This document set comprises project plans and specifications for the Collier Area Transit (CAT) Fuel Station Expansion at the Radio Road facility in Naples, Collier County, Florida, prepared by design consultants Atkins and Stillwater Technologies, Inc. The project involves the installation of one new 12,000-gallon double-walled UL-2085 aboveground diesel fuel storage tank (AST-3), conversion of one existing 6,000-gallon tank from diesel to gasoline (AST-1), retention of one existing 6,000-gallon diesel tank (AST-2), modification of four existing fuel dispensers (two converted to gas, two remaining diesel), installation of a new concrete pad measuring 12 feet by 40 feet 9 inches, installation of a new 2-inch steel siphon manifold between existing and new diesel tanks, and associated electrical, piping, and site work. The sealed bid deadline is July 22, 2026, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for July 8, 2026, at 10:00 a.m. and an immediate site visit following the meeting, both at 8300 Radio Road, Naples, Florida 34104. All work must comply with the Florida Building Code 2024 (8th Edition), NFPA standards, and applicable electrical codes including NEC Article 514 for hazardous locations.
The project specifications detail comprehensive requirements for tank installation, piping, testing, and electrical work. The new 12,000-gallon tank weighs approximately 21,900 pounds and requires anchoring with 3/4-inch by 12-inch wedge-type anchors embedded into a 4,000 PSI concrete foundation slab. All piping must be installed with a minimum slope of 1/8 inch per foot toward sumps with sensors, and product lines must undergo air pressure testing at 50 PSI prior to backfill and hydrostatic precision tightness testing at 1 times operating pressure with an allowable tolerance of 0.010 gallons per hour. Electrical work includes new Veeder Root tank level probes and interstitial sensors for the new diesel tank, integration with the existing Veeder-Root TLS-350 fuel management system, grounding installation with copper-clad ground rods achieving resistance of 25 ohms or less, and compliance with hazardous location classifications (Class 1, Division 1 and 2) per NEC Article 514. The project is grant-funded and prospective bidders must register on the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to obtain complete bid documents.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8300 Radio Road Naples, Collier County, Florida
VICINITY SKETCH
N
FUEL ENGINEER: OWNER:
LOCATION SKETCH
N
SITE
SITE
STILLWATER TECHNOLOGIES, INC.
2101 W. SR-434, SUITE 135
LONGWOOD, FL 32779
(407) 206-7222; (407) 206-7223 (fax) Contact: Rick Blecha, P.E.
Email: rblecha@stillwatertech.com
COLLIER AREA TRANSIT
C/O REAL PROPERTY MANAGEMENT
3335 TAMIAMI TRAIL EAST, SUITE 101
NAPLES, FLORIDA 34112
OVERALL WORK AREA PLAN
NOTES AND SPECIFICATIONS
DEMOLITION PLAN
INDEX OF DRAWINGS
PE02
PE03
PE01 COVER SHEET
PARCEL ID: 00399360008
FDEP FAC ID #9102759
PRIME DESIGN CONSULTANT:
ATKINS
4030 W. BOY SCOUT BLVD., SUITE 700
TAMPA, FL 33607
(813) 282-7275 Contact: Mira Ticu mira.ticu@atkinsrealis.com
FUEL SYSTEM INSTALL PLAN
FUEL STORAGE and DISTRIBUTION SYSTEM
TANK ADDITION PLANS
GENERAL STATEMENT:
COLLIER AREA TRANSIT
PASSENGER TRANSFER FACILITY
PE04
F e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE01
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
COVER SHEET
PROJECT
NAME:
No. Date Description
FAB
PERMIT
08/26/24
FUEL STATION EXPANSION
0 08/26/24 Permit Documents
FAB
FAB
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
PE05
PE06 DIESEL FUEL TANK DETAILS
S-001 GENERAL NOTES
S-100 FOUNDATION PLAN & DETAILS
E-001 ELECTRICAL LEGEND
E-101 ELECTRICAL SITE PLAN
E-201 ENLARGED PLAN
E-301 FUEL TANK SITE CLASSIFICATION AREA DETAIL
E-302 FUEL TANK - PARTIAL CONTROL RISER DIAGRAM
E-501 DETAILS
E-502 DETAILS
E-401 PARTIAL ONE-LINE DIAGRAM - FUEL STATION BUILDING
AutoCAD SHX Text THE PROPOSED WORK WILL CONSIST OF THE INSTALLATION OF ONE NEW 12,000-GALLON DOUBLE-WALLED UL-2085 ABOVEGROUND DIESEL FUEL STORAGE TANK. TWO EXISTING 6,000-GALLON TANKS WILL REMAIN AND ONE TANK WILL BE CONVERTED FROM DIESEL TO GAS. FOUR EXISTING DISPENSERS WILL REMAIN AND TWO WILL BE CONVERTED FROM DIESEL TO GAS. THE FUEL EQUIPMENT UNDER THE CANOPY IN THE FUELING AREA WILL REMAIN AND BE MODIFIED PER THE NEW DESIGN.
AutoCAD SHX Text CODE REFERENCES: THE SYSTEM SHALL BE DESIGNED IN FULL COMPLIANCE WITH THE LATEST EDITION OF THE APPLICABLE SECTIONS OF THE FOLLOWING CODES, STANDARDS, AND GUIDELINES. WHERE CONFLICT EXISTS, CONTRACTOR SHALL FOLLOW THE MOST STRINGENT REQUIREMENTS. IN CASE OF A CONFLICT BETWEEN THE UNIFORM FIRE CODE AND THE NATIONAL FIRE PREVENTION ASSOCIATION STANDARDS, THE MOST STRINGENT CONDITION SHALL APPLY: - FLORIDA BUILDING CODE 2024 (8TH EDITION) AS APPLICABLE FLORIDA BUILDING CODE 2024 (8TH EDITION) AS APPLICABLE - NFPA 1-FIRE CODE 2018 EDITION CHAPTER 66.22 AS APPLICABLE - NFPA 30-FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE 2021 EDITION - NFPA 30A- CODE FOR MOTOR FUEL DISPENSING FACILITIES CODE 2021 EDITION - NFPA 70-NATIONAL ELECTRIC CODE 2017 EDITION - FACTORY MUTUAL (FM) - UNDERWRITERS LABORATORY (UL) OTHER STATE OR COUNTY CODES AS APPLICABLE. COMPLY WITH ALL APPLICABLE SECTIONS OF NEC 514 INCLUDING SWITCH NEUTRAL BREAKERS, SEALOFFS AND AREA HAZARD CLASSIFICATIONS.
PROPOSED WORK
AREA
PROPOSED WORK
AREA
OVERALL SITE PLAN
OVERALL AERIAL
F e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE02
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
OVERALL WORK AREA PLAN
PROJECT
NAME:
No. Date Description
FAB
FUEL STATION EXPANSION
FAB
FAB
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
N
N
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
PERMIT
08/26/24
08/26/24 Permit Documents
GENERAL NOTES
FUEL SYSTEM SPECIFICATIONS
F e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE03
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
NOTES AND SPECIFICATIONS
PROJECT
NAME:
No. Date Description
FAB
FUEL STATION EXPANSION
FAB
FAB
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
PERMIT
08/26/24
08/26/24 Permit Documents
AutoCAD SHX Text
5.00 PIPING: 5.10 ALL PIPE (FLEXIBLE, SEMI-RIGID, FIBERGLASS, AND STEEL) FITTINGS, RISERS, ETC. SHALL BE FURNISHED AND ALL PIPE (FLEXIBLE, SEMI-RIGID, FIBERGLASS, AND STEEL) FITTINGS, RISERS, ETC. SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. CONTRACTOR SHALL CONFIRM WHAT MATERIALS ARE BEING FURNISHED BY THE OWNER. 5.12 THE INTERIOR SURFACE OF ALL PIPING AND FITTINGS SHALL BE MADE FREE OF DIRT, GREASE, SCALE, PARTICLES, THE INTERIOR SURFACE OF ALL PIPING AND FITTINGS SHALL BE MADE FREE OF DIRT, GREASE, SCALE, PARTICLES, ETC. BEFORE INSTALLING. INSTALLATION OF ALL PIPE AND/OR FITTINGS SHALL BE MADE IN COMPLETE ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AS WELL AS OWNER'S PLANS AND SPECIFICATIONS. 5.13 PRODUCT PIPING SHALL BE INSTALLED SO AS TO SLOPE CONTINUOUSLY TOWARD SUMPS WITH SENSORS AT A PRODUCT PIPING SHALL BE INSTALLED SO AS TO SLOPE CONTINUOUSLY TOWARD SUMPS WITH SENSORS AT A MINIMUM OF 1/8" PER FOOT. TRAPS OR SAGS SHALL NOT BE PERMITTED IN ANY PIPING. 5.14 PIPING SHALL BE PLACED ON A PREPARED BED (6" MINIMUM BACKFILL MATERIAL) IN SUCH A MANNER AS TO PIPING SHALL BE PLACED ON A PREPARED BED (6" MINIMUM BACKFILL MATERIAL) IN SUCH A MANNER AS TO MINIMIZE POINTS AT WHICH ONE PIPE MAY CROSS OVER ANOTHER PIPE AND SHALL NOT BE SUPPORTED WITH FOREIGN OBJECTS SUCH AS WOOD, BRICK BLOCKS, PIPE, ETC. AT POINTS WHERE PIPES MUST CROSS, A MINIMUM OF TWICE THE NOMINAL PIPE DIAMETER MUST SEPARATE THE PIPES. PARALLEL PIPING SHALL BE SEPARATED BY A MINIMUM DISTANCE OF TWICE THE PIPE DIAMETER. 5.15 ANY PRESSURE LOSS OCCURRENCE ON ANY PIPING COMPONENT OF THE SYSTEM SHALL BE INVESTIGATED WITHIN ANY PRESSURE LOSS OCCURRENCE ON ANY PIPING COMPONENT OF THE SYSTEM SHALL BE INVESTIGATED WITHIN 24 HOURS DURING CONSTRUCTION OPERATIONS. 6.00 STEEL PIPING: 6.05 ALL STEEL PIPE EXPOSED TO SOIL SHALL BE WRAPPED WITH CORROSION CONTROL TAPE. ALL STEEL PIPE EXPOSED TO SOIL SHALL BE WRAPPED WITH CORROSION CONTROL TAPE. 6.10 STEEL PIPE AND FITTINGS SHALL ONLY BE USED TO FABRICATE RISER PIPING ABOVE GROUND, VENT LINE RISERS STEEL PIPE AND FITTINGS SHALL ONLY BE USED TO FABRICATE RISER PIPING ABOVE GROUND, VENT LINE RISERS AND OTHER PIPING AS SET FORTH IN THE DRAWINGS. 6.11 PIPING SHALL BE SEAMLESS CLASS A120, SCHEDULE 40. STEEL FITTINGS SHALL BE CLASS 150 AND/OR 250 PSI PIPING SHALL BE SEAMLESS CLASS A120, SCHEDULE 40. STEEL FITTINGS SHALL BE CLASS 150 AND/OR 250 PSI MINIMUM MALLEABLE IRON, A.P.I. SPECIFICATION 3L GR B. 6.12 ALL THREAD FITTINGS AND JOINT TO PLUG CONNECTIONS SHALL USE MANUFACTURER SPECIFIED JOINT COMPOUND ALL THREAD FITTINGS AND JOINT TO PLUG CONNECTIONS SHALL USE MANUFACTURER SPECIFIED JOINT COMPOUND AND TIGHTENED UNTIL SEALED. ONLY GASOLINE RESISTANT THREAD COMPOUNDS SHALL BE USED. 6.13 VERTICAL RISERS FOR TANK VENTING SYSTEM SHALL BE INSTALLED PLUMB. PROVIDE ANGLE STRAP TO INSURE VERTICAL RISERS FOR TANK VENTING SYSTEM SHALL BE INSTALLED PLUMB. PROVIDE ANGLE STRAP TO INSURE RISERS ARE PLUMB AND SECURE. RISERS MUST HAVE ADEQUATE PROTECTION AND STABILITY TO BE TERMINATED A MINIMUM OF 12'-0" ABOVE FINISHED GRADE. 7.00 TANK AND PIPE TESTING: 7.10 THE CONTRACTOR SHALL NOTIFY OWNER'S PROJECT ENGINEER A MINIMUM OF TWO WORKING DAYS IN ADVANCE OF SCHEDULED AIR TESTING IN ORDER THAT THE ENGINEER OR HIS/HER DESIGNATE MAY BE PRESENT DURING TESTING. 7.11 ALL TESTING SHALL BE CONDUCTED USING NEW ("OUT OF THE BOX") PRESSURE GAUGES. THE CONTRACTOR SHALL ALL TESTING SHALL BE CONDUCTED USING NEW ("OUT OF THE BOX") PRESSURE GAUGES. THE CONTRACTOR SHALL TEST ALL PRIMARY PRODUCT AND VENT LINES PER MANUFACTURER'S GUIDELINES OR AS REQUIRED BY LOCAL OR STATE INSPECTION AGENCIES PRIOR TO PLACEMENT OF ANY BACKFILL MATERIAL. 7.12 THE CONTRACTOR SHALL USE A SOAP SOLUTION TO TEST LINES AND JOINTS FOR LEAKAGE. THE AIR PRESSURE THE CONTRACTOR SHALL USE A SOAP SOLUTION TO TEST LINES AND JOINTS FOR LEAKAGE. THE AIR PRESSURE SHALL REMAIN ON ALL PRODUCT LINES DURING ENTIRE CONSTRUCTION OF THE PROJECT. 7.13 THE CONTRACTOR SHALL MONITOR THE PRESSURE ON ALL LINES DURING CONSTRUCTION TO ENSURE DAMAGE HAS THE CONTRACTOR SHALL MONITOR THE PRESSURE ON ALL LINES DURING CONSTRUCTION TO ENSURE DAMAGE HAS NOT OCCURRED TO ANY UNDERGROUND PIPING DURING THE PERFORMANCE OF WORK BY THE CONTRACTOR OR HIS/HER SUB-CONTRACTORS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPORT ANY LOSS OF AIR PRESSURE IMMEDIATELY TO OWNER'S PROJECT ENGINEER. 7.14 ALL WORK SHALL CEASE UNTIL THE NATURE AND THE CAUSE OF THE PROBLEM HAS BEEN DETERMINED AND ALL WORK SHALL CEASE UNTIL THE NATURE AND THE CAUSE OF THE PROBLEM HAS BEEN DETERMINED AND CORRECTED. ANY REPAIR OR REPLACEMENT SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. THE REPAIRED/REPLACED LINE SHALL BE RETESTED AT 50 PSI AIR PRESSURE AND DETERMINED TO BE HOLDING 50 PSI OF AIR PRESSURE PRIOR TO ANY BACKFILL MATERIAL BEING PLACED IN THIS AREA. 7.15 AIR PRESSURE SHALL NOT BE REMOVED FROM ANY UNDERGROUND LINES UNTIL AFTER PAVING OVER THE TANK AIR PRESSURE SHALL NOT BE REMOVED FROM ANY UNDERGROUND LINES UNTIL AFTER PAVING OVER THE TANK AREA AND THE PIPE LINE TRENCHES IS IN PLACE. 7.16 HYDROSTATIC TESTING: HYDROSTATIC TESTING: 1. AFTER ALL PAVING IS IN PLACE, PRIOR TO THE FINAL CHECK-OUT AND START-UP, THE CONTRACTOR SHALL AFTER ALL PAVING IS IN PLACE, PRIOR TO THE FINAL CHECK-OUT AND START-UP, THE CONTRACTOR SHALL PERFORM A "HYDROSTATIC PRECISION TIGHTNESS" TEST ON ALL TANKS AND PRODUCT LINES. 2. THE PRESSURE FOR THE TEST SHALL BE 1½ TIMES THE OPERATING PRESSURE FOR THE PRODUCT LINES WITH THE PRESSURE FOR THE TEST SHALL BE 1½ TIMES THE OPERATING PRESSURE FOR THE PRODUCT LINES WITH AN ALLOWABLE TOLERANCE OF .010 GALLONS PER HOUR. 3. REMOVE LEAK DETECTORS PRIOR TO PRESSURIZING LINES AND REPLACE PRIOR TO START-UP. AFTER REMOVE LEAK DETECTORS PRIOR TO PRESSURIZING LINES AND REPLACE PRIOR TO START-UP. AFTER REPLACEMENT LEAK DETECTORS SHALL BE TESTED TO INSURE THEY ARE OPERATING IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 4. THE FINAL "PRECISION TIGHTNESS" TEST SHALL BE PERFORMED BY AN INDEPENDENT TANK AND LINE TESTING THE FINAL "PRECISION TIGHTNESS" TEST SHALL BE PERFORMED BY AN INDEPENDENT TANK AND LINE TESTING FIRM OF THE CONTRACTOR'S CHOICE, BUT MUST BE APPROVED BY OWNER. A MINIMUM TWO WORKING DAYS NOTICE SHALL BE GIVEN TO OWNER PRIOR TO THE SCHEDULED TESTING. THE OWNER OR HIS/HER DESIGNATE SHALL OBSERVE THE TESTING. 