This file contains mechanical drawings and specifications from the Michigan Department of Technology, Management and Budget's State Facilities Administration Design and Construction Division for HVAC renovations at the Saginaw Correctional Facility (File No. 472/22064.CTS). The project involves replacement of existing dampers, installation of new fire/smoke damper actuators, and various control upgrades across multiple buildings at the facility located at 9625 Pierce Rd, Freeland, MI. Bids must be submitted electronically through SIGMA by February 19, 2025 at 2:00 PM ET, with a contract period of 100 days. Site visits can be arranged through Ed LaPlant (989-695-9880 Ext. 273-1501).
The bid package includes detailed mechanical floor plans showing HVAC systems for Buildings 100-900 and 1200, along with sequence of operations for HVAC controls detailing the functionality of mechanical room supply fans, equipment room exhaust fans, boiler and pump sequences, and combustion air louvers. The project includes a $40,000 allowance amount in the base bid. An add alternate is included for replacement of all mechanical/electrical room supply fans. A performance bond and payment bond are required for all bids over $50,000, and each bid must be accompanied by a 5% bid guarantee. Builders risk insurance must be provided by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
X-EF-3
X-EF-1
X-EF-14
X-EF-5
X-EF-4
X-EF-6
X-EF-2
X-EF-15
X-EF-8
X-EF-13
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-CUH-14
X-CUH-3
X-CUH-2
X-CUH-18
X-CUH-8
X-CUH-7 X-CUH-4
X-CUH-1
X-CUH-13
X-CUH-11
X-CUH-12
X-UH-6
X-UH-5
X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTRX-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTRX-FTR
X-FTR X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-FTR
X-10x6 SA
X-14x6 SA
X-12x8 SA
X-16x6 SAX-10x6 SA
X-18x10 SA
X-10x6 SA
X-20x10 SA
X-16x6 SA
X-16x10 SA
X-12x6 SA
X-20x10 SA X-12x6 SA
X-16x10 SA
X-12x6 SA
X-18x10 SA
X-12x12 SA
X-12x6 SAX-8x6 SA X-16x10 SA
X-8x6 SA
X-14x6 SA
X-12x8 SA
X-8x6 SA
X-8x6 SA
X-10x8 SA
X-10x6 SA X-8x6 SA
X-8x6 SA
X-8x6 SAX-16x10 SA
X-14x10 SA X-8x6 SA
X-8x6 SA
X-12x8 SA X-8x6 SA X-8x6 SA
X-8x8 SA
X-12x6 SA
X-12x6 SA
X-12x6 SA X-8x6 SA
X-8x6 SA
X-18x16 SA
X-18x10 SA
X-10x6 SA
X-18x22 SA
X-18x10 SA
X-18x10 SA
X-26x22 SA
X-18x10 SA
X-45x22 SA
X-34x16 SA
X-18x10 SA
X-18x10 SA
X-30x16
SA
X-22x16 SA X-24x16 SA
X-22x12 SA
X-10x6 SA
X-10x6 SA
X-18x10 SA
X-18x10 SA
X-22x6 SA
X-28x12 SA
X-24x12 SA
X-14x8 SA
X-14x6 SA
X-12x6 SA
X-10x6 SA X-8x6
SA
X-20x6 SA
X-20x12 SA X-16x10 SA
X-8x6 SA
X-16x10 SA
X-12x10 SA
X-10x6 SA
X-14x8 SA
X-14x6 SA
X-8x6 SA
X-10x6 SA X-8x6 SA
X-16x6 SA
X-18x8 SA
X-14x6 SA
X-14x10 SA X-12x10 SA X-12x10 SA
X-34x12 SA
X-18x10 SAX-16x6 SA
X-20x12 SA X-18x12 SA X-16x12 SA X-16x10 SA X-16x8 SA X-16x6 SA
X-16x6 SA X-16x6 SA
X-16x6 SAX-16x6 SAX-16x6 SA
X-8x6
SA (TYP.)
X-8x6 EA
(TYP.)
