Section 01 57 19.doc
DOC document 79 KB Posted
- Attached to
- Request for Proposals- New Modular office, including demolition, at the William J. Hughes Technical CEnter
- Solicitation number
- 25350
About this file
Section 01 57 19 (doc)
View the file
Other files
Show 40 more
Latest 50 of 149 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
1.1
SUMMARY
This section covers the furnishing of all labor, materials, and equipment and performing all work required for the protection of the environment during construction operations except for those measures set forth in other sections of these specifications.
1.2
REFERENCES
APPLICABLE PUBLICATIONS: The publications listed below are integral to this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. Department of Labor, Occupational Safety and Health Administration (OSHA) Regulations, including but not limited to:
29 CFR 1910.12
Subpart B - Adoption and Extension of Established Federal Standards, Construction Work
29 CFR 1910.94
Subpart G - Occupational Health and Environmental Control, Ventilation
29 CFR 1910.95
Subpart G - Occupational Health and Environmental Control, Occupational Noise Exposure
29 CFR 1910.106
Subpart H - Hazardous Materials, Flammable and Combustible Liquids
29 CFR 1910.109
Subpart H - Hazardous Material, Explosives and Blasting Agents
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1910.120 Hazardous Waste Operations and Emergency Response
29 CFR 1910.134
Subpart I - Personal Protective Equipment, Respiratory Protection
29 CFR 1910.178
Subpart N - Materials Handling and Storage, Powered Industrial Truck
29 CFR 1910.1000 Subpart Z- Toxic and Hazardous Substances, Air
Contaminants
29 CFR 1910.1200 Subpart Z - Toxic and Hazardous Substances Hazard Communication
29 CFR 1926.21
Subpart C - Safety Training and Education
29 CFR 1926.350
Subpart J - Welding and Cutting
Environmental Protection Agency (EPA) Regulations:
40 CFR 51
Federal Conformity Determination for Federal Actions
40 CFR 261
Identification and Listing of Hazardous Waste
40 CFR 262
Standards Applicable to Generators of Hazardous Waste
40 CFR 263
Standards Applicable to Transporters of Hazardous Waste
40 CFR 264
Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 300
National Contingency Plan
New Jersey Administrative Code (NJAC):
NJAC 2:90
State Soil Conservation Committee
NJAC 7:1E
Discharges of Petroleum and Other Hazardous Substances
NJAC 7:9
Water Pollution Control
NJAC 7:10
Safe Drinking Water Act
NJAC 7:14A
The New Jersey Pollutant Discharge Elimination System
NJAC 7:18
Regulations Governing the Certification of Laboratories and Environmental Measurements
NJAC 7:19
Water Supply Allocation Permits
NJAC 7:26
Solid Waste
NJAC 7:26G
Hazardous Waste
NJAC 7:27
Bureau of Air Pollution Control Regulations
NJAC 7:30
Pesticide Control Code
Federal Aviation Regulations (FAR)
FAR Part 77 – Obstructions
FAR Part 139 – Wildlife Hazards/Attractants
Federal Aviation Administration (FAA) Orders 1050.1F
Policies and Procedures for Considering Environmental Impacts
1050.10D
Prevention, Control, and Abatement of Environmental Pollution at FAA Facilities
1050.12
Application of Nonrestricted and Restricted-Use Facilities
1050.17
Airway Facilities Environmental and Safety Compliance Program
3900.13B
Personal Protective Equipment and Clothing
3900.24A
Accident and Fire Reporting
3900.25
Respiratory Protection Program
4443.
Building Permit
Federal Aviation Administration William J. Hughes Technical Center (Center) Orders
1050.2
Recycling
3900.55
Occupational Safety and Health 3900.19B
Occupational Safety and Health Program Army Corps of Engineers (COE)
COE EM-385-1-1
1996 Corps of Engineers Safety and Health Requirements Manual
1.3 DEFINITIONS
1.3.1 Chemical Wastes
This includes salts, acids, alkali’s, herbicides, pesticides, and organic chemicals.
