This document is a set of architectural construction drawings for Building 1502 Finish Upgrades located at 5187 Selma Highway, Montgomery, Alabama 36108.
The project encompasses comprehensive interior renovation work across two levels, with a focus on restroom upgrades, conference room improvements, and server room modifications. Key work includes demolition and replacement of existing restroom fixtures (water closets, urinals, lavatories, mirrors, and grab bars) in Rooms 125, 126, 129-132, 231, and 232 with ADA-compliant components; professional tile and grout cleaning in affected spaces; removal and replacement of casework and sinks with new stainless steel fixtures; carpet removal and replacement with new Shaw Contract carpet (Timeless style, 5T653 Tweed); and installation of new LED cove lighting in Conference Room 228. Conference Room 228 (899 SF) requires extensive upgrades including new video wall installation (government-furnished), new LED cove lighting, removal of existing projector screen and controls, new wall paint, new wood trim, and new electrical floor box with four duplex receptacles. Server Rooms 262 and 266 require installation of new raised flooring systems while maintaining existing server operations and grounding bus bars. The contractor is responsible for protecting and repairing any damage to existing equipment during construction and must verify all field conditions prior to bidding. General provisions address ADA compliance, fire-rated construction requirements, contractor-furnished inspections, and adherence to applicable codes and OSHA standards.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T01.00 TITLE SHEET & DRAWING INDEX
T02.00 GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS
T03.00 TYPICAL MOUNTING HEIGHTS & CLEARANCES
05 ARCH. DEMOLITION
AD2.00 DEMOLITION FLOOR PLAN
AD2.01 DEMOLITION FLOOR PLAN
AD6.00 DEMOLITION ENLARGED PLANS & ELEVATIONS
AD6.01 DEMOLITION ENLARGED PLANS & ELEVATIONS
AD6.02 DEMOLITION ENLARGED PLANS AND ELEVATIONS
06 ARCHITECTURAL
A02.00 FLOOR PLANS
A02.01 FLOOR PLANS
A06.00 ENLARGED FLOOR PLANS & ELEVATIONS
A06.01 ENLARGED FLOOR PLANS & ELEVATIONS
A06.02 ENLARGED FLOOR PLANS & ELEVATIONS
A06.03 ENLARGED FLOOR PLANS & ELEVATIONS
Sheet Number
Date
Sheet Title
T01.00
TITLE SHEET & DRAWING
INDEX
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
BLDG 1502 FINISH UPGRADES
5187 SELMA HIGHWAY
MONTGOMERY, AL 36108
Rev. Description Date
MA
X
" M
AX
" M
IN 44
"-4
8"
PAPER TOWEL
DISPENSER
MIRROR
SOAP
DISPENSER
ROBE
HOOK
TO
T
OP
O
F
HO
OK
4'
- 0 " T
YP
1'- 5"
LAVATORY. PROVIDE ADA INSULATION
KIT WHEN REQUIRED
URINAL
42" MIN
MAX
1'-0"
" M
IN
" M
IN 40
" M
IN
" M
IN
WATER CLOSET TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
HORIZONTAL
GRAB BAR
VERTICAL GRAB BAR
MIN
1'-3"
39 MIN - 41 MAX
ALLOWABLE
MOUNTING
AREA
TO
B
OT
TO
M
OF
R
EF
LE
CT
IV
E
SU
RF
AC
E
" M
AX
H
AF
F
MI
N.
M
AX
16" - 18"
MI
N.
M
AX
. 3 6"
12 MIN
36 MIN.
HORIZONTAL
GRAB BAR
TYPICAL ADA MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED):
Closest paper roll.
7-9" to CL of
" A
BO
VE
F
IN
IS
HE
D
FL
OO
R
SHOWER ROD
TOWEL BAR
ACAL
MAX.
1'-3"
MAX.
1'-3"
" M
IN
" M
AX
CONTROLS AND HAND SHOWER
SHALL BE LOCATED WITHIN
HATCH AREA
HAND SHOWER GLIDE
RAIL NOT SHOWN, SEE
SPECS
TRANSFER SHOWER CONTROL WALL
LOCATED OPPOSITE SEAT WALL.
4" MAX.
" M
AX
TO
F
IR
E
EX
TI
NG
UI
SH
ER
H
AN
DL
E
3'- 6"
M
AX
AD
A
MA
X
" M
AX
FIRE
EXTINGUISHER
CABINET
3'-
7/1
" M
AX
5'-
7/1
" M
IN
ADA ELECTRIC
WATER COOLER
DIRECTION INDICATOR
HALL CALL
CONTROLS
ELEVATOR DOOR
H
AF
F
" M
IN
" M
AX
MI
N.9"
" M
IN
MIN.
8"
" M
AX
6" MAX.
11" MIN
CL
1'- 3"
1'- 3"
5" MAX. 15" MIN.
MIN. CLEAR DEPTH
4'-0"
MI
N.
C
LE
AR
W
ID
TH
2'- 6"
ADA ELECTRIC
FOUNTAIN SKIRT
WHERE LOCATED IN
CIRCULATION PATH
" M
IN
18" MIN
(A)
FRONT APPROACH, PULL SIDE
" M
IN
(B)
FRONT APPROACH, PUSH SIDE
" M
IN12" MIN
(C)
FRONT APPROACH, PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
36" MIN 60
" M
IN
(D)
HINGE APPROACH, PULL SIDE
42" MIN 54
" M
IN
(E)
HINGE APPROACH, PULL SIDE
" M
IN
22" MIN
(F)
HINGE APPROACH, PUSH SIDE
(G)
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND LATCH
" M
IN
22" MIN
24" MIN
" M
IN
(H)
LATCH APPROACH, PULL SIDE
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN
24" MIN
24" MIN
" M
IN
(J)
LATCH APPROACH, PUSH SIDE
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
24" MIN
" M
IN
" M
IN
12" MIN
(C)
PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
X > 8"
" M
IN
(B)
PUSH SIDE
" M
IN
18" MIN
X > 8"
(A)
PULL SIDE
24" MIN
" M
IN
(D)
STOP OR LATCH APPROACH
22 MIN
m in
(C)
POCKET OR HINGE APPROACH
(B)
SIDE APPROACH
M
IN
m in
(A)
FRONT APPROACH
" M
IN
" M
AX
CL
18 MIN
M
IN
CENTERED ON RAISED CHARACTERS
HEIGHT OF RAISED CHARACTERS ABOVE FLOOR LOCATION OF SIGNS AT DOORS
AREA OF REFUGE
AREA OF REFUGE
Sheet Number
Date
Sheet Title
T03.00
TYPICAL MOUNTING
HEIGHTS & CLEARANCES
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
1. ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1 ARE THE REFERENCE STANDARDS USED FOR SCOOPING PROVISIONS FOR ACCESSIBILITY.
THE MORE STRINGENT PROVISIONS OF THE TWO STANDARDS ARE INDICATED.
2. DIAGRAMS SHOWN ARE FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT NECESSARILY INCLUDED IN THE PROJECT.
3. COORDINATE ADA REQUIREMENTS WITH ALL REQUIRED CONCEALED WOOD BLOCKING.
4. REFER TO MANUFACTURER'S LITERATURE REGARDING RECOMMENDATIONS FOR MOUNTING PRODUCTS AND MATERIALS IN COMPLIANCE WITH ADA
STANDARDS.