5. THE STP CONTAINMENT SUMPS AND DISPENSER SUMPS SHALL HAVE A WATER TIGHTNESS TEST. THE SUMPS THE STP CONTAINMENT SUMPS AND DISPENSER SUMPS SHALL HAVE A WATER TIGHTNESS TEST. THE SUMPS SHALL BE FILLED WITH WATER FOR A PERIOD OF 24 HOURS WITH A MAXIMUM ALLOWABLE LEAKAGE RATE OF ½ INCH. IF THE SUMPS EXCEED THE ALLOWABLE LEAKAGE, THEN THE SUMPS AND CONNECTIONS SHALL BE INVESTIGATED AND ADJUSTED TO BE WITHIN THE ALLOWABLE WATER TIGHTNESS PARAMETERS. 8.00 DISPENSER CHECK OUT: 8.10 DISPENSERS SHALL ONLY BE ACTIVATED IN THE PRESENCE OF AN AUTHORIZED DISPENSER REPRESENTATIVE AND DISPENSERS SHALL ONLY BE ACTIVATED IN THE PRESENCE OF AN AUTHORIZED DISPENSER REPRESENTATIVE AND THE OWNER. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY OF ANY DAMAGE TO THE DISPENSER(S) IF THIS INSTRUCTION IS NOT FOLLOWED. 8.11 TO PURGE LINES, ACTIVATE DISPENSER BY TURNING OPERATING HANDLE "ON" FOR THE MOST REMOTE STP, BUT TO PURGE LINES, ACTIVATE DISPENSER BY TURNING OPERATING HANDLE "ON" FOR THE MOST REMOTE STP, BUT DO NOT OPEN NOZZLE. ALL STP'S TO REMAIN ON WITHOUT OPERATING NOZZLES FOR FIVE MINUTES. INSPECT THE CONNECTIONS UNDER EACH DISPENSER AND AT THE STP UNION FOR LEAKS. DEACTIVATE DISPENSER AND OPEN EACH NOZZLE, BEGINNING WITH THE NOZZLE MOST REMOVED FROM THE STP AND WORKING BACK IN SEQUENCE, DELIVER 200 GALLONS OF PRODUCT, OR ENOUGH TO ENSURE ALL AIR IS REMOVED FROM PRODUCT LINES, THROUGH EACH NOZZLE. 9.00 DISPENSING SYSTEM ELECTRICAL CHECK OUT: 9.10 TURN OFF CIRCUIT BREAKERS CONTROLLING STP'S. TURN OFF CIRCUIT BREAKERS CONTROLLING STP'S. 9.11 CONFIRM ALL NOZZLES ARE IN BOOT. CONFIRM ALL NOZZLES ARE IN BOOT. 9.12 TURN ON CIRCUIT BREAKER OR SWITCH CONTROLLING ONE STP, ONE HOSE AT A TIME, FOR PRODUCT GRADE TURN ON CIRCUIT BREAKER OR SWITCH CONTROLLING ONE STP, ONE HOSE AT A TIME, FOR PRODUCT GRADE MATCHING STP. PERFORM THE FOLLOWING: 1. REMOVE NOZZLE REMOVE NOZZLE 2. TURN OPERATING HANDLE "ON" AND DISPENSE PRODUCT TO CONFIRM HOSE IS PRESSURIZED. TURN OPERATING HANDLE "ON" AND DISPENSE PRODUCT TO CONFIRM HOSE IS PRESSURIZED. 3. VERIFY THAT ONLY THE CORRECT STP TURNS ON. VERIFY THAT ONLY THE CORRECT STP TURNS ON. 4. VERIFY THAT GRADE LEVELS ON EACH SIDE OF THE DISPENSER ARE THE SAME. VERIFY THAT GRADE LEVELS ON EACH SIDE OF THE DISPENSER ARE THE SAME. 5. REPEAT THE ABOVE STEPS FOR EACH PRODUCT GRADE. REPEAT THE ABOVE STEPS FOR EACH PRODUCT GRADE. 9.13 REPEAT THE ABOVE PROCEDURE FOR EACH HOSE POSITION. REPEAT THE ABOVE PROCEDURE FOR EACH HOSE POSITION. 9.14 IF MISCONNECTING OR OTHER PROBLEMS ARE DETECTED USING THE ABOVE PROCEDURE, CORRECTIONS OR REPAIRS IF MISCONNECTING OR OTHER PROBLEMS ARE DETECTED USING THE ABOVE PROCEDURE, CORRECTIONS OR REPAIRS ARE TO BE MADE AND ENTIRE SYSTEM CHECK OUT IS TO BE REPEATED.
AutoCAD SHX Text TANK INSTALLATION SPECIFICATIONS 1.00 GENERAL: 1.01 SUMMARY SUMMARY A. THE WORK INCLUDES EXCAVATING, TRENCHING, BACKFILLING, COMPACTING, GRADING AND TESTING FOR THE THE WORK INCLUDES EXCAVATING, TRENCHING, BACKFILLING, COMPACTING, GRADING AND TESTING FOR THE CONSTRUCTION AND INSTALLATION OF PETROLEUM STORAGE TANKS AND FUEL PRODUCTS PIPING. UNLESS SPECIFIED OTHERWISE IN THE EQUIPMENT SCHEDULE, THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS TO COMPLETE THE INSTALLATION OF ALL SYSTEMS AND EQUIPMENT AS SHOWN HEREON AND AS REQUIRED BY THE CONTRACT. B. NO EQUIPMENT IS BEING FURNISHED BY THE OWNER. NO EQUIPMENT IS BEING FURNISHED BY THE OWNER. C. TANKS RECEIVED AT THE SITE SHALL BE PROTECTED AGAINST DAMAGE. THE CONTRACTOR SHALL BE TANKS RECEIVED AT THE SITE SHALL BE PROTECTED AGAINST DAMAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OFF LOADING THE TANKS AT THE SITE. D. ALL PROPOSED UNDERGROUND WORK IN THE CONCRETE OR PAVEMENT TRAFFIC AREAS SHALL BE BORED (NOT ALL PROPOSED UNDERGROUND WORK IN THE CONCRETE OR PAVEMENT TRAFFIC AREAS SHALL BE BORED (NOT TRAFFIC AREAS SHALL BE BORED (NOT SHALL BE BORED (NOT OPEN CUT). ANY OTHER EXCAVATIONS THAT ARE OPEN CUT SHALL MEET OSHA, SUBPART P, "EXCAVATIONS, TRENCHING, AND SHORING" REQUIREMENTS FOR BANK SLOPES. ALL NON CONTAMINATED MATERIALS ARE THE RESPONSIBILITY OF THE PETROLEUM CONTRACTOR. 1.02 JOB CONDITIONS JOB CONDITIONS A. OBTAIN ALL REQUIRED APPROVALS, PERMITS AND LICENSES BEFORE INSTALLING TANKS AND PIPING AND FOLLOW OBTAIN ALL REQUIRED APPROVALS, PERMITS AND LICENSES BEFORE INSTALLING TANKS AND PIPING AND FOLLOW THE RULES AND REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.03 SUBMITTALS SUBMITTALS A. OBTAIN ALL REQUIRED APPROVALS, PERMITS AND LICENSES BEFORE INSTALLING STORAGE TANKS AND PIPING OBTAIN ALL REQUIRED APPROVALS, PERMITS AND LICENSES BEFORE INSTALLING STORAGE TANKS AND PIPING AND FOLLOW THE RULES AND REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 2.00 BACKFILL: 2.01 GENERAL A. BACKFILL MATERIAL SHALL BE APPROVED BY THE ENGINEER BEFORE USE. BACKFILL MATERIAL SHALL BE APPROVED BY THE ENGINEER BEFORE USE. 2.02 GRANULAR BACKFILL: A. GRANULAR BACKFILL SHALL CONSIST OF PROPERLY SIZED PEA GRAVEL OR CLEAN SOIL MEETING REQUIREMENTS GRANULAR BACKFILL SHALL CONSIST OF PROPERLY SIZED PEA GRAVEL OR CLEAN SOIL MEETING REQUIREMENTS OF ASTM. PEA GRAVEL MUST BE WASHED, NATURALLY ROUNDED, 1/4" NOMINAL SIZE, RANGING FROM 1/8" TO 1/4" DIAMETER. B. ALL GRANULAR BACKFILL SHALL BE WRAPPED WITH GEOTEXTILE FABRIC AS LISTED IN THE SCHEDULE OF MATERIALS. 3.00 EXCAVATIONS: 3.01 TRENCHING GUIDELINES: 1. FOR EXCAVATION, TRENCH WIDTH AND DEPTH SHALL BE AS FOLLOWS: FOR EXCAVATION, TRENCH WIDTH AND DEPTH SHALL BE AS FOLLOWS: A. AMPLE WIDTH TO ALLOW A MINIMUM FREE WORKING SPACE. AMPLE WIDTH TO ALLOW A MINIMUM FREE WORKING SPACE. B. WIDTH OF HAND EXCAVATED TRENCHES MAY BE REDUCED PROVIDING APPROVAL IS GIVEN IN WRITING BY THE WIDTH OF HAND EXCAVATED TRENCHES MAY BE REDUCED PROVIDING APPROVAL IS GIVEN IN WRITING BY THE ENGINEER, STABILITY OF SOIL IS CONSISTENT WITH DEPTH OF TRENCH REQUIRED, AND PIPE CAN BE SATISFACTORILY INSTALLED TO LINE AND GRADE AND PROPERLY BACKFILLED. 3.02 BACKFILL AND COMPACTION (NOTE: COMPACTION REQUIREMENTS DO NOT APPLY TO GRANULAR BACKFILL MATERIALS BACKFILL AND COMPACTION (NOTE: COMPACTION REQUIREMENTS DO NOT APPLY TO GRANULAR BACKFILL MATERIALS DESCRIBED IN 2.02 ABOVE.) 1. COMPACT BACKFILL MATERIAL TO NOT LESS THAN 98% OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM COMPACT BACKFILL MATERIAL TO NOT LESS THAN 98% OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D-1557. A. PLACE BACKFILL MATERIAL UNDER PIPE IN HORIZONTAL UNIFORM LAYERS NOT EXCEEDING 8" IN THICKNESS. PLACE BACKFILL MATERIAL UNDER PIPE IN HORIZONTAL UNIFORM LAYERS NOT EXCEEDING 8" IN THICKNESS. BRING EACH LAYER UP UNIFORMLY AND THOROUGHLY COMPACT USING PNEUMATIC OR OTHER APPROVED COMPACTION. PUDDLING OR WATER FLOODING FOR CONSOLIDATION OF THE BACKFILL SHALL NOT BE DONE. COMPACT EACH LATER OF BACKFILL TO 98%. 