1.3.2 Debris
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.
1.3.3 Discharge
Any intentional or unintentional action or omission resulting in the releasing, spilling, leaking, pumping, pouring, emitting, emptying or dumping of hazardous substance into surface or ground waters or onto lands from which it might flow or drain into said waters or into the air.
1.3.4 Drip Line
The outer most horizontal perimeter of the foliage or limbs of trees and shrubs.
1.3.5 Hazardous Substance
Such elements and compounds, including petroleum, petroleum products, pesticides, solvents and other substances as set forth NJAC 7:E.
1.3.6 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
1.3.7 Oily Waste
Petroleum products and bituminous materials.
1.3.8 Pollutant
Any dredged spoil, solid waste, sewage, garbage, refuse, oil, grease, sewage sludge, munitions, chemical wastes, biological materials, thermal waste, wrecked or discarded equipment, rock, sand, construction waste or runoff or other residue discharged to the land, ground waters or surface waters.
1.3.9 Rubbish
Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
1.3.10 Sanitary Wastes
1.3.10.1 Sewage
Wastes characterized as domestic sanitary sewage.
1.3.10.2 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.3.11 Sediment
Soil and other debris that have eroded and have been transported by runoff water or wind.
1.3.12 Solid Waste
Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.3.13 Volatile Organic Substance
Any organic substances, mixture of organic and inorganic substances including, but not limited to , petroleum crudes, petroleum fractions, petrochemicals, solvents, diluents, and thinners which have vapor pressures or sums of partial pressures of substances of 0.02 pounds per square inch (one millimeter of mercury) absolute or greater measured at standard conditions of atmospheric pressure and a temperature of 60 degrees Fahrenheit; in the case of surface coating formulations, includes coalescing or other agent, regardless of vapor pressure, which evaporates from the coating during the drying phase; but does not include methane, CFC-11, CFC-12, CFC-22, FC-23, CFC-113, CFC-114 and CFC-115.
1.3.14 Wetlands
Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs and similar areas. National Wetland Inventory Maps, promulgated by the U.S. Fish and Wildlife Service, shall be used to identify wetlands to be protected. Maps are available from the Fish and Wildlife Service and the New Jersey Department of Environmental Protection.
1.4 SUBMITTALS
1.4.1 SD-08, Statements
1.4.1.1 Site Safety and Health Plan (SSHP)
The Contractor shall submit four copies of a SSHP to the Contracting Officer within ten (10) calendar days after contract award.
1.4.1.2 Monthly Recycling Report
1.4.2 SD-18, Records
1.4.2.1 Disposal permit for hazardous waste
Submit five (5) copies of the applicable EPA and state permits or licenses for transportation, treatment, storage, and disposal of hazardous waste by permitted facilities.
1.4.2.2 Laboratory Analysis
Submit three copies of an approved laboratory analysis of materials collected before disposing of waste materials. The laboratory shall be certified by the State of New Jersey for each parameter performed in accordance with NJAC 7:18-1.1 et. seq.
1.4.2.3 Material Safety Data Sheets (MSDS)
Submit (3) copies of all MSDS for each material to be used in accordance with 29 CFR 1910.1200, Subpart Z.
1.4.2.4 Revegetation Plan
Submit five (5) copies of the revegetation plan
1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, all environmental protection measures established, during the life of the contract. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with all applicable Federal, state, and local regulations pertaining to the environment, including but not limited to water, air, soil, sediment, wetlands, floodplains, and noise pollution.
1.5.1 Revegetation Plan
Within five (5) days after the Notice to Proceed, the Contractor shall meet with the Contracting Officer to discuss the proposed revegetation plan and to develop mutual understanding relative to the details of the revegetation including measures to provide for revegetation of the site in accordance with New Jersey Administrative Code 7:50.
