2651_Sapp_Lane_DS_Structural_Inspection_Report.pdf

PDF 775 KB Posted

Attached to
CDBG - 2651 Sapp Lane Foundation Rehabilitation
Solicitation number
25/26-006
Issued by
Clay County, Miramar Beach CDP, Florida

About this file

This is a Structural Inspection Report prepared by Fortress Engineering Group LLC for Clay County Board of County Commissioners regarding housing foundation and substructure rehabilitation services at 2651 Sapp Lane, Middleburg, Florida 32068. The inspection, conducted on August 13, 2025, by Licensed Inspector Nicholas Oliver and digitally signed by Stephen L. McCorvey on September 4, 2025, documents the structural condition of a single-family residential property occupied at the time of inspection. The inspection scope was limited to a noninvasive, visual assessment of foundation and substructure concerns, with the engineer accessing the crawlspace to examine masonry block foundation, wood beam and joist floor structure with plywood sub-flooring, wood wall structure, and wood gable roof framing. The report identifies major structural deficiencies requiring full replacement rather than repair, with specific findings noting damaged and deteriorated joists showing signs of wood-destroying organisms, compression at bearing locations, and cracking along mid-span beams that indicate extensive interior damage.

The executive summary concludes that the substructure and foundation present many major deficiencies beyond repair and will require complete replacement to achieve safe and serviceable conditions. Key recommendations include replacing the majority of floor beams with adequately sized, like-material beams spanning from pier to pier and contacting a qualified general contractor to execute the repairs. The report explicitly notes limitations including restricted access to certain areas, lack of invasive testing or soil analysis, and that findings are general in nature and should not serve as finalized design documentation. The engineer assumes no liability for defects in areas that could not be accessed and reserves the right to amend findings if additional information becomes available. This inspection report serves as the technical basis for the related CDBG-funded Request for Proposal for comprehensive foundation rehabilitation services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2651 Sapp Lane Wiluette Heard-Ware

FL CA# 34117 Page 1 of 7

FORTRESS ENGINEERING GROUP LLC

904.821.7300

Steve@FortressEngineeringGroup.com https://fortressengineeringgroup.com

STRUCTURAL INSPECTION REPORT

2651 Sapp Lane Middleburg, FL 32068

Wiluette Heard-Ware 08/13/2025

Inspector

Nicholas Oliver Licensed Inspector

(904) 821-7300 nic@fortressengineeringgroup.com

This item has been digitally signed and sealed by Stephen L. McCorvey on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

09/04/2025 tel:904.821.7300 mailto:Steve@FortressEngineeringGroup.com https://fortressengineeringgroup.com/ tel:(904) 821-7300 mailto:nic@fortressengineeringgroup.com

FL CA# 34117 Page 2 of 7

TABLE OF CONTENTS

1: Inspection Details

2: Foundation & Structure

FL CA# 34117 Page 3 of 7

2.2.1 Foundation & Structure - Floor Structure: Damaged/Deteriorated Joists

SUMMARY

REPAIR

RECOMMENDATIONS

FL CA# 34117 Page 4 of 7

In Attendance

Property Manager Occupancy

Occupied Type of Building

Single Family

Weather Conditions

Clear

Scope of Service: Scope of Service

Our firm was contracted to perform a noninvasive, visual inspection at the subject building to provide a professional opinion regarding foundation and substructure concerns identified by a previous inspection company. Fortress Engineering Group visually investigated the subject building and subsequently prepared this report. No other buildings on the property were inspected and they are not within this scope of report.

Scope of Service: Executive Summary

To Whom It May Concern, The substructure and foundation was observed with many major deficiencies that are beyond repair and will require full replacement in order to be in safe and serviceable condition. Many portions of the foundation will require full replacement before the surrounding structure can be repaired in a workmanlike manner.

Please feel free to contact Fortress Engineering Group LLC for further information regarding foundation repair design.