2. TRENCH BACKFILL: TRENCH BACKFILL: A. BACKFILL TRENCHES IMMEDIATELY AFTER APPROVAL OF THE LINE CONSTRUCTION BY THE OWNER'S PROJECT BACKFILL TRENCHES IMMEDIATELY AFTER APPROVAL OF THE LINE CONSTRUCTION BY THE OWNER'S PROJECT ENGINEER. 3.03 TESTING FOR COMPACTION: (NOTE: TESTING FOR COMPACTION IS NOT REQUIRED FOR GRANULAR BACKFILL MATERIALS TESTING FOR COMPACTION: (NOTE: TESTING FOR COMPACTION IS NOT REQUIRED FOR GRANULAR BACKFILL MATERIALS DESCRIBED IN 2.02 ABOVE.) A. TESTING AND INSPECTION SERVICE: THE CONTRACTOR SHALL PROVIDE A GEOTECHNICAL TESTING FIRM FOR THE TESTING AND INSPECTION SERVICE: THE CONTRACTOR SHALL PROVIDE A GEOTECHNICAL TESTING FIRM FOR THE TESTING OF BACKFILL MATERIALS PROPOSED FOR USE IN THE PROJECT AND FIELD TESTING FOR QUALITY CONTROL DURING EARTHWORK OPERATIONS. ALL TESTING AND INSPECTION SHALL BE UNDER THE DIRECT SUPERVISION OF A REGISTERED GEOTECHNICAL ENGINEER. 4.00 STORAGE TANKS: 4.10 THE CONTRACTOR SHALL PERFORM ALL TESTING AS REQUIRED BY THE OWNER AND AS SET FORTH IN THE THE CONTRACTOR SHALL PERFORM ALL TESTING AS REQUIRED BY THE OWNER AND AS SET FORTH IN THE SPECIFICATIONS. 4.12 THE CONTRACTOR SHALL PERFORM AND PROVIDE FOUR (4) COPIES OF DOCUMENTATION OF ALL WARRANTY THE CONTRACTOR SHALL PERFORM AND PROVIDE FOUR (4) COPIES OF DOCUMENTATION OF ALL WARRANTY VALIDATION TESTING REQUIRED BY THE TANK MANUFACTURER(S) TO OWNER. 4.13 ANCHORING OF TANKS SHALL BE PERFORMED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS UNLESS ANCHORING OF TANKS SHALL BE PERFORMED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS UNLESS DIRECTED OTHERWISE BY OWNER. 4.14 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSPECT THE STORAGE TANKS UPON THEIR ARRIVAL TO THE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSPECT THE STORAGE TANKS UPON THEIR ARRIVAL TO THE SITE PRIOR TO UNLOADING. CONTRACTOR SHALL COORDINATE WITH THE AUTHORITY HAVING JURISDICTION. INSPECT THE TANKS FOR SUCH DAMAGE AS DENTS, SCRATCHES, ETC. ANY DAMAGE OBSERVED SHALL BE NOTED ON THE DELIVERY TICKET AND BY ACKNOWLEDGED BY BOTH THE CONTRACTOR AND THE DELIVERY TRUCK DRIVER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCEPT OR REJECT THE TANKS. 4.15 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TANKS ARE CORRECT IN MEASUREMENT, SUCH AS IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TANKS ARE CORRECT IN MEASUREMENT, SUCH AS DIAMETER AND LENGTH, PRIOR TO INSTALLATION. 4.16 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EQUIPMENT AND MANPOWER AT THE SITE TO UNLOAD THE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EQUIPMENT AND MANPOWER AT THE SITE TO UNLOAD THE STORAGE TANKS. CONTRACTOR SHALL EXERCISE CAUTION DURING UNLOADING AS NOT TO DAMAGE THE TANKS. ANY DAMAGE OCCURRING DURING UNLOADING SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CORRECT, TO THE MANUFACTURER'S SPECIFICATIONS AND TO THE SATISFACTION OF THE OWNER, WITHOUT ADDITIONAL COST TO THE OWNER. 4.17 BEFORE THE TANKS ARE INSTALLED, IF THE INTERSTITIAL SPACE HAS RETAINED IT'S VACUUM THAT THE TANK WAS BEFORE THE TANKS ARE INSTALLED, IF THE INTERSTITIAL SPACE HAS RETAINED IT'S VACUUM THAT THE TANK WAS SHIPPED WITH, THE CONTRACTOR SHALL REMOVE ALL TANK DELIVERY BUNG CAPS AND FURNISH AND INSTALL TANK PLUGS IN ALL BUNGS. 4.18 TANKS SHALL BE INSTALLED LEVEL AND MEASURE FOR SAME. TANK INSIDE DIAMETER SHALL BE MEASURE EBFORE TANKS SHALL BE INSTALLED LEVEL AND MEASURE FOR SAME. TANK INSIDE DIAMETER SHALL BE MEASURE EBFORE AND AFTER ANCHOR STRAPS ARE INSTALLED PER MANUFACTURER'S GUIDELINES. ALL TANK INSTALLATION TESTING SHALL VE RECORDED AND TURNED OVER TO OWNER.
1. CONTRACTOR IS TO VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO START OF DEMOLITION & CONSTRUCTION. CONTRACTOR IS TO VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO START OF DEMOLITION & CONSTRUCTION. 2. DURING CONSTRUCTION, WHEN COMBUSTIBLES ARE BROUGHT ONTO THE SITE IN SUCH QUANTITIES AS DEEMED HAZARDOUS BY THE DURING CONSTRUCTION, WHEN COMBUSTIBLES ARE BROUGHT ONTO THE SITE IN SUCH QUANTITIES AS DEEMED HAZARDOUS BY THE FIRE OFFICIAL, ACCESS ROADS AND A SUITABLE TEMPORARY SUPPLY OF WATER ACCEPTABLE TO THE FIRE DEPARTMENT SHALL BE PROVIDED AND MAINTAINED. 3. THE CONTRACTOR SHALL DEMO ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR CONSTRUCTION AND SHALL BE RESPONSIBLE THE CONTRACTOR SHALL DEMO ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR CONSTRUCTION AND SHALL BE RESPONSIBLE FOR PREVENTING ANY CONSTRUCTION ACTIVITIES FROM TAKING PLACE OUTSIDE OF THE AREAS OF CONSTRUCTION SHOWN ON THE PLANS. ANY ON-SITE OR OFF-SITE AREAS DISTURBED SHALL BE REPLACED WITH THE SAME OR BETTER. DISTURBED LANDSCAPED AREAS WILL BE SEEDED, MULCHED OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY FOLLOWING CONSTRUCTION. 4. THE CONTRACTOR SHALL PROTECT ALL UTILITIES AND OTHER IMPROVEMENTS SHOWN ON THESE PLANS AND ALL OTHER UTILITIES AND THE CONTRACTOR SHALL PROTECT ALL UTILITIES AND OTHER IMPROVEMENTS SHOWN ON THESE PLANS AND ALL OTHER UTILITIES AND OTHER IMPROVEMENTS NOT SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIRS OF UTILITIES AND OTHER IMPROVEMENTS DAMAGED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER, AT NO ADDITIONAL COST TO THE OWNER, AND SHALL MAINTAIN SUFFICIENT PROTECTION TO ALL UTILITIES REQUIRED TO PROTECT THEM FROM DAMAGE. 5. THE CONTRACTOR SHALL UTILIZE THE FOLLOWING STEPS TO SECURE UTILITY LOCATES AT LEAST 72 HOURS PRIOR TO CONSTRUCTION: THE CONTRACTOR SHALL UTILIZE THE FOLLOWING STEPS TO SECURE UTILITY LOCATES AT LEAST 72 HOURS PRIOR TO CONSTRUCTION: a. THE CONTRACTOR SHALL CONTACT SUNSHINE 811 BY CALLING 811 (800.432.4770) OR VISITING THE CONTRACTOR SHALL CONTACT SUNSHINE 811 BY CALLING 811 (800.432.4770) OR VISITING HTTP://WWW.SUNSHINE811.COM/ TO SUBMIT A TICKET. b. AFTER COMPLETING THE SUBMISSION PROCESS, THE CONTRACTOR WILL BE GIVEN A TICKET NUMBER THAT MUST BE RETAINED. AFTER COMPLETING THE SUBMISSION PROCESS, THE CONTRACTOR WILL BE GIVEN A TICKET NUMBER THAT MUST BE RETAINED. c. THE CONTRACTOR SHALL PREPARE A MAP SHOWING THE AREA IN WHICH THE UTILITIES ARE TO BE LOCATED AND WRITE THE THE CONTRACTOR SHALL PREPARE A MAP SHOWING THE AREA IN WHICH THE UTILITIES ARE TO BE LOCATED AND WRITE THE SUNSHINE TICKET NUMBER ON THE MAP. d. THE MAP ALONG WITH THE SUNSHINE TICKET NUMBER MUST BE SUBMITTED BY THE CONTRACTOR TO THE OWNER AND THE MAP ALONG WITH THE SUNSHINE TICKET NUMBER MUST BE SUBMITTED BY THE CONTRACTOR TO THE OWNER AND ENGINEER. 6. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND ENFORCE ALL APPLICABLE SAFETY REGULATIONS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND ENFORCE ALL APPLICABLE SAFETY REGULATIONS. 7. THE CONTRACTOR SHALL PROVIDE ALL SHEETING, SHORING AND BRACING REQUIRED TO PROTECT ADJACENT STRUCTURES AND THE CONTRACTOR SHALL PROVIDE ALL SHEETING, SHORING AND BRACING REQUIRED TO PROTECT ADJACENT STRUCTURES AND UTILITIES OR TO MINIMIZE TRENCH WIDTH AS REQUIRED. SHEETING AND SHORING TO BE DESIGNED BY A STATE OF FLORIDA REGISTERED P.E., RETAINED BY THE CONTRACTOR. 8. ALL MATERIALS, INSTALLATION, AND TESTING SHALL BE IN ACCORDANCE WITH THE GOVERNING JURISDICTION'S STANDARDS AND ALL MATERIALS, INSTALLATION, AND TESTING SHALL BE IN ACCORDANCE WITH THE GOVERNING JURISDICTION'S STANDARDS AND SPECIFICATIONS. WHERE THE SPECIFICATIONS CONFLICT, 9. ALL REFERENCE TO ANY PAVEMENT REMOVAL INCLUDES EXISTING SURFACE COURSE AND BASE MATERIALS. ALL REFERENCE TO ANY PAVEMENT REMOVAL INCLUDES EXISTING SURFACE COURSE AND BASE MATERIALS. 10. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIRED CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIRED CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK. 11. ALL REFERENCES TO PROPOSED CONSTRUCTION INDICATES CONSTRUCTION INCLUDED IN THESE PLANS. ALL REFERENCES TO PROPOSED CONSTRUCTION INDICATES CONSTRUCTION INCLUDED IN THESE PLANS. 12. ALL MUD, DIRT OR OTHER MATERIALS TRACKED OR SPILLED ONTO THE SITE DUE TO CONSTRUCTION SHALL BE PROMPTLY REMOVED ALL MUD, DIRT OR OTHER MATERIALS TRACKED OR SPILLED ONTO THE SITE DUE TO CONSTRUCTION SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR. 13. THE CONTRACTOR SHALL ENSURE THAT THERE IS NO DIRECT OR INDIRECT DISCHARGE OF GROUNDWATER WITHDRAWALS OFF-SITE THE CONTRACTOR SHALL ENSURE THAT THERE IS NO DIRECT OR INDIRECT DISCHARGE OF GROUNDWATER WITHDRAWALS OFF-SITE WITHOUT PROPER PERMITS SECURED. 14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING APPLICABLE TESTING WITH THE SERVICES OF AN APPROVED TESTING THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING APPLICABLE TESTING WITH THE SERVICES OF AN APPROVED TESTING LABORATORY AND SOILS ENGINEER PER PROJECT SPECIFICATIONS, APPLICABLE REGULATORY AGENCIES AND AS MAY BE FOUND IN THE ENGINEERING CONSTRUCTION DRAWINGS. CONTRACTOR TO VERIFY ALL TESTING WITH THE OWNER PRIOR TO COMMENCING CONSTRUCTION. 15. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND CONSTRUCTION STANDARDS ADOPTED BY APPLICABLE LOCAL CODES AND STANDARDS. WHERE CONFLICTS OR OMISSIONS EXIST, THE APPLICABLE LOCAL CODES AND STANDARDS SHALL DICTATE. SUBSTITUTIONS AND DEVIATION FROM PLANS AND SPECIFICATIONS SHALL BE PERMITTED ONLY WHEN THE ENGINEER HAS ISSUED WRITTEN APPROVAL. 16. CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE OWNER AND OWNER'S ENGINEER SHOP DRAWINGS ON ALL PROPOSED ITEMS TO BE CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE OWNER AND OWNER'S ENGINEER SHOP DRAWINGS ON ALL PROPOSED ITEMS TO BE USED ON THIS SITE. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. ENGINEER'S APPROVAL OF A SHOP DRAWING DOES NOT RELIEVE THE CONTRACTOR'S RESPONSIBILITY FOR THE PERFORMANCE OF THE ITEM. 17. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION REQUIREMENTS OF THE VARIOUS IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL AGENCIES. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTIONS ACCORDING TO AGENCY INSTRUCTIONS. NO CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY OTHER DOCUMENTATION FROM ALL OF THE PERMITTING AND ANY OTHER REGULATORY AUTHORITIES. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK INCLUDING ANY PENALTIES, STOP WORK ORDERS ON ADDITIONAL WORK RESULTING FROM THE CONTRACTOR BEING IN VIOLATION OF THE REQUIREMENTS ABOVE SHALL BE FULLY BORNE BY THE CONTRACTOR. 18. WORK BEING PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH THE OWNER'S PLANNED WORK SCHEDULE AND WORK BEING PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH THE OWNER'S PLANNED WORK SCHEDULE AND OTHER WORK BEING PERFORMED ON THE SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE ACTIVITIES, WHERE NECESSARY, WITH THE OWNER, OTHER CONTRACTORS, AND UTILITY COMPANIES. WORK SCHEDULES SHALL BE COMMUNICATED TO THE OWNER REGULARLY SO THAT THE OWNER'S DAILY USAGE OF THE SITE CAN BE COORDINATED WITH CONSTRUCTION SCHEDULES. 19. BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED AND COMPACTED TO A FIRMNESS EQUAL TO THAT OF THE SOIL ADJACENT TO THE BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED AND COMPACTED TO A FIRMNESS EQUAL TO THAT OF THE SOIL ADJACENT TO THE TRENCH AROUND THE PIPES IN 6" LAYERS UP TO AN UNDISTURBED LEVEL OF AT LEAST 1' ABOVE THE TOP OF THE PIPES. 20. REPAIR AND REPLACEMENT OF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION REPAIR AND REPLACEMENT OF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THEN EXISTING CONDITIONS BEFORE COMMENCING CONSTRUCTION WORK UNLESS SPECIFICALLY EXEMPTED BY THE PLANS. ADDITIONAL COSTS ARE INCIDENTAL TO OTHER CONSTRUCTION AND NO EXTRA COMPENSATION WILL BE ALLOWED. 21. RECORD DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING INFORMATION ON A SET OF THE APPROVED PLANS RECORD DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING INFORMATION ON A SET OF THE APPROVED PLANS CONCURRENTLY WITH CONSTRUCTION PROGRESS. WITHIN TWO WEEKS FOLLOWING FINAL INSPECTIONS THE CONTRACTOR SHALL SUBMIT ONE SET OF DRAWINGS TO THE ENGINEER OF RECORD. THE FINAL RECORD DRAWINGS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS. DRAWING TO BE LEGIBLY MARKED TO RECORD ACTUAL CONSTRUCTION. DRAWINGS SHALL SHOW ACTUAL LOCATION OF ALL UTILITIES AND RELATED ITEMS, BOTH ABOVE AND BELOW GROUND. ALL CHANGES TO PIPING LOCATION INCLUDING HORIZONTAL & VERTICAL LOCATIONS OF UTILITIES SHALL BE CLEARLY SHOWN AND REFERENCED TO PERMANENT SURFACE IMPROVEMENTS. DRAWINGS SHALL ALSO SHOW ACTUAL INSTALLED PIPE MATERIAL. DRAWINGS SHALL CLEARLY SHOW ALL FIELD CHANGES OF DIMENSION AND DETAIL. DRAWINGS SHALL CLEARLY SHOW ALL DETAILS NOT ON ORIGINAL CONTRACT DRAWINGS BUT CONSTRUCTED IN THE FIELD. ALL EQUIPMENT AND PIPING RELOCATIONS SHALL BE CLEARLY SHOWN. LOCATIONS OF ALL MANHOLES, HYDRANTS, VALVES AND VALVE BOXES SHALL BE SHOWN. 31. CONTRACTOR SHALL SOD/SEED/REPLANT ALL DISTURBED AREAS TO ORIGINAL PRE-CONSTRUICTION CONDITIONS. CONTRACTOR SHALL SOD/SEED/REPLANT ALL DISTURBED AREAS TO ORIGINAL PRE-CONSTRUICTION CONDITIONS. 32. FOLLOWING CONSTRUCTION, CONTRACTOR SHALL CLEANUP PROJECT SITE TO ORIGINAL PRE-CONSTRUCTION CONDITIONS. FOLLOWING CONSTRUCTION, CONTRACTOR SHALL CLEANUP PROJECT SITE TO ORIGINAL PRE-CONSTRUCTION CONDITIONS. 33. CONTRACTOR SHALL COORDINATE WITH OWNER REGARDING LOCATION OF PROPOSED LAYDOWN YARDS. UPON COMPLETION OF CONTRACTOR SHALL COORDINATE WITH OWNER REGARDING LOCATION OF PROPOSED LAYDOWN YARDS. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE THE LAYDOWN AREAS TO THEIR ORIGINAL CONDITIONS OR BETTER. 34. CONTRACTOR SHALL PROVIDE OWNER WITH PROPOSED PROJECT PHASING PLANS (IF APPLICABLE) PRIOR TO CONSTRUCTION. CONTRACTOR SHALL PROVIDE OWNER WITH PROPOSED PROJECT PHASING PLANS (IF APPLICABLE) PRIOR TO CONSTRUCTION. SURROUNDING ADJACENT FACILITIES SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY TEMPORARY FACILITY SHUTDOWNS SHALL BE APPROVED BY OWNER PRIOR TO SHUT DOWN.
F e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE04
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
DEMOLITION PLAN
PROJECT
NAME:
No. Date Description
FAB
FUEL STATION EXPANSION
FAB
FAB
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
N 0' 2' 4' 8'
GRAPHIC SCALE: 1/4" = 1'-0"
12'
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
PERMIT
08/26/24
08/26/24 Permit Documents
AutoCAD SHX Text APPROXIMATE LOCATION OF NEW 8' 12,000-GALABOVEGROUND STORAGE TANK (SEE SHEET 'PE05')
AutoCAD SHX Text APPROXIMATE LOCATION OF NEW CONCRETE PAD FOR NEW TANK. REMOVE EXISTING ASPHALT, BASE AND SUBGRADE AS REQUIRED FOR NEW CONCRETE INSTALLATION
AutoCAD SHX Text
EXISTING 6,000-GAL ABOVEGROUND TANK TO REMAIN
AutoCAD SHX Text
EXISTING 6,000-GAL ABOVEGROUND TANK TO REMAIN
AutoCAD SHX Text
EXISTING FILTRATION UNIT FOR EXISTING AST-2 TO REMAIN
AutoCAD SHX Text EXISTING FILTRATION SUPPLY AND RETURN PIPING TO AST-1 TO BE REMOVED AND REROUTED TO NEW AST-3 PER INSTALL PLAN SHEET 'PE05' (TYP.)
AutoCAD SHX Text EXISTING FILTRATION UNIT TO AST-1 TO BE MODIFIED AND ROUTED TO NEW AST-3 PER PIPING CHANGE DEPICTED ON 'PE05'
AutoCAD SHX Text REMOVE AND REPLACE GRASS AT TRENCH FOR NEW ELECTRICAL CONDUITS TO EXISTING PANELS
AutoCAD SHX Text
AST-1
AutoCAD SHX Text
AST-2
AutoCAD SHX Text
EXISTING FUEL SYSTEM PANELS AND EQUIPMENT
AutoCAD SHX Text
EXISTING CARD READER TO REMAIN
AutoCAD SHX Text
EXISTING DIESEL DISPENSER TO BE MODIFIED FOR GAS DISPENSING
AutoCAD SHX Text
EXISTING DIESEL DISPENSER TO REMAIN
AutoCAD SHX Text
EXISTING DEF STORAGE AND DISPENSING UNIT TO REMAIN
AutoCAD SHX Text
(DIESEL)
AutoCAD SHX Text
INT
AutoCAD SHX Text
STP
AutoCAD SHX Text
SP
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
EV
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text
PV/CG
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
INT
AutoCAD SHX Text
STP
AutoCAD SHX Text
SP
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
EV
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
(DIESEL)
AutoCAD SHX Text
EXISTING UNDERGROUND FUEL PIPING TO REMAIN
AutoCAD SHX Text
EXISTING UNDERGROUND FUEL PIPING TO REMAIN
AutoCAD SHX Text EXISTING 2" SIPHON MANIFOLD AND FITTINGS TO BE REMOVED; NEW MANIFOLD DEPICTED ON SHEET 'PE05'
PV/CG
e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE05
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
FUEL SYSTEM INSTALL PLAN
PROJECT
NAME:
No. Date Description
FAB
FUEL STATION EXPANSION
FAB
FAB
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
N 0' 2' 4' 8'
GRAPHIC SCALE: 1/4" = 1'-0"
12'
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
PERMIT
08/26/24
08/26/24 Permit Documents
AutoCAD SHX Text NEW 8' UL2085 12,000-GALDOUBLE-WALLED ABOVEGROUND STORAGE TANK (DIESEL); SEE SHEET 'PE06' FOR TANK-TOP LAYOUT
AutoCAD SHX Text EXISTING 8' 6,000-GAL UL2085DOUBLE-WALLED ABOVEGROUND DIESEL STORAGE TANK TO REMAIN
AutoCAD SHX Text EXISTING 8' 6,000-GAL UL2085DOUBLE-WALLED ABOVEGROUND STORAGE TANK TO BE CLEANED AND CONVERTED TO GAS
AutoCAD SHX Text EXISTING DOUBLE-WALLED UNDERGROUND PRODUCT PIPING TO REMAIN AND BE CLEANED AND CONVERTED TO GAS
AutoCAD SHX Text TWO (2) EXISTING DISPENSERS TO REMAIN AND BE CONVERTED FOR GAS USE. REPLACE ALL HANGING HARDWARE AND DISPENSER DOOR PANELS FOR GAS DISPENSING
AutoCAD SHX Text EXISTING DOUBLE-WALLED UNDERGROUND PRODUCT PIPING TO REMAIN AND CONTINUE TO BE USED FOR DIESEL
AutoCAD SHX Text
TWO (2) EXISTING DIESEL DISPENSERS TO REMAIN AND CONTINUE AS DIESEL USE
AutoCAD SHX Text TWO (2) EXISTING DIESEL FILTRATION UNITS TO REMAIN. MODIFY SUPPLY AND RETURN PIPING FOR AST-2 TO SERVICE THE NEW 12,000-GAL DIESEL AST (AST-3)
AutoCAD SHX Text NEW 2" STEEL SIPHON MANIFOLDBETWEEN EXISTING 6,000-GAL DIESEL TANK AND NEW 12,000-GAL DIESEL TANK
AutoCAD SHX Text
LIMITS OF NEW CONCRETE PAD
AutoCAD SHX Text
EXISTING FUEL SYSTEM PANELS AND EQUIPMENT TO REMAIN AND BE MODIFIED FOR NEW TANK
AutoCAD SHX Text
EXISTING BREAKER PANELS TO REMAIN
AutoCAD SHX Text
AST-1
AutoCAD SHX Text
AST-2
AutoCAD SHX Text
AST-3
AutoCAD SHX Text
EXISTING CARD READER TO REMAIN
AutoCAD SHX Text
EXISTING CANOPY COLUMN (TYP. OF 6)
AutoCAD SHX Text
EXISTING DEF STORAGE AND DISPENSING UNIT TO REMAIN
AutoCAD SHX Text
INSTALL SIPHON TUBE FROM STP TO NEW SIPHON MANIFOLD
AutoCAD SHX Text
(DIESEL)
AutoCAD SHX Text
(GAS)
AutoCAD SHX Text
(DIESEL)
AutoCAD SHX Text
SIPHON MANIFOLD CONNECTION AND DROP TUBE AT AST-2 AND AST-3
AutoCAD SHX Text
FILL CONTAINMENT BOX BY TANK MANUFACTURER MOUNTED TO TANK
AutoCAD SHX Text
MODIFY EXISTING STP TO PULL FROM NEW SIPHON MANIFOLD
AutoCAD SHX Text EXISTING UNDERGROUND WATER UTILITY (DEPICTED PER PREVIOUS SITE DESIGN PLANS) TO REMAIN; CONTRACTOR TO PROTECT AND CONFIRM LOCATION PRIOR TO CONSTRUCTION
AutoCAD SHX Text
NEW 6" BOLLARD (TYPICALOF (15) AT 4' CENTERS)
AutoCAD SHX Text
INT
AutoCAD SHX Text
STP
AutoCAD SHX Text
SP
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
EV
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text
PV/CG
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
INT
AutoCAD SHX Text
STP
AutoCAD SHX Text
SP
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
EV
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
INT
AutoCAD SHX Text
SP
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
EV
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
VR
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
VR
AutoCAD SHX Text ADD VAPOR RECOVERY CONNECTION TO EXISTING FILL BOX; SWITCH FILL DROP TUBE LOCATION AND ADD 4" VAPOR RECOVERY PIPE
AutoCAD SHX Text
PV/CG
AutoCAD SHX Text
CG
AutoCAD SHX Text
PV
AutoCAD SHX Text
TM
AutoCAD SHX Text
SUP
AutoCAD SHX Text
SIPH
AutoCAD SHX Text
MW
AutoCAD SHX Text
EV
AutoCAD SHX Text
RET
AutoCAD SHX Text F
AutoCAD SHX Text
SP
AutoCAD SHX Text
CG
AutoCAD SHX Text
PV
AutoCAD SHX Text
INT
AutoCAD SHX Text
STP
AutoCAD SHX Text
- FILL
AutoCAD SHX Text
- SPARE
AutoCAD SHX Text
- CLOCK GAUGE
AutoCAD SHX Text