Fourteen (14) days after the revegetation plan meeting, submit to the Contracting Officer the proposed revegetation plan for further discussion, review, and approval.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
3.1.1 Land Resources
3.1.1.1 Temporary Construction
Remove traces of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other signs of construction. Grade temporary roads, parking areas, and similar temporarily used areas to conform with surrounding contours. Temporary construction facilities shall not be located in or encroach wetlands, streams or wildlife management areas unless prior approval has been received from the Contracting Officer.
3.1.2 Water Resources
3.1.2.1 Oily Wastes
Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Any tank utilized for storage shall be double walled and designed to contain the type of liquids required for the project as well as providing secondary containment. Surround all temporary fuel oil or petroleum storage tanks with a temporary earth berm of sufficient size and strength to contain 110% (by volume) of the contents of the tanks in the event of leakage or spillage. The berm shall be covered by poly sheeting to protect the soil from contamination that might occur from the filling, draining, or failure of the tank. All spills and discharges of oily or other hazardous substances shall be immediately reported to the Contracting Officer or authorized representative in accordance with NJAC 7:1E-2.14, Standard Operating Procedures.
3.1.2.2 Wetlands Protection
Except in conformance with an issued Federal or State permit do not disturb, alter, fill, affect, drain, encroach upon or destroy any wetlands. Do not disturb, alter, fill, affect, encroach upon, or destroy upland buffers within 150 feet of wetlands or alter surface or ground water flows into or from wetlands. Do not allow the discharge of petroleum products, pesticides, hazardous substances, chemicals, solid wastes or silt into wetlands. Do not stage construction materials, supplies, or equipment in wetlands or floodplains.
3.1.3 Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified. Protect and do not alter, modify or affect endangered or threatened species habitat. Protect other noted critical fish and wildlife habitats.
3.1.3.1 Wildlife Hazard Abatement
Comply with the requirements and recommendations set forth in FAR Part 139 or as approved by the Contracting Officer.
3.2 HISTORICAL AND ARCHAEOLOGICAL RESOURCES
Carefully protect in-place and report immediately to the Contracting Officer items having possible historical and archaeological interest or human skeletal remains discovered in the course of work. Stop work in the immediate area of the discovery until directed by the Contracting Officer to resume work. Protect monuments, markers, and works of art.
3.3 EROSION AND SEDIMENT CONTROL MEASURES
Soil erosion measures shall comply with the Standards for Soil Erosion and Sediment Control in New Jersey, revised April 1987, in accordance with NJAC 2:90 et. seq. and as indicated on the drawings.
3.3.1 Burnoff
Burnoff of the ground cover is not permitted.
3.3.2 Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified. Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.
3.3.3 Temporary Protection of Erodible Soils
Use the following methods to prevent erosion and control sedimentation:
3.3.3.1 Mechanical Retardation and Control of Runoff
Mechanically retard and control the rate of runoff from the construction site. This includes construction of diversion ditches, benches, and berms to retard and divert runoff to protected drainage courses.
3.3.3.2 Borrow
Permitted only in areas where suitable environmental controls are possible and upon the approval of the Contracting Officer. Borrow areas shall not be constructed in wetlands or in environmentally sensitive areas.
3.3.3.3 Vegetation and Mulch
Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control. Revegetate in accordance with approved revegetation plan.
a.
Seeding: Provide new seeding where ground is disturbed. Seed type shall be consistent with NJAC 7:50 requirements. Include topsoil or nutriment during the seeding operation necessary to establish or reestablish a suitable stand of grass. The topsoil and seeding operation shall be as indicated on the drawings.
3.4 CONTROL AND DISPOSAL OF SOLID AND SANITARY WASTES
Pick up solid wastes, and place in containers which are regularly emptied. Do not prepare, cook, or dispose of food on the project site. Prevent contamination of the site of other areas when handling and disposing of wastes. On completion, leave the areas clean. Control and dispose of waste.
