Section 26 41 00.doc
DOC document 47 KB Posted
- Attached to
- Request for Proposals- New Modular office, including demolition, at the William J. Hughes Technical CEnter
- Solicitation number
- 25350
About this file
Section 26 41 00 (doc)
View the file
Other files
Show 40 more
Latest 50 of 149 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modular Office Building No. 365
2016005
SECTION 26 41 00
LIGHTNING PROTECTION SYSTEM
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81
(2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
(2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
NFPA 780
(2014) Standard for the Installation of Lightning Protection Systems
U.S. AIR FORCE (USAF)
AFI 32-1065
(1998) Grounding Systems
UNDERWRITERS LABORATORIES (UL)
UL 467
(2007) Grounding and Bonding Equipment
UL 96
(2005; Reprint Mar 2015) Standard for Lightning Protection Components UL Electrical Construction (2012) Electrical Construction Equipment Directory
1.2 RELATED REQUIREMENTS
1.2.1 Verification of Dimensions
Confirm all details of work, verify all dimensions in field, and advise Contracting Officer of any discrepancy before performing work. Obtain prior approval of Contracting Officer before making any departures from the design.
1.2.2 System Requirements
Provide a system furnished under this specification consisting of the latest UL Listed products of a manufacturer regularly engaged in production of lightning protection system components. Comply with NFPA 70, NFPA 780, and UL 96.
1.2.3 Lightning Protection System Installers Documentation
Provide documentation showing that the installer is certified with a commercial third-party inspection company whose sole work is lightning protection, or is a UL Listed Lightning Protection Installer. In either case, the documentation must show that they have completed and passed the requirements for certification or listing, and have a minimum of 2 years documented experience installing lightning protection systems for DoD projects of similar scope and complexity.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings Overall lightning protection system; G SD-06 Test Reports Lightning Protection and Grounding System Test; G SD-07 Certificates Lightning Protection System Installers Documentation; G Component UL Listed and Labeled; G Lightning protection system inspection certificate; G Roof manufacturer's warranty; G
1.4 QUALITY ASSURANCE
In each standard referred to herein, consider the advisory provisions to be mandatory, as though the word "shall" or "must" has been substituted for "should" wherever it appears. Interpret references in these standards to "authority having jurisdiction," or words of similar meaning, to mean Contracting Officer.
1.4.1 Installation Drawings
1.4.1.1 Overall System Drawing
Submit installation shop drawing for the overall lightning protection system. Include on the drawings the physical layout of the equipment (plan view and elevations), mounting details, relationship to other parts of the work, and wiring diagrams.
1.4.1.2 Major Components
Submit detail drawings for each major component including manufacturer's descriptive and technical literature, catalog cuts, and installation instructions.
1.4.2 Component UL Listed and Labeled
Submit proof of compliance that components are UL Listed and Labeled. Listing alone in UL Electrical Constructn, which is the UL Electrical Construction Directory, is not acceptable evidence. In lieu of Listed and Labeled, submit written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that items have been tested and conform to requirements and testing methods of Underwriters Laboratories.
1.4.3 Lightning Protection System Inspection Certificate
Provide certification from a commercial third-party inspection company whose sole work is lightning protection, stating that the lightning protection system complies with NFPA 780 and AFI 32-1065. Third party inspection company cannot be the system installer or the system designer. Alternatively, provide a UL Lightning Protection Inspection Master Label Certificate for each facility indicating compliance to NFPA 780 and FAA-Std 19. In either case, FAA Std-19 takes precedence over NFPA 780, whether or not it is more stringent.
Inspection must cover every connection, air terminal, conductor, fastener, accessible grounding point and other components of the lightning protection system to ensure 100% system compliance. This includes witnessing the tests for the resistance measurements for ground rods with test wells, and for continuity measurements for bonds. It also includes verification of proper surge protective devices for power, data and telecommunication systems. Random sampling or partial inspection of a facility is not acceptable.
1.5 SITE CONDITIONS
Confirm all details of work, verify all dimensions in field, and advise Contracting Officer of any discrepancy before performing work. Obtain prior approval of Contracting Officer before changing the design.
PART 2 PRODUCTS
2.1 MATERIALS
Do not use a combination of materials that forms an electrolytic couple of such nature that corrosion is accelerated in the presence of moisture unless moisture is permanently excluded from the junction of such metals. Where unusual conditions exist which would cause corrosion of conductors, provide conductors with protective coatings, such as tin or lead, or oversize conductors. Where a mechanical hazard is involved, increase conductor size to compensate for the hazard or protect conductors. When metallic conduit or tubing is provided, electrically bond conductor to conduit or tubing at the upper and lower ends by clamp type connectors or welds (including exothermic). All lightning protection components, such as bonding plates, air terminals, air terminal supports and braces, chimney bands, clips, connector fittings, and fasteners are to comply with the requirements of UL 96 classes as applicable.
2.1.1 Main and Bonding Conductors
NFPA 780 and UL 96 Class II, or Class II modified materials as applicable.
2.1.2 Copper Only
Provide copper conductors, except where aluminum conductors are required for connection to aluminum equipment.
]2.2 COMPONENTS
2.2.1 Air Terminals
Provide solid air terminals with a blunt tip. Tubular air terminals are not permitted. Support air terminals more than 600 mm (24 inches) in length by suitable brace, supported at not less than one-half the height of the terminal.
2.2.2 Ground Rods
Provide [ground rods made of solid copper conforming to conform to UL 467. Provide ground rods that are not less than 20 mm (3/4 inch) in diameter and 3000 mm (10 feet) in length. Do not mix ground rods of copper-clad steel or solid copper on the job.
2.2.3 Connections and Terminations
Provide connectors for splicing conductors that conform to UL 96, class as applicable. Conductor connections can be made by clamps or welds (including exothermic). Provide style and size connectors required for the installation.
2.2.4 Connector Fittings
Provide connector fittings for "end-to-end", "Tee", or "Y" splices that conform to NFPA 780 and UL 96.
PART 3 EXECUTION
3.1 INTEGRAL SYSTEM
Provide a lightning protection system that meets the requirements of NFPA 780, including tie-ins to existing lightning protection systems. Lightning protection system consists of air terminals, roof conductors, down conductors, ground connections, and grounding electrodes and ground ring electrode conductor. Expose conductors on the structures except where conductors are required to be in protective sleeves. Bond secondary conductors with grounded metallic parts within the building. Make interconnections within side-flash distances at or below the level of the grounded metallic parts.
3.1.1 Roof-Mounted Components
Coordinate with the roofing manufacturer and provide certification that the roof manufacturer's warranty is not violated by the installation methods for air terminals and roof conductors.
3.1.1.1 Air Terminals
Use adhesive shoes with adhesive approved by the roof manufacturer when installing air terminals on "rubber" (EPDM) type roofs. In areas of snow or constant wind, ensure that a section of roofing material (minimum dimensional area of 92,900 square mm (1 square foot)) is first glued to the roof and then the air terminal is glued to it unless the roof manufacturer recommends another solution.
3.1.1.2 Roof Conductors
Use adhesive shoes with adhesive approved by the roof manufacturer when installing roof conductors on "rubber" (EPDM) type roofs.
3.1.2 Down Conductors
Protect exposed down conductors from physical damage as required by NFPA 780. Use Schedule 80 PVC to protect down conductors. Paint the Schedule 80 PVC to match the surrounding surface with paint that is approved for use on PVC.
3.1.3 Ground Connections
Attach each down conductor and ground ring electrode to ground rods by welding (including exothermic),or brazing. All connections to ground rods below ground level must be by exothermic weld. Accessible connections above ground level can be accomplished by mechanical clamping.
3.1.4 Grounding Electrodes
Extend driven ground rods vertically into the existing undisturbed earth for a distance of not less 3000 mm (10 feet). Set ground rods not less than 915 mm (3 feet) nor more than 2440 mm (8 feet), from the structure foundation, and at least beyond the drip line for the facility. After the completed installation, measure the total resistance to ground using the fall-of-potential method described in IEEE 81. For ground ring electrode, provide continuous No. 4/0 bare stranded copper cable. Lay ground ring electrode around the perimeter of the structure in a trench not less than 915 mm (3 feet) nor more than 2440 mm (8 feet) from the nearest point of the structure foundation, and at least beyond the drip line for the facility. Install ground ring electrode to a minimum depth of 765 mm (30 inches). Install a ground ring electrode in earth undisturbed by excavation, not earth fill, and do not locate beneath roof overhang, or wholly under paved areas or roadways where rainfall cannot penetrate to keep soil moist in the vicinity of the cable.
3.2 APPLICATIONS
3.2.1 Nonmetallic Exterior Walls with Metallic Roof
Bond metal roof sections together which are insulated from each other so that they are electrically continuous, having a surface contact of at least 1935 square mm (3 square inches).
3.3 RESTORATION
Where sod has been removed, place sod as soon as possible after completing the backfilling. Restore, to original condition, the areas disturbed by trenching, storing of dirt, cable laying, and other work. Overfill to accommodate for settling. Include necessary topsoil, fertilizing, liming, seeding, sodding, sprigging or mulching in any restoration. Maintain disturbed surfaces and replacements until final acceptance.
3.4 FIELD QUALITY CONTROL
3.4.1 Lightning Protection and Grounding System Test
Test the lightning protection and grounding system to ensure continuity is not in excess of 1 ohm and that resistance to ground is not in excess of 5 ohms. Provide documentation for the measured values at each test point. Test the ground rod for resistance to ground before making connections to the rod. Tie the grounding system together and test for resistance to ground. Make resistance measurements in dry weather, not earlier than 48 hours after rainfall. Include in the written report: locations of test points, measured values for continuity and ground resistances, and soil conditions at the time that measurements were made. Submit results of each test to the Contracting Officer.
-- End of Section -- Section 26 41 00 Page 1