GENERAL NOTES:
3/8" = 1'-0"T03.00
5 ADA DOOR OPENING MANEUVERING CLEARANCES
1/8" = 1'-0"T03.00
1 TYPICAL SIGNAGE MOUNTING DIAGRAMS
202A
A101
1 Ref
Re f
1 Ref
Re f
A101
Ref
1Re f 1 Re f
Ref
ROOM NAME
150 SF
BUILDING ELEVATION TAG
INTERIOR ELEVATION TAG
BUILDING SECTION TAG
WALL SECTION TAG
DETAIL TAG
GENERAL SYMBOL LEGEND:
ROOM TAG
ADA APPROVED TURNING SPACE
SPOT ELEVATION
DOOR TAG (SEE DOOR SCHEDULE)
WALL/STOREFRONT/WINDOW TAG
(SEE OPENING SCHEDULE)
REVISION TAG (SEE REVISION SCHEDULE)
1 SPECIFIC NOTE TAG
MD5.55
SIM
MD5.55
SIM
MD5.55
SIM
ESF-10
Sheet Number
Date
Sheet Title
T02.00
GENERAL WORK NOTES,
ABBREVIATIONS &
SYMBOLS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
ACT Acoustical Ceiling Tile A/C Air Conditioning AB Anchor Bolt ADA American Disabilities Act AFF Above Finish Floor BM Beam BRG Bearing BRK Brick CFCI Contractor Furnished Contractor Installed CIP Cast In Place CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONT Continuous CONTR Contractor COORDF Coordination CORR Corridor CT Ceramic Tile CTR Center DBL Double DET Detail DIA Diameter DR Drain DN Down DS Downspout DW Dishwasher DWG Drawing DWR Drawer EA Each EF Exhaust Fan EJ Expansion Joint EL Elevation ELEC Electrical EQ Equal EX Existing EXT Exterior FF Finish Floor FIN Finish FL Floor Line FlSNG Flashing FTG Footing GA Gauge GFRC Glass Fiber Reinforced Concrete
GWB GWB
HT Height HM Hollow Metal HOR Horizontal HR Handrail HTR Heater HVAC Heating, Ventilation & Air Conditioning HxWxL Height, width, length IN Inches INSUL Insulation INT Interior
JST Joist JT Joint LAM Laminate LAV Lavatory LVR Louver MIN Minimum MAX Maximum MECH Mechanical MET Metal MFR Manufacturer MH Man Hole MIN Minimum MISC Miscellaneous MLDG Moulding MO Masonry Opening MTD Mounted MW Microwave NIC Not In Contract NO Number NOM Nominal NTS Not to Scale OC On Center OFCI Owner Furnished Contractor Installed OFOI Owner Furnished Owner Installed OPP Opposite P Paint PL Plate / Property Line PL LAM Plastic Laminate PLYWD Plywood PNL Panel PT Pressure Treated R Radius / Riser RB Rubber Base REFR Refrigerator REINF Reinforce (D) REV Revised RM Room SCHED Schedule SECT Section SHT Sheet SHW Single Hung Window SIM Similar SPECS Specifications SQ Square SS Sanitary Sewer STD Standard SVT Solid Vinyl Tile STL Steel T Tile T&G Tongue & Groove TYP Typical UNO Unless Noted Otherwise VERT Vertical VTR Vent Thru Roof VWC Vinyl Wall Covering WD Wood WWM Welded Wire Mesh WWF Welded Wire Fabric YP Yellow Pine
TYPICAL ABBREVIATION LEGEND:GENERAL PROJECT NOTES:
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY CONDITIONS
1. CONTRACTOR TO VISIT SITE AND TO BECOME TOTALLY FAMILIAR WITH EXTENT OF WORK REQUIRED PRIOR TO BID.
2. CONTRACTOR TO VERIFY DIMENSIONS OF INTERIOR PARTITION WALLS. IF DISCREPANCY OCCURS, NOTIFY ARCHITECT PRIOR TO
FRAMING.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF NEW WORK.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE CONTRACTOR, VERIFY ALL EXISTING
CONDITIONS. LOCATION OF WALLS SHALL BE AS SHOWN ON PLAN RELATIVE TO EXISTING CONDITIONS.
5. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT IMMEDIATELY TO THE GOVERNMENT ANY VARIANCES OR FIELD CONDITIONS THAT MAY
CAUSE CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
GENERAL PROJECT NOTES (CONTINUED):
CONTRACTOR'S RESPONSIBILTY TO COMPLY WITH APPLICABLE GOVERNING CODES/AUTHORITIES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS, AND ORDINANCES. EACH TRADE CONTRACTOR
IS RESPONSIBLE FOR OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY GOVERNING ENTITIES.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO ASSURE SAFETY OF ALL PERSONS ON SITE
DURING ENTIRE COURSE OF CONSTRUCTION.
3. NEITHER THE ARCHITECT, NOR THE GOVERNMENT SHALL BE RESPONSIBLE FOR JOB SAFETY. EACH TRADE CONTRACTOR
SHALL BE RESPONSIBLE FOR JOB SITE SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND SHALL PROVIDE
APPROPRIATE WARNINGS, BARRICADES, ETC. AS REQUIRED PER CODES.
4. PROMPTLY NOTIFY THE GOVERNMENT IN WRITING IF ANY CONTRACT DOCUMENTS ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS AND ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE MODIFICATIONS.
5. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES, LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO THE GOVERNMENT, THAT TRADE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND BEARS COSTS ATTRIBUTED TO BRING WORK TO COMPLIANCE OF SUCH CODES, LAWS, ORDINANCES, AND RULES AND
REGULATIONS.
GENERAL PROVISIONS FOR FIRE RATED CONSTRUCTION
1. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE EITHER OF FIRE RATED CONSTRUCTION OR
COORDINATED WITH THE ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS BEHIND THE
ACCESSORIES.
2. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND AS DETERMINED BY
CONTRACTOR.
3. ALL NEW AND EXISTING FIRE WALLS IN WORK AREAS ARE TO BE CARRIED TO THE UNDERSIDE OF THE ROOF DECK AND SEALED AS REQUIRED FOR NECESSARY FIRE RATINGS, AND LABELED PER THE AUTHORITY HAVING JURISDICTION.
4. MATERIALS WITHIN PLENUMS. EXCEPT AS REQUIRED BY THE 2009 INTERNATIONAL MECHANICAL CODE SECTION 602.2.1.1 THROUGH 602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPEAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM
E84 OR UL 723.
MISCELLANEOUS GENERAL PROVISIONS:
1. CONTRACTOR TO NOTIFY GOVERNMENT IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
S
W
N
E
FINANCE
ENTRY
BREAK
MISSION SUPPORT
LOBBY
LOBBY
SECURITY CLASSROOM
WOMEN
SECURITY FORCES
MECHANICAL
CUSTOMER DESK
CFO
CLASS./RED. OFF.
SUPER.
COMMANDER
RECRUITING
RETENTION
TESTING
MOBILITY STORAGE
FATS
PASS & ID
OFFICE
GUARD MOUNT
CATM WOMEN
MEN
NCO OFFICEVAULT CLEANING
FLGT SGT
CSC
SWITCH
STAGING
STORAGE
ELEV ELEC COM
CIRCULATION
MEN
MEN
MEN MEN
JAN
RECRUITING
OPERATIONS
CONTRACTING
CONTRACTING
117 116
129130131135
133 132
140 138 137
VESTIBULE
STAIR
AUDITORIUM
STAGE
VENDING
MECH
STAIR
ELECTRICAL
139A
TRENCH HEADER
TRENCH HEADER
SHADED AREAS INDICATE WHERE EXISTNG CARPET TIE
IS TO BE REMOVED AND REPLACED. (ABI #2)
GENERAL SCOPE NOTES:
INDICATES 1 HR FIRE RATED WALL
INDICATES 2 HR FIRE RATED WALL
AD6.00
AD6.00
AD6.00
Sheet Number
Date
Sheet Title
AD2.00
DEMOLITION FLOOR
PLAN
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
3/32" = 1'-0"AD2.00
1 LEVEL 1 FLOOR PLAN
16' 32'8'4'0'
N
E
AUDITORIUM BELOW
AUDIO / VISUAL
CIRCULATION
WING COMMAND
XPL
CONFERENCE
SUPPORT GROUP
WOMEN
ELEV
ELEV. EQUIP
MECHANICAL
JAG
VICE COMMANDER COMMANDERSAFETY CHIEFGROUP COMMANDERCOUNSELING
ATTORNEY ATTORNEY
TRAINING/INTERVIEWCOMMANDER
1ST SGT
SUPER.
EXEC. OFFICER
OIC/NCOIC
MEN WOMENMEETING AREA
OIC 3DO HISTORIAN
VIDEO EDITING
CONTROL BOOTH
EQUIP. STOR.
PA OFFICER
NCOIC
BRANCH CHEIF
CMSGT
NCOICCOM
ELEC
JOURNALADMIN
MEN
JAN
PHOTO/GRAPHICS
207206
223224225226
219217216
229 230
235236237238
251 249 248 245 244 242
252 213
CIRCULATION
CIRCULATION
STAIR
IG
STAIR
RESTROOM
CBRNE
MOS CELL
ICC
COMMAND POST
EOC
CIRCULATION
COMMAND POST
INTEL
MAINTENANCE
VESTIBULE
OFFICE
BREAK ROOM
CHECK POINT
SERVER
SERVER
RAMP
RAMP
CONSOLE
SUPERVISOR
EA
PRINTER AREA
1:12 SLOPE
1:12 SLOPE
TRENCH HEADERTRENCH HEADER
TR
EN
CH
H
EA
DE
R
TR
EN
CH
H
EA
DE
R
TR
EN
CH
H
EA
DE
R
AD6.00
AD6.00
AD6.01
A06.03
A06.03
AD6.01
CARPET IN ROOM 228 TO BE REPLACED AS PART OF THE BASE BID AND NOT INCLUDED AS AN ABI.
SPECIFIC NOTES:
1 SHADED AREAS INDICATE WHERE EXISTING CARPET TIE
IS TO BE REMOVED AND REPLACED. (ABI #1)
GENERAL SCOPE NOTES:
INDICATES 1 HR FIRE RATED WALL
INDICATES 2 HR FIRE RATED WALL
Sheet Number
Date
Sheet Title
AD2.01
DEMOLITION FLOOR
PLAN
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
3/32" = 1'-0"AD2.01
1 LEVEL 2 FLOOR PLAN
LEGEND:
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
DOTTED LINE GENERALLY INDICATES EXISTING AREAS TO BE REMOVED, INCLUDING BUT NOT
LIMITED TO WALLS, DOORS, FLOOR COVERING, CEILINGS, ETC... IN CASE OF UNCERTAINTY
PROVIDE WRITTEN REQUEST TO ARCHITECT.