X-10x10 SA X-8x8 SA X-8x6 SAX-10x8 SA X-8x6 SA
X-10x6 SA X-10x8 SA
X-8x6 EA X-8x8 EA X-10x8 EA X-12x8 EA X-12x10 EA X-12x8 EA
X-10x8 EA X-8x8 EA X-8x6 EA
X-16x12 RA
X-32x12 OPEN
END RA
X-20x18 RA
& SA UP
X-22x12 OPEN
END RA
X-22x6 RA
18x6 OPEN
END RA
X-12x6 RA
X-12x8 RA
X-12x12
OPEN
END RA
X-22x12 OPEN
END RA
X-30x12 OPEN
END RA
X-12X8 OPEN
END RA
X-12X6 OPEN
END RA
X-18X10
OPEN END RA X-34X12 OPEN
END RA
X-12X12
OPEN END RA
X-20x12 RA
X-28x18 RA
X-10x12 RA
X-34x18 RA
X-8x6 RA
X-8x6 RA
X-48X12 OPEN
END RA
X-22x6 RA (TYP)
X-10X10 UP
TO X-EF-7
X-8x6 EA
X-8x6 EA X-14x6 EA
X-12x6 EA
X-8x8 EA
X-8x6 EA
X-8x8
EA
X-8x6 EA
X-6x6 EA
X-8x6 EA
X-8x8 EA
X-SD 360
14" TYP. 2
X-SD 200
8" TYP. 2
X-SD 200
8" ---
X-SD 240
8" ---
X-SD320
14"---
X-SD 240
10" ---
X-SD 80
6" TYP. 2
X-SD 85
6" TYP. 2
X-SD 75
6" ---
X-SD 150
7" ---
X-SD 85
6" TYP. 3
X-SD 100
6" TYP. 2
X-SD 80
6" TYP. 2
X-SD 105
6" ---
X-SD 85
6" ---
X-SD 200
8" TYP. 2
X-SD 330
12" ---
X-SD 215
10" ---
X-SD 165
8" --- X-SD 165
8" ---
X-SD 130
6" ---
X-SD 320
12" ---
X-SD 75
6" TYP. 4 X-SD 75
6" ---
X-SD 170
8" ---
X-SD 65
6" ---
X-SD 115
6" TYP. 3
X-SD 145
10" ---
X-SD 310
10" ---
X-SD 245
10" ---
X-SD 50
6" ---
X-SD 50
6" ---
X-SD 140
6" ---
X-SD 230
10" ---
X-SD 285
--- TYP. 4 X-SD 260
--- TYP. 3
X-SD 50
--- TYP. 18
X-EG 50
--- TYP. 18
X-EG 50
--- TYP. 4
X-EG 75
--- TYP. 2X-EG 235
X-EG 75
X-EG 120
--- TYP. 2
X-EG 75
--- TYP. 2X-EG 75
--- TYP. 2
X-EG 75
X-EG 500
X-12X8 UP
TO EF-10
X-SD 200
8" ---
X-SD 180
8" ---
X-45x22
SA UP
X-SD 840
15" TYP. 4
X-SD 840
15" TYP. 6
X-EG 220
X-EG 220
X-EG 410
X-RG 180
--- ---X-RG 215
X-RG 290
X-RG 180
--- TYP. 2
X-RG 215
X-RG 220
X-EG 75
X-RG 130
X-RG 235
X-RG 150
--- TYP. 2
X-RG 85
X-RG 85
--- TYP. 2
X-RG 260
X-RG 90
X-RG 145
X-RG 180
X-RG 200
24X24 UP
TO X-EF-9
X-RG 290
--- --- X-RG 150
X-RG 115
X-RG 650
X-RG 205
X-RG 120
X-RG 290
X-RG 65
--- TYP. 2
X-RG 190
X-RG 1140
X-RG 780
X-8x6 SA
X-EG 50
--- TYP. 2 X-EG 50
--- TYP. 2
X-SD 50
--- TYP. 2
X-SD 50
--- TYP. 2
X-26x26
RA UP
X-FTRX-EF-8
X-CUH-5X-CUH-6
X-EF-16
F/S F/S
F/S
F/S F/S F/S
F/S
F/S
F/S F/SF/SF/SF/S
F/S
F/S
F/S F/S
T
T
T
T
T
T
X-AHU-2
X-AHU-4
AC-200-2
T
AC-200-1
T
AC-200-3
T
S
S
S
S
X-AHU-3
S
X-AHU-1
(ZONE 1)
S
X-AHU-1
(ZONE 2)
X-AHU-1
(ZONE 3)
X-AHU-1
(ZONE 5)
X-AHU-1 (ZONE 7)
S
S
SS
X-AHU-1
(ZONE 4)
S
S
S
S
S
S
S
S S
S
X-AHU-1
(ZONE 6)
S
S
S
S
S
S
S
S
MANUAL SMOKE PURGE
KEYED SWITCH
DP1 1
1 1 1
S
S
S S
S
T
X-AHU-1
(ZONE 8)
HVAC KEY NOTES
INSTALL NEW 24-VOLT FIRE/SMOKE DDC
DAMPER ACTUATOR, CONTROLS, CONTROL
WIRING, AND ALL ASSOCIATED ACCESSORIES
PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS IN THE LOCATIONS SHOWN. NEW
DDC ACTUATORS TO BE INSTALLED ON
EXISTING COMBINATION FIRE/SMOKE DAMPER.
CONNECT NEW DDC ACTUATOR TO EXISTING
FIRE ALARM SYSTEM.
INSTALL NEW FLAT PLATE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER
THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONNECT NEW FLAT PLATE
SENSOR TO EXISTING DDC CONTROL PANEL
AND EXISTING JCI BAS. PROVIDE ALL
COMPONENTS REQUIRED TO INTEGRATE NEW
FLAT PLATE SENSOR ONTO THE EXISTING
FRONT-END GRAPHICS.
INSTALL NEW DUCT MOUNTED SENSOR,
CONTROL WIRING, CONTROLS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. CONNECT NEW
DUCT MOUNTED SENSOR TO EXISTING DDC
CONTROL PANEL AND EXISTING JCI BAS.
PROVIDE ALL COMPONENTS REQUIRED TO
INTEGRATE NEW DUCT MOUNTED SENSOR
ONTO THE EXISTING FRONT-END GRAPHICS.
