25043-ITB-Kipnuk Transformers and H Piles Addendum #01.pdf
PDF 30 KB Posted
- Solicitation number
- 1625-061
- Issued by
- Alaska
About this file
This document is an Addendum (No. 01) issued by the Alaska Energy Authority for the Kipnuk Transformers and H Piles project, associated with Solicitation No. RFQ 25043. The addendum, dated April 1, 2025, provides clarification regarding a specific technical specification for transformers, specifically addressing a question about the 50kVA 3-phase transformer configuration. The document confirms that the solicitation requires 3x 50kVA transformers, forming a 150kVA 3-phase bank, rather than a single 50kVA total transformer configuration.
The addendum requires acknowledgment by email and maintains that all other terms, conditions, and specifications of the original Request for Quotes remain unchanged. The technical clarification focuses on the transformer specifications, noting specific technical details such as the 12470/7200 Grounded Wye configuration and 208/120 Ground Wye parameters. The document represents a standard process in government procurement to ensure bidders have clear and precise understanding of technical requirements before submitting quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 2025-1600-0292 Amendment 1.pdf | ||
| RFP 2025-1600-0292 - Questions and Answers.xlsx | XLSX spreadsheet | |
| RFP-Submittal-Forms- A-F.docx | DOCX document | |
| ITB 2025-1600-0292- Submittal Forms.docx | DOCX document | |
| RFQ 1125137 - Kodiak Fume Hood Servicing.pdf | ||
| Reference Forms 2 of 2.zip.crdownload | CRDOWNLOAD file | |
| ITB 2025-1600-0292 Printing and Mailing Services.pdf | ||
| Reference Forms 2 of 2.zip | ZIP file | |
| ITB 2025-1600-0292 Printing and Mailing Services.pdf.crdownload | CRDOWNLOAD file | |
| Reference Form 1 of 2.zip | ZIP file | |
| ITB 2025-1600-0292- Bid Schedule.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 1 Printed on 04/01/2025
Date: April 1, 2025 Project: Kipnuk Transformers and H Piles Solicitation No.: RFQ 25043 Addendum No.: 01
TO ALL PLAN HOLDERS:
The following changes, additions, clarifications, and/or deletions are hereby made a part of the RFQ Documents for the above noted project, fully and completely as if the same were fully contained therein. All other terms, conditions, and specifications of the original Request for Quotes remain unchanged.
This addendum must be acknowledged by email.
The modifications directed by this Addendum One are described on this page.
CHANGES TO DOCUMENTS:
The RFQ Package is hereby clarified, changed, or modified by the following:
1. Question: Would you please provide clarification about the 50kVA 3-phase transformer requested on RFQ 25043? Are they wanting 3x 50kVA (150kVA 3-phase bank) or expecting to make 50kVA total out of a 3-phase bank? The later alternative is highly unlikely b/c a manufacturer would have to custom engineer and produce 17.5kVA polemounts.
Answer: 3x 50kVA 150kVA 3-phase bank.
END OF ADDENDUM #01