SPECIFIC NOTE TAG 1
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS OF EXISTING CONDITIONS ARE GENERAL AND APPROXIMATE. GENERAL CONTRACTOR IS STRONGLY RECOMMENDED TO VISIT THE FACILITY PRIOR TO BID TO BECOME TOTALLY FAMILIAR WITH THE QUANTITY AND SCOPE OF THE WORK. THE GENERAL NOTES SHOWN LISTED ON THIS PAGE SHALL APPLY TO ALL SHEETS. SPECIFIC NOTES ARE SHOWN ON INDIVIDUAL SHEETS AND PERTAIN ONLY TO THAT PARTICULAR SHEET.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR AND MAKE REPAIR TO ANY AND ALL DAMAGE TO "EXISTING TO REMAIN" EQUIPMENT, FIXTURES, WALLS, FLOORS, DOORS, WINDOWS, HARDWARE, TRIM, OR ANY OTHER BUILDING ELEMENT THAT MAY OCCUR DURING THE DEMOLITION AND/OR CONSTRUCTION PHASES. ALL REPAIRS SHALL BE MADE PRIOR TO BENEFICIAL OCCUPANCY.
3. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS AND PROVIDE SHORING AS REQUIRED IN ALL AFFECTED AREAS PRIOR
TO AND DURING DEMOLITION AND/OR CONSTRUCTION.
4. CONTRACTOR SHALL ASSUME THAT ANY AND ALL CONCRETE/MASONRY INDICATED TO BE REMOVED IS REINFORCED.
5. REMOVE ALL MISC. HARDWARE, PANELING, CLIPS, FASTENERS, ETC FROM ANY AND ALL SURFACES TO RECEIVE A NEW FINISH.
PATCH SUBSTRATE BY FILLING, GRINDING AND SANDING SMOOTH WITH ACCEPTABLE CONSTRUCTION INDUSTRY AND CODE COMPLIANT MATERIALS. PREPARE SURFACE FOR ACCEPTANCE OF MANUFACTURER SPECIFIED FINISH AND SURFACE TREATMENT.
INSTALLATION OF FINISH INDICATES ACCEPTANCE OF SUBSTRATE BY APPLICATOR.
6. CONTRACTOR SHALL LEAVE WORK SITE GENERALLY CLEAN AT THE END OF EACH WORK DAY (ESPECIALLY AROUND THE
EXTERIOR OF THE BUILDING AND WITHIN THE STAGING AREA).
7. REMOVE ALL EXISTING FINISHES AS REQUIRED IN PREPARATION FOR INSTALLATION OF NEW FINISHES. SEE FINISH SCHEDULE
AND PROJECT SPECIFICATIONS.
8. PROTECT ALL EXISTING BUILT IN EQUIPMENT AS REQUIRED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING EQUIPMENT RESULTING FROM CONSTRUCTION ACTIVITIES AT NO COST TO THE GOVERNMENT. VERIFY CONDITIONS OF EXISTING EQUIPMENT WITH THE GOVERNMENT PRIOR TO BEGINNING ON SITE DEMOLITION
AND CONSTRICTION ACTIVITIES.
9. WHERE EXISTING FLOOR FINISHES ARE TO BE DEMOLISHED, PREPARE CONCRETE FLOOR SLAB AS REQUIRED TO INSTALL NEW
FLOOR FINISHES. REFER TO FINISH SCHEDULE AND PROJECT SPECIFICATIONS.
GENERAL DEMOLITION NOTES:
WOMEN
2 2
2 2
6 6
AD6.00
MEN
2 2
AD6.004
Si m
6 Sim
5 Sim
4 4
MEN
MEN
MEN
MEN
WOMEN
4 4
AD6.007 AD6.00 7
Si m
AD6.007
Si m
AD6.00 7
Si m
AD6.007
Si m
23 22 23 22
23 22 23 22 23 22
NOTE: CLEAN ALL WALL AND
FLOOR TILE/ GROUT IN THESE
SPACES.
6 6
6 6 6
31 31 31
4 4
SPECIFIC NOTES:
EXISTING MIRRORS TO BE REMOVED AND REPLACED WITH NEW.1
EXISTING TOILETS AND FLUSH VALVE ASSEMBLY TO BE REMOVED AND REPLACED WITH NEW.2
EXISTING SINK AND COUNTERTOP TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK. SEE SECTIONS.3
EXISTING TILE AND GROUT TO BE PROFESSIONALLY CLEANED WITH K9041 TEXSPAR PLUS TILE AND GROUT HAZE CLEANER. SWEEP OR VACUUM THE FLOOR OF ALL LOOSE DEBRIS. MIX THE APPROPRIATE LEGGE LIQUID CLEANER ACCORDING TO THE LABEL AND FLOOD THE FLOOR WITH MOP. LET THE SOLUTION STAND FOR APPROXIMATELY 10 MINUTES. PLACE A CUP FULL OF TEXSPAR PLUS EVERY 2-3 FEET AND KEEP SOLUTION WET AT ALL TIMES DURING THIS PROCEDURE. USE A NYLON STRIPPING PAD OR EQUAL ON SMOOTH SURFACES OR A NYLO GRIT OR SCRUB GRIT II BRUSH ON TEXTURED SURFACES. SCRUB USING A ROTARY SCRUBBER. HOP THE MACHINE ON TOP OF THE TEXSPAR AND CREATE A SLURRY. SPREAD OUT AND SCRUB WITH SOLUTION SLOWLY IN AN OVERLAPPING PATTERN. CROSS SCRUB AT 90 DEGREES TO ENSURE PROPER CONTACT. PICK UP SOLUTION WITH A WET VACUUM AND RINSE SEVERAL TIMES WITH WATER UNTIL FLOOR IS THOROUGHLY
CLEAR OF RESIDUE.
EXISTING CASEWORK AND SINK TO BE DEMOLISHED. 5
EXISTING WALL TO RECEIVE NEW PAINT. PATCH ALL DAMAGE TO EXISTING GYPSUM WALLS PRIOR TO PAINTING.6
CUT NEW POWER FLOOR BOX IN EXISTING FLOOR ASSEMBLY. COORDINATE FINAL LOCATION OF NEW
FLOOR BOX WITH GOVERNMENT PRIOR TO INSTALLATION. INTERCEPT CONDUCTORS SERVING
ADJACENT EXISTING FLOOR BOXES AND EXTEND EXISTING CIRCUITS RP-EM-2A-16, 18, 20 TO NEW FLOOR BOX LOCATION. NEW FLOOR BOX TO CONTAIN (4) 120V DUPLEX RECEPTACLES. REMOVE 2 EXISTING 120V RECEPTACLES IN 2 EXISTING ADJACENT FLOOR BOXES. PROVIDE NEW CONDUIT AND
WIRING IN ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING POWER/ DATA FLOOR BOX TO REMAIN.8
EXISTING POWER OUTLETS TO REMAIN.9
REMOVE AND REPLACE EXISTING CARPET. NEW CARPET EQUAL TO SHAW CONTRACT-TEXTURE STUDY, TIMELESS (5T653, TWEED.
EXISTING COVE LIGHTING TO BE REPLACED WITH NEW LED COVE LIGHTING. (ABI #3)11
REMOVE EXISTING DOOR, FRAME, AND TRANSOM WINDOW ABOVE. PATCH WITH GYPSUM WALL BOARD. SEE ELEVATIONS .12
NEW VIDEO WALL. GOVERNMENT FURNISHED GOVERNMENT INSTALLED.13
EXISTING WOOD TRIM TO REMAIN.14
NEW WOOD TRIM TO MATCH EXISTING WOOD TRIM.15
PAINT WALL COLOR EQUAL TO SHERWIN WILLIAMS 7069 IRON ORE.16
(2) NEW 1 1/2" CONDUIT FROM NEW FLOOR BOX TO NEW 4 x 4 x 4 RECESSED JUNCTION BOX BEHIND VIDEO WALL.17
NEW LED COVE LIGHTING FIXTURE. NEW COVE LIGHTING TO BE LED TYPE AND CARRY 10
YEAR WARRANTY, MINIMUM. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND
ENSURE NEW COVE LIGHTING IS COMPATIBLE WITH EXISTING CONDITIONS. INSTALL IN
ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING PROJECTOR SCREEN AND CONTROLS TO BE DEMOLISHED. REMOVE ALL WIRING AND PATCH WALL/ CEILING.19
PAINT OFFICE WALL FOLLOWING DOOR AND TRANSOM REMOVAL/ PLUMBING CHANGES.20
EXISTING H/C DOMESTIC WATER LINES TO BE CUT AND CAPPED AT MAIN ABOVE FIRST FLOOR CEILING. REMOVE EXISTING PIPE.
EXISTING SANITARY PIPE TO REMAIN IN WALL. REMOVE TRAP AND SINK CONNECTION. VENT THROUGH ROOF TO REMAIN. INSTALL
WALL CLEAN OUT IN ADJACENT OFFICE AREA. PATCH, REPAIR, AND PAINT WALL AS SHOWN.
REMOVE EXISTING SHOWER SEATS AND PATCH TILE.22
REMOVE EXISTING SHOWER HEAD AND INSTALL NEW SHOWER ASSEMBLY EQUAL TO BRADLEY CORP BUILT-IN SHOWERS WITH CONCEALED SUPPLIES MODEL 1C. DELUXE SHOWERHEAD TO BE INSTALLED IN ALL SHOWERS. HAND SHOWER WITH SLIDE BAR
TO BE INSTALLED IN ADA SHOWERS.
REMOVE EXISTING ELECTRIC WATER COOLER (EWC) AND INSTALL NEW BOTTLE FILL TYPE EWC EQUAL TO ELKAY LZSTL8WSLK EZH20 FILLING STATION AND VERSATILE BI-LEVEL ADA COOLER. REMOVE EXISTING GYPSUM BOARD AND MODIFY FRAMING AS REQUIRED TO INSTALL NEW WATER COOLER AND CARRIER. PATCH, REPAIR, AND PAINT EXISTING WALLS WITHIN WATER COOLER
ALCOVE PRIOR TO INSTALLING NEW WATER CHILLER.
REMOVE EXISTING PAPER TOWEL DISPENSER AND SURROUNDING TILE. PATCH AND PAINT WALL.25
EXISTING WOOD TRIM TO BE DEMOLISHED. SALVAGE FOR REUSE.26
EXISTING HVAC REGISTER TO REMAIN. PROTECT WITH TEMPORARY FILTER MEDIA DURING DEMOLITION/ RENOVATION.27
NEW MIRROR (24" x 48") CENTER OVER SINK.28
REMOVE EXISTING PAPER TOWEL DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT
NEW LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
REMOVE EXISTING SOAP DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT NEW
LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
EXISTING SINK TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK EQUAL TO STURDIBUILT 19" x 23" x 4" SINGLE BOWL LAVATORY SINK KIT WITH FAUCET, DRAIN, AND OVERFLOW. PROVIDE MANUAL OPERATION OPTION. PATCH AND REPAIR
WALL TILE AS REQUIRED TO REMOVE EXISTING SINK AND INSTALL NEW.
REMOVE EXISTING STAINLESS STEEL WALL MOUNTED SOAP DISPENSER. PROVIDE AND INSTALL NEW SOAP DISPENSER IN ORIGINAL DISPENSER LOCATION. NEW DISPENSER TO BE MANUAL PUMP TYPE WITH PADDLE, COMPATIBLE WITH 800 ML FOAM REFRESH REFILLS, 5 3/8" x 9" x 5 3/8", WHITE PLASTIC.
REMOVE EXISTING SPEAKERS AND ALL ASSOCIATED CABLING BACK TO POINT OF ORIGIN. PATCH EXISTING WALL PRIOR TO
PAINTING.
1/4" = 1'-0"AD6.00
1 WOMEN 126 & 232 ENLARGED EXISTING/DEMOLITION PLAN
1/4" = 1'-0"AD6.00
2 MEN 125 & MEN 231 ENLARGED EXISTING/DEMOLITION PLAN
Sheet Number
Date
Sheet Title
AD6.00
DEMOLITION ENLARGED
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
1/4" = 1'-0"AD6.00
3 RESTROOMS 129-132 ENLARGED EXISTING/ DEMOLITION PLAN
1/2" = 1'-0"AD6.00
4 TYPICAL RESTROOM ELEVATION A
1/2" = 1'-0"AD6.00
5 TYPICAL RESTROOM ELEVATION B
1/2" = 1'-0"AD6.00
6 TYPICAL RESTROOM ELEVATION C
1/2" = 1'-0"AD6.00
7 TYPICAL SINGLE RESTROOM ELEVATION A
MEN WOMEN
249 248
TRENCH HEADER
11 11
899 SF
CONFERENCE
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS OF EXISTING CONDITIONS ARE GENERAL AND APPROXIMATE.
GENERAL CONTRACTOR IS STRONGLY RECOMMENDED TO VISIT THE FACILITY PRIOR TO BID TO BECOME TOTALLY FAMILIAR WITH THE QUANTITY AND SCOPE OF THE WORK. THE GENERAL NOTES SHOWN LISTED ON THIS PAGE SHALL APPLY TO ALL SHEETS.
SPECIFIC NOTES ARE SHOWN ON INDIVIDUAL SHEETS AND PERTAIN ONLY TO THAT PARTICULAR SHEET.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR AND MAKE REPAIR TO ANY AND ALL DAMAGE TO "EXISTING TO REMAIN" EQUIPMENT, FIXTURES, WALLS, FLOORS, DOORS, WINDOWS, HARDWARE, TRIM, OR ANY OTHER BUILDING ELEMENT THAT MAY OCCUR DURING THE DEMOLITION AND/OR CONSTRUCTION PHASES. ALL REPAIRS SHALL BE MADE PRIOR TO BENEFICIAL OCCUPANCY.
3. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS AND PROVIDE SHORING AS REQUIRED IN ALL AFFECTED AREAS PRIOR TO
AND DURING DEMOLITION AND/OR CONSTRUCTION.
4. CONTRACTOR SHALL ASSUME THAT ANY AND ALL CONCRETE/MASONRY INDICATED TO BE REMOVED IS REINFORCED.
5. REMOVE ALL MISC. HARDWARE, PANELING, CLIPS, FASTENERS, ETC FROM ANY AND ALL SURFACES TO RECEIVE A NEW FINISH.
PATCH SUBSTRATE BY FILLING, GRINDING AND SANDING SMOOTH WITH ACCEPTABLE CONSTRUCTION INDUSTRY AND CODE COMPLIANT MATERIALS. PREPARE SURFACE FOR ACCEPTANCE OF MANUFACTURER SPECIFIED FINISH AND SURFACE TREATMENT.
INSTALLATION OF FINISH INDICATES ACCEPTANCE OF SUBSTRATE BY APPLICATOR.
6. CONTRACTOR SHALL LEAVE WORK SITE GENERALLY CLEAN AT THE END OF EACH WORK DAY (ESPECIALLY AROUND THE EXTERIOR
OF THE BUILDING AND WITHIN THE STAGING AREA).
7. REMOVE ALL EXISTING FINISHES AS REQUIRED IN PREPARATION FOR INSTALLATION OF NEW FINISHES. SEE FINISH SCHEDULE AND
PROJECT SPECIFICATIONS.
8. PROTECT ALL EXISTING BUILT IN EQUIPMENT AS REQUIRED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING EQUIPMENT RESULTING FROM CONSTRUCTION ACTIVITIES AT NO COST TO THE GOVERNMENT. VERIFY CONDITIONS OF EXISTING EQUIPMENT WITH THE GOVERNMENT PRIOR TO BEGINNING ON SITE DEMOLITION
AND CONSTRICTION ACTIVITIES.
9. WHERE EXISTING FLOOR FINISHES ARE TO BE DEMOLISHED, PREPARE CONCRETE FLOOR SLAB AS REQUIRED TO INSTALL NEW
FLOOR FINISHES. REFER TO FINISH SCHEDULE AND PROJECT SPECIFICATIONS.
GENERAL DEMOLITION NOTES:
LEGEND:
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
DOTTED LINE GENERALLY INDICATES EXISTING AREAS TO BE REMOVED, INCLUDING BUT NOT
LIMITED TO WALLS, DOORS, FLOOR COVERING, CEILINGS, ETC... IN CASE OF UNCERTAINTY
PROVIDE WRITTEN REQUEST TO ARCHITECT.
SPECIFIC NOTE TAG 1
SPECIFIC NOTES:
EXISTING MIRRORS TO BE REMOVED AND REPLACED WITH NEW.1
EXISTING TOILETS AND FLUSH VALVE ASSEMBLY TO BE REMOVED AND REPLACED WITH NEW.2
EXISTING SINK AND COUNTERTOP TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK. SEE SECTIONS.3
EXISTING TILE AND GROUT TO BE PROFESSIONALLY CLEANED WITH K9041 TEXSPAR PLUS TILE AND GROUT HAZE CLEANER. SWEEP OR VACUUM THE FLOOR OF ALL LOOSE DEBRIS. MIX THE APPROPRIATE LEGGE LIQUID CLEANER ACCORDING TO THE LABEL AND FLOOD THE FLOOR WITH MOP. LET THE SOLUTION STAND FOR APPROXIMATELY 10 MINUTES. PLACE A CUP FULL OF TEXSPAR PLUS EVERY 2-3 FEET AND KEEP SOLUTION WET AT ALL TIMES DURING THIS PROCEDURE. USE A NYLON STRIPPING PAD OR EQUAL ON SMOOTH SURFACES OR A NYLO GRIT OR SCRUB GRIT II BRUSH ON TEXTURED SURFACES. SCRUB USING A ROTARY SCRUBBER. HOP THE MACHINE ON TOP OF THE TEXSPAR AND CREATE A SLURRY. SPREAD OUT AND SCRUB WITH SOLUTION SLOWLY IN AN OVERLAPPING PATTERN. CROSS SCRUB AT 90 DEGREES TO ENSURE PROPER CONTACT. PICK UP SOLUTION WITH A WET VACUUM AND RINSE SEVERAL TIMES WITH WATER UNTIL FLOOR IS THOROUGHLY
CLEAR OF RESIDUE.