1: INSPECTION DETAILS

Information section-ZjFjZTBlOTItYjRhNy01MTIwLWEwN2QtZmJlNzk1MWZkZWNm

FL CA# 34117 Page 5 of 7

Limitations

General

GENERAL

This report is presented as a Limited Condition Survey. The report, its' contents, and findings are strictly our opinion based on the engineer's education, training, and experience with similar conditions we have observed with similar structures. There may be other attributable factors that are not visible or able to be determined without invasive testing which could include destroying otherwise adequate or serviceable portions of the building. The attached photos are intended to provide general representation of some of the areas, and not conclusive of all affected areas. Fortress Engineering Group LLC reserves the right to amend this report and our findings, conclusions, and recommendations if additional information becomes available to us after the date of inspection.

General

LIMITED ACCESS

It is important to note that we inspect the reasonably accessible areas of the structure, and sometimes cannot access certain areas due to access and safety concerns. We assume no liability for defects not observed, found, or reported in such areas. This inspection and report are in no way a guarantee, expressed or implied, of the future performance, sufficiency, or life expectancy of any structural component or system.

General

MEANS AND METHODS

The structural engineer shall not have control or be responsible for the construction means, methods, techniques, procedures, or sequences; for the acts or omissions of the contractor or any other persons performing the work, or for the failure for any of them to construct the work in accordance with the contract documents. The findings contained in this report are general in nature and should not be utilized as finalized design documentation. Subject to local building official requirements, design parameters, level of alteration, and construction sequencing, additional repairs may be required that are not considered, identified, or referenced in this report.

General

SOIL TESTING / SAMPLING

Although we aim to provide as much structural insight as reasonably possible to each client we serve, it is important to note that we do not perform any soil testing, sampling, analysis, or any other measure used to determine soil profile, strength parameters, composition, compaction, capacity, depth, or any other measure of current or future soil performance below the inspected structure. If such information is desired, we recommend consulting with a licensed geotechnical engineer that performs such services.

General

THIRD PARTY SHARING

This report and it's contents are provided solely for the use of the purchaser and person's who sign and agree to our engineering service agreement. We assume zero liability for the use, misinterpretation, or sharing of this report with other parties other than the original purchaser of this report.

FL CA# 34117 Page 6 of 7

Inspection Method

Crawlspace Access, Visual Foundation: Material

Masonry Block Floor Structure: Material

Wood Beams, Wood Joist

Floor Structure: Sub-floor

Plywood Wall Structure: Material

Wood Roof Framing: Material

Wood

Roof Framing: Style

Gable

2: FOUNDATION & STRUCTURE

IN NI NP R

2.1 Foundation X X

2.2 Floor Structure X X

2.3 Wall Structure X

2.4 Roof Framing X

IN = Inspected NI = Not Inspected NP = Not Present R = Recommendations

Information

Recommendations section-ZmVmYWMyNzktMTg3MS01N2FjLWI5ZmItOThjOTlkZjYyOWY5

2.2.1 Floor Structure

DAMAGED/DETERIORATED JOISTS

The noted beams were observed with damage/deterioration, which appeared to be the result of wood destroying organisms (WDO). The beams showed signs of compression at various bearing locations and cracking along the mid span of beams, which is likely indicative of excessive damage on the inside of the framing materials caused by WDO. Although the beams were still functioning at the time of inspection, the extent of damage is beyond repair and will require full replacement in order to be considered in safe and serviceable condition.

We recommend replacing the majority of the floor beams with adequately sized, like material beams, that span from bearing point to bearing point (pier to pier).

Please feel free to contact Fortress Engineering Group LLC for further information regarding foundation repair design.

Recommendation

Contact a qualified general contractor.

Cracked and compressed beams Compressed and deteriorated beams Cracked and sagging beams

Repair Recommendations

FL CA# 34117 Page 7 of 7

Cracked and sagging beams

Cracked beams

Cracked and sagging beams

Compressed beams

2025-09-04T15:58:14-0400
Stephen L. McCorvey

File details come from the government source that posted it. Updated .