3.4.1 Disposal of Rubbish and Debris
Dispose of rubbish and debris in accordance with the requirements specified. Remove and dispose rubbish and debris from Government property at a properly licensed facility.
3.4.2 Garbage Disposal
Place garbage in approved containers and remove and dispose of garbage from Government property at a properly licensed facility.
3.4.3 Sewage, Odor, and Pest Control
Use chemical toilets or comparably effective units, and periodically empty wastes into a district sanitary sewage system. Include provisions for pest control in accordance with NJAC 7:30 and elimination of odors. Sewage discharges onto the land or into surface or ground water from leaks, spills or broken pipes must immediately be reported to the Security Operations Center.
3.4.4 Recycling
The Contractor shall comply with Center Order 1050.2.
On a monthly basis the Contractor shall provide a written report of the volume or weight of the following recycled materials:
Office – Paper, aluminum cans, glass containers of all colors, triangle 1 and 2 plastics, and cardboard.
Construction – Concrete, asphalt, iron, steel, carbon, bulk aluminum, copper, bulk plastics, batteries, oil, and fuel.
3.5 CONTROL AND DISPOSAL OF HAZARDOUS WASTE
3.5.1 Hazardous Storage Containers
Choose approved containers utilizing the Hazardous Materials Table (HMT) in 49 CFR 172.101. Refer to 49 CFR 173 to ensure manufacturing is in compliance with 49 CFR 178. Store hazardous waste in approved containers properly labeled to identify the type of waste and the date the container was filled. Remove the containers from the project site, and handle, transport and dispose of hazardous waste within 90 days in accordance with 40 CFR 263, 40 CFR 264 and NJAC 7:26-7.1 through 12.1 et. seq. and paragraph 3.8 of this section. For oil and hazardous material spills, notify the Contracting Officer immediately.
3.5.2 Petroleum Products
Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation. Dispose of lubricants to be discarded and all excess oil as hazardous waste in accordance with NJAC 7:26G-7.1 to 9.1 et. seq.
3.5.3 Lead-Acid Battery Electrolyte
Dispose of electrolyte solution from lead-acid batteries. Do not dump electrolyte onto the ground or into storm drains or sanitary sewers. Comply with 29 CFR 1910.178(g), when installing or charging storage batteries. Use one of the following alternatives for disposal of waste electrolyte:
a.
An industrial waste treatment plant, if available and approved by the Contracting Officer for neutralizing and disposing of battery acid electrolyte.
b.
Transport the electrolyte to a state-approved hazardous waste disposal site. The method of transportation and equipment shall comply with applicable Federal and state regulations.
3.5.4 Discharges
Prevent discharges of hazardous materials or pollutants from entering the environment. If an accidental leak occurs, take immediate steps to contain free flowing liquid, e.g. construct temporary containment dikes using soil. All spills and discharges of hazardous materials shall be immediately reported to the Security Operations Center and the Contracting Officer in accordance with NJAC 1:E-2.14, Standard Operating Procedures.
3.6 DUST CONTROL
Keep dust down at all times, including during nonworking periods. Sprinkle or treat, using water only, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
3.7 NOISE
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.
3.8 HAZARDOUS WASTE GENERATION
Handle generated hazardous waste (e.g. paints, oils, solvents, fuels, dielectric oil, etc.) in accordance with NJAC 7:26G-7.1 to 9.1 et. seq. and with 40 CFR 262. All hazardous waste shall be properly classified, packaged, marked and labeled prior to removal to a disposal facility.
3.8.1 Hazardous Waste Transportation
Transport hazardous waste in accordance with NJAC 7: 26G-7.1 to 9.1 et. seq. A hazardous waste manifest will be prepared for each shipment of hazardous waste. The transporter shall possess a valid Environmental Protection Agency (EPA) identification number and also be registered as a hazardous waste hauler with the State of New Jersey Department of Environmental Protection and any other applicable State. The Contracting Officer shall be notified at least five days prior to removal of any hazardous waste from the Technical Center.
