About this file

This is a Scope of Work and contract exhibits document for Agreement Number 26HS0006 issued by the California Department of Veterans Affairs for fire protection system services at California Central Coast Veterans Cemetery (CCCVC) located in Seaside, California. The contract requires the contractor to provide comprehensive inspection, testing, maintenance, and repair services for both fire sprinkler systems and fire hydrant flow systems. Services must be performed during standard business hours (8:00 a.m. to 5:00 p.m., Monday through Friday) unless prior written approval is obtained for overtime or holiday work. The contractor must complete a five-year inspection, testing, maintenance, and certification of both systems within one month of contract award, followed by annual inspection and testing services. The contractor must also conduct a complete survey of existing equipment within the first month and provide detailed equipment lists with location maps by the end of the second month. The contractor is required to respond to consultation and repair requests within 48 hours and to emergency repair requests within two hours of notification. All work must comply with California Building Code 2019, California Fire Code Chapter 9, NFPA standards 13, 25, and 291, and must be performed by qualified service technicians with a minimum of two years' experience and a current California C-16 contractors license.

This solicitation is restricted to certified Small Business or Micro Business firms only. The contractor must maintain Commercial General Liability insurance with combined single limits of at least $1,000,000 per occurrence and Workers' Compensation coverage. Prevailing wage rates apply in accordance with California Labor Code Section 1770, with certified payroll reporting required prior to payment authorization. The rate sheet includes line items for five-year sprinkler inspection and testing, annual sprinkler inspection and testing, five-year fire hydrant flow system inspection and testing, annual hydrant inspection and testing, hourly rates for consultation and repairs during regular and non-business hours, emergency service hourly rates, and a $5,000 parts allowance for the contract term, with parts reimbursement at actual cost plus 10 percent markup. The contractor must submit monthly invoices to the CalVet Contract Manager for approval and include all required documentation for processing. All parts replaced remain property of CCCVC, and the contractor provides a 90-day guarantee on all services and parts. The State reserves the right to terminate the contract with 30 days' written notice, or immediately for cause.

View the file

Other files

File Type Posted
26HS0006_-_CCC.pdf PDF
26HS0006_-_Quote_Rate_Sheet.xlsx XLSX spreadsheet
Sample_Insurance_Template.pdf PDF
26HS0006_-_STD_204.pdf PDF
26HS0006_-_STD_205.pdf PDF
26HS0006_-_Bidder_Declaration.pdf PDF
26HS0006_-_CUF_Form.pdf PDF
26HS0006_-_DVBE_Declarations.pdf PDF
26HS0006_-_Sample_STD_213.pdf PDF
26HS0006_-_Darfur.pdf PDF
DVBEProgramRequirements_-_Contracts_-_Revision_Date_012022.pdf PDF
26HS0006_-_SFQ_(SB)_Letter.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

California Department of Veterans Affairs Agreement Number: 26HS0006 Exhibit A - Scope of Work TBD

FIRE PROTECTION SYSTEM SERVICES (SPRINKLERS & HYDRANTS)

1. INTRODUCTION/SERVICES

A. The Contractor shall provide services, as specified herein, to the California Department of Veterans Affairs (CalVet). The Contractor shall provide services at California Central Coast Veterans Cemetery (CCCVC), located at 2900 Parker Flats Road, Seaside, CA 93955. The Contractor shall provide all labor, materials, staff, transportation, license, permits, and every other item of expense necessary, unless otherwise stated, to provide fire protection system inspection, testing, maintenance, and repair services.

Services shall be provided at CCCVC, upon request and in compliance with the terms of this Agreement.

B. All work shall be coordinated and approved by the Contract Manager or a designated representative.

Services shall be performed during standard business hours, 8:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise specified. No work is to be performed on State holidays, or on an overtime basis, unless prior approval is received in writing from the Contract Manager or designee, prior to this work taking place. Any and all services performed outside the scope of this Agreement or not approved by the Contract Manager will be at the sole risk and expense of the Contractor.

C. The Contractor shall be able to perform the tasks associated with providing services under the scope of their license. The Contractor shall provide services in accordance with federal and state laws and regulations, and CalVet and CCCVC policies.

D. The Contractor is not authorized to deliver or commence performance of services as described in the Agreement until written approval has been obtained from the Contract Manager and the Contractor has received an executed contract from CalVet. Any delivery or performance of service commenced prior to the Contractor obtaining all written approvals shall be considered voluntary on the part of the Contractor.

2. EQUIPMENT

A. Including in this Agreement are all components connected to or related to Cemetery’s Fire Protection System, including the fire sprinkler system and fire hydrant flow system.

B. The Contractor shall survey the existing fire sprinkler system and fire hydrant flow system within the first month of the contract start date. The Contractor shall provide a complete, detailed list of all equipment included in the fire sprinkler system and fire hydrant flow system to the Contract Manager, or designee, no later than the end of the second month of the contract. Each list submission shall also include a map location of where the equipment is located.

3. MINIMUM QUALIFICATIONS

A. The Contractor must be licensed to conduct business in California.

B. All services performed under this Agreement shall be performed by qualified service technicians (personnel) in the employ or under the direction of the Contractor.

C. The Contractor shall possess a current C-16 License issued by the California State Contractors Licensing Board (CSLB).

