26-8630_Bid_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 26-8630
- Issued by
- Collier County, Florida
About this file
This is a bid schedule document for Collier County, Florida's Invitation to Bid Solicitation 26-8630 for the Collier Area Transit Fuel Station Expansion at Radio Road Facility, a grant-funded construction project. The project encompasses six major work categories: clearing and grading site preparation, fuel systems demolition and conversion (including removal of existing piping and conversion of a 6,000-gallon above-ground storage tank from diesel to gasoline), new fuel systems construction (including installation of a 12,000-gallon double-walled diesel storage tank, vapor recovery connections, overfill alarm systems, and siphon manifolds), sitework demolition, new concrete construction for the tank pad with bollards and sod replacement, and comprehensive electrical work including tank-level probes, sensors, conduit installation, grounding systems, and integration with the existing fuel management system. Sealed bids are due by July 22, 2026, at 3:00 p.m., with a non-mandatory pre-bid meeting scheduled for July 8, 2026, at 10:00 a.m. and an immediate site visit following the meeting, both at 8300 Radio Road, Naples, Florida.
The bid schedule lists all line items with quantities and unit costs, though all unit costs and total costs are currently shown as zero and require vendor completion. The project involves numerous discrete items across fuel system components, concrete work, electrical infrastructure, and site restoration, with quantities ranging from single items to approximately 145 linear feet of grounding loop. As a grant-funded project, this work is financed through external grant sources rather than Collier County general funds. Prospective bidders must register through the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to access complete project documentation and submit their sealed bids.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown
Vendor Name:
| Invitation to Bid Solicitation: 26-8630 | |||||
| Collier Area Transit Fuel Expansion at Radio Road Facility (Grant Funded) | |||||
| Bid Schedule | |||||
| No. | Description | Quantity | Unit | Unit Cost | Total Cost |
| 1 | Clearing & Grading | ||||
| 1.1 | Site preparation for demolition and new construction | 1 | LS | $ - 0 | |
| 1.2 | Fine Grading | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| 2 | Fuel Systems - Existing Conditions/Demolition | ||||
| 2.1 | Remove existing filtration supply and return piping to AST-1 | 15 | LF | $ - 0 | |
| 2.2 | Remove 2" siphon manifold and fittings | 1 | LS | $ - 0 | |
| 2.3 | Clean existing double-walled UG product piping and convert to gas. | 45 | LF | $ - 0 | |
| 2.4 | Clean existing 6,000 GAL double-walled above ground storage tank convert to gas (AST-1) | 1 | EA | $ - 0 | |
| 2.5 | Protect existing underground water utility lines | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| 3 | Fuel Systems - New Construction | ||||
| 3.1 | Furnish and Install all tank equipment | 1 | LS | $ - 0 | |
| 3.2 | New 12,000 Gal. Double Walled Above Ground Strg Tank - Diesel (AST-3) | 1 | EA | $ - 0 | |
| 3.3 | Add Vapor Recovery Connection to existing fill box - Incld. 4" Vapor Recovery Pipe. | 1 | EA | $ - 0 | |
| 3.4 | Switch fill drop tube location | 1 | EA | $ - 0 | |
| 3.5 | New battery powered tank overfill Visual & Audible Alarm Box w/ Alram Acklowledgement Switch/Reset Panel mounted to vertical fill pipe | 1 | EA | $ - 0 | |
| 3.6 | 3" Black Steel fill pipe | 10 | LF | $ - 0 | |
| 3.7 | New 2" steel siphon manifold between existing 6,000 Gal diesel tank and new 12,000 gal diesel tank | 15 | LF | $ - 0 | |
| 3.8 | New siphon manifold Connection & Drop tube at ATS-2 and ATS-3 | 2 | EA | $ - 0 | |
| 3.9 | New Siphon Tube from STP to New Siphon Manifold | 5 | LF | $ - 0 | |