EXISTING CASEWORK AND SINK TO BE DEMOLISHED. 5
EXISTING WALL TO RECEIVE NEW PAINT. PATCH ALL DAMAGE TO EXISTING GYPSUM WALLS PRIOR TO PAINTING.6
CUT NEW POWER FLOOR BOX IN EXISTING FLOOR ASSEMBLY. COORDINATE FINAL LOCATION OF NEW
FLOOR BOX WITH GOVERNMENT PRIOR TO INSTALLATION. INTERCEPT CONDUCTORS SERVING
ADJACENT EXISTING FLOOR BOXES AND EXTEND EXISTING CIRCUITS RP-EM-2A-16, 18, 20 TO NEW FLOOR BOX LOCATION. NEW FLOOR BOX TO CONTAIN (4) 120V DUPLEX RECEPTACLES. REMOVE 2 EXISTING 120V RECEPTACLES IN 2 EXISTING ADJACENT FLOOR BOXES. PROVIDE NEW CONDUIT AND
WIRING IN ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING POWER/ DATA FLOOR BOX TO REMAIN.8
EXISTING POWER OUTLETS TO REMAIN.9
REMOVE AND REPLACE EXISTING CARPET. NEW CARPET EQUAL TO SHAW CONTRACT-TEXTURE STUDY, TIMELESS (5T653, TWEED.
EXISTING COVE LIGHTING TO BE REPLACED WITH NEW LED COVE LIGHTING. (ABI #3)11
REMOVE EXISTING DOOR, FRAME, AND TRANSOM WINDOW ABOVE. PATCH WITH GYPSUM WALL BOARD. SEE ELEVATIONS .12
NEW VIDEO WALL. GOVERNMENT FURNISHED GOVERNMENT INSTALLED.13
EXISTING WOOD TRIM TO REMAIN.14
NEW WOOD TRIM TO MATCH EXISTING WOOD TRIM.15
PAINT WALL COLOR EQUAL TO SHERWIN WILLIAMS 7069 IRON ORE.16
(2) NEW 1 1/2" CONDUIT FROM NEW FLOOR BOX TO NEW 4 x 4 x 4 RECESSED JUNCTION BOX BEHIND VIDEO WALL.17
NEW LED COVE LIGHTING FIXTURE. NEW COVE LIGHTING TO BE LED TYPE AND CARRY 10
YEAR WARRANTY, MINIMUM. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND
ENSURE NEW COVE LIGHTING IS COMPATIBLE WITH EXISTING CONDITIONS. INSTALL IN
ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING PROJECTOR SCREEN AND CONTROLS TO BE DEMOLISHED. REMOVE ALL WIRING AND PATCH WALL/ CEILING.19
PAINT OFFICE WALL FOLLOWING DOOR AND TRANSOM REMOVAL/ PLUMBING CHANGES.20
EXISTING H/C DOMESTIC WATER LINES TO BE CUT AND CAPPED AT MAIN ABOVE FIRST FLOOR CEILING. REMOVE EXISTING PIPE.
EXISTING SANITARY PIPE TO REMAIN IN WALL. REMOVE TRAP AND SINK CONNECTION. VENT THROUGH ROOF TO REMAIN. INSTALL
WALL CLEAN OUT IN ADJACENT OFFICE AREA. PATCH, REPAIR, AND PAINT WALL AS SHOWN.
REMOVE EXISTING SHOWER SEATS AND PATCH TILE.22
REMOVE EXISTING SHOWER HEAD AND INSTALL NEW SHOWER ASSEMBLY EQUAL TO BRADLEY CORP BUILT-IN SHOWERS WITH CONCEALED SUPPLIES MODEL 1C. DELUXE SHOWERHEAD TO BE INSTALLED IN ALL SHOWERS. HAND SHOWER WITH SLIDE BAR
TO BE INSTALLED IN ADA SHOWERS.
REMOVE EXISTING ELECTRIC WATER COOLER (EWC) AND INSTALL NEW BOTTLE FILL TYPE EWC EQUAL TO ELKAY LZSTL8WSLK EZH20 FILLING STATION AND VERSATILE BI-LEVEL ADA COOLER. REMOVE EXISTING GYPSUM BOARD AND MODIFY FRAMING AS REQUIRED TO INSTALL NEW WATER COOLER AND CARRIER. PATCH, REPAIR, AND PAINT EXISTING WALLS WITHIN WATER COOLER
ALCOVE PRIOR TO INSTALLING NEW WATER CHILLER.
REMOVE EXISTING PAPER TOWEL DISPENSER AND SURROUNDING TILE. PATCH AND PAINT WALL.25
EXISTING WOOD TRIM TO BE DEMOLISHED. SALVAGE FOR REUSE.26
EXISTING HVAC REGISTER TO REMAIN. PROTECT WITH TEMPORARY FILTER MEDIA DURING DEMOLITION/ RENOVATION.27
NEW MIRROR (24" x 48") CENTER OVER SINK.28
REMOVE EXISTING PAPER TOWEL DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT
NEW LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
REMOVE EXISTING SOAP DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT NEW
LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
EXISTING SINK TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK EQUAL TO STURDIBUILT 19" x 23" x 4" SINGLE BOWL LAVATORY SINK KIT WITH FAUCET, DRAIN, AND OVERFLOW. PROVIDE MANUAL OPERATION OPTION. PATCH AND REPAIR
WALL TILE AS REQUIRED TO REMOVE EXISTING SINK AND INSTALL NEW.
REMOVE EXISTING STAINLESS STEEL WALL MOUNTED SOAP DISPENSER. PROVIDE AND INSTALL NEW SOAP DISPENSER IN ORIGINAL DISPENSER LOCATION. NEW DISPENSER TO BE MANUAL PUMP TYPE WITH PADDLE, COMPATIBLE WITH 800 ML FOAM REFRESH REFILLS, 5 3/8" x 9" x 5 3/8", WHITE PLASTIC.
REMOVE EXISTING SPEAKERS AND ALL ASSOCIATED CABLING BACK TO POINT OF ORIGIN. PATCH EXISTING WALL PRIOR TO
PAINTING.
4 4
32 32
1/4" = 1'-0"AD6.01
1 CONFERENCE 228 ENLARGED EXISTING/DEMOLITION PLAN
Sheet Number
Date
Sheet Title
AD6.01
DEMOLITION ENLARGED
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
Rev. Description Date
1/4" = 1'-0"AD6.01
2 MEN 249 & WOMEN 248 ENLARGED EXISTING PLAN
DDonovan Rectangle
9 9
14 14
27 27 27 27
27 27
1/2" = 1'-0"AD6.02
2 CONFERENCE ROOM 228 ELEVATION B
1/2" = 1'-0"AD6.02
1 CONFERENCE ROOM 228 ELEVATION A
Sheet Number
Date
Sheet Title
AD6.02
DEMOLITION ENLARGED
PLANS AND ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
N
E
FINANCE
ENTRY
BREAK
MISSION SUPPORT
LOBBY
LOBBY
SECURITY CLASSROOM
WOMEN
SECURITY FORCES
MECHANICAL
CUSTOMER DESK
CFO
CLASS./RED. OFF.
SUPER.
COMMANDER
RECRUITING
RETENTION
TESTING
MOBILITY STORAGE
FATS
PASS & ID
OFFICE
GUARD MOUNT
CATM WOMEN
MEN
NCO OFFICEVAULT CLEANING
FLGT SGT
CSC
SWITCH
STAGING
STORAGE
ELEV ELEC COM
CIRCULATION
MEN
MEN
MEN MEN
JAN
RECRUITING
OPERATIONS
CONTRACTING
CONTRACTING
117 116
129130131135
133 132
140 138 137
VESTIBULE
STAIR
AUDITORIUM
STAGE
VENDING
MECH
STAIR
ELECTRICAL
139A
TRENCH HEADER
TRENCH HEADER
HATCHED AREAS ARE REPRESENTATIVE OF EXISTING CARPET TO BE
REPLACED. NEW CARPET TO BE EQUAL TO SHAW CONTRACT -
TEXTURE STUDY, TIMELESS (5T653), TWEED, BRICK PATTERN. (ABI #2)
GENERAL SCOPE NOTE:
NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION AND
REINSTALLATION OF EXISTING FURNISHINGS AS REQUIRED TO
INSTALL NEW CARPETING IN ALL AREAS.
A06.00
A06.00
Sheet Number
Date
Sheet Title
A02.00
FLOOR PLANS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
3/32" = 1'-0"A02.00
1 LEVEL 1 FLOOR PLAN - NEW
N
E
AUDITORIUM BELOW
AUDIO / VISUAL
CIRCULATION
WING COMMAND
XPL
CONFERENCE
SUPPORT GROUP
WOMEN
ELEV
ELEV. EQUIP
MECHANICAL
JAG
VICE COMMANDER COMMANDERSAFETY CHIEFGROUP COMMANDERCOUNSELING
ATTORNEY ATTORNEY
TRAINING/INTERVIEWCOMMANDER
1ST SGT
SUPER.
EXEC. OFFICER
OIC/NCOIC
MEN WOMENMEETING AREA
OIC 3DO HISTORIAN
VIDEO EDITING
CONTROL BOOTH
EQUIP. STOR.
PA OFFICER
NCOIC
BRANCH CHEIF
CMSGT
NCOICCOM
ELEC
JOURNALADMIN
MEN
JAN
PHOTO/GRAPHICS
207206
223224225226
219217216
229 230
235236237238
251 249 248 245 244 242
252 213
CIRCULATION
CIRCULATION
STAIR
IG
STAIR
RESTROOM
CBRNE
MOS CELL
ICC
COMMAND POST
EOC
CIRCULATION
COMMAND POST
INTEL
MAINTENANCE
VESTIBULE
OFFICE
BREAK ROOM
CHECK POINT
SERVER
SERVER
RAMP
RAMP
CONSOLE
SUPERVISOR
EA
PRINTER AREA
1:12 SLOPE
1:12 SLOPE
TRENCH HEADERTRENCH HEADER
TR
EN
CH
H
EA
DE
R
TR
EN
CH
H
EA
DE
R
TR
EN
CH
H
EA
DE
R
AD6.00
AD6.00
AD6.01
A06.03
A06.03
AD6.01
CARPET IN ROOM 228 TO BE REPLACED AS PART OF THE BASE BID AND NOT INCLUDED AS AN ABI.
SPECIFIC NOTES:
CONTRACTOR TO INSTALL GOVERNMENT FURNISHED F-35 REPLICA AIRCRAFT IN THIS LOCATION.
REPLICA AIRCRAFT TO BE HUNG FROM EXISTING ROOF STRUCTURE. EXISTING HANGING CABLES
MAY BE UTILIZED; HOWEVER, THE CONTRACTOR SHALL REVIEW EXISTING MOUNTING CABLE/
ACCESSORIES AND GOVERNMENT FURNISHED REPLICA AIRCRAFT PRIOR TO THE BID AND INCLUDE IN THEIR BID ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO ADAPT EXISTING HARDWARE TO FIT NEW REPLICA AIRCRAFT AS REQUIRED TO SUCCESSFULLY INSTALL NEW REPLICA AIRCRAFT.
HATCHED AREAS ARE REPRESENTATIVE OF EXISTING CARPET TO BE
REPLACED. NEW CARPET TO BE EQUAL TO SHAW CONTRACT -
TEXTURE STUDY, TIMELESS (5T653), TWEED, BRICK PATTERN. (ABI #1)
GENERAL SCOPE NOTE:
NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION AND
REINSTALLATION OF EXISTING FURNISHINGS AS REQUIRED TO
INSTALL NEW CARPETING IN ALL AREAS.
Sheet Number
Date
Sheet Title
A02.01
FLOOR PLANS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
3/32" = 1'-0"A02.01
1 LEVEL 2 FLOOR PLAN - NEW
WOMEN
A06.00 3
MEN
125A06.003
Si m
6 Sim
4 Sim
A06.00
28 2828
4 4
A06.00
A06.00
1/2" SOLID SURFACE TOP
AND BACKSPLASH
1/2" CORIAN - SMOKY TOPAZ
SOLID SURFACE W/ BUILT-
UP EDGE
WALL TYPE VARIES, SEE
WALL TYPE PLAN
CONCEALED BLOCKING AS REQ. FOR
CASEWORK INSTALLATION.
STAINLESS STEEL SINK &
FAUCET
2'-
2'-0"
REFER TO INTERIOR ELEVATIONS
3/4" MARINE PLYWOOD W/ WILSONART -
7922 BRIGHTON WALNUT PLASTIC
LAMINATE VENEER
(REMOVABLE)
1 1 /4"
MARINE PLYWOOD W/ WILSONART -
7922 BRIGHTON WALNUT PLASTIC
LAMINATE TOP AT SINK
ADA COMPLIANT VANITY SUPPORT
BRACKET SYSTEM PAINTED
1 MM EDGE ON ALL EDGES
FINISHED SOLID SURFACE
EDGE, BASE CORNERS
BACKER LAMINATE
2'- 3"
9"
11"
8"
1"
SPECIFIC NOTES:
EXISTING MIRRORS TO BE REMOVED AND REPLACED WITH NEW.1
EXISTING TOILETS AND FLUSH VALVE ASSEMBLY TO BE REMOVED AND REPLACED WITH NEW.2
EXISTING SINK AND COUNTERTOP TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK. SEE SECTIONS.3
EXISTING TILE AND GROUT TO BE PROFESSIONALLY CLEANED WITH K9041 TEXSPAR PLUS TILE AND GROUT HAZE CLEANER. SWEEP OR VACUUM THE FLOOR OF ALL LOOSE DEBRIS. MIX THE APPROPRIATE LEGGE LIQUID CLEANER ACCORDING TO THE LABEL AND FLOOD THE FLOOR WITH MOP. LET THE SOLUTION STAND FOR APPROXIMATELY 10 MINUTES. PLACE A CUP FULL OF TEXSPAR PLUS EVERY 2-3 FEET AND KEEP SOLUTION WET AT ALL TIMES DURING THIS PROCEDURE. USE A NYLON STRIPPING PAD OR EQUAL ON SMOOTH SURFACES OR A NYLO GRIT OR SCRUB GRIT II BRUSH ON TEXTURED SURFACES. SCRUB USING A ROTARY SCRUBBER. HOP THE MACHINE ON TOP OF THE TEXSPAR AND CREATE A SLURRY. SPREAD OUT AND SCRUB WITH SOLUTION SLOWLY IN AN OVERLAPPING PATTERN. CROSS SCRUB AT 90 DEGREES TO ENSURE PROPER CONTACT. PICK UP SOLUTION WITH A WET VACUUM AND RINSE SEVERAL TIMES WITH WATER UNTIL FLOOR IS THOROUGHLY
CLEAR OF RESIDUE.
EXISTING CASEWORK AND SINK TO BE DEMOLISHED. 5
EXISTING WALL TO RECEIVE NEW PAINT. PATCH ALL DAMAGE TO EXISTING GYPSUM WALLS PRIOR TO PAINTING.6
CUT NEW POWER FLOOR BOX IN EXISTING FLOOR ASSEMBLY. COORDINATE FINAL LOCATION OF NEW
FLOOR BOX WITH GOVERNMENT PRIOR TO INSTALLATION. INTERCEPT CONDUCTORS SERVING
ADJACENT EXISTING FLOOR BOXES AND EXTEND EXISTING CIRCUITS RP-EM-2A-16, 18, 20 TO NEW FLOOR BOX LOCATION. NEW FLOOR BOX TO CONTAIN (4) 120V DUPLEX RECEPTACLES. REMOVE 2 EXISTING 120V RECEPTACLES IN 2 EXISTING ADJACENT FLOOR BOXES. PROVIDE NEW CONDUIT AND
WIRING IN ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING POWER/ DATA FLOOR BOX TO REMAIN.8
EXISTING POWER OUTLETS TO REMAIN.9
REMOVE AND REPLACE EXISTING CARPET. NEW CARPET EQUAL TO SHAW CONTRACT-TEXTURE STUDY, TIMELESS (5T653, TWEED.
EXISTING COVE LIGHTING TO BE REPLACED WITH NEW LED COVE LIGHTING. (ABI #3)11
REMOVE EXISTING DOOR, FRAME, AND TRANSOM WINDOW ABOVE. PATCH WITH GYPSUM WALL BOARD. SEE ELEVATIONS .12
NEW VIDEO WALL. GOVERNMENT FURNISHED GOVERNMENT INSTALLED.13
EXISTING WOOD TRIM TO REMAIN.14
NEW WOOD TRIM TO MATCH EXISTING WOOD TRIM.15
PAINT WALL COLOR EQUAL TO SHERWIN WILLIAMS 7069 IRON ORE.16
(2) NEW 1 1/2" CONDUIT FROM NEW FLOOR BOX TO NEW 4 x 4 x 4 RECESSED JUNCTION BOX BEHIND VIDEO WALL.17
NEW LED COVE LIGHTING FIXTURE. NEW COVE LIGHTING TO BE LED TYPE AND CARRY 10
YEAR WARRANTY, MINIMUM. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND
ENSURE NEW COVE LIGHTING IS COMPATIBLE WITH EXISTING CONDITIONS. INSTALL IN
ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING PROJECTOR SCREEN AND CONTROLS TO BE DEMOLISHED. REMOVE ALL WIRING AND PATCH WALL/ CEILING.19
PAINT OFFICE WALL FOLLOWING DOOR AND TRANSOM REMOVAL/ PLUMBING CHANGES.20
EXISTING H/C DOMESTIC WATER LINES TO BE CUT AND CAPPED AT MAIN ABOVE FIRST FLOOR CEILING. REMOVE EXISTING PIPE.
EXISTING SANITARY PIPE TO REMAIN IN WALL. REMOVE TRAP AND SINK CONNECTION. VENT THROUGH ROOF TO REMAIN. INSTALL
WALL CLEAN OUT IN ADJACENT OFFICE AREA. PATCH, REPAIR, AND PAINT WALL AS SHOWN.
REMOVE EXISTING SHOWER SEATS AND PATCH TILE.22
REMOVE EXISTING SHOWER HEAD AND INSTALL NEW SHOWER ASSEMBLY EQUAL TO BRADLEY CORP BUILT-IN SHOWERS WITH CONCEALED SUPPLIES MODEL 1C. DELUXE SHOWERHEAD TO BE INSTALLED IN ALL SHOWERS. HAND SHOWER WITH SLIDE BAR
TO BE INSTALLED IN ADA SHOWERS.
REMOVE EXISTING ELECTRIC WATER COOLER (EWC) AND INSTALL NEW BOTTLE FILL TYPE EWC EQUAL TO ELKAY LZSTL8WSLK EZH20 FILLING STATION AND VERSATILE BI-LEVEL ADA COOLER. REMOVE EXISTING GYPSUM BOARD AND MODIFY FRAMING AS REQUIRED TO INSTALL NEW WATER COOLER AND CARRIER. PATCH, REPAIR, AND PAINT EXISTING WALLS WITHIN WATER COOLER
ALCOVE PRIOR TO INSTALLING NEW WATER CHILLER.
REMOVE EXISTING PAPER TOWEL DISPENSER AND SURROUNDING TILE. PATCH AND PAINT WALL.25
EXISTING WOOD TRIM TO BE DEMOLISHED. SALVAGE FOR REUSE.26
EXISTING HVAC REGISTER TO REMAIN. PROTECT WITH TEMPORARY FILTER MEDIA DURING DEMOLITION/ RENOVATION.27
NEW MIRROR (24" x 48") CENTER OVER SINK.28
REMOVE EXISTING PAPER TOWEL DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT
NEW LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
REMOVE EXISTING SOAP DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT NEW
LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
EXISTING SINK TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK EQUAL TO STURDIBUILT 19" x 23" x 4" SINGLE BOWL LAVATORY SINK KIT WITH FAUCET, DRAIN, AND OVERFLOW. PROVIDE MANUAL OPERATION OPTION. PATCH AND REPAIR
WALL TILE AS REQUIRED TO REMOVE EXISTING SINK AND INSTALL NEW.
REMOVE EXISTING STAINLESS STEEL WALL MOUNTED SOAP DISPENSER. PROVIDE AND INSTALL NEW SOAP DISPENSER IN ORIGINAL DISPENSER LOCATION. NEW DISPENSER TO BE MANUAL PUMP TYPE WITH PADDLE, COMPATIBLE WITH 800 ML FOAM REFRESH REFILLS, 5 3/8" x 9" x 5 3/8", WHITE PLASTIC.
REMOVE EXISTING SPEAKERS AND ALL ASSOCIATED CABLING BACK TO POINT OF ORIGIN. PATCH EXISTING WALL PRIOR TO
PAINTING.
EXISTING TILE
SUBSTRATE TO REMAIN
FOLLOWING TILE
DEMOLITION NEW 1/2" GYPSUM WALL
BOARD OVER EXISTING
SUBSTRATE
SCHLUTER - RONDEC
NEW 1 X 4 WOOD
BLOCKING
Sheet Number
Date
Sheet Title
A06.00
ENLARGED FLOOR
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
1/4" = 1'-0"A06.00
1 WOMEN 126 & 232 ENLARGED NEW PLAN
1/4" = 1'-0"A06.00
2 MEN 125 & MEN 231 ENLARGED NEW PLAN
1/2" = 1'-0"A06.00
3 TYPICAL RESTROOM ELEVATION A - NEW
1/2" = 1'-0"A06.00
4 TYPICAL RESTROOM ELEVATION B - NEW
1/2" = 1'-0"A06.00
6 TYPICAL RESTROOM ELEVATION C - NEW
1 1/2" = 1'-0"A06.00
5 ADA COMPLIANT SINK
Rev. Description Date
3" = 1'-0"A06.00
7 EXISTING TILE BASE WITH NEW GWB
CONFERENCE
A06.021
18 18
A06.02 2
SPECIFIC NOTES:
EXISTING MIRRORS TO BE REMOVED AND REPLACED WITH NEW.1
EXISTING TOILETS AND FLUSH VALVE ASSEMBLY TO BE REMOVED AND REPLACED WITH NEW.2
EXISTING SINK AND COUNTERTOP TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK. SEE SECTIONS.3
EXISTING TILE AND GROUT TO BE PROFESSIONALLY CLEANED WITH K9041 TEXSPAR PLUS TILE AND GROUT HAZE CLEANER. SWEEP OR VACUUM THE FLOOR OF ALL LOOSE DEBRIS. MIX THE APPROPRIATE LEGGE LIQUID CLEANER ACCORDING TO THE LABEL AND FLOOD THE FLOOR WITH MOP. LET THE SOLUTION STAND FOR APPROXIMATELY 10 MINUTES. PLACE A CUP FULL OF TEXSPAR PLUS EVERY 2-3 FEET AND KEEP SOLUTION WET AT ALL TIMES DURING THIS PROCEDURE. USE A NYLON STRIPPING PAD OR EQUAL ON SMOOTH SURFACES OR A NYLO GRIT OR SCRUB GRIT II BRUSH ON TEXTURED SURFACES. SCRUB USING A ROTARY SCRUBBER. HOP THE MACHINE ON TOP OF THE TEXSPAR AND CREATE A SLURRY. SPREAD OUT AND SCRUB WITH SOLUTION SLOWLY IN AN OVERLAPPING PATTERN. CROSS SCRUB AT 90 DEGREES TO ENSURE PROPER CONTACT. PICK UP SOLUTION WITH A WET VACUUM AND RINSE SEVERAL TIMES WITH WATER UNTIL FLOOR IS THOROUGHLY
CLEAR OF RESIDUE.
EXISTING CASEWORK AND SINK TO BE DEMOLISHED. 5
EXISTING WALL TO RECEIVE NEW PAINT. PATCH ALL DAMAGE TO EXISTING GYPSUM WALLS PRIOR TO PAINTING.6
CUT NEW POWER FLOOR BOX IN EXISTING FLOOR ASSEMBLY. COORDINATE FINAL LOCATION OF NEW
FLOOR BOX WITH GOVERNMENT PRIOR TO INSTALLATION. INTERCEPT CONDUCTORS SERVING
ADJACENT EXISTING FLOOR BOXES AND EXTEND EXISTING CIRCUITS RP-EM-2A-16, 18, 20 TO NEW FLOOR BOX LOCATION. NEW FLOOR BOX TO CONTAIN (4) 120V DUPLEX RECEPTACLES. REMOVE 2 EXISTING 120V RECEPTACLES IN 2 EXISTING ADJACENT FLOOR BOXES. PROVIDE NEW CONDUIT AND
WIRING IN ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING POWER/ DATA FLOOR BOX TO REMAIN.8
EXISTING POWER OUTLETS TO REMAIN.9
REMOVE AND REPLACE EXISTING CARPET. NEW CARPET EQUAL TO SHAW CONTRACT-TEXTURE STUDY, TIMELESS (5T653, TWEED.
EXISTING COVE LIGHTING TO BE REPLACED WITH NEW LED COVE LIGHTING. (ABI #3)11
REMOVE EXISTING DOOR, FRAME, AND TRANSOM WINDOW ABOVE. PATCH WITH GYPSUM WALL BOARD. SEE ELEVATIONS .12
NEW VIDEO WALL. GOVERNMENT FURNISHED GOVERNMENT INSTALLED.13
EXISTING WOOD TRIM TO REMAIN.14
NEW WOOD TRIM TO MATCH EXISTING WOOD TRIM.15
PAINT WALL COLOR EQUAL TO SHERWIN WILLIAMS 7069 IRON ORE.16
(2) NEW 1 1/2" CONDUIT FROM NEW FLOOR BOX TO NEW 4 x 4 x 4 RECESSED JUNCTION BOX BEHIND VIDEO WALL.17
NEW LED COVE LIGHTING FIXTURE. NEW COVE LIGHTING TO BE LED TYPE AND CARRY 10
YEAR WARRANTY, MINIMUM. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND
ENSURE NEW COVE LIGHTING IS COMPATIBLE WITH EXISTING CONDITIONS. INSTALL IN
ACCORDANCE WITH ALL NATIONAL ELECTRICAL CODE REQUIREMENTS.
EXISTING PROJECTOR SCREEN AND CONTROLS TO BE DEMOLISHED. REMOVE ALL WIRING AND PATCH WALL/ CEILING.19
PAINT OFFICE WALL FOLLOWING DOOR AND TRANSOM REMOVAL/ PLUMBING CHANGES.20
EXISTING H/C DOMESTIC WATER LINES TO BE CUT AND CAPPED AT MAIN ABOVE FIRST FLOOR CEILING. REMOVE EXISTING PIPE.
EXISTING SANITARY PIPE TO REMAIN IN WALL. REMOVE TRAP AND SINK CONNECTION. VENT THROUGH ROOF TO REMAIN. INSTALL
WALL CLEAN OUT IN ADJACENT OFFICE AREA. PATCH, REPAIR, AND PAINT WALL AS SHOWN.
REMOVE EXISTING SHOWER SEATS AND PATCH TILE.22
REMOVE EXISTING SHOWER HEAD AND INSTALL NEW SHOWER ASSEMBLY EQUAL TO BRADLEY CORP BUILT-IN SHOWERS WITH CONCEALED SUPPLIES MODEL 1C. DELUXE SHOWERHEAD TO BE INSTALLED IN ALL SHOWERS. HAND SHOWER WITH SLIDE BAR
TO BE INSTALLED IN ADA SHOWERS.
REMOVE EXISTING ELECTRIC WATER COOLER (EWC) AND INSTALL NEW BOTTLE FILL TYPE EWC EQUAL TO ELKAY LZSTL8WSLK EZH20 FILLING STATION AND VERSATILE BI-LEVEL ADA COOLER. REMOVE EXISTING GYPSUM BOARD AND MODIFY FRAMING AS REQUIRED TO INSTALL NEW WATER COOLER AND CARRIER. PATCH, REPAIR, AND PAINT EXISTING WALLS WITHIN WATER COOLER
ALCOVE PRIOR TO INSTALLING NEW WATER CHILLER.
REMOVE EXISTING PAPER TOWEL DISPENSER AND SURROUNDING TILE. PATCH AND PAINT WALL.25
EXISTING WOOD TRIM TO BE DEMOLISHED. SALVAGE FOR REUSE.26
EXISTING HVAC REGISTER TO REMAIN. PROTECT WITH TEMPORARY FILTER MEDIA DURING DEMOLITION/ RENOVATION.27
NEW MIRROR (24" x 48") CENTER OVER SINK.28
REMOVE EXISTING PAPER TOWEL DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT
NEW LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
REMOVE EXISTING SOAP DISPENSER AND REINSTALL IN NEW LOCATION. PROVIDE SOLID WOOD BLOCKING IN WALL AT NEW
LOCATION. PATCH/ REPAIR/ PAINT GYPSUM BOARD WALL AS REQUIRED.
EXISTING SINK TO BE REMOVED AND REPLACED WITH NEW STAINLESS STEEL SINK EQUAL TO STURDIBUILT 19" x 23" x 4" SINGLE BOWL LAVATORY SINK KIT WITH FAUCET, DRAIN, AND OVERFLOW. PROVIDE MANUAL OPERATION OPTION. PATCH AND REPAIR
WALL TILE AS REQUIRED TO REMOVE EXISTING SINK AND INSTALL NEW.
REMOVE EXISTING STAINLESS STEEL WALL MOUNTED SOAP DISPENSER. PROVIDE AND INSTALL NEW SOAP DISPENSER IN ORIGINAL DISPENSER LOCATION. NEW DISPENSER TO BE MANUAL PUMP TYPE WITH PADDLE, COMPATIBLE WITH 800 ML FOAM REFRESH REFILLS, 5 3/8" x 9" x 5 3/8", WHITE PLASTIC.
REMOVE EXISTING SPEAKERS AND ALL ASSOCIATED CABLING BACK TO POINT OF ORIGIN. PATCH EXISTING WALL PRIOR TO
PAINTING.
NEW J MOLD
EXISTING GWB TO
REMAIN (PAINT)
EXISTING WOOD TRIM TO
REMAIN (BEYOND)
NEW WOOD TRIM - MATCH
EXISTING
NEW WOOD BLOCKING
WOOD BASE BEYOND
NEW GWB (PAINT)
6 3/4"
NEW 3/4" PLYWOOD BACKING
SEALANT
Sheet Number
Date
Sheet Title
A06.01
ENLARGED FLOOR
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
1/4" = 1'-0"A06.01
1 CONFERENCE 228 ENLARGED NEW PLAN
3" = 1'-0"A06.01
2 DETAIL A
9 9
14 14
A06.01
A06.01
SIM
27 27 27 27
6 6
27 27
1/2" = 1'-0"A06.02
1 CONFERENCE ROOM 228 ELEVATION A - NEW
1/2" = 1'-0"A06.02
2 CONFERENCE ROOM 228 ELEVATION B -NEW
Sheet Number
Date
Sheet Title
A06.02
ENLARGED FLOOR
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
INSTALL NEW RAISED FLOORING SYSTEM IN THIS SPACE.
MATCH HEIGHT AND TYPE WITH ADJACENT ROOM.
1 EXISTING SERVER TO REMAIN IN OPERATION. CONTRACTOR TO
TEMPORARILY RAISE AND SUPPORT RACK AS REQUIRED TO
INSTALL NEW RAISED FLOORING. REINSTALL RACK AND ADJUST
ALL CABLING RUNS, LADDER RACK, ETC. AS REQUIRED
FOLLOWING FLOOR SYSTEM INSTALLATION. SEE IMAGES OF
EXISTING CONDITIONS BELOW.
2 EXISTING GROUND BUS BAR IN THIS SPACE TO REMAIN.
PROPERLY GROUND NEW RAISED FLOOR USING EXISTING
GROUND BUS BAR.
1 1 1
EXISTING GROUND BUS BAR IN THIS SPACE TO REMAIN. PROPERLY GROUND
NEW RAISED FLOOR USING EXISTING GROUND BUS BAR.
EXISTING SERVER TO REMAIN IN OPERATION. CONTRACTOR TO TEMPORARILY
RAISE AND SUPPORT RACK AS REQUIRED TO INSTALL NEW RAISED FLOORING.
REINSTALL RACK AND ADJUST ALL CABLING RUNS, LADDER RACK, ETC. AS
REQUIRED FOLLOWING FLOOR SYSTEM INSTALLATION. SEE IMAGES OF
EXISTING CONDITIONS BELOW.
1/4" = 1'-0"A06.03
1 SERVER ROOM 266 ENLARGED PLAN
1/4" = 1'-0"A06.03
2 SERVER ROOM 202 ENLARGED PLAN
3/16" = 1'-0"A06.03
4 ROOM 266 IMAGES
Sheet Number
Date
Sheet Title
A06.03
ENLARGED FLOOR
PLANS & ELEVATIONS
3/11/2026
B U
IL
D
IN
G
FI
N
IS
H U
PG
R
AD
ES
S
EL
M A
H
IG
H W
AY
M
O N
TG
O
M
ER
Y, A
L
Rev. Description Date
3/16" = 1'-0"A06.03
3 SERVER ROOM 262 IMAGES
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - T01-00 - TITLE SHEET & DRAWING INDEX.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - T03-00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - T02-00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - AD2-00 - DEMOLITION FLOOR PLAN.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - AD2-01 - DEMOLITION FLOOR PLAN.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - AD6-00 - DEMOLITION ENLARGED PLANS & ELEVATIONS.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - AD6-01 - DEMOLITION ENLARGED PLANS & ELEVATIONS.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - AD6-02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
| A06.00 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.01 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.02 - ENLARGED FLOOR PLANS & ELEVATIONS |
| A06.03 - ENLARGED FLOOR PLANS & ELEVATIONS |
| AD2.00 - DEMOLITION FLOOR PLAN |
| AD2.01 - DEMOLITION FLOOR PLAN |
| AD6.00 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.01 - DEMOLITION ENLARGED PLANS & ELEVATIONS |
| AD6.02 - DEMOLITION ENLARGED PLANS AND ELEVATIONS |
| T01.00 - TITLE SHEET & DRAWING INDEX |
| T02.00 - GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS |
| T03.00 - TYPICAL MOUNTING HEIGHTS & CLEARANCES |
| 26017_Bldg 1502 Finish Upgrades_R24_CENTRAL - Sheet - A02-00 - FLOOR PLANS.pdf |
| Sheets |
| A02.00 - FLOOR PLANS |
| A02.01 - FLOOR PLANS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .