This document appears to be a set of submittal requirements for a chiller replacement project at the Naval Facilities Engineering Command (NAVFAC) in the Camp Lejeune area of responsibility. The key details are:
The solicitation number is N4008525R2548 for the "Chiller Replacement 19, 321, AS255, FC300, HP513" project. Only mechanical contractors listed on the General Requirements cover page may submit proposals. The document outlines a variety of required submittals, including certificates, reports, plans, and product data. Specific submittals include an Accident Prevention Plan, Activity Hazard Analysis, Construction Schedule, Crane Work Plan, Crane Critical Lift Plan, Crane Operator qualifications, Equipment Delivery Schedule, Environmental Protection Plan, Traffic Control Plan, and Backflow Preventer tests and certifications. The document also requires close-out submittals such as the Contractor Schedule, List of Contact Personnel, and DD1354 Transfer & Acceptance forms. Overall, this appears to be a standard set of federal procurement submittal requirements for a mechanical construction project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
1.11
1.14.6
Crane Reports
SD-07 CERTIFICATES
Confined Space Entry Permit
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
Approving AuthorityContractor Schedule Dates
TITLE AND LOCATION
(Enter Contract Title and Locaiton Here)
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A C T I V I T Y
N O
T R A N S M I T T A L
N O
(d)
SD-11 CLOSEOUT SUBMITTALS
Contractor Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
Certificate of Compliance
SD-01 PRECONSTRUCTION SUBMITTALS
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
P A R A G R A P H
N O
S P E C
S E C T
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Submittals 1.
SCHEDULE
PRE-CONSTRUCTION SUBMITTALS
Complete Submittal Package
ELECTRICAL FEED
PIPING
HVAC EQUIPMENT SPECS
Third Party Certification of Barge-
Mounted Movile Cranes
Qaulity Control Plan (QC Plan)
Backflow Preventer Tests (If Applicable)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
SD-11 CLOSEOUT SUBMITTALS
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicab
Environmental Protection Plan
Preconstruction Survey
Notice of Intent (If applicable)
CLOSE-OUT SUBMITTALS
SD-03 PRODUCT DATA
Backflow Preventers (If Applicable)
Backflow Preventers Certificate (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
Backflow Tester Certification (If Applicable)