A copy of the manifest shall be forwarded to the government for review prior to any shipping of waste to allow time for corrections. Only the government or approved contractor may sign manifests. All original copies are to be forwarded to the Environmental Engineering Group, ANG-E333 within 24 hours for processing to the NJDEP.
3.9 HAZARDOUS WASTE DISPOSAL
Dispose of hazardous waste in accordance with NJAC 7:2626G-7.1 to 9.1 et. seq., 40 CFR 263 and 40 CFR 264. All hazardous waste shall be transported to a treatment, storage and/or disposal facility that is either permitted or possess interim status under the Resource Conservation and Recovery Act and/or the State which the facility is located. All hazardous waste manifests shall be signed by a Center representative.
3.10 AIR
3.10.1 Open Burning
Open burning for salvage operations and of rubbish is strictly prohibited.
3.10.2 Volatile Organic Substances (VOS)
All architectural coatings shall comply with NJAC 7:27-23.3 requirements regarding the maximum allowable VOS content per volume of the specific coating.
3.11
SUPERFUND AREAS OF CONCERN (AOC)
The entire Center was placed on the National Priorities List (Superfund) on October 1, 1990. There are currently 25 separate parcels of land called AOC's located throughout the Center on which the disposal of hazardous wastes did occur or is suspected of having occurred. Every reasonable effort has been made to delineate and avoid contaminated areas. However, if during the course of performing any subsurface work, debris (paper, wood, concrete, asphalt, brick, vehicle/airplane parts, eating utensils, dishware, scrap metal, drums, military ordnance, etc); unusual odors; or staining is encountered subsurface work at that particular location will stop and the Environmental Engineering Group, ANG-E333 will be notified immediately.
3.12
ENVIRONMENTAL HEALTH AND SAFETY
3.12.1 Organizational Responsibilities
a. Key Personnel and Organization Chart: The Contractor shall provide, at a minimum, an organizational chart and resumes of key personnel involved in all phases of construction. This chart must include Senior-Level Management, Project Manager, Site Safety and Health Officer (SSHO), Field Supervisor, and Foreman Personnel.
b. Site Safety and Health Officer (SSHO): The Contractor must employ or contract a qualified individual (e.g., a certified industrial hygienist, safety engineer, etc.) to function as the SSHO for the project. That individual must be responsible to the Contractor and have the authority and knowledge necessary to implement the SSHP and verify compliance with applicable safety and health requirements.
c. At a minimum, the SSHO shall have the following responsibilities and authority to perform the following functions:
1. Be present at all times when work is being conducted, or have an authorized alternate.
2. Have the authority to enforce the SSHP and stop operations if safety and health of personnel may be jeopardized.
3. Effect evacuation of the site if necessary.
4. Evaluate monitoring data to make field decisions regarding safety and health.
5. Respond and visit the site within 24 hours of notification from the Contracting Officer regarding health and safety violations and concerns.
d.
The SSHO shall meet the following minimum qualifications:
1. Possess a sound working knowledge of state and federal occupational safety and health regulations and hazardous waste management regulations.
2. Have formal educational training in occupational safety and health. The SSHO must have completed and provide valid certificate for candidate’s 30- hour OSHA sponsored/approved course in Occupational Safety and Health Standards for Construction.
3.12.2 Hazard Assessment
The Contractor shall perform and provide a hazard assessment for each location and operation to be performed. The hazard assessment shall be based on the best information available regarding conditions present at the site as well as the practice and tools to be applied in the operation and shall include but not be limited to the following:
a.
A preliminary evaluation of the site's characteristics.
b.
An evaluation of the known (including the use of chemical safety data sheets) chemical hazards and conditions that may pose inhalation, skin adsorption/contact, or ingestion hazards.
c.
An evaluation of known or potential safety hazards associated with each task.
d.
An overview of the site including descriptions of the operations and tasks to be performed. Include the following:
1.
Size and location of the site.
2.
Description of the operation and tasks to be performed.
3.
Approximate duration of the operation and each task.
4.
Site topography and special features (e.g., structures, tanks, etc.).
5.
Known or suspected pathways of contaminant dispersion pertinent to the operation and tasks performed.
6.
Site accessibility.
7.
Safety and health hazards expected on the site.
3.12.3 Confined Space Entry
All confined space entries must be arranged with the Technical Center Safety Office. An entry permit identifying all conditions that must be satisfied prior to confined space entry shall be prepared in accordance with COE EM-385-1-1, 29 CFR 1910.146, and 29 CFR 1910.147.
Comply with Center confined space entry procedures, including permitting in accordance with Chapter 20 of Center Order 3900.55, Occupational Safety and Health. Entry permits shall be obtained by submitting a Trouble Desk call at 609-485-4122. CT Form 3900-40 must be properly filled in and signed prior to a confined space entry and a copy of the form must be provided to the FAA Technical Center Safety Office, ACX-42.
Provide documentation that employees designated as confined space team members have been trained in accordance with 29 CFR 1910.146.
Entry into and work in a confined space will not be allowed when oxygen readings are less than 19.5% or greater than 23.5% or if the Lower Flammable Limit (LFL) reading is greater than 10%, unless these conditions are adequately addressed in the confined space entry program. In addition, action levels for toxic atmospheres shall be determined.
The SSHP shall describe the standard operating safety procedures, engineering controls and safe work practices to be implemented for compliance with these permit requirements.
In addition to the requirements set forth in COE EM-385-1-1, 29 CFR 1910.146, and 29 CFR 1910.147, the Contractor shall also satisfy the following:
a. The Contractor shall supply all sampling and testing equipment and personnel.
b. The Contractor shall have an OSHA approved mechanical extraction system that utilizes a full torso harness.
3.12.4 Personnel Protection
The Contractor shall apply engineering and/or work practice controls as a means of protecting personnel in performance of site-specific tasks. Engineering controls shall be implemented to reduce and maintain employee exposure to at or below safety levels for those tasks demonstrating known or suspected hazards. Work practice controls shall be applied when engineering controls are impractical and shall be incorporated as site-specific standard operating procedures (SOPs) for personnel precautions and routine operations.
3.12.5 Personal Protective Equipment and Levels of Protection
a. The Contractor shall use personal protective equipment (PPE) only when engineering and/or work practice controls have been deemed impractical or insufficient to protect employees during site operations.
b. The Contractor shall select PPE based on an evaluation of performance characteristics, site specific tasks, and known or suspected hazards and shall assemble the PPE into levels or protection (LOP) or ensembles appropriate for the site.
c. The Contractor shall include in the SSHP a list of components for each protective ensemble, the LOP selected for each task, the rationale for each task-specific selection, and any contaminant action levels to be followed in LOP decision making.
d. The Contractor shall include a description of their respiratory protection program and the method of respirator fit testing employed.
e. The Contractor shall only make use of NISOH/MSHA approved respiratory protective equipment.
f. The Contractor shall establish a PPE program addressing the following elements:
1.
Site hazards
2.
PPE selection
3.
PPE use
4.
Duration of site operations
5.
PPE maintenance and storage
6.
PPE decontamination
7.
PPE training and proper fit
8.
Donning and doffing procedures
9.
PPE inspection
10.
PPE in-use monitoring
11.
Evaluation of program effectiveness
12.
Heat stress and temperature limitations
3.12.6 Employee Heat and Cold Stress Monitoring
As dictated by seasonal conditions, the Contractor shall implement an employee heat or cold stress monitoring program during site operations and shall incorporate the program into the site SSHP.
a. The program shall include employee awareness of the signs and symptoms of heat or cold stress, preventive measures, and employee parameters to be monitored.
b. The Contractor shall maintain a daily heat or cold stress log on all employees on-site engaging in field activities and shall describe the log in the SSHP.