INSTALL SALVAGED THERMOSTAT, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER
THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONNECT SALVAGED
THERMOSTAT TO EXISTING DDC CONTROL
PANEL AND EXISTING JCI BAS. PROVIDE ALL
COMPONENTS REQUIRED TO INTEGRATE NEW
THERMOSTAT ONTO THE EXISTING FRONT-END
GRAPHICS.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-402
BUILDING 200 FIRST FLOOR
PLAN - MECHANICAL NEW
DBP
CAT
N BUILDING 200 FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
2/3/2025 ADDENDUM 2
X-SF-5
X-EF-12X-12x8 EA X-12x8
EA DN
X-UH-1
X-UH-4
X-EF-7
M
X-EH-5
(LOCATED
ON ROOF)
X-SF-4X-SF-3 X-SF-2 X-SF-1X-XT-1
X-P-1
X-P-2
X-P-3
X-P-4
X-EF-11
X-16x8 EA
X-16x8
EA DN
X-UH-3
X-UH-2
X-8" VTRX-8" VTR
X-DWH-2 X-DWH-1
X-12x8 EA X-12x8
EA DN
X-EF-10
X-EF-9
M
X-EH-4
(LOCATED
ON ROOF)
X-DAC-1
M
X-708x152 OA
X-56" PLENUM
X-AHU-4
X-RF-3
EA UP
TO X-EH-3
X-20x18
RA DN
X-20x18
SA DN
X-20x18 RA
X-20x18 SA
X-AHU-3
X-30x30
SA DN
X-30x30 SA
M
X-AHU-2
EA UP
TO X-EH-2
X-46x34 RA
X-RF-2
X-50x38 RA
X-32x50
RA
X-32x50 RA
X-46x34
SA DN
X-30x16 SA
X-30x16 SAX-30x16 SA X-30x16 SAX-30x14 SA
X-46x34 SA
X-42x34 SA
X-46x34 SA
X-24x20
SA DN
X-24x20
SA DN
X-42x24 SAX-40x20 SA
X-24x20
SA DN
X-24x20
SA DN
X-20x20 SA
X-20x20
SA DN
X-RF-1
X-26x26 RA X-26x26 RA
X-26x26 RA
X-AHU-1
M
EA UP
TO X-EH-1
X-180x152 OA
X-56" PLENUM
X-26x26 RA X-14x22
SA DN,
ZONE 8
X-6x22 SA DN, ZONE 7
X-16x18
SA DN,
ZONE 1
X-8x18 SA DN, ZONE 5
X-8x22 SA DN, ZONE 2
X-8x22 SA DN, ZONE 4
X-6x22 SA DN, ZONE 3
X-8x22 SA DN, ZONE 6
X-680x56 LOUVER
X-LOUVER X-LOUVER
M
M
X-WATER
SOFTENER
X-8" VTRX-8" VTR
X-DWH-4 X-DWH-3
X-IT RACK
X-CONCRETE PAD
X-CONCRETE PAD
X-COND
X-CONDENSER RAIL
X-CONDENSER RAIL
M
M
M
X-P-6
X-P-6
X-LOUVER
M
M
M
MMM
B-200-1
M
M
M
M
M
M
T
X-SF-5 X-UH-4
T
T
X-UH-3
T X-SF-4
T
X-UH-2
T
X-SF-3
T
X-UH-1
CU-200-1
CU-200-1 CU-200-2
6" VTR
(TYP. 4)
4" CA VTR
(TYP. 4)
X-AHU-1 & X-RF-1
DDC CONTROL
PANEL
X-AHU-2 & X-RF-2
DDC CONTROL
PANEL
X-AHU-3 DDC
CONTROL PANEL
X-AHU-4 & X-RF-3 DDC
CONTROL PANEL
CC-200-1
M
EPO SWITCH
EPO SWITCH
M
M
M
MULTIZONE DAMPER
ACTUATOR(S), 8 ACTUATORS
M
M
MISC. EQUIPMENT
DDC CONTROL
PANEL
CU-200-3
4" CONCRETE
PAD (TYP.)
B-200-2
B-200-3 B-200-4
M
M
M
M
B-200-1
M
M
M
M
M
M
M
T
X-SF-5 X-UH-4
T
T
X-UH-3
T X-SF-4
T
X-UH-2
T
X-SF-3
T
X-UH-1
CU-200-1
CU-200-1 CU-200-2
6" VTR
(TYP. 4)
4" CA VTR
(TYP. 4)
X-AHU-1 & X-RF-1
DDC CONTROL
PANEL
X-AHU-2 & X-RF-2
DDC CONTROL
PANEL
X-AHU-3 DDC
CONTROL PANEL
X-AHU-4 & X-RF-3 DDC
CONTROL PANEL
CC-200-1
M
EPO SWITCH
EPO SWITCH
M
M
M
M
M
MULTIZONE DAMPER
ACTUATOR(S), 8 ACTUATORS
M
M
MISC. EQUIPMENT
DDC CONTROL
PANEL
CU-200-3
4" CONCRETE
PAD (TYP.)
B-200-2
B-200-3 B-200-4
M
M
D-200-5
D-200-6
D-200-7
1 1
D-200-1 D-200-4
1 1
D-200-2 D-200-3 1 1
SF-200-1 SF-200-2 SF-200-3 SF-200-4
SF-200-5 1 1 1 1 1
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-403
BUILDING 200 SECOND
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 200 SECOND FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
2/5/2025 ADDENDUM 2
X-12x6
SA
X-SD 350
12"ø ---
X-22x18 SA X-24x18 SA
X-14x6
SA
X-RG ---
X-28x18 RA
X-FTR
X-RG 4600
X-VAV-301-29
T
S1
HVAC KEY NOTES
INSTALL NEW FLAT PLATE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER
THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONNECT NEW FLAT PLATE
SENSOR TO EXISTING DDC CONTROL PANEL
AND EXISTING JCI BAS. PROVIDE ALL
COMPONENTS REQUIRED TO INTEGRATE NEW
FLAT PLATE SENSOR ONTO THE EXISTING
FRONT-END GRAPHICS.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE ABOVE CEILING SPACE IN
THE LOCATION SHOWN. MODIFY EXISTING
PIPING AS REQUIRED TO INSTALL NEW SENSOR.
CONNECT SALVAGED SENSOR TO THE EXISTING
DDC CONTROL PANEL AND JCI BAS. PROVIDE
ALL REQUIRED EQUIPMENT TO INTEGRATE
SALVAGED SENSOR ON TO THE EXISTING
FRONT-END GRAPHICS.
