25R0002 - Attachment IX(J) - Technical Offer Worksheet.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
USWC JONES ACT TANKER
Solicitation number
N3220525R0002
Issued by

About this file

This is a Technical Offer Worksheet template that outlines 12 specific requirements offerors must address when submitting proposals for a Jones Act compliant tanker vessel to the Department of the Navy Military Sealift Command. The worksheet requires documentation and warranties related to vessel safety, security, and operational capabilities including: Ship Inspection Report (SIRE) System participation, current Q-88 documentation, vessel approval status, stowage plans, Safety Management Certificate, International Ship Security Certificate, and Certificate of Inspection.

The technical requirements specifically focus on the vessel's cargo handling capabilities, including details about tank coatings (excluding coal tar coating), heating coil specifications (with restrictions on copper/yellow metal compounds for Jet Fuel), and a six-month cargo history. The vessel must be capable of carrying clean products like F76, JP5, JP8, or JA1 with a minimum capacity of 280,000 BBLs within segregated tanks featuring double valve isolation, Segregated Ballast Tanks (SBT), and Inert Gas System (IGS).

View the file

Other files

File Type Posted
25R0002 - Attachment IX(J) - Technical Offer Worksheet (A0003).xlsx XLSX spreadsheet
N3220525R0002-A0003.pdf PDF
N3220525R0002-A0002.pdf PDF
N3220525R0002-A0001.pdf PDF
N3220525R0002.pdf PDF
25R0002 - Attachment IX(B-1) - Wage Determination (CBA-2025-59).pdf PDF
25R0002 - Attachment IX(H) - DD Form 254.pdf PDF
25R0002 - Attachment IX(L) - CBRN.docx DOCX document
25R0002 - Attachment IX(E) - GFP.xlsx XLSX spreadsheet
25R0002 - Attachment IX(Q) - MECSP Worksheet.docx DOCX document
25R0002 - Attachment IX(G) - Crew Complement.docx DOCX document
25R0002 - Attachment IX(F) - Basic Pricing Data.xlsx XLSX spreadsheet
25R0002 - Attachment IX(K) - ATFP.pdf PDF
25R0002 - Attachment IX(O) - CONSOL Station Requirement.docx DOCX document
25R0002 - Attachment IX(N) - Shipboard Security System.docx DOCX document
25R0002 - Attachment IX(S) - MSC SOM.pdf PDF
25R0002 - Attachment IX(I) - PWS.docx DOCX document
25R0002 - Attachment IX(B-2) - Wage Determination (CBA-2025-60).pdf PDF
25R0002 - Attachment IX(M) - CBR-D Decon Station.pdf PDF
25R0002 - Attachment IX(D) - Shipyard Data Information Template.xls XLS spreadsheet
25R0002 - Attachment IX(R) - Contract Data Requirement List.docx DOCX document
25R0002 - Attachment IX(T) - Clarification and Question Form.docx DOCX document
25R0002 - Attachment IX(P) - SFLLL.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL OFFER WORKSHEET
Technical Proposal
RequirementRequirement DescriptionOfferor
Page # / Box #COMMENTS
Section 3.1Warrant that vessel is a party to the Ship Inspection Report (SIRE) System and date of last SIRE report or, in the event of a new contruction is offered, a warrant that vessel will be a party to the SIRE System and confirmation that a copy of the current report will be provided as soon as possible post-award.
Section 3.2Copy of the vessel's current Q-88. Not more than sixty (60) days old.
Section 3.3Warrant that the vessel has has not been rejected or refused by any Charterer or refinery since becoming a party to the (SIRE) System.
Section 3.4Warrant that, in addition to Jones Act Compliance, the vessel is or will be approved for non-coastwise voyages.
Section 3.5Stowage plans for each cargo listed in Attachment IX(I), Paragraph (c).
Section 3.6Copy of vessel’s current Class Society issued Safety Management Certificate (SMC) or, in the event of a new contruction is offered, a warrant that the vessel will be issued a Safety Management Certificate and confirmation that a copy will be provide after award immediately upon its issuance.
Section 3.7Copy of vessel’s current Flag State issued International Ship Security Certificate (ISSC) or, in the event of a new contruction is offered, a warrant that the vessel will be issued an International Ship Security Certificate and confirmation that a copy will be provide after award immediately upon its issuance.
Section 3.8Copy of vessel's Certificate of Inspection (COI) or, in the event of a new contruction is offered, a warrant that the vessel will be issued a COI and confirmation that a copy will be provide after award immediately upon its issuance.
Section 3.9Provide, if vessel cargo tanks are or will be internally coated, the coil type or composition (such as stainless steel, copper, etc.). Vessels with coil types or compositions that are incompatible with the fuel to be carried will be rejected.
Section 3.10If vessel cargo tanks have heating coils, provide the date heating coils were last pressure tested and the results of the test (passed or failed). Date of last pressure test shall be within 12 months of the date of offer and, thereafter, cannot exceed 12 months for duration of this charter. Vessel tanks with copper or yellow metal compounds are not acceptable for Jet Fuel cargoes.
Section 3.11Provide a listing of all cargoes carried for the previous six months and the refineries these cargoes were loaded.
Section 3.12Provide, if vessel cargo tanks are or will be internally coated, the coating type (epoxy, inorganic zinc, etc.). Coal tar coating is not acceptable. If tanks are not or will not be coated then state “none”. Vessels with coatings that are incompatible with the fuel to be carried will be rejected.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .