Daily Inspection Report.doc
DOC document 54 KB Posted
- Attached to
- Request for Proposals- New Modular office, including demolition, at the William J. Hughes Technical CEnter
- Solicitation number
- 25350
About this file
Daily Inspection Report (doc)
View the file
Other files
Show 40 more
Latest 50 of 149 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAILY CONSTRUCTION INSPECTION REPORT
FORMCHECKBOX
General
FORMCHECKBOX
Structural Start Date:
FORMCHECKBOX
Architectural
FORMCHECKBOX
Mechanical Completion Date:
FORMCHECKBOX
Civil
FORMCHECKBOX
Electrical Report Date:
Sheet
| Report No. |
| Temp. A.M. |
| Temp. P.M. |
| Weather A.M. |
| Weather P.M. |
| 1 |
| of |
| 1 |
Prime Contractor:
Contractor’s Supt.
Contract No.
Job Name
Prime & Sub-Contractor’s Forces
(List Separately) Work performed or In Progress
| No. |
| Trade |
| Hours |
| Description |
| YES |
| NO |
| YES |
| NO |
Was heavy equipment used today?
Were any photos taken today?
Was any work performed today? If not, why?
Was there any damage to Gov’t property? If so, explain.
Is contract workmanship satisfactory? If not, why?
Was there any Government Furnished Material supplied to contractor? If so, list
Was all work performed today under this contract inspected?
If not, explain
Is contractor on schedule?
Are delivered contractor materials satisfactory? If not, explain.
Were there any unusual occurrences which should be brought to the attention of the C.O.? If so, explain
REMARKS: (If additional space is required, use continuation sheet(s). CT Form 6900-3.1.
Jersey had broken Hydraulic line for their backhoe was fixed without incident
J Wolfe signed a field change for the concrete handicapped ramp
Construction activity proceeded without incident
I CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF, ALL WORK PERFORMED OR IN PROGRESS AS NOTED
ABOVE WAS INSPECTED, ACCEPTED, AND IS IN ACCORDANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, REVIEWED
Chief Inspector
| UNLESS OTHERWISE STATED UNDER ‘REMARKS’. |
| Resident Engineer |
CONSTRUCTION REPRESENTATIVE: _________________________________________________________________________