M-403.1
BUILDING 300 FIRST FLOOR
PLAN - MECHANICAL NEW
DBP
CAT
N BUILDING 300 FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
X-48x48 LOUVERX-UH-1
X-SF-2
X-30x48 LOUVER X-72x48 LOUVER
X-SF-1
M
X-IH-6
(LOCATED
ON ROOF)
X-EH-2
(LOCATED
ON ROOF)
M
M
M
X-RF-4
X-24x24 RA
X-33" RA
X-33"
RA
X-24x24 RA
X-26" RA
X-24x24 SA
X-AHU-4
X-24x24 SA
X-30x20 SA
X-26" SA
X-AHU-3
M
M X-96x40
RA
X-42x24 SA UP
TO X-IH-4
X-96x54 SA UP
TO X-IH-3
M
X-44x36
RA
M
X-44x40 EA
X-194x48 LOUVER
X-44x40
RA
X-RF-3
X-42x42 RA DN
X-42" RA
X-44x30
RA DN
M
X-EH-1
(LOCATED
ON ROOF)
X-AHU-5X-AHU-2
M
X-36x20 SA UP
TO X-IH-5
X-22x18
SA DN
X-22x18
RA DN
X-36x20 SA UP
TO X-IH-2
M
M
X-RF-2
X-22x18
SA DN
X-22x18 SA
X-22x18 RA
X-22x18
RA
X-30x48 LOUVER
M
X-22x18
SA DN
X-22x18
SA
X-22x18 EA
X-P-11X-P-10
X-7" VTR
X-DWH-2
X-7" VTR
X-DWH-1
X-UH-2
X-AHU-1
X-30x20 RA
X-26" SA
X-26" RA
X-24X24 RA
X-RF-1
X-30x48 LOUVER
X-33" RA
X-36x30 SA UP
TO X-IH-1
M
M
X-CHEMICAL
POT FEEDER
X-IT RACK X-CONCRETE
PAD
X-CONDENSOR RAIL X-CONDENSOR RAIL
M
X-P-1 X-P-2
M
M
M
M
M
M
M M
X-IH-6
(LOCATED
ON ROOF)
CU-300-1
T
X-SF-2
T
X-UH-2
T
X-SF-1
T
X-UH-1
T
X-SF-2
T
X-UH-2
T
X-SF-1
T
X-UH-1
X-SF-2
X-UH-2 X-SF-1
X-UH-1
6" VTR
(TYP. 4)
4" CA VTR
(TYP. 4)
X-AHU-1 & X-RF-1
CONTROL PANEL
X-AHU-2 & X-RF-2
CONTROL PANEL
X-AHU-5
CONTROL PANEL
X-AHU-3 & X-RF-3
CONTROL PANEL
MISC. EQUIPMENT
CONTROL PANEL
X-AHU-4 & X-RF-4
CONTROL PANEL
CC-300-1
CONCRETE
PAD
EPO SWITCH
EPO SWITCH
M
B-300-1
B-300-2
B-300-3
B-300-4
MMM
D-300-2
D-300-4
D-300-3
D-300-1
2 2
SF-300-2 SF-300-11 1
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-404
BUILDING 300 SECOND
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 300 SECOND FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
UP
UP
X-LOUVER
X-UH-1 X-EH-1
X-SF-1
T T
M
X-IT RACK
M
X-40x16
F/S
M-405
D-400-4
D-400-3 1
SF-400-1
3 2
X-24x24 LOUVER
X-SF-2
X-8" VTR
X-DWH-1
X-8" VTR
X-DWH-2
X-UH-2
X-P-1X-P-2
X-52x32 LOUVER X-78x48 LOUVER
X-AHU-1
M
X-66x14 EA
UP TO X-EH-3
M
X-EH-2
X-RF-1
X-28x14 RA
M
X-24x24 SA, ZONE 2
X-11x10 SA, ZONE 1
X-12x8 SA, ZONE 3
X-12x6 SA, ZONE 4 X-18x12 SA, ZONE 5
X-20x12 SA, ZONE 8
X-12x10 SA, ZONE 7
X-16x8 SA, ZONE 6
X-CONCRETE PAD
M
M
X-P-4 X-P-9
M
T
T
X-UH-2
T
X-UH-2
X-SF-2 & X-EH-2
B-400-1
B-400-2
4'' CA VTR
(TYP.)
6'' VTR
(TYP.)
MISC. EQUIPMENT DDC
CONTROL PANEL
AHU-1 DDC CONTROL
PANEL
EPO SWITCH MULTIZONE DAMPER
ACTUATOR (8), 8
ACTUATORS
RELIEF & RA DAMPER
ACTUATOR (BELOW)
T
T
X-UH-2
T
X-UH-2
X-SF-2 & X-EH-2
B-400-1
B-400-2
4'' CA VTR
(TYP.)
6'' VTR
(TYP.)