- DIESEL FILTER RETURN
AutoCAD SHX Text
- EMERGENCY VENT
AutoCAD SHX Text
- MANWAY
AutoCAD SHX Text
- SIPHON MANIFOLD CONNECTION
AutoCAD SHX Text
- DIESEL FILTER SUCTION
AutoCAD SHX Text
- PRIMARY VENT
AutoCAD SHX Text
- TANK LEVEL PROBE
AutoCAD SHX Text
- INTERSTICE SENSOR
AutoCAD SHX Text
- SUBMERSIBLE TRANSFER PUMP
AutoCAD SHX Text
LEGEND - ABOVEGROUND TANK FITTINGS/EQUIPMENT
AutoCAD SHX Text
VR
AutoCAD SHX Text
- VAPOR RECOVERY
AutoCAD SHX Text
3" BLACK STEEL PAINTED FILL PIPE
AutoCAD SHX Text
NEW BATTERY POWERED TANK OVERFILL ALARM BOX MOUNTED TO VERTICAL FILL PIPE
EXISTING EMERGENCY STOP SWITCH TO REMAIN
TANK WIND LOAD AND ANCHORING
24"Ø CONCRETE FOOTING
YARD SURFACE AS
OCCURS
ELASTOMERIC SEALANT
6"Ø ROUND SCH 80 STEEL
FILLED WITH CONCRETE;
PAINT SAFETY YELLOW
9"
'-0
M
IN
'-0
4 BOLLARD DETAIL (TYPICAL)
F e b ru a ry
J:
\5
A T
K
IN
S N o rt h A m e ri ca
In c\
C o lli e r
C o u n ty T ra n si t
A S
T A d d iti o n \C o n st P la n s\
-B
A S
E -3
.d w g
PE06
Sheet Number:Drawn By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
DIESEL FUEL TANK DETAILS
PROJECT
NAME:
No. Date Description
FAB
FUEL STATION EXPANSION
FAB
FAB
12,000 GALLON ABOVEGROUND DIESEL STORAGE TANK DETAIL
NOTES:
1. CONTRACTOR SHALL USE COMPONENTS
THAT SHALL COMPLY WITH ALL (INCLUDING
THROUGHPUT VOLUMES) REQUIREMENTS
OF (NESHAP) EPA REGULATION 40 CFR PART
63 AS APPLICABLE TO THIS PROJECT.
2. REFER TO TANK MANUFACTURER'S DETAILS
AND SPECIFICATIONS FOR ADDITIONAL AST
INFORMATION.
Copyright © Atkins Limited (2023)
+1 813 282 7275 +1 813 282 9767
Tel:
Fax:
4030 West Boy Scout Blvd.
Suite 700 Tampa FL 33607
Tel:
Fax:
www.atkinsglobal.com
C O
L L
IE
R
C O
U N
T Y
F
L O
R
ID
A
100086779
2101 W. SR-434
Suite 135 Longwood, Florida 32779
(407) 206-7222
(407) 206-7223 fax
FL. Cert. of Auth. #8326
F U
E L
T A
N K
A D
D
IT
IO
N
5 DIESEL FILTRATION SYSTEM PIPING DETAILS
2 TANK GROUNDING DETAIL
COLLIER AREA
TRANSIT
8300 RADIO ROAD
NAPLES, FL 34112
239.352.8097
C O
L L
IE
R
A R
E A
T R
A N
S
IT
P A
S S
E N
G E
R T
R A
N S
F E
R F
A C
IL
IT
Y
PERMIT
08/26/24
08/26/24 Permit Documents
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text WIND LOAD: 1. FLORIDA BUILDING CODE 2020 AND ASCE 7-16 FLORIDA BUILDING CODE 2020 AND ASCE 7-16 2. ROOF LIVE LOAD - N.A. ROOF LIVE LOAD - N.A. 3. WIND - 170 MPH. WIND - 170 MPH. 4. RISK CATEGORY - II RISK CATEGORY - II 5. INTERNAL PRESSURE COEFFICIENT - N.A. INTERNAL PRESSURE COEFFICIENT - N.A. 6. COMPONENTS AND CLADDING - ASSUME 81 PSF. COMPONENTS AND CLADDING - ASSUME 81 PSF. 7. SOIL CAPACITY 2000 PSF ASSUMED. SOIL CAPACITY 2000 PSF ASSUMED. 8. TANK WEIGHS APPROXIMATELY 21,900 LBS. TANK WEIGHS APPROXIMATELY 21,900 LBS. 9. TANK IS STABLE WITH A FACTOR OF SAFETY >1.1 TANK IS STABLE WITH A FACTOR OF SAFETY >1.1 WITH ANCHORAGE.
AutoCAD SHX Text NOTE: TANK AND APPURTENANCES WEIGH APPROXIMATELY 21,900 LBS. BASED ON WIND LOAD FOR COLLIER COUNTY AT 170 MPH PER ASCE 7-16 TANK IS STABLE WITH A FACTOR OF SAFETY IN EXCESS OF ±1.1
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text
PROPOSED CONCRETE SLAB (BY OTHERS)
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text PROVIDE 3/4" x12"WEDGE TYPE ANCHORS EMBEDDED 7" INTO CONCRETE (TOTAL 4 AT TANK LEGS) (SEE NOTE FOR WIND LOAD)
AutoCAD SHX Text
TANK SADDLE (TYPICAL OF 2)
AutoCAD SHX Text
NEW UL-2085 12,000 GALLON DOUBLE-WALL ABOVEGROUND STORAGE TANK
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
SECONDARY EMERGENCY VENT
AutoCAD SHX Text
TANK LEVEL MONITOR/PROBE
AutoCAD SHX Text
TANK INTERSTICE SENSOR
AutoCAD SHX Text
CLOCK GAUGE WITH OVERFILL ALARM
AutoCAD SHX Text
FILL TUBE WITH MORRISON 9095AA WITH MORRISON 9095AA 3" OVERFILL PREVENTION VALVE
AutoCAD SHX Text
NEW 12,000 GALLON DOUBLE-WALL UL-2085 DIESEL FUEL ABOVEGROUND TANK
AutoCAD SHX Text
MANWAY
AutoCAD SHX Text
PRIMARY VENT
AutoCAD SHX Text
FILL WITH POSITIVE SHUT OFF DROP TUBE
AutoCAD SHX Text
PRIMARY EMERGENCY VENT
AutoCAD SHX Text 4"x1" DOUBLE TAP BUSHING AND 1" DROP TUBE (SEE DETAIL #1)
AutoCAD SHX Text
1" UNION
AutoCAD SHX Text
1" THREADED NIPPLE
AutoCAD SHX Text
2" THREADED CONNECTOR
AutoCAD SHX Text
OUTSIDE WALL OF TANK
AutoCAD SHX Text
1" MORRISON 910ER MECHANICAL ANTI SIPHON VALVE
AutoCAD SHX Text
1" BALL VALVE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text PROVIDE 3/4" x12" WEDGE TYPE ANCHORSEMBEDDED INTO CONCRETE SLAB (TOTAL 4 AT TANK LEGS)
AutoCAD SHX Text 12' x 40'-9" x 8" THICK 4,000 PSI CONCRETE SLAB (SEE SHEETS 'PE04' & 'PE05')
AutoCAD SHX Text
SPARE 4"
AutoCAD SHX Text
DIESEL FILTRATION RETURN
AutoCAD SHX Text
DIESEL FILTRATION SUCTION WITH DROP TUBE
AutoCAD SHX Text
1" STEEL DROP TUBE WITH FOOT VALVE
AutoCAD SHX Text
SIPHON MANIFOLD AND DROP TUBE
AutoCAD SHX Text
SPARE 4"
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SUCTION
AutoCAD SHX Text 4"x1" DOUBLE TAP BUSHING
AutoCAD SHX Text
1" UNION
AutoCAD SHX Text
1" THREADED NIPPLE
AutoCAD SHX Text
2" THREADED CONNECTOR
AutoCAD SHX Text
OUTSIDE WALL OF TANK
AutoCAD SHX Text
1" BALL VALVE
AutoCAD SHX Text
RETURN
AutoCAD SHX Text 3/4" DIAMETER X 10'-0" LONG COPPER CLAD UL LISTED GROUND ROD OR OTHER ELECTRODE AS SPECIFIED IN NATIONAL ELECTRIC CODE (N.E.C. 250). WITH GROUND CLAMP
AutoCAD SHX Text NOTES: 1. SIZE OF CONDUCTORS SHALL COMPLY WITH N.E.C. TABLE IN SECTION 250. SIZE OF CONDUCTORS SHALL COMPLY WITH N.E.C. TABLE IN SECTION 250. 2. CHECK RESISTANCE TO GROUND. IF RESISTANCE EXCEEDS 25 OHMS INSTALL ADDITIONAL GROUND RODS WITH CONDUCTORS CHECK RESISTANCE TO GROUND. IF RESISTANCE EXCEEDS 25 OHMS INSTALL ADDITIONAL GROUND RODS WITH CONDUCTORS SHOWN, SEPARATED AT LEAST 10'-0" UNTIL RESISTANCE IS REDUCED TO 25 OHMS OR LESS (N.E.C. 250). CONTRACTOR MUST DEMONSTRATE TO OWNER OR INSPECTOR THAT RESISTANCE IS 25 OHMS OR LESS. 3. INSTALL ADDITIONAL GROUNDING POINTS AS/IF REQUIRED BY N.E.C. OR OTHER APPLICABLE CODE(S).INSTALL ADDITIONAL GROUNDING POINTS AS/IF REQUIRED BY N.E.C. OR OTHER APPLICABLE CODE(S).