D. All work shall be performed by personnel who have developed competence through training and experience. A minimum of two years’ experience inspecting fire sprinkler systems and fire hydrant flow systems is required. Upon request, Contractor shall provide CalVet proof that personnel providing service to CCCVC meet this requirement. Acceptable proof may be a resume showing experience, training, and/or factory school completion.

4. REFERENCE DOCUMENTS AND STANDARDS

A. All proposed equipment, materials, and services in this contract shall strictly conform to the latest editions of the following codes and standards:

1. California Building Code 2019.

2. California Fire Code (CFC) Chapter 9: Fire Protection and Life Safety Systems, specifically but not limited to 901.6: Inspection, Testing, and Maintenance.

3. National Fire Protection Association (NFPA) 13: Standard for the Installation of Sprinkler Systems.

4. National Fire Protection Association (NFPA) 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

5. National Fire Protection Association (NFPA) 291: Recommended Practice for Fire Flow Testing and Marking of Hydrants.

5. CONTRACTOR’S RESPONSIBILITIES

A. General Provisions Related to Scope of Work

1. The Contractor shall attend an introductory meeting with the Contract Manager within ten (10) days of being awarded the contract. During this introductory meeting, the Contractor and Contract Manager will determine if the schedule outlined in the Rate Sheet needs to be adjusted as a result of the actual contract execution date. Schedule may have tentative dates as placeholders; however, at a minimum, the schedule must contain the required month of services. The schedule will be made for the duration of the Agreement. Final approval of all schedules, including dates and times for services to occur, is at the discretion of the Contract Manager or designee.

2. The Contractor shall conduct its operations in such a manner as to avoid damage to the Cemetery’s property. If any such property is damaged by reason of the Contractor’s operations, it shall be replaced or restored at the Contractor’s expense and to the satisfaction of the Contract Manager or designee.

3. The Contractor shall check in at the Administration Office prior to commencing work. Upon completion of work, and prior to leaving Cemetery grounds, the Contractor shall check out in the Administration Office by submitting a written report of all work performed that day.

4. Current forms as created by the California State Fire Marshal (SFM), or the equivalent, must be submitted for all work performed. Information included on such reports shall include, but is not limited to, the location and description of work performed, pictures, comments, and any necessary analysis, results, and interpretation.

5. When deficiencies result, the Contractor shall report them to the Contract Manager or designee. Any deficiencies reported are to be repaired and brought into compliance standards within three (3) business days of findings.

6. The Contractor shall respond to any and all inquiries by Contract Manager or designee within twenty-four (24) hours of receiving the inquiry.

7. If sub-contractors will be required to complete any scope of work listed herein, their costs shall be captured within this Agreement. The Contractor shall include a line item indication for any work that would be performed by the subcontractor.

B. Fire Sprinkler System

The Contractor shall perform inspection, testing, maintenance, and service of the Cemetery’s Fire Sprinkler System, according to applicable standards. Inspection and testing shall include every applicable test prescribed by, and shall be performed on the intervals required by, the applicable codes and standards. In instances where the results of the inspections and testings are not 100% PASS, the Contractor must notify the Contract Manager or designee of the deficiency(ies) in the inspection and testing report. All work performed and parts required that relate to correcting the deficiencies will require advance written approval from the Contract Manager prior to work being started. Services shall occur on the following intervals:

1. Annually

2. Five-Year

a. The Contractor shall provide five-year sprinkler testing and inspection within one (1) month of being awarded this contract. All subsequent quarterly and annual service dates will be set accordingly after the initial five-year testing.

b. Five-year sprinkler service shall include any re-inspection required for correction and compliance.

C. Fire Hydrant Flow System

The Contractor shall perform inspection, testing, maintenance, and service of the Cemetery’s Fire Hydrant Flow System, according to applicable standards. In instances where the results of the inspections and testings are not 100% PASS, the Contractor must notify the Contract Manager or designee of the deficiency(ies) in the inspection and testing report. All work performed and parts required that relate to correcting the deficiencies will require advance written approval from the Contract Manager prior to work being started. Services shall occur on the following intervals:

1. Annually

2. Five-Year

a. The Contractor shall provide five-year hydrant flow system testing and inspection within one (1) month of being awarded this contract. All subsequent annual service dates will be set accordingly after the initial five-year testing.

b. Five-year fire hydrant flow system service shall include any re-inspection required for correction and compliance.

D. Additional Visits for Consolations or Repairs

1. Within forty-eight (48) hours of notification by Contract Manager or designee, the Contractor shall have a technician available and on-site at CCCVC to meet with the Contract Manager, designee, or State Fire Marshal.

2. Visits are charged hourly from the time the technician arrives at the agreed-upon time.

3. Services may include consultations, repairs, maintenance, and any other service deemed necessary by the Contract Manager to meet the required standards.

4. Every effort shall be made to perform repair services during normal business hours; State holidays and weekends excluded. The State may, at its discretion, allow access to the equipment during non-business hours when necessary. Non-emergency repair services performed outside of normal business hours must be approved in advance in writing by the Contract Manager.

E. Emergency Services

The Contractor shall provide any necessary emergency repairs upon request from the Contract Manager.

The Contractor must respond to requests for emergency repair within two (2) hours of notification from CCCVC. When possible, emergency repairs will be performed during normal business hours as specified herein. The State may, at its discretion, allow access to the equipment during non-business hours when necessary.