3.12.7 Contingency Planning
The Contractor shall develop and implement an Emergency Response Plan (ERP) to handle anticipated on-site emergencies prior to start of site operations. The ERP shall be incorporated into the SSHP as a separate section of that document and shall be periodically reviewed and amended to keep it current with new or changing site conditions or information.
3.12.8 On-site Construction Health and Safety Briefing
The following elements of the Center’s Environmental Health and Safety program will be briefed by the Center’s safety personnel at the preconstruction conference and are included here as informational guidance. These elements shall be rigorously enforced by the Contractor and will be periodically inspected for by the government.
Pre-construction Conference Safety and Health Briefing:
1. The Contractor is solely and directly responsible for the Safety and Health of his employees and subcontractors.
2. The Contractor shall have a written Site Safety and Health Plan (SSHP) for performing this job in accordance with OSHA standards. This Plan shall be kept on site for easy access.
3. The Contractor shall using the right tools and equipment for the job, properly maintained and suitable for doing the job safely.
4. If the Safety Office identifies OSHA violations, it is expected that these violations be corrected expeditiously.
5. This is a Federal Government facility. Thus, smoking is not allowed except in designated areas.
6. Substance abuse, horseplay, and the like are unsafe on a worksite and shall not be tolerated.
7. The Contractor must provide his own First Aid. In an emergency, South Jersey Transportation Authority Emergency Medical Squad personnel may assist. To report an emergency on base, dial 911.
8. If the Contractor experiences a mishap, (i.e. an injury, illness, motor vehicle accident or damaged property), he shall report it through his safety office and worker's compensation program. The Contractor shall also report the mishap to the Contracting Officer's Technical Representative/Resident Engineer, who in turn will report it to the Contracting Officer and the Technical Center Safety Office within 24 hours of its occurrence.
9. Drivers are not allowed to block roadways. Engines must be turned off with brakes set before leaving the cab of any vehicle, particularly during loading and unloading.
10. A spotter/guide must be used when backing in congested areas. The Contractor shall be liable for any damage to Government property.
11. Personal protective equipment is mandatory for certain operations and must be provided by the Contractor for his employees. Safety shoes are required for anyone on a construction site. Hard hats and safety glasses are required where heavy objects or equipment are being lifted above head level.
12. Ladders must be in good condition and properly stabilized. The top step shall not be used.
13. All scaffolding must be level, stable, and meet OSHA standards. Hand-rails, mid-rails, and toe boards must be installed. Fall protection is required for all operations 6 feet or more above the lower level.
14. Barricades must be erected before the work is begun and maintained until the work is completed.
15. Excavation of 4 feet or more must be properly shored or protected in the form of proper sloping, benching, or shielding. Proper means of egress must be provided.
16. A Burn Permit is required from the Technical Center Fire Inspectors. The Contractor shall contact the Construction Representative or Resident Engineer at least 48 hours in advance to request a Burn Permit before lighting a torch, striking an arch with welding equipment, or igniting a fire of any kind on Technical Center property.
17. The Contractor shall provide a fire watch during any welding and torch work. All combustibles and flammables must be removed from the burn site.
18. The Contractor shall ensure that all of his employees know how to report a fire or activate a Fire Alarm. To report a fire on base, dial 911.
19. Material Safety Data Sheets are required and must be made immediately available for any chemical used during this project.
20. The Contractor shall be responsible for removal of waste material, including hazardous waste.
21. A Confined Space Entry Permit is required from the Safety Office before entering any confined space. The Construction Representative or Resident Engineer shall apply for this Permit at least 24 hours in advance by calling 609-485-5898, 4809, 7890, or 8214. The Contractor shall take full responsibility and liability for ensuring that all hazards that may exist in the confined space have been abated prior to entry.