| 3.10 | Modify existing Fuel System Panels and equipment for new tank (Allow) | 4 | EA | $ - 0 | |
| 3.11 | Provide 3/4" x 12" Wedge Type Anchors | 4 | EA | $ - 0 | |
| 3.12 | Diesel filtration suction with drop tube | 1 | EA | $ - 0 | |
| 3.13 | Reroute filtration supply and return piping to new AST-3 | 50 | LF | $ - 0 | |
| 3.14 | New Tank Level Probe, Interstitial Sensor and New Vent | 1 | LS | $ - 0 | |
| 3.15 | Tie-In to existing piping (Supply/Return & Vent Lines) | 2 | EA | $ - 0 | |
| 3.16 | New Filters, Gauges, Fittings | 1 | LS | $ - 0 | |
| 3.17 | Modify existing STP to pull from new siphon manifold | 2 | EA | $ - 0 | |
| 3.18 | Modify existing filtration unit | 1 | EA | $ - 0 | |
| 3.19 | Modify existing dispensers for gas use. Replace all hanging hardware and dispenser door panels for gas dispensing. | 2 | EA | $ - 0 | |
| 3.20 | Provide Fuel System Startup, Testing & Training | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| 4 | Sitework - Demolition | ||||
| 4.1 | Remove existing bus parking stall | 1 | EA | $ - 0 | |
| 4.2 | Remove existing asphalt, base and subgrade for new concrete installation | 53 | SY | $ - 0 | |
| 4.3 | Remove existing grass | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| 5 | New Construction - Site Concrete | ||||
| 5.1 | 12" Thk 4,000 psi Concrete Slab (For New Tank) | 20 | CY | $ - 0 | |
| 5.2 | New 6" Bollards | 15 | EA | $ - 0 | |
| 5.3 | New Sod Replacement | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| 6 | Electrical | ||||
| 6.1 | New Veeder root tank level probe for Diesel tank (AST-3) | 1 | EA | $ - 0 | |
| 6.2 | New Veeder root tank interstitial sensor for Diesel tank (AST-3) | 1 | EA | $ - 0 | |
| 6.3 | Junction Box (Hazardous Rated) | 1 | EA | $ - 0 | |
| 6.4 | 3/4" PVC SCH 80 UG Conduit | 10 | LF | $ - 0 | |
| 6.5 | 3/4" GRC Conduit | 50 | LF | $ - 0 | |
| 6.6 | 3/4" GRC Riser Conduit along Building Wall | 10 | LF | $ - 0 | |
| 6.7 | Belden 88760-002 For Diesel Tank Probe & Sensor Control Wiring | 70 | LF | $ - 0 | |
| 6.8 | Provide sealing and patching for conduit wall penetration as required. Provide conduit rated fittings as required. Provide conduit seal-offs across hazardous boundary as required. | 1 | LS | $ - 0 | |
| 6.9 | Field Verify Fuel Station EPO is functional & Shut-off Power from both the normal power and generator power from bus wash building power distribution panels. Report findings to Engineer | 1 | LS | $ - 0 | |
| 6.10 | Grounding Loop | 145 | LF | $ - 0 | |
| 6.11 | Ground Rods | 2 | EA | $ - 0 | |
| 6.12 | Provide Grounding Bar at existing Fuel Station System Control Room for Electrical System Grounding. Integrate new grounding bar to existing electrical system grounding | 1 | EA | $ - 0 | |
| 6.13 | Connect New Storage Tank to Fuel Station System Grounding | 1 | LS | $ - 0 | |
| 6.14 | Field Verify Fuel System Leak & Overfill Audible & Visual Alarm Devices are part of the existing Fuel Management System | 1 | LS | $ - 0 | |
| 6.15 | Field Coordinate installation of New Diesel Tank Level & Leak (Interstitial) Sensors Integration and Connections to existing Fuel Management System | 1 | LS | $ - 0 | |
| 6.16 | Field Verify Main Electrical Feeder Breaker Serving existing Fuel Station Building Electrical System contains a Hunt-trip Device connected to an Emergency Power Off Device at Fueling Station | 1 | LS | $ - 0 | |
| 6.17 | Field Verify transformer is properly grounded | 1 | LS | $ - 0 | |
| 6.18 | Field Verify Fuel Station Main Disconnect Feeder Breaker at Bus Wash Building MDP has a Shunt-Trip Devices to shut-off Power off (EPO) Device | 1 | LS | $ - 0 | |
| 6.19 | Field Verify Fuel Station ATS Emergency Feeder Breaker at Bus Wash Building GDP has Shunt-Trip Device Interlocked with EPO at Fuel Station Building | 1 | LS | $ - 0 | |
| 6.20 | Electrical Sitework | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Total Cost | $ - 0 |
File details come from the government source that posted it. Updated .