Emergency services provided by the Contractor, if at the specific request of the State, will be compensated for actual hours worked on-site at the Contractor’s emergency call hourly rate, as specified in Exhibit B-1, Rate Sheet. Any emergency service provided shall be completed on the same working day unless a written notification of delay is submitted to the Contract Manager immediately upon diagnosis of equipment deficiency. Any parts requiring replacement will be replaced in accordance with the Parts Replacement section specified herein.

6. PREVAILING WAGES

A. In accordance with the provisions of Section 1770 of the Labor Code, the Department has determined that the general prevailing wage rates are applicable in the county in which the work is being performed and are the rates established and published by the Director of Industrial Relations, http://www.dir.ca.gov/oprl/pwd/.

1) The Notice to Contractors stipulates that the prevailing wage rates are applicable to the classes of labor to be used on this project.

2) Pursuant to Labor Code Section 1776, completed certified payroll reporting forms for all workers involved in this project shall be submitted to the Contract Manager prior to the authorization of any payment for work under this contract.

B. Both parties shall retain a copy of the prevailing rates on file. Copies of the prevailing rate of per diem wages are on file with the California Department of Veterans Affairs and shall be made available to any interested party on request. LC § 1773.2.

C. Pursuant to Labor Code Section 1775, the Contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200.00) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided http://www.dir.ca.gov/oprl/pwd/ in subdivision (b) by any subcontractor under the contractor. This provision shall not apply to properly indentured apprentices.

D. Pursuant to Labor Code Section 1813, the contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty-five ($25) for each work employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

7. PARTS REPLACEMENT

A. This Agreement shall include replacement of any part that becomes worn or inoperable, or that otherwise affects the equipment’s operability in any way. A written estimate of the required part(s) shall be submitted to the Contract Manager and approved before replacement in all cases. Parts replaced under this Agreement shall be new, factory-manufactured, or exceeding Original Equipment Manual (OEM) specifications. The Contractor should maintain an adequate supply and/or must be able to obtain within a reasonable amount of time any necessary replacement parts to perform repairs and maintenance in a timely manner. Consumables and other supply items are hereby excluded.

B. When parts are needed, the Contractor will be reimbursed for the actual cost of the parts plus 10%, including shipping charges and taxes paid by the Contractor to obtain the parts. Proof of cost, such as a copy of the actual invoice for the parts from the business from which it was purchased, shall be attached to the Contractor’s invoice for reimbursement. CalVet may elect to purchase the parts themselves as determined by the Contract Manager.

C. Any parts replaced shall remain the property of CCCVC. The only exception is when the Contract Manager authorizes the Contractor to use the part(s) as a refund for “core” charges. If the Contractor is authorized to use the part for “core” exchange, the invoice must reflect the reduced cost of the parts based on “core” exchange value.

D. The State assumes no responsibility and shall not reimburse the Contractor for parts ordered by the Contractor and/or labor if the part was installed prior to authorization by the Contract Manager. The Contractor shall be responsible for the replacement of parts necessitated by the Contractor’s negligence at their expense to the State.

8. WORK AREA

While working on equipment, the Contractor agrees to perform services with as little disruption to the Cemetery’s operations as possible. All tools, equipment, and other materials belonging to the Contractor will be removed from the Cemetery at the end of each working day. The State shall not be responsible for the storage of any Contractor property.

The Contractor shall protect all existing facilities, completed work, and work in progress from damage. The Contractor shall provide adequate supervision, signage, fencing, barricades, lighting, etc., to ensure a safe working environment.

9. WORKMANSHIP

All work provided by the Contractor shall conform to the latest requirements for Federal, State, City, and County regulations. This includes but is not limited to Titles 17, 19, and 22 of the California Code of Regulations. The Contractor is responsible for compliance with all applicable laws, codes, rules, and regulations in connection with work performed under this Agreement. Any services performed by the Contractor will be inspected by the State after completion. The State is solely responsible for determining the acceptability of the work performed and the operability of the equipment.

10. GUARANTEE

The Contractor will guarantee all services performed by the Contractor’s service technicians, including any replaced parts, for a minimum of ninety (90) days from the date of service performance. If it is determined that failure has occurred due to defective parts or workmanship, the Contractor shall correct the failure at no additional expense to the State. The return times to correct work previously done will be coordinated and scheduled by the Contract Manager.

11. INDEPENDENT CONTRACTORS STATUS

A. The Contractor/Providers shall be considered “Independent Contractors” in relation to CalVet and the State. Therefore, the Contractor/Providers shall not be considered employees of CalVet and shall not be entitled to any employee benefits from CalVet or the State, including, but not limited to, the following:

1. Premium Pay, Overtime Pay, or Holiday Pay,

2. Medical Insurance,

3. Vacation or Sick Leave,

4. Worker’s Compensation, and

5. Other employee benefits.

12. CONTACT INFORMATION

A. The project representatives during the term of this agreement will be:

1. CalVet Representative/Contract Manager:

California Central Coast Veterans Cemetery (CCCVC)

TBD

2900 Parker Flats Road Seaside, CA 93955 Phone:

Email:

2. Contractor Representative:

TBD

B. The Contract Representatives, addresses, and phone/fax numbers may be changed by issuing a twenty (20)-day prior written notification and shall not require a formal amendment of this Agreement. The notifying party shall provide complete contact information for the replacement Contract Representative, including name, title, mailing address, phone/fax numbers, and email address. All other changes require a formal written amendment to this agreement.