MISC. EQUIPMENT DDC
CONTROL PANEL
AHU-1 DDC CONTROL
PANEL
EPO SWITCH MULTIZONE DAMPER
ACTUATOR (8), 8
ACTUATORS
RELIEF & RA DAMPER
ACTUATOR (BELOW)
D-400-1
D-400-2
SF-400-21
M
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
INSTALL NEW DDC ACTUATOR, CONTROLS
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
CONNECT NEW DDC ACTURATOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-405
BUILDING 400 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 400 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 400 MECHANICAL ROOM - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
UP
UPUP
UP
M
X-LOUVER
X-SF-1
X-UH-1
X-EH-1
M
X-IT RACK
T T
X-TG 550
--- TYP. 2
X-TG 440
--- TYP. 2
X-TG 350
--- TYP. 2
X-22x10 SA X-22x8 SA X-18x10 SAX-22x10 SA
F/S F/S F/S F/S
M-406
D-500-3
D-500-4
2 2 2 2
3 23 2
SF-500-1
X-UH-2
X-DWH-1
X-8" VTR
X-DWH-2
X-8" VTR
X-78x48
LOUVER
M
X-24x24
LOUVER
X-SF-2
X-AHU-1
M X-42x18 SA
UPX-EH-2
X-P-1 X-P-2
M
X-18x10 SA, ZONE 1
X-10x8 SA, ZONE 2
X-10x10 SA, ZONE 4
X-CONCRETE
PAD
M
X-10x8 SA, ZONE 3
X-P-4
TX-UH-1
T
X-SF-2 & X-EH-2
B-500-2 B-500-1
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
4'' CA VTR
(TYP.)
6'' VTR (TYP.)
EPO SWITCH
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
TX-UH-1
T
X-SF-2 & X-EH-2
B-500-2 B-500-1
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
4'' CA VTR
(TYP.)
6'' VTR (TYP.)
EPO SWITCH
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
1 D-500-1
D-500-2
SF-500-21
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-406
BUILDING 500 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 500 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 201 BUILDING 500 MECHANICAL ROOM - MECHANICAL NEW
UP UP
X-10x18 SA
X-10x18 SA
X-24x18 SA
X-30x18
RA
X-26x20
RA
X-10x16 SA
X-10x24 SA
X-26x20 RA
X-24x18 SA
X-30x18 RA F/S
F/S
F/S
F/S
F/S
F/S
F/S
X-SD 300
X-SD 50
4"ø ---
X-12x6 SA
X-6x4 SA F/S
M-407
3 2
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-2 DDC CONTROL
PANEL
X-12" VTR
X-DWH-1
X-DWH-2
X-12" VTR
X-24x24 LOUVER
X-EF-1
X-UH-2
X-24x24 LOUVER
X-EF-2
X-30"x18 SA
UP TO X-IH-7
M
X-48x48 LOUVER
X-48x48 LOUVER
X-48x48 LOUVER
X-UH-1
X-RF-1
X-26x20 RA
M
X-30x24 RA
X-RF-2
X-30x18 RA
M
X-30x24 RA
X-RF-3
X-26x20 RA MX-30x24 RA
X-30x24 SA
X-AHU-1
M
M X-48x48 SA UP
TO X-IH-1
X-30x24 SA
X-AHU-2
M
M X-48x48 SA UP
TO X-IH-2
X-24x18 SA
X-24x18 SA
X-30x18 DUCT
UP (CAPPED)
TO X-IH-4
M
X-30x24 RAX-AHU-3
M
X-36x48 SA UP
TO X-IH-3
X-10x16 SA, ZONE 5
X-10x24 SA, ZONE 4
X-10x24 SA, ZONE 1
X-10x14 SA, ZONE 2X-10x18 SA, ZONE 3
X-20x12 SA
M
X-24x30 SA UP
TO X-IH-5
M
X-12x30 CA DN
X-P-1
X-P-2 X-CONCRETE
PAD
X-IT RACK
M
X-24x18 SA
X-24x18 SA
X-HC-4
X-HC-3
X-HC-2
X-HC-1
X-P-9
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-2 DDC CONTROL
PANEL
T T
X-UH-2 X-EF-1
B-600-1
B-600-2
4'' CA VTR (TYP.)
6'' VTR (TYP.)
X-AHU-3 DDC CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
T
T
MULTIZONE DAMPER
ACTUATOR(S), 5 ACTUATORS
EPO SWITCH
T T
X-UH-2 X-EF-1
B-600-1
B-600-2
4'' CA VTR (TYP.)
6'' VTR (TYP.)
X-AHU-3 DDC CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
T
T
MULTIZONE DAMPER
ACTUATOR(S), 5 ACTUATORS
EPO SWITCH
D-600-2
D-600-1
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-407
BUILDING 600 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 600 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 600 MECHANICAL ROOM - MECHANICAL NEW
UPUP
UP
UP
UP
X-EH-1
X-UH-1 M
X-LOUVER
X-SF-1
X-IT RACK
M
T T
X-TG 800
--- TYP. 2
X-TG 500
--- TYP. 2
X-22x12 RA X-22x12 RA X-22x8 RA
X-TG 800
--- TYP. 2
F/S F/S F/S F/S
X-16x12 SA
M-408
D-700-3
D-700-4
2 2 2 2
SF-700-1 1
3 3
X-CONCRETE
PAD
X-20x48
LOUVERM
X-20x24 SA
DN TO 6" AFF
M
X-AHU-1
X-EH-2
X-42x42
LOUVER
M X-12x42
LOUVER
X-14x18 SA, ZONE 4
X-12x8 SA, ZONE 2
X-16x12 SA, ZONE 1
X-UH-2
X-DWH-1
X-DWH-2
X-8" VTR
X-24x24
LOUVER
X-SF-2
X-P-2 X-P-1
M
X-8" VTR
X-14x18 SA, ZONE 3
X-P-4
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
M
