGINEER SHOULD
CROSSING ARE NECESSARY.
AND THE TOPS OF PROPOSED RELOCATED WATER MAINS WHERE VERTICAL
CLEARANCE SEPARATION BETWEEN THE BOTTOM OF PROPOSED STORM PIPES
30. CONTRACTOR TO MAINTAIN A MINIMUM OF 18" OF VERTICAL
PRIOR TO CONSTRUCTION.
UTILITIES. AND SHALL COORDINATE WITH THE LOCAL UTILITY COMPANY
UTILITIES ONLY IF NECESSARY FOR THE PROTECTION OF THE
AND SEWER MAINS, CONTRACTPR TO REMOVE AND REPLACE EXISTING
EXISTING UTILITIES. INCLUDING EXISTING WATER MAINS, GAS LINES,
29. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
28. THIS PROJECT WILL NOT INCLUDE ASPHALT INDEXING.
PRIOR TO CONSTRUCTION.
COORDINATE WITH BRYAN COUNTY AND UTILITY OWNER A MINIMUM OF 72
27. ALL EXISTING GAS LINES ARE ACTIVE. CONTRACTOR TO
HOURS PRIOR TO CONSTRUCTION.
OF EXISTING WATER MAINS USING EXISTING VALVES A MINIMUM IF 72
COORDINATE WITH BRYAN COUNTY TO SCHEDULE SHUT DOWN OF SECTIONS
26. ALL EXISTING WATER MAINS ARE ACTIVE. CONTRACTOR TO
DISTRICT'S FIELD MANUAL (THE GREEN BOOK).
WITH THE STATE OF GEORGIA SOIL AND WATER CONSERVATION
EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE
EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING
UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING.
PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN
PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET
25. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
PARCEL 5.
COUNTY AND THE ENGINEER FOR THE LOCATION OF NEW DRIVEWAY FOR
ON ANY PROPOSED DISTURBANCE TO ACCESS. COORDINATE WITH BRYAN
CONSTRUCTION. COORDINATE WITH PROPERTY OWNERS AND BRYAN COUNTY
24. MAINTAIN ACCESS TO THE PROPERTIES AT ALL TIMES DURING
IN EASEMENTS.
23. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED ITEMS
BETTER AFTER CONSTRUCTION IS COMPLETED.
22. RESTORE TEMPORARY EASEMENTS AREA TO EXISTING CONDITIONS OR
THE PLANS.
21. UTILIZE CLASS V REINFORCED CONCRETE PIPE WHERE NOTED IN
INSTALLCONDUIT/EQUIPMENT.
PRIOR TO ANY NEW PAVING. NO NEW PAVING SHALL BE CUT TO
20. ALL CONDUIT WHICH IS RUN UNDER ROADWAY SHALL BE INSTALLED
ITEM IS TO BE INCLUDED WITH THE COST OF THE CONDUIT.
GALVANIZED PULL WIRE IN EACH EMPTY CONDUIT. THE COST OF THIS
19. THE CONTRACTOR SHALL INSTALL A NYLON PULL CORD OR
WITHIN THE RIGHT OF WAY.
ON THE DRAWING ARE DIAGRAMMATIC. CONTRACTOR SHALL INSTALL THEM
18. ALL CONDUIT AND ELECTRICAL JUNCTION BOXES (EJB) PLACEMENTT
EARTH AT A DEPTH OF NOT LESS THAN 24".
INSTALLED UNDERNEATH ROADWAYS AND DRIVES SHALL BE BUIRIED IN
17. ALL UNDERGROUND CONDUIT SHALL BE SCH 40 PVC. CONDUIT
PROCEDURES SHALL FOLLOW GDOT STANDARD SPECIFICATIONS.
BE PAID FOR IN OVERALL COST OF BID. TESTING FREQUENCY AND
OF ALL REQUIRED QUALITY TESTING SERVICES. COST OF TESTING SHALL
16. CONTRACTOR SHALL BE RESPONSIBLE FOR EMPLOYMENT AND PAYMENT
CUT/FILL LIMITS WILL BE CUT FLUSH WITH EXISTING GROUND.
BE ALLOWED OUTSIDE OF CUT/FILL LIMITS. ALL STUMPS OUTSIDE
EXCEPTION OF TREES MARKED FOR PRESERVATION. NO GRUBBING WILL
BELFAST KELLER ROAD, OAK LEVEL ROAD, AND SR 144, WITH THE
15. CONTRACTOR SHALL CLEAR AND GRUB ENTIRE RIGHT OF WAY ALONG
COMPLETE.
SPECIFICATIONS AND WILL BE INCLUDED IN PRICE BID FOR GRADING
ACCORDANCE WITH SECTION 411 OF THE GEORGIA STANDARD
REQUIRED, SAW CUT OF EXISTING PAVEMENT WILL BE REQUIRED IN
14. IN AREAS WHERE NEW PAVEMENT OR PAVEMENT WIDENING IS
DURING THE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITIES
ARE BASED ON INFORMATION OBTAINED FROM UTILITY COMPANIES.
13. THIS IS NOT A SUE UTILITY LOCATION PROJECT. UTILITIES SHOWN
THAT WILL BE REMOVED OR DESTROYED TO ALLOW FOR CONSTRUCTION.
TREES WITHIN THE CONSTRUCTION LIMITS OR LIMITS OF DISTURBANCE
TREES TO REMAIN IN THE RIGHT OF WAY. THIS DOES NOT APPLY TO
TRAILER PLACEMENT, ETC.) OCCUR UNDER THE DRIP LINE OF EXISTING
VEHICULAR USE, BORROW OR WASTE ACTIVITIES, SEDIMENT BASINS,
ACTIVITIES (SUCH AS THE USE OF EASEMENTS, STAGING,CONSTRUCTION,
12. THE CONTRACTOR SHALL ENSURE THAT NO CONSTRUCTION-RELATED
FOREST SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE.
PLANTS IN SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA
TREE - PAULOWNIA TMENTOSA SEE 'A MANAGEMENT GUIDE FOR INVASIVE
BROUSSONETIA PAYRIFERA CHINABERRY - MELIA AZEDARACH PRINCESS
ALTISSIMA WHITE MULBERRY - MORUS ALBA PAPER MULBERRY -
MIMOSA- ALBIZIA JULIBRISSIN TREE OF HEAVEN - AILANTHUS
PROTECTION AND SHOULD BE REMOVED IF POSSIBLE. THESE INCLUDE:
11. INVASIVE OR UNDESIRABLE SPECIES DO NOT QUALIFY FOR ANY
INVASIVE PEST PLANTS.
SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE ON SPECIFIC
SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA FOREST
201.3.05.A. SEE 'A MANAGEMENT GUIDE FOR INVASIVE PLANTS IN
SPECIFICATION SECTION 201-CLEARING AND GRUBBING RIGHT OF WAY,
10. INCLUDE ERADICATION OF INVASIVE SPECIES IF ENCOUTERED PER
ITEMS. COST WILL BE INCLUDED IN OVERALL BID SUBMITTED.
9. NO SEPARATE PAYMENT WILL BE MADE FOR TEMPORARY DRAINAGE
DRAINS AND BOX CULVERTS.
8. FOUNDATION BACKFILL MATERIAL TP II WILL BE USED AT ALL CROSS
CONSTRUCTION DEBRIS AT NO ADDITIONAL COST TO THE PROJECT.
SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING BRIDGE /
CONTRACTOR SHALL PROVIDE AN ENVIRONMETALLY APPROVED SITE AS
CONSTRUCTION DEBRIS WITHIN THE PROJECT'S LIMITS. THE
7. THERE IS NO KNOWN SUTIBLE PLACE TO BURY EXISTING BRIDGE/
INCLUDED IN THE PRICE BID FOR GRADING COMPLETE.
EXISTING PAVEMENT REMOVAL AND PREPARATION, SHALL ALSO BE
JOINTS ASSOCIATED WITH SHOULDER REMOVAL, AS WELL AS ALL OTHER
IN THE PRICE BID FOR GRADING COMPLETE. SAWED LONGITUDINAL
TO BE CONSTRUCTED SHALL BE REMOVED. REMOVAL SHALL BE INCLUDED
6. EXISTING PAVED SHOULDERS WHERE NEW TRAVEL OR TURN LANES ARE
COMPLETE.
STRUCTURES SHALL BE INCLUDED IN THE PRICE BID FOR GRADING
ALL COSTS ASSOCIATED WITH THE REMOVAL OF THESE PIPES AND
CONSTRUCTION LIMITS ARE TO BE REMOVED UNLESS OTHERWISE NOTED.
5. ALL EXISTING PIPES AND STRUCTURES WITHIN THE PROPOSED
INFORMATION.
STANDARD SPECIFICATION AND SUPPLEMENTS THERETO FOR ADDITIONAL
LANDFILL OR IN AN ENGINEERED FILL. SEE SECTION 201 OF THE
PERMITTED SOLID WASTE FACILITY, A PERMITTED INERT WASTE
OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED IN EITHER A
OCCURRING IN THEM. ALL COMMON FILL OR EXCESS MATERIAL DISPOSED
ENVIRONMENTALLY APPROVED PRIOR TO CONSTRUCTION ACTIVITIES
4. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE
FOR PIPE ON THE PROJECT.
WRAPPING PIPE JOINTS SHALL BE INCLUDED IN THE OVERALL COST
MINIMUM OVERLAP. EQUIVALENT TO MIRAFI 14ON. THE COST FOR
OF FILTER FABRIC, 4'-0" WIDE. CENTERED ON JOINT WITH A 1'-0"
3. ALL CONCRETE PIPE JOINTS SHALL BE WRAPPED WITH TWO LAYERS
THE COST FOR PIPE ON THE PROJECT.
TO THE COST OF THE PROJECT AND THE COST SHALL BE INCLUDED IN
(EXISTING AND PROPOSED) SHALL BE CONSIDERED INCIDENTAL
THE FLUSHING AND CLEANING OF DROP INLETS, CULVERTS AND PIPES
COMPLETION OF CONSTRUCTION TO REMOVE ANY SILT AND DEBRIS.
2. CONTRACTOR IS TO FLUSH ALL RETAINED INLETS AND PIPE AT THE
FOR THIS PROJECT.
PROJECT IS MORE THAN 1.0 ACRE, A NOTICE OF INTENT IS REQUIRED
1. SINCE THE PROJECT DISTURBED AREA ASSOCIATED WITH THIS
GENERAL NOTES
04-0001
COMPACT ROUNDABOUT
SR 144/ OAK LEVEL ROAD
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/19/2024 arce.r
GPLOT-ORD
gplotborder-ORD.tbl
2769153_04.dgn
1:03:57 PM
GPLN-CE
www.thomasandhutton.com
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
9/5/2024
9/19/2024
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
File details come from the government source that posted it. Updated .