Exhibit B - Budget Detail and Payment Provisions TBD

1. STANDARD BUDGET DETAIL AND PAYMENT PROVISIONS

A. Invoicing and Payment

1. For services satisfactorily rendered, and upon receipt and approval of the invoices, the State agrees to compensate the Contractor for services rendered in accordance with the rates in Exhibit B-1.

2. Invoices shall include the Agreement Number and shall be submitted in not more frequently than monthly in arrears to:

Original Invoice Approval Copy Department of Veterans Affairs CalVet Accounting Office 1227 “O” Street Room 402 Sacramento, CA 95814 APInvoices@calvet.ca.gov

California Central Coast Veterans Cemetery (CCCVC) Attn: TBD 2900 Parker Flats Road Seaside, CA 93955

B. Budget Contingency Clause

1. It is mutually agreed that if the Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall be of no further form and effect. In this event, the State shall have no liability to pay any funds whatsoever to Contractor or to furnish any other considerations under this Agreement, and Contractor shall not be obligated to perform any provisions of this Agreement.

2. If funding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the option to either cancel this Agreement with no liability occurring to the State, or offer an Agreement amendment to Contractor to reflect the reduced amount.

C. Prompt Payment Clause

Payment will be made in accordance with, and within the time specified in, Government Code, Chapter 4.5, commencing with Section 927.

2. SPECIAL BUDGET DETAIL AND PAYMENT PROVISIONS

Submissions of Invoices/Claims

A. All invoices/claims must be completed thoroughly and legibly, with all applicable fields completed.

Invoices/claims that are submitted to the appropriate location but have been altered, or are inaccurate, or do not provide all necessary information will not be accepted and will be returned to the Contractor for correction.

B. Any changes to this provision relating to the invoice/claim submittal process, including but not limited to an address, form, or process change, shall be an administrative change managed through the appropriate designated CalVet office and shall not require a contract amendment.

C. Contractor shall submit monthly invoices to the CalVet Contract Manager for approval and processing.

Invoices/claims submitted shall include the following information in order to be considered complete and acceptable for processing, or the invoice/claim will be returned:

1) Contractor’s Company name exactly as it appears on the Payee Data Record (STD.204)

2) Contractor’s Company address, phone number and e-mail

3) Date of invoice/claim

4) Invoice/claim number

5) CalVet location where services were performed

Exhibit B - Budget Detail and Payment Provisions TBD

6) Contract/Agreement Number

7) Date(s) of Service

8) Total dollar amount being billed

9) First and Last name of Contractor or Provider performing services, if applicable

10) Contractor’s or Provider’s Classification, whichever is applicable

11) Contractor’s final invoice must be clearly marked as “Final Invoice.”

12) When applicable, Contractors shall include the following information on the invoice/claim submitted for hourly reimbursement:

a) Hourly Rate

b) Time in and time out

c) Total hours worked

d) Any other information or documentation reasonably required to verify and substantiate the provision of services and the charges for such services.

3. CONTRACTOR OVERPAYMENTS

A. If the State determines that an overpayment has been made to the Contractor, the State will seek recovery immediately upon discovery of the overpayment by: (a) calling the Contractor’s accounting office to request a refund of the overpayment amount, or (b) offsetting subsequent Contractor payments by the amount of the overpayment if Contractor repayment or credit is not received within thirty (30) days from the date of notice.

B. If Contractor discovers it has received an overpayment, Contractor must notify the State and refund the overpayment immediately.

4. DVBE Withhold

A. For contracts with DVBE subcontractors pursuant to Mil. & Vet. Code Section 999.7, ten thousand dollars ($10,000) will be withheld from the final payment, or the full final payment if less than ten thousand dollars ($10,000), until the prime contractor complies with the certification requirements of subdivision (d) of Mil.

& Vet. Code Section 999.5. The prime contractor shall be given 30 days’ notice to cure the defect. If, after 30 calendar days from the date of notice, the prime contractor refuses to comply with the certification requirements, CalVet shall permanently deduct ten thousand dollars ($10,000) from the final payment, or the full payment if less than ten thousand dollars ($10,000).

B. CalVet shall maintain all records of the information provided by the prime contractor pursuant to Section

999.5 and shall establish appropriate review procedures for those records to ensure the accuracy and completeness of the award amounts and paid amounts reported. The records shall be maintained in a manner that facilitates access and review by external auditors. Records collected pursuant to this section shall be retained for a minimum of six years after collection. (Mil. & Vet. Code Section 999.55)

Exhibit B-1, Rate Sheet TBD

RATE SHEET

The Contractor must be able to provide the services listed below. Subcontractors may be used to comply with this requirement. Subcontractor Agreements may be used to comply with this requirement. Subcontractor(s) information must be identified on Bidder Declaration (GSPD-05-105). If additional Subcontractors are added during the term of the Agreement, an updated GSPD-05-105 must be submitted.

The rates listed below are in effect for the term of the Agreement, including any extension of the term through an amendment.