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
D-700-1
D-700-2
SF-700-21
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-408
BUILDING 700 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 700 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 700 MECHANICAL ROOM - MECHANICAL NEW
UP
UP
UP
X-EH-1
X-UH-1 M
X-LOUVER
X-SF-1
X-IT RACK
M
T T
X-TG 800
--- TYP. 2
X-TG 500
--- TYP. 2
X-22x12 RA X-22x12 RA X-22x8 RA
X-TG 800
--- TYP. 2
F/S F/S F/S F/S
X-16x12 SA
M-409
D-800-3
D-800-4
2 2 2 2
SF-800-1 1
3 3
X-CONCRETE
PAD
X-20x48
LOUVERM
X-20x24 SA
DN TO 6" AFF
M
X-AHU-1
X-EH-2
X-42x42
LOUVER
M X-12x42
LOUVER
X-14x18 SA, ZONE 4
X-12x8 SA, ZONE 2
X-16x12 SA, ZONE 1
X-UH-2
X-DWH-1
X-DWH-2
X-8" VTR
X-24x24
LOUVER
X-SF-2
X-P-2 X-P-1
M
X-8" VTR
X-14x18 SA, ZONE 3
X-P-4
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
M
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
D-800-1
D-800-2
SF-800-21
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-409
BUILDING 800 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 800 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 800 MECHANICAL ROOM - MECHANICAL NEW
UP
UP
UP
UPUP
UP
UP
UP
UP
X-EH-1
X-UH-1 M
X-LOUVER
X-SF-1
X-IT RACK
M
T T
X-TG 800
--- TYP. 2
X-TG 500
--- TYP. 2
X-22x12 RA X-22x12 RA X-22x8 RA
X-TG 800
--- TYP. 2
F/S F/S F/S F/S
X-16x12 SA
M-410
D-900-3
D-900-4
2 2 2 2
SF-900-1 1
3 3
X-CONCRETE
PAD
X-20x48
LOUVERM
X-20x24 SA
DN TO 6" AFF
M
X-AHU-1
X-EH-2
X-42x42
LOUVER
M X-12x42
LOUVER
X-14x18 SA, ZONE 4
X-12x8 SA, ZONE 2
X-16x12 SA, ZONE 1
X-UH-2
X-DWH-1
X-DWH-2
X-8" VTR
X-24x24
LOUVER
X-SF-2
X-P-2 X-P-1
M
X-8" VTR
X-14x18 SA, ZONE 3
X-P-4
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
M
T
X-UH-2
T
X-SF-2 & X-EH-2
B-700-1 B-700-2
6'' VTR
4'' CA VTR 6'' VTR
4'' CA VTR
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
EPO SWITCH
D-900-1
D-900-2
SF-900-21
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-410
BUILDING 900 UPPER LEVEL
FLOOR PLAN - MECHANICAL
NEW
DBP
CAT
N BUILDING 900 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 900 MECHANICAL ROOM - MECHANICAL NEW
UP
UPUP
UP
M
X-LOUVER
X-SF-1
X-UH-1
X-EH-1
M
X-IT RACK
T T
X-TG 550
--- TYP. 2
X-TG 440
--- TYP. 2
X-TG 350
--- TYP. 2
X-22x10 SA X-22x8 SA X-18x10 SAX-22x10 SA
F/S F/S F/S F/S
M-411
D-1200-3
D-1200-4
2 2 2 2
3 23 2
SF-1200-1
X-UH-2
X-DWH-1
X-8" VTR
X-DWH-2
X-8" VTR
X-78x48
LOUVER
M
X-24x24
LOUVER
X-SF-2
X-AHU-1
M X-42x18 SA
UPX-EH-2
X-P-1 X-P-2
M
X-18x10 SA, ZONE 1
X-10x8 SA, ZONE 2
X-10x10 SA, ZONE 4
X-CONCRETE
PAD
M
X-10x8 SA, ZONE 3
X-P-4
TX-UH-1
T
X-SF-2 & X-EH-2
B-500-2 B-500-1
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
4'' CA VTR
(TYP.)
6'' VTR (TYP.)
EPO SWITCH
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
TX-UH-1
T
X-SF-2 & X-EH-2
B-500-2 B-500-1
MISC. EQUIPMENT DDC
CONTROL PANEL
X-AHU-1 DDC CONTROL
PANEL
4'' CA VTR
(TYP.)
6'' VTR (TYP.)
EPO SWITCH
MULTIZONE DAMPER
ACTUATOR(S), 4 ACTUATORS
1 D-1200-1
D-1200-2
SF-1200-21
HVAC KEY NOTES
INSTALL NEW DAMPER AND ALL ASSOCIATED
ACCESSORIES AT THE LOCATION SHOWN.
CONTRACTOR TO FIELD VERIFY DIMENSIONS FOR
NEW DAMPER PRIOR TO ORDERING. INSTALL
SALVAGED DAMPER ACTUATOR, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES ON NEW DAMPER. CONTRACTOR
TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW
DAMPER.
INSTALL NEW 24-VOLT FIRE/SMOKE DDC DAMPER
ACTUATOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS
IN THE LOCATIONS SHOWN. NEW DDC
ACTUATORS TO BE INSTALLED ON EXISTING
COMBINATION FIRE/SMOKE DAMPER. CONNECT
NEW DDC ACTUATOR TO EXISTING FIRE ALARM
SYSTEM.
INSTALL RELOCATED SALVAGED FIN TUBE LOOP
WATER TEMPERATURE SENSOR, CONTROL
WIRING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOWER LOWER PIPING
CHASE IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO INSTALL NEW
SENSOR. CONNECT SALVAGED SENSOR TO THE
EXISTING DDC CONTROL PANEL AND JCI BAS.
PROVIDE ALL REQUIRED EQUIPMENT TO
INTEGRATE SALVAGED SENSOR ON TO THE
EXISTING FRONT-END GRAPHICS.
ADD ALTERNATE KEY NOTES
INSTALL NEW SUPPLY FAN, FILTER RACK, DAMPER, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. EXISTING SUPPLY FAN CONTROL WIRING AND
CONTROLS TO BE RE-USED. INSTALL SALVAGED DAMPER ACTUATOR,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES ON NEW
DAMPER. CONTRACTOR TO PROVIDE ALL REQUIRED COMPONENTS TO
CONNECT SALVAGED ACTUATOR TO NEW DAMPER. CONNECT NEW SUPPLY
FAN TO EXISTING DDC CONTROL PANEL AND JCI BAS. PROVIDE ALL REQUIRED
EQUIPMENT TO INTEGRATE NEW SUPPLY FAN ON TO THE EXISTING
FRONT-END GRAPHICS. MODIFY EXISTING CONDUIT, WIRING, AND OTHER
ASSOCIATED ELECTRICAL COMPONENTS AS REQUIRED TO POWER NEW
SUPPLY FAN.
22030.01
472/22064.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KEY PLAN
SCALE: NTS
N
472SRFMAINTPROJ
1/22/2025 CD SET
M-411
BUILDING 1200 UPPER
LEVEL FLOOR PLAN -
MECHANICAL NEW
DBP
CAT
N BUILDING 1200 UPPER LEVEL FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 BUILDING 1200 MECHANICAL ROOM - MECHANICAL NEW
Bidding and Contract Document (R 02/24) Project Name: Saginaw Correctional Facility – File No. 472/22064.CTS HVAC Renovations
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
472/22064.CTS
DEPARTMENT/AGENCY
Department of Corrections
CONTRACT TIME(S)
100-days
PROJECT NAME
Saginaw Correctional Facility - HVAC Renovations
LOCATION
9625 Pierce Rd, Freeland, MI 48623
BID OPENING DATE
February 19th, 2025 at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT:
Ed LaPlant – LaplantE@michigan.gov Phone Number: 989-695-9880 Ext. 273-1501
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work: Replacement of existing dampers, installation of new fire/smoke damper actuators, and various control upgrades.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:LaplantE@michigan.gov
Bidding and Contract Document (R 02/24) Project Name: Saginaw Correctional Facility – File No. 472/22064.CTS
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
Dampers
Fire Alarm
Electrical
Mechanical
Controls
ALLOWANCE AMOUNT $40,000
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Bidding and Contract Document (R 02/24) Project Name: Saginaw Correctional Facility – File No. 472/22064.CTS
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Add Alternate Item No.
Bid
Item Bid Price
1 1 Replacement of all
Mechanical/Electrical Room Supply
Fans
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Item No. Bid
Item Bid
State of Michigan Project No. 22030.01
Department of Technology, Management and Budget January 2025
Design and Construction Division
For the Department of Corrections
File/No: 472/22061.MAA
Saginaw Correctional Facility (SRF) – HVAC Renovations
SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 230993 - 1
SECTION 230993 – SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes control sequences for HVAC systems, subsystems, and equipment.
B. This Section describes the minimum performance requirements for the systems and does not necessarily include all elements of control required for proper and safe operation of the systems.
The Contractor shall provide all necessary safeties interlocks, high limits, low limits, time delays, and control logic for a complete and operable system.
C. Related Sections include the following:
1. Division 23 Section "Instrumentation and Controls for HVAC" for control equipment and devices and submittal requirements.
D. All equipment, valves, fans, etc, shall be controlled by the temperature control contractor unless specified to be controlled by another method in the specifications or the construction documents.
1.3 DEFINITIONS
A. DDC: Direct-digital controls.
B. BAS: Building Automation System.
1.4 MECHANICAL ROOM SUPPLY FANS
A. Existing sequence of operations to remain. Sequence of operation provided below for reference.
Contractor to confirm proper operation at completion of project.
B. Equipment Controlled:
1. Building 100: Mechanical Room Supply Fan (X-SF-1) and relief hood (X-EH-2)
2. Building 200:
Design and Construction Division
For the Department of Corrections
SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 230993 - 2
a. Mechanical Room Supply Fans (X-SF-1, X-SF-2, X-SF-3, and X-SF-4) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-5) and relief hood (X-EH-5).
3. Building 300:
a. Mechanical Room Supply Fans (X-SF-1) and relief hood (X-EH-1)
b. Electrical Room Supply Fan (X-SF-2) and relief hood (X-EH-2).
4. Building 400:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
5. Building 500:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
6. Building 700:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
7. Building 800:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
8. Building 900:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
9. Building 1200:
a. Mechanical Room Supply Fans (X-SF-2) and relief hood (X-EH-2)
b. Electrical Room Supply Fan (X-SF-1) and relief hood (X-EH-1)
C. BAS monitors space temperature and operates two position damper actuators on relief hood and supply fan(s) in sequence to maintain space temperature. On a rise in space temperature above
75 deg F, BAS opens relief hood damper and supply fan damper(s). After dampers are proven open, the supply fan(s) shall start as needed to maintain space temperature. Once space temperature setpoint is met turn off supply fan (s) and close all dampers. Alarm system if room temperature rises above 100 deg F (adjustable).
D. Display and/or control the following:
1. Space temperature.
2. Space temperature setpoints.
3. Supply Fan status.
4. Damper positions.
5. Room high limit alarm status.
1.5 EQUIPMENT ROOM EXHAUST FANS
A. Existing sequence of operations to remain. Sequence of operation provided below for reference.
Contractor to confirm proper operation at completion of project.
B. Equipment Controlled:
Design and Construction Division
For the Department of Corrections
SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 230993 - 3
1. Building 100: Electrical Room Exhaust Fan X-EF-44 and associated intake hood damper.
2. Building 600:
a. Electrical Room Exhaust Fan X-EF-1 and associated intake hood damper, X-IH-7
b. Mechanical Room Exhaust Fan X-EF-2 and associated intake hood damper, X-IH-
4.
C. BAS monitors space temperature and operates two position damper actuator on intake louver in sequence to maintain space temperature. On a rise in space temperature above 75 deg F, BAS opens intake damper and starts exhaust fan. Prove damper open before fan starts. Once space temperature setpoint is met turn off exhaust fan and close damper. Alarm system if room temperature rises above 100 deg F (adjustable).
D. Display and/or control the following:
1. Space temperature.
2. Space temperature setpoints.
3. Exhaust Fan status.
4. Damper position
5. Room high limit alarm status.
1.6 ARSENAL ROOM HOOD EXHAUST FAN (ADMINISTRATION BUILDING)
A. Existing sequence of operations to remain. Sequence of operation provided below for reference.
Contractor to confirm proper operation at completion of project.
B. Equipment Controlled: X-EF-2 and X-IH-2
C. Exhaust fan to be controlled by a wall switch. When switch is turned both 2 position damper actuators on the intake hood damper and exhaust air damper shall open. Once dampers are proven open the exhaust fan shall start. When wall switch is turn off the exhaust fan shall turn off and both dampers shall close. Alarm system if either damper fails to open and/or exhaust fan fails. Monitor exhaust fan status through a current sensing rely.
D. Display and/or control the following:
1. Wall switch status
2. Damper position
3. Damper alarm
4. Exhaust fan status
5. Exhaust fan alarm
1.7 BOILER AND PUMP SEQUENCE
A. Existing sequence of operations to remain. Sequence of operation provided below for reference.
Contractor to confirm proper operation at completion of project.
Design and Construction Division
For the Department of Corrections
SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 230993 - 4
B.
C. Equipment Controlled:
1. Building 100: B-100-1, B-100-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (Fin Tube pump), and X-P-5 (AHU and Unit Heater pumps), and associated control valves.
2. Building 200: B-200-1, B-200-2, B-200-3, B-200-4, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-3 (Fin Tube pump), and X-P-4 (Fin
Tube pump) and associated control valves.
3. Building 300: B-300-1, B-300-2, B-300-3, B-300-4, X-P-10 (AHU and Unit Heater pumps), X-P-11 (AHU and Unit Heater pumps), X-P-1 (Fin Tube pump), and X-P-2 (Fin
Tube pump) and associated control valves.
4. Building 400: B-400-1, B-400-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), and X-P-6 (Fin Tube pump) and associated control valves.
5. Building 500: B-500-1, B-500-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), X-P-6 (Fin Tube pump), X-P-7 (Fin
Tube pump), and X-P-8 (Fin Tube pump) and associated control valves.
6. Building 600: B-600-1, B-600-2, X-P-1 (Primary pumps), X-P-2 (Primary pumps), X-P-
3 (East Building Fin Tube pump), X-P-4 (East Building Fin Tube pump), X-P-5 (West
Building Fin Tube pump), X-P-6 (West Building Fin Tube pump), X-P-7 (Cabinet Unit
Heater Zone pump), X-P-8 (Cabinet Unit Heater Zone Pump) and associated control valves.
7. Building 700: B-700-1, B-700-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), X-P-6 (Fin Tube pump), X-P-7 (Fin
Tube pump), and X-P-8 (Fin Tube pump) and associated control valves.
8. Building 800: B-800-1, B-800-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), X-P-6 (Fin Tube pump), X-P-7 (Fin
Tube pump), and X-P-8 (Fin Tube pump) and associated control valves.
9. Building 900: B-900-1, B-900-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), X-P-6 (Fin Tube pump), X-P-7 (Fin
Tube pump), and X-P-8 (Fin Tube pump) and associated control valves.
10. Building 1200: B-1200-1, B-1200-2, X-P-1 (AHU and Unit Heater pumps), X-P-2 (AHU and Unit Heater pumps), X-P-5 (Fin Tube pump), X-P-6 (Fin Tube pump), X-P-7 (Fin
Tube pump), and X-P-8 (Fin Tube pump) and associated control valves.
D. Boilers to be equipped with controls that allows the boiler control panels to control sequencing of all boilers and boiler pumps in the boiler room as required to maintain loop supply water temperature at the optimum efficiencies based on outdoor air temperature reset schedule.
Boilers shall alternate being the lead and standby boilers. Before a boiler starts the associated boiler control valve shall open. If the boiler control panel turns a boiler off, the boiler’s control valve shall close. If a boiler fails, start standby boiler and alarm BAS.
E. BAS to send signal to boiler control panel to activate the heating system whenever the outdoor temperature is below 55 deg F (adjustable).
F. Hot water supply loop temperature shall be capable of being changed from the BAS.
Design and Construction Division
For the Department of Corrections
SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 230993 - 5
G. AHU and Unit Heater Pumps/Primary: The BAS shall operate the AHU and Unit Heater pumps in a lead/standby arrangement with one pump operating in lead mode and the other pump in standby (lag) mode. The BAS activates the lead pump whenever the outdoor temperature is below 55 deg F (adjustable). The BAS monitors current sensing relays on the pump to verify its operating status and alarms if pump fails. Standby pump is activated if the lead pump fails.
Pump operation rotates lead/lag status to even pump wear.
H. Building 100 Fin tube Pump: The BAS shall operate the fin tube pump whenever the outdoor temperature is below 55 deg F (adjustable). The BAS monitors current sensing relays on the pump to verify its operating status and alarms if pump fails. Fin tube heating supply water temperature to be based on the outdoor air temperature.