AutoCAD SHX Text
OPTIONAL GROUND ROD BOX
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text
BARE #6 COPPER TO GROUND ROD
AutoCAD SHX Text NOTE: WHEN RUNNING ABOVE GROUND, USE CONDUIT TO PROTECT GROUND WIRE WHEREVER POSSIBLE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
MECHANICALLY CONNECT TO GROUND LUG (TYP)
AutoCAD SHX Text
REMOTE FILL BOX MOUNTED TO TANK (BY TANK MANUFACTURER)
AutoCAD SHX Text
3" BALL VALVE
AutoCAD SHX Text
3" SCHEDULE 80 BLACK STEEL FILL PIPE(PRIMED AND PAINTED)
AutoCAD SHX Text
MORRISON 9I8 CLOCK GAUGE AND ALARM
AutoCAD SHX Text
TANK OVERFILL ALARM BOX MORRISON 918 MOUNTED TO FILL PIPE
AutoCAD SHX Text
3" CHECK VALVE
3" UNION
CAST-IN-PLACE CONCRETE
1. CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF THE
FOLLOWING CODES AND STANDARDS (LATEST EDITIONS):
A. ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE."
B. ACI 117 "STANDARD TOLERANCES FOR CONCRETE CONSTRUCTION
AND MATERIALS".
C. ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS".
D. ACI 304 "RECOMMENDED PRACTICE FOR MEASURING, MIXING,
TRANSPORTING AND PLACING CONCRETE".
E. ACI 305 "RECOMMENDED PRACTICE FOR HOT WEATHER
CONCRETING".
F. ACI 311 "RECOMMENDED PRACTICE FOR CONCRETE INSPECTION".
G. ACI 347 "RECOMMENDED PRACTICE FOR CONCRETE FORMWORK".
H. ACI 315 "MANUAL OF STANDARD PRACTICE FOR DETAILING
REINFORCED CONCRETE STRUCTURES"
I. ACI MANUAL OF CONCRETE PRACTICE-PARTS 1 THRU 5 AS
APPROPRIATE TO TYPE OF CONSTRUCTION.
J. CRSI "MANUAL OF STANDARD PRACTICE".
2. CONCRETE SHALL BE NORMAL WEIGHT UNO AND SHALL CONFORM TO
ASTM C-94 IN ADDITION TO THE FOLLOWING:
A. PORTLAND CEMENT SHALL MEET ASTM C-150 TYPEI/II.
B1. AGGREGATES FOR SLAB ON GRADE SHALL MEET ASTM C-33
(1" MAX).
B2. AGGREGATES ELSEWHERE SHALL MEET ASTM C-33 (3/4" MAX).
C. AIR ENTRAINING AGENT SHALL MEET ASTM C-260.
D. WATER REDUCING AGENT SHALL MEET ASTM C-494.
E. CALCIUM CHLORIDE SHALL NOT BE USED IN THE MIX.
G. CURING COMPOUND SHALL MEET ASTM C309 TYPE 1 UNO.
3. CONCRETE SHALL HAVE THE MINIMUM ULTIMATE COMPRESSIVE
STRENGTH AT 28 DAYS AS INDICATED BELOW. MIX DESIGNS SHALL BE
APPROVED BY THE ENGINEER BEFORE USE.
CONCRETE MIX REQUIREMENTS
COMPONENT 28-DAY STRENGTH W/C RATIO SLUMP
SLAB-ON-GRADE 4,000 PSI 0.50 4 TO 6 IN
CONCRETE CAST
ABOVE GRADE
4,000 PSI 0.45 4 TO 6 IN
4. FLY ASH, SUBSTITUTING FOR CEMENT, SHALL NOT EXCEED 25% BY
WEIGHT.
5. FOR MASS CONCRETE PLACEMENT AS DEFINED BY ACI 207 FLY ASH,
SUBSTITUTING FOR CEMENT, SHALL NOT EXCEED 30% BY WEIGHT.
6. REINF BARS USED IN CONCRETE SHALL BE GRADE 60 KSI
DEFORMED BAR CONFORMING TO ASTM SPECIFICATION A-615.
REINFORCEMENT SHALL BE RUST,OIL, AND SCALE FREE AND SHALL
BE PLACED AND BENT IN ACCORDANCE WITH THE REFERENCED
STANDARDS INDICATED IN NOTE 1 OF THIS SECTION. SHOP DWGS FOR
REINFORCEMENT LAYOUT, DETAILING, AND PLACING SHALL BE
APPROVED BY THE STRUCT ENGINEER PRIOR TO FABRICATION, SITE
DELIVERY, AND INSTALLATION.
7. WELDED WIRE FABRIC TO BE USED FOR CONCRETE REINFORCEMENT
WHERE INDICATED SHALL CONFORM TO ASTM A-185 AND SHALL BE
FURNISHED IN FLAT SHEETS (RATHER THAN ROLLS). FABRIC SHALL BE
SUPPORTED ON CHAIRS TO MAINTAIN THE PROPER LOCATION WITHIN
THE CONCRETE AND SHALL BE PLACED IN ACCORDANCE WITH THE
REFERENCED STANDARDS INDICATED IN NOTE 1 OF THIS SECTION.
MINIMUM LAP SHALL BE TWO PANELS.
8. CONCRETE SHALL BE CURED IN ACCORDANCE WITH ACI STANDARDS
AND SPECIFICATIONS UTILIZING A CURING COMPOUND WITH
FUGITIVE DYE. THE CONTRACTOR SHALL BEGIN CONCRETE CURING
IMMEDIATELY AFTER FINISHING OPERATIONS ARE COMPLETED.
9. CONCRETE ADMIXTURES SHALL BE UTILIZED ONLY WITH PRIOR
APPROVAL FROM THE STRUCT ENGINEER.
10. CONCRETE ADDITIVES SHALL BE COORDINATED BY THE CONTRACTOR
TO INSURE COMPATIBILITY WITH FLOOR COVERINGS, EXPOSED,
POLISHED, AND STAINED FINISHES AS SPECIFIED BY THE ARCH.
11. CONCRETE TESTING SHALL BE REQUIRED FOR CIP CONCRETE
ELEMENTS AND SHALL BE PERFORMED BY A QUALIFIED, INDEPENDENT
TESTING LAB. MINIMUM TESTING SHALL BE FOR SLUMP IN
ACCORDANCE WITH ASTM C143 AND FOR COMPRESSIVE STRENGTH
IN ACCORDANCE WITH ASTM C39.
12. COMPRESSIVE STRENGTH TESTING SHALL BE CONDUCTED FOR EACH
CLASS, FOR EVERY FIFTY CUBIC YARDS OF CONCRETE PLACED PER
DAY. PLACEMENTS LESS THAN FIFTY CUBIC YARDS SHALL ALSO BE
TESTED PER DAY FOR EACH CLASS. A MINIMUM OF FOUR LAB-CURED
AND SIX FIELD-CURED CYLINDERS SHALL BE COLLECTED. TWO
CYLINDERS SHALL BE KEPT IN RESERVE AND TESTED, IF NECESSARY,
WITH PRIOR APPROVAL FROM THE STRUCT ENGINEER.
13. MIX DESIGN SUBMITTALS SHALL BE SENT TO THE STRUCT ENGINEER
FOR REVIEW AND APPROVAL PRIOR TO CONCRETE PLACEMENT AND
SHALL BE UNIQUELY IDENTIFIED WITH MIX NUMBER AND EXACT
LOCATION WHERE MIX WILL BE PLACED ON THE STRUCTURE.
SUBMITTALS SHALL INCLUDE DATA FROM RECENT FIELD AND LAB
CYLINDER TESTS AND STATISTICAL, TESTED BACK-UP DATA PER ACI
318.
14. CONCRETE TICKETS FOR CONCRETE MIXES DELIVERED TO THE SITE
SHALL IDENTIFY THE EXACT TIME THAT THE MIX IS BATCHED.
CONCRETE PLACEMENT SHALL OCCUR WITHIN ONE AND A HALF
HOURS FROM THE TIME THE PROPORTIONED…