Fire Sprinkler System Unit Rate

FIVE-YEAR INSPECTION, TESTING, MAINTENANCE,

SERVICE AND CERTIFICATION

ANNUAL INSPECTION, TESTING, MAINTENANCE AND SERVICE

Fire Hydrant Flow System Unit Rate

FIVE-YEAR INSPECTION, TESTING, MAINTENANCE,

SERVICE AND CERTIFICATION

ANNUAL INSPECTION, TESTING, MAINTENANCE AND SERVICE

Additional Visits for Consults or Repairs Hourly Rate

REGULAR BUSINESS HOURS (MON-FRI 8:00 AM - 5:00 PM)

NON-BUSINESS HOURS (MON-FRI 5:01 PM-7:59 AM, ALL HOURS

SAT-SUN)

Emergency Services Hourly Rate

REGULAR BUSINESS HOURS (MON-FRI 8:00 AM - 5:00 PM)

NON-BUSINESS HOURS (MON-FRI 5:01 PM-7:59 AM, ALL HOURS

SAT-SUN)

Parts Parts Allowance PARTS (Includes the 10% contractor markup) for the term of the contract $5,000.00

Exhibit C, General Terms and Conditions TBD

1. General Terms and Conditions

A. General Terms and Conditions (GTCs)

The (GTCs) are hereby incorporated by reference and made part of this agreement as if attached.

hereto. These documents may also be viewed at the California Department of General Services website: https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/GTC-Updates/GTC-225- February-2025.pdf https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/GTC-Updates/GTC-225-February-2025.pdf https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/GTC-Updates/GTC-225-February-2025.pdf

Exhibit D – Special Terms and Conditions TBD

1. EXCISE TAX

The State of California is exempt from Federal Excise Taxes, and no payment will be made for any taxes levied on employees' wages. The State will pay for any applicable State of California or local sales or use taxes on the services rendered or equipment or parts supplied pursuant to this Contract. California may pay any applicable sales or use tax imposed by another state.

2. STATUTORY AND REGULATORY PROVISIONS

A. This Contract shall be governed and construed in accordance with all applicable statutory and regulatory provisions including, but not limited to:

1) Title XVIII of the Federal Social Security Act

2) Title XIX of the Federal Social Security Act

3) Chapters 7 and 8 (commencing with Section 14000), Part 3, Division 9, Welfare and Institutions Code

4) Division 3, Title 22, California Code of Regulations (CCR)

5) Health and Safety Code Section 1340 et seq.

6) All applicable Federal provisions which regulate the administration of health care programs and budget revisions, as contained in the Code of Federal Regulations (CFR), Title 42, and Title 45, Part 74, Title 42 United States Code, Sections 1395 et seq. and 1396 et seq.

7) Sub-chapter 13 (commencing with Section 6800), Chapter 4, Part 1, Title 17, CCR; and

8) All other applicable laws and regulations.

B. Any provision of this Contract in conflict with the applicable laws and regulations is hereby amended to conform to the provisions of those laws and regulations. Such amendment of the Contract shall be effective on the effective date of the statutes or regulations necessitating it, and shall be binding on the parties even though the amendment may not have been reduced to writing and formally agreed upon and executed by the parties. If, due to amendment in laws of regulations, Contractor is unable or unwilling to comply with the provisions of the amendment(s), State or Contractor may terminate this Contract in accordance with the Termination provision of this Contract.

3. EXAMINATION AND AUDIT

A. Contractor shall allow the State and its related entities, the Comptroller General of the United States, Department of Justice (DOJ), and the Bureau of Medi-Cal Fraud, or their duly authorized representatives, to inspect or otherwise evaluate the quality, appropriateness, and timeliness of services performed under this Contract, and to inspect, evaluate, and audit any and all books, records, and facilities maintained by the Contractor and Subcontractors pertaining to services under this Contract at any time during normal business hours.

B. Contractor shall be subject to the examination and audit of the State Auditor for a period of three (3) years after final payment under this Contract in accordance with Government Code, Section 85467.7. The examination and audit shall be confined to those matters directly connected with the performance of the contract, including, but not limited to, the costs of administering the Contract.

C. Books and records include, but are not limited to, all physical records originated or prepared pursuant to the performance under this Contract, including working papers, reports, financial records, and books of account, Medical Records, prescriptions files, Subcontracts, and any other documentation pertaining to medical and non-medical services for residents of the Home. Upon request, at any time during the term of this Contract, the Contractor shall furnish any record or copy.

4. RESOLUTION OF DISPUTES

A. The Contractor may dispute and appeal a decision or action by the State arising out of the Interpretation or administration of this Contract. A written dispute notice shall be submitted to the Contract Manager within thirty (30) calendar days from the date the Contractor receives notice of the decision or action in dispute.

The Contractor’s dispute notice shall state the following, based on the most accurate information available to the Contractor:

1) That it is a dispute pursuant to this Section.

2) The date, nature, and circumstances of the conduct, which is the subject of dispute.

3) The names, telephone numbers, function, and activity of each contractor, subcontractor, State official, or employee involved in or knowledgeable about the conduct.

4) The identification of any documents and the substance of any oral communications involved in the conduct. Copies of all identified documents shall be attached.

5) The reason why the Contractor is disputing the conduct.

6) The cost impact to the Contractor directly attributable to the alleged conduct, if any.

7) The Contractor’s desired remedy.

B. The State and the Contractor agree to try to resolve all contractual issues by negotiation and mutual agreement at the Contract Manager level. The parties recognize that the implementation of this policy depends on open-mindedness, and the need for both sides to present adequate supporting information on matters in question. The Contract Manager, in a written decision stating the factual basis for the decision, will decide any disputes concerning performance of this Contract. Before issuance of the Contract Manager’s decision, informal discussions between the parties by the individuals who have not participated substantially in the matter in dispute will be considered by the parties in efforts to reach mutual agreement.

C. The Contract Manager will render a decision or request additional substantiating documentation from the

Contractor within thirty (30) days of receipt of the Contractor’s appeal. A copy of the decision will be provided to the Contractor. The decision shall be final and conclusive unless, within thirty (30) days from the date of the decision, the Contractor files a written appeal addressed to the Undersecretary, California Department of Veterans Affairs.

D. The Undersecretary’s decision shall be final and conclusive unless the decision is arbitrary, capricious, grossly erroneous or if any determination of fact is unsupported by substantiating evidence. The Undersecretary’s decision will be in writing and may encompass facts, interpretations of the Contract, and determination or application of law. The Contractor may, prior to the Undersecretary’s decision, present oral or documentary evidence, and arguments in support of the Contractor’s appeal. The decision will either:

1) Find in favor of the Contractor, in which case the Undersecretary may:

a) Countermand the earlier conduct which caused the Contractor to file a dispute; or

b) Reaffirm the conduct and, if there is a cost impact sufficient to constitute a change in obligations pursuant to the payment provisions, direct the State to comply with that Section.

2) Deny the Contractor’s dispute and, where necessary, direct the manner of future performance; or

3) Request additional substantiating documentation in the event the information in the Contractor’s dispute or appeal is inadequate to permit a decision to be made under paragraphs (1) or (2) above, advise the Contractor as to what additional information is required, and establish how that information will be furnished. The Contractor shall have thirty (30) days to respond to the Undersecretary’s request for further information. Upon receipt of this additional requested information, the

Undersecretary will have thirty (30) days to respond with a decision. Failure to supply additional information required by the Undersecretary within the time period specified above shall constitute waiver by the Contractor of all claims.

E. Attorney’s fees and costs for any dispute or subsequent trial shall be borne by the respective parties.

Both parties waive trial by jury, and any trial in superior or municipal court shall be by a judge alone. Any litigation arising out of this Contract shall be conducted in a California Court pursuant to California law.

F. Contractor shall continue with the responsibilities under this Contract during any dispute.

5. AGENCY LIABILITY (Applies only to Federally Funded Contracts)

The Contractor warrants by execution of this Contract, that no person or selling agency has been employed or retained to solicit or secure this Contract upon Contract or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Contractor for the purpose of securing business. For breach or violation of this warranty, the State shall, in addition to other remedies provided by law, have the right to annul this Contract without liability, paying only for the value of the work actually performed, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee.

6. POTENTIAL SUBCONTRACTORS

For all Agreements, with the exception of Interagency Agreements and other governmental entities/auxiliaries exempt from bidding, nothing contained in this Contract or otherwise shall create any contractual relation between the State and any subcontractors, and no subcontract shall relieve the Contractor of Contractor’s responsibilities and obligations hereunder. The Contractor agrees to be as fully responsible to the State for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by any of them, as it is for the acts and omissions of persons directly employed by the Contractor.

The Contractor's obligation to pay its subcontractors is an independent obligation from the State’s obligation to make payments to the Contractor. As a result, the State shall have no obligation to pay or enforce the payment of any moneys to any subcontractor.

7. REPORTING SMALL BUSINESS (SB)/MICRO BUSINESS (MB) AND /OR DISABLED VETERANS

BUSINESS ENTERPRISE (DVBE) UTILIZATION

A. If SB/MB and/or DVBE Subcontractor participation is a requirement on this Agreement, the Contractor must report the actual amount paid to certified Subcontractors. The Contractor must comply with Government Code Section 14841 and Military and Veterans Code Section 999.5(d) by reporting the actual utilization of certified Subcontractor(s) during the performance of this Agreement. The Contractor shall prepare and submit the report to the Contract Manager within 60 days from receipt of final payment.

B. Withhold: Pursuant to Mil. & Vet. Code Section 999.7, ten thousand dollars ($10,000) will be withheld from the final payment, or the full final payment if less than ten thousand dollars ($10,000), until the prime contractor complies with the certification requirements of subdivision (d) of Mil. & Vet. Code Section

999.5. Prime contractor shall be given 30 days’ notice to cure the defect. If, after 30 calendar days from the date of notice, the prime contractor refuses to comply with the certification requirements, CalVet shall permanently deduct ten thousand dollars ($10,000) from the final payment, or the full payment if less than ten thousand dollars ($10,000).

8. SUBSTITUTION OF DVBEs

A. If applicable, DVBE subcontractors shall be used per the California Code of Regulations (CCR), Title 2 §

1896.70 unless a substitution is approved in writing by the Department of General Services (DGS),Office of Small Business & Disabled Veteran Business Enterprise (OSDS). A DVBE subcontractor shall be replaced by another DVBE to perform the work originally stated. The substitution shall maintain, at minimum, the level of participation goal stated in the bid.

1) The Contractor shall simultaneously notify the DVBE and the CalVet Contract Manager of the intended substitution. The written notice shall contain the reasons for the substitution and be sent by certified mail. The Contractor shall submit the following to the CalVet Contract Manager:

i. A copy of the written notice issued to the DVBE with proof of delivery. In the absence of proof of delivery, provide the certified mail receipts.

ii. A copy of the DVBE’s consent or opposition to the substitution. In the absence of the consent or opposition, provide the returned and unopened certified mail.

iii. The name and supplier number of the business being substituted and the name and supplier number of the proposed replacement. If a DVBE cannot be identified as a replacement, the Contractor shall document the absence of DVBEs. This documentation shall include but is not limited to:

1. Contact CalVet’ SB/DVBE Coordinator regarding the absence of DVBEs to perform the specific work.

2. Search results from the DGS website for DVBEs to perform the specific work.

3. Communication with a DVBE Community Organization nearest the worksite regarding the absence of DVBEs, if applicable.

4. Documented communication with DVBEs describing the work to be performed, its percentage of the overall contract, the corresponding dollar amount, and their responses to the request.

2) The DVBE shall have up to five (5) business days from the postmark date to consent or oppose the substitution. A copy of the DVBE’s reply shall be sent simultaneously by certified mail to the Contractor and the CalVet Contract Manager.

3) When written oppositions to a substitution are filed, CalVet shall grant the DVBE a hearing. The hearing notice shall be issued within five (5) business days from receipt of the opposition. If CalVet grants the substitution, continue to G, below.

4) The CalVet Contract Manager shall submit the substitution request to the DGS, OSDS:

i. The request must meet the criteria as specified above or § 4107 of the Public Contract Code for

Public Works.

ii. The substitution request shall be accompanied by the hearing decision, when applicable.

5) The OSDS will respond to substitution requests within three (3) business days. The OSDS shall consent to the substitution of another DVBE in any of the following situations:

i. When the DVBE becomes bankrupt, insolvent or goes out of business.

ii. When the DVBE does not perform as listed in the Bidder Declaration.

iii. When the DVBE does not meet the bond requirements of the contractor.

iv. When the DVBE’s name is incorrect due to an inadvertent clerical error. In the case of public works contracts, compliance with § 4107.5 of the Public Contract Code is required.

v. When the DVBE is not licensed as required by any State of California regulatory agency.

vi. When CalVet, or its duly authorized officer, determines that the DVBE:

1. Did not perform in accordance with the plans and specifications; or,

2. Has delayed or disrupted the progress of the work.

6) The DVBE substitution process shall not be used as an excuse for noncompliance with any provision of law. This includes, but is not limited to, the Subletting and Subcontracting Fair Practices Act (§ 4100 et seq., Public Contract Code) or any Agreement requirements relating to substitution of subcontractors.

7) Contractors who proceed with work pending a substitution decision may be subject to contract termination, recovery of damages under rights, remedies and penalties. This is outlined in § 999.9 of the Military and Veterans Code, § 10115.10 of the Public Contract Code or § 4110 of the Public Contract Code (applies to public works only). Failure to adhere to the DVBE participation in the performance of the Agreement may be cause for Agreement termination and recovery of damages under the rights and remedies due CalVet.

8) Any DVBE firm acting/working under subcontract must be responsible for providing materials, supplies, equipment or services and must carry out its responsibility by actually performing, managing, or supervising the work involved that is normal for its business services and functions.

9) The Contractor shall maintain records of all subcontracts entered into with DVBE Subcontractors including records of materials purchased from DVBE suppliers. Such records shall show the name and address of each DVBE Subcontractor or supplier and the total dollar amount paid to each one.

Upon completion of the Agreement, a summary of these records shall be prepared and certified correct by the Contractor or his authorized representative and the summary shall be furnished to the CalVet Contract Manager.

9. SMALL BUSINESS OR DISABLED VETERAN BUSINESS ENTERPRISE CERTIFICATION

A. Contractor shall maintain its status as a Department of General Services (DGS) certified Small Business

(SB)/Microbusiness (MB) or Disabled Veteran Business Enterprise (DVBE), as applicable, throughout the term of this Agreement.

B. Subcontractor must also maintain its certification with the DGS Office of Small Business & Disabled Veteran Business Enterprise Services as a SB/MB or DVBE, as applicable, for the duration of this Agreement.

10. INSURANCE REQUIREMENTS

A. Upon contract award, contractor must furnish to the State an original certificate(s) of insurance stating that the contractor has the following types of coverage, if applicable:

1) Commercial General Liability: Combined Single Limit (CSL) for no less than $1,000,000 per occurrence for bodily injury and property damage. The policy must include coverage for liabilities arising out of premises, operations, independent contractors, products/completed operations, personal & advertising injury, and liability assumed under an insured contract. This insurance shall apply separately to each insured against whom claim is made or suit is brought subject to the contractor’s limit of liability.

2) Professional Liability: (Applies to any contract in which the work is of a professional nature such as, but not limited to, physicians, architects, engineers, accountants, or consultants) Covering any damages caused by an error, omission, or any negligent acts. Limits of not less than $1,000,000 per claim and $3,000,000 aggregate.

3) Automobile Liability (Applies to any contract in which the contractor will likely use a vehicle to complete the project or drive a vehicle onto State property): Limits of not less than $1,000,000 per accident. Such insurance shall cover liability arising out of an automobile including owned, hired, and non-owned autos.

a) MCS90 endorsement on the Automobile policy (required whenever contractor will be transporting Hazardous materials i.e. Pest Control and Waste contracts.)

4) Pollution Liability/Environmental Impairment Liability (Applies only to Pollution Contracts – i.e. Pest Control and Waste Contracts): In addition, the certificate evidencing general liability must include evidence of one of the following if applicable to the service:

a) Pesticide/Herbicide Endorsement, OR

b) An endorsement deleting the general liability pollution exclusion, OR

c) A separate environmental/pollution liability policy with limits not less than $1,000,000 covering bodily injury and property damage from pollution and related clean up costs incurred arising out of the work or services to be performed under this contract.

5) Workers’ Compensation (Mandatory for all Contractors who have at least one employee): Contractor shall maintain workers’ compensation and employer’s liability coverage for all its employees who will be engaged in the performance of the contract, including special coverage extensions where applicable. Contractor shall furnish a certificate for Workers’ Compensation issued by an insurance carrier licensed to write Workers’ Compensation insurance in the State of California, including the name of the carrier and the date of expiration of insurance, or a Certificate of Consent to Self-Insure issued by the Department of Industrial Relations.

6) Fidelity Bond/Crime Insurance: (Applies only to contracts handling State money or securities – i.e.

Armored Car Service Contracts) Contractor shall maintain Employee Dishonesty and, when applicable, Inside/Outside Money & Securities coverages for state-owned property in the care, custody and control of the Contractor. Coverage limits shall not be less than the amount scheduled in the contract. The policy shall include as Contractor. Coverage limits shall not be less than the amount scheduled in the contract. The policy shall include as loss payee the California Department of Veterans Affairs

7) The certificate(s) of insurance shall be on an ACORD form, or equivalent, and must show

“occurrence” coverage. The certificates of insurance must also contain all of the following provisions:

a) Name and address of the insurance company, policy number, and beginning and ending dates of the policy.

b) Statement that the insurer will not cancel the insured’s coverage without 30 days prior written notice to the State.

c) Statement that the State of California, its officers, agents, employees, and servants are included as additional insured on the policy, but only insofar as the operations under this contract. The additional insured endorsement must accompany the certificate of insurance. This does not pertain to professional liability.

8) Contractor agrees that any insurance herein provided shall be in full force and effect at all times during the term of the contract. In the event said insurance coverage expires at any time during the term of this contract, Contractor agrees to provide, at least ten (10) days prior to said expiration date, a new certificate of insurance evidencing insurance coverage as provided for herein for not less than the remainder of the term of the contract, or for a period of not less than one (1) year. In the event contractor fails to keep in effect at all times insurance coverage herein provided, State may, in addition to any other remedies it may have, terminate the contract upon the occurrence of such event, subject to the provisions of the contract.

9) Contractor shall notify the State within five (5) days if any insurance coverage identified in the contract is altered in any way.

11. RIGHT TO TERMINATE

A. The State reserves the right to terminate this Contract subject to thirty (30) days written notice to the

Contractor. Contractor may submit a written request to terminate this Contract only if the State should substantially fail to perform its responsibilities as provided herein. However, the Contract can be immediately terminated for cause. The term “for cause” shall mean that the Contractor fails to meet the terms, conditions, and/or responsibilities of the contract. In this instance, the contract termination shall be effective as of the date indicated on the State’s notification to the Contractor.

B. This Contract may be suspended or cancelled without notice, at the option of the Contractor, if the

Contractor or State’s premises or equipment are destroyed by fire or other catastrophe, or so substantially damaged that it is impractical to continue service, or in the event the Contractor is unable to render service as a result of any action by any governmental authority.

12. FORCE MAJEURE

Neither party shall be liable to the other for any delay in or failure of performance, nor shall any such delay in or failure of, performance constitute default, if such delay or failure is caused by “Force Majeure.” As used in this section, “Force Majeure” is defined as follows: Acts of war and acts of god such as earthquakes, floods, and other natural disasters such that performance is impossible.

13. EVALUATION OF CONTRACTOR

Performance of the Contractor under this Agreement will be evaluated. The evaluation shall be prepared on Contract/Contractor Evaluation Sheet (STD 4), and maintained in the Agreement file. For consultant agreements, a copy of the evaluation will be sent to the Department of General Services, Office of Legal Services, if it is negative and over $5,000.

14. SB/DVBE PARTICIPATION

In accordance with requirements set forth by the State, the CalVet shall enforce all laws, rules, and regulations pertaining to this program. It is the Contractors responsibility to provide CalVet with all required documents as outlined in this agreement. The CalVet reserves the right to contact each SB and DVBE identified by the Contractor to verify compliance. Failure to meet SB/DVBE requirements under Exhibit B, and Exhibit C (GTC 02/2025), paragraphs 19.a and 19.b. may deem the Contractor to be non-responsible and rejected from future bid and contract opportunities with the CalVet.

15. LICENSES AND PERMITS

The Contractor shall be an individual or firm licensed to do business in California and shall obtain at his/her expense all license(s) and permit(s) required by law for accomplishing any work required in connection with this contract.

If you are a Contractor located within the State of California, a business license from the city/county in which you are headquartered is necessary; however, if you are a corporation, a copy of your incorporation documents/letter from the Secretary of State’s Office can be submitted. If you are a Contractor outside the State of California, you will need to submit to the California Department of Veterans Affairs a copy of your business license or incorporation papers for your respective State showing that your company is in good standing in that state.

In the event any license(s) and/or permit(s) expire at any time during the term of this contract, Contractor agrees to provide agency a copy of the renewed license(s) and/or permit(s) within 30 days following the expiration date.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .