About this file

This is Construction Bid Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration Design and Construction Division for HVAC renovations at the Saginaw Correctional Facility (File No. 472/22064.CTS). The addendum extends the bid due date to February 19, 2025 at 2:00pm, with questions due to Matrix Consulting Engineers by February 12, 2025. The project involves miscellaneous HVAC renovations in several buildings, including installation of new 24-volt combination fire/smoke DDC damper actuators, controls, and associated accessories. A mandatory pre-bid meeting was held on January 31, 2025. The contract period is 100 calendar days from notice to proceed to substantial completion (June 18, 2025), with final completion 30 days after.

The project requires a bid security equal to 5% of the base bid and includes a $40,000 allowance for provisionary/contingency scope. Bids must be submitted electronically through SIGMA VSS. The contractor must provide performance and payment bonds, proof of insurance including builder's risk, and is responsible for obtaining all required permits and inspections. Special working conditions apply due to the correctional facility setting, including required security clearance, site-specific training, escort requirements, and restricted work hours (6:00 AM - 6:00 PM Monday-Friday). The contractor must be on site 100% of the time and use Michigan products when possible where price, quality and performance are equal or superior.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

2/5/2025

PROJECT NAME

Saginaw Correctional Facility – HVAC Renovations

FILE NUMBER

472/22064.CTS

PROFESSIONAL

Matrix Consulting Engineers, Inc.

PROJECT DIRECTOR

Chris Schanbeck

BID OPENING DATE:

2/19/2025

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. 1/31/2025 Prebid meeting sign-in sheet (attached).

2. 1/31/2025 Prebid meeting agenda (attached).

3. Project Clarification: Questions are due to Matrix (dpung@matrixceinc.com), Friday, February 12, 2025 at 2:00 pm.

4. Project Clarification: Bid due date is extended to Wednesday, February 19, 2025 at

2:00pm.

5. Clarification: Sheet M-000, M-100, M-301, M-302, M-303, M-304, M-305, M-306, M-307, M-308, M-309, M-310, and M-311 reissued (attached). Added notes for Add Alternate #1 and added notes for the relocation/installation of sensors.

6. Clarification: M-401, M-402, M-403, M-404, M-405, M-406, M-407, M-408, M-409, M-410, and M-411 reissued (attached). Added notes for Add Alternate #1 and added notes for the relocation/installation of sensors.

7. Clarification: M-303.1 and M-403.1 issued (attached). Added notes for the relocation/installation of sensors and schedules for Add Alternate #1.

8. Clarification: Specification Section 230993 – Sequence of Operations for HVAC Controls reissued (attached).

9. Clarification: Bid Summary Form reissued (attached). Updated to include Add Alternate #1 and extend bid due date.

10. Clarification: A lap-top workstation does not need to be included as part of the project.

11. Clarification: Prime contractor is to determine the scope of work cover by each discipline and ensure that all project scope is included in bid.

ACKNOWLEDGMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Devon Pung, Matrix Consulting Engineers DATE: 2/5/2025

APPROVED BY: Chris Schanbeck PROJECT DIRECTOR: Chris Schanbeck DATE: 2/5/2025 http://www.michigan.gov/SIGMAVSS

MANDATORY PRE-BID MEETING

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

Project: Saginaw Correctional Facility, HVAC Renovations

File Number: 472/22064.CTS

Date & Time: Friday, January 31, 2025, at 10:00am

A. Introductions and Sign-in Sheet

All attendees are to sign-in. Individuals can represent only one firm that may submit a bid.

B. Project Scope: Miscellaneous HVAC Renovations in several buildings as specified in the contract documents.

C. Addendum will be issued to document any questions, issues or changes to the contract documents that arise during bidding. All questions or issues shall be submitted via email including any items discussed in this meeting that are not documented in an addendum. The sign-in sheet will be issued in an addendum.

D. Bid Submissions

1. Execute and include all required forms and documents. Refer to Bidder’s Checklist.

a. Note the allowance, $40,000, to be included in the bid for provisionary or contingency scope as directed in writing from the PSC and Project Director.

b. Bid Security equal to five percent (5%) of the base bid is required.

2. Bids shall be submitted electronically in Adobe PDF format to SIGMA VSS.

a. Maximum file size for uploading attachments is 25 MB.

b. Do not wait until the last minute. Submit early.

c. If you experience issues or have questions regarding your electronic submission, you must work through the SIGMA Help Center for assistance and if necessary, receive a ticket number prior to contacting the DCD.

E. Items to be provided by Contractor after notification of award including but not limited to:

1. Performance and Payment Bonds,

2. Proof of Insurance including Builder’s Risk and

3. Additional documentation requested.

F. Schedule

1. February 5, 2025, 2:00pm, any questions must be submitted to dpung@matrixceinc.com.

2. February 12, 2025, 2:00pm, Bids are due on SIGMA VSS.

3. March 10, 2025, Anticipated Pre-construction Kickoff Meeting and Notice to Proceed to be confirmed after contract is executed.

4. Contract Time specified as 100 calendar days from notice to proceed to substantial completion, June 18, 2025. Final completion anticipated 30 calendar days after substantial completion.

5. Liquidated damages specified at $500 per day after substantial completion.

G. Use Michigan products and recycled and/or environmentally friendly products whenever possible where price, quality and performance are equal to, or superior to non-Michigan products.

H. Permits - The contractor is responsible for obtaining and paying for all permits required by LARA, or any other agency as required. The Contractor is responsible for scheduling all inspections.

RFP 472/22064.CTS PRE-BID MEETING 1/31/2025

I. The Contractor is responsible for managing and supervising the work and must be on site 100% of time.

J. Special Working Conditions – Department of Corrections. Refer to Appendix II for additional information.

1. Security Clearance Request – LEIN Clearance and site-specific training. All employees will be required to attend orientation prior to any onsite activity.

2. Working hours will be confirm but generally understood to be daylight hours between 6:00

AM and 6:00 PM during normal business days (Monday through Friday). Additional weekday hours or work on weekends or State Holidays is NOT allowed unless specific written permission is granted.

3. Facility Escort will be required for each work crew at all times inside the secure perimeter. A single escort will be provided for this work. Scheduling of the work shall be coordinated in advance with escort availability.

4. Additional security requirements: in/out of perimeter, onsite items, sally port access, etc.

5. Site controls & staging

K. PSC to review technical and any additional scope information.

L. Comments – Questions – Walk Through

9625 PIERCE ROAD,

FREELAND, MI 48623

FILE NUMBER: 472/22064.CTS

MATRIX PROJECT NUMBER: 22030.01MECHANICAL/ELECTRICAL ENGINEER

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

FOR DEPARTMENT OF CORRECTIONS

SAGINAW CORRECTIONAL FACILITY (SRF) - HVAC RENOVATIONS

N SITE MAP

MECHANICAL DRAWING INDEX

M-000

TITLE SHEET

DBP

CAT

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

472SRFMAINTPROJ

1/22/2025 CD SET

2/5/2025 ADDENDUM 2

GENERAL HVAC NOTES

1. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS, AT

LEAST 10 FEET FROM OUTDOOR AIR INTAKES.

2. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER

MANUFACTURERS WRITTEN INSTRUCTIONS.

3. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION

THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.

4. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.

5. FIRE DAMPERS & COMBINATION FIRE/SMOKE DAMPERS SHALL

MATCH RATING OF WALL. UNLESS NOTED OTHERWISE.

6. INTERLOCK FIRE/SMOKE DAMPERS BY ELECTRICAL TRADES.

PROVE OPEN BEFORE AIR HANDLING UNITS FAN(S) START.

7. COORDINATE LOUVER SIZES PRIOR TO CONSTRUCTION AND

ORDERING NEW DAMPERS.

8. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER

DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.

9. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,

ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT

MAY AFFECT THE WORK.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"

CONDITION DURING CONSTRUCTION.

11. ALL WORK SHALL BE PERFORMED BY LICENSED

CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.

12. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,

LATEST APPLICABLE EDITION.

13. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT

FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED

OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED

SHEET METAL, MIN. 26 GA.

14. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR

SPECIFICATIONS THE MORE STRINGENT AND GREATER COST

ITEM SHALL BE USED.

15. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.

IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL

NECESSARY OFFSETS. INSTALL WORK IN MANNER TO

CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE

HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.

DO NOT SCALE FROM DRAWINGS.

16. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,

REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE

STATUTES, ORDINANCES, CODES OR REGULATIONS OF

FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING

JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

17. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY

OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,

ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION

BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE

FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING

AND SPECIFICATIONS.

18. DRAWING LAYOUT IS SCHEMATIC. EXACT LOCATION OF

EQUIPMENT SHALL BE COORDINATED WITH BUILDING

STRUCTURE, EQUIPMENT FURNISHED, AND ALL OTHER TRADES

PRIOR TO INSTALLATION. ANY CONTRACTOR INSTALLING

WORK WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS

WORK AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF

ANY AND ALL TRADES WORK.

19. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS

REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.

CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY

LOCAL CODES. POWER SHALL BE PROVIDED BY THE

ELECTRICAL CONTRACTOR.

20. CONTRACTOR TO REPAIR CEILING/WALL/ROOF TO MATCH

EXISTING AS REQUIRED WHERE NEW/DEMOLITION WORK

OCCURRED.

21. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST

CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER

TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.

22. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO

OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED

THROUGHOUT THE PROJECT.

23. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH

AT THE PROJECT.

24. CONTRACTOR TO PATCH AND PAINT EXISTING WALLS AS

NEEDED TO MATCH EXISTING WHERE DEMOLITION AND/OR

NEW WORK IS COMPLETED.

25. FIELD VERIFY EXISTING SIZE OF ALL EQUIPMENT PRIOR TO

ORDERING NEW EQUIPMENT.

26. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN

ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER TO

DISABLE THE FIRE ALARM.

27. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL

USE TAMPERPROOF SCREWS.

28. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT

AND SHALL MAINTAIN ALL EXISTING WARRANTIES.

29. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR

INSTALLATION OF ALL 24 VOLT CONTROL WIRING AS REQUIRED

TO CONTROL ALL HVAC EQUIPMENT PER THE SEQUENCE OF

OPERATIONS. REFER TO MECHANICAL SPECIFICATIONS AND

COORDINATE WITH MECHANICAL CONTRACTOR. ELECTRICAL

CONTRACTOR IS RESPONSIBLE FOR INSTALLING WIRING AND

RACEWAY PER ELECTRICAL SPECIFICATIONS.

30. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING

AND INSTALLING ALL MECHANICAL EQUIPMENT.

31. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER

HARDWARE REQUIRED FOR WIRING THE HVAC EQUIPMENT

PER THE SEQUENCE OF OPERATIONS.

MECHANICAL SYMBOLS LEGEND

HVAC PIPING SYMBOLS

HVAC PIPING

HVAC DUCTWORK

F/S

F/S s s

TEMPERATURE CONTROL SYMBOLS

MISCELLANEOUS NOTES

HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES

MECHANICAL ABBREVIATIONS

AFF ABOVE FINISH FLOOR

AC AIR COMPRESSOR

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

A.T.C. ARCHITECTURAL TRADES CONTRACTOR

B BOILER

B.A.S. BUILDING AUTOMATION SYSTEM

CAF COMBUSTION AIR FAN

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CHLR CHILLER

CHP CONSOLE HEAT PUMP

CONV CONVECTOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONTROL VALVE

CWP CHILLED WATER PUMP

DB DRY BULB

DFU DUCT FURNACE

DIA DIAMETER

DN DOWN

DPR DAMPER

DS DUCT SILENCER

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

E.T.C. ELECTRICAL TRADES CONTRACTOR

EVR EVAPORATOR

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST EXISTING

FF FINISH FLOOR

FPM FEET PER MINUTE

FT FEET

FTR FINNED TUBE RADIATION

FU FURNACE

GAL GALLON

GFRH GAS FIRED RADIANT HEATER

GR GRILLE

H HUMIDIFIER

HC HEATING COIL

HD HEAD (FT)

HP HORSE POWER

HHP HORIZONTAL HEAT PUMP

HTG HEATING

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IAH INTAKE HOOD

LAT LEAVING AIR TEMPERATURE

LH LATENT HEAT (MBH)

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MIN MINIMUM

M.T.C. MECHANICAL TRADES CONTRACTOR

N.C. NOISE CRITERIA

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NTS NOT TO SCALE

P PUMP

PCR PUMPED CONDENSATE RETURN

PD PRESSURE DROP

RCP RADIANT CEILING PANEL

REQ'D REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RLH RELIEF HOOD

RTU ROOF TOP UNIT

SD SUPPLY DIFFUSER

SF SUPPLY FAN

SG SUPPLY GRILLE

SH SENSIBLE HEAT (MBH)

SM SHEET METAL

SQ. FT. SQUARE FEET

SST SATURATED SUCTION TEMPERATURE

STR STRAINER

TC TOTAL COOLING (MBH)

TCL TEMPERATURE CONTROL

T&P TEMPERATURE & PRESSURE RELIEF VALVE

TYP TYPICAL

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

VRH VARIABLE AIR VOLUME REHEAT BOX

FPVAV FAN POWERED VARIABLE AIR VOLUME BOX

V.F.D VARIABLE FREQUENCY DRIVE

ZD ZONE DAMPER

X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)

ITEM

EXISTING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

COOLING TOWER WATER SUPPLY

COOLING TOWER WATER RETURN

DIRECT EXPANSION

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

SUCTION (REFRIGERANT)

LIQUID (REFRIGERANT)

SUCTION (DIRECT EXPANSION)

LIQUID (DIRECT EXPANSION)

LOW PRESSURE STEAM (0-20 LBS.)

MEDIUM PRESSURE STEAM (21-75 LBS.)

HIGH PRESSURE STEAM (76 LBS. & ABV.)

STEAM CONDENSATE (GRAVITY)

PUMPED STEAM CONDENSATE

STEAM CONDENSATE BOILER FEED

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

SOLENOID VALVE

EXPANSION VALVE WITH

THERMOSTATIC BULB

PLUG VALVE

BUTTERFLY VALVE

RELIEF VALVE

HOSE & DRAIN END VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVE

GAS PRESSURE REGULATOR

STRAINER (BLOW-OFF)

FLOW DIRECTION

PIPING DROP

PIPING RISE

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

THERMOMETER

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

BACK FLOW PREVENTER

PIPE CAP

PIPE BREAK

THERMOMETER WELL

EXPANSION LOOP

EXPANSION COMPENSATOR

FLOAT & THERMOSTATIC STEAM TRAP

INVERTED BUCKET STEAM TRAP

THERMOSTAT

PROGRAMMABLE THERMOSTAT

THERMOSTAT (W/ NIGHT SETBACK)

ROOM SENSOR

HUMIDISTAT

PRESSURE GAUGE

DAMPER (ELECTRIC OPERATION)

DAMPER (PNEUMATIC OPERATION)

DAMPER BLADES

SUPPLY AIR DUCT

EXIST SUPPLY AIR DUCT

RETURN AIR DUCT

EXIST RETURN AIR DUCT

OUTSIDE AIR DUCT

EXIST OUTSIDE AIR DUCT

EXHAUST AIR DUCT

EXIST EXHAUST AIR DUCT

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

OUTSIDE AIR DUCT RISER (AS NOTED)

EXHAUST AIR DUCT

INSULATED DUCTWORK (AS NOTED)

SUPPLY AIR DIFFUSER (SQUARE)

SUPPLY AIR DIFFUSER (INLINE)

TURNING VANES

SURFACE MTD. GRILLE

SUPPLY AIR DIFFUSER (ROUND)

90° TEE W/45° APPROACH

CONICAL TAKE-OFF

CONICAL TAKE-OFF W/ DAMPER

BALANCE DAMPER

RETURN AIR DUCT BOOT

ECCENTRIC REDUCER

CONCENTRIC REDUCER

VERTICAL FIRE DAMPER

EXISTING VERTICAL FIRE DAMPER

HORIZONTAL FIRE DAMPER

EXISTING HORIZONTAL FIRE DAMPER

VERTICAL SMOKE DAMPER

HORIZONTAL SMOKE DAMPER

VERTICAL FIRE / SMOKE DAMPER

HORIZONTAL FIRE / SMOKE DAMPER

DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,

PROVIDED & WIRED BY E.T.C.

UNIT HEATER

CEILING EXHAUST FAN

ROOF MOUNTED EXHAUST FAN

DEMOLITION

POINT OF CONNECTION BETWEEN NEW AND

EXISTING

POINT OF EXISTING TO REMAIN AND EXISTING

TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

X

X

XX

XXXX

XX

XXXX

SA

OA

X-OA

X-EA

EA

X-SA

X-RA

RA

SCP

SC

DXS

DXL

HR

CR

CD

CS

DX

CTR

HPR

HS

HPS

CTS

CWR

CWS

S

L

LPS

MPS

HPS

SC (BF)

TAG CFM

NECK REMARKS

SIZE

BT

FT

SD-1 250

8"ø ---

P

H

S

T

T P

T N

M

M

SD

1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING

DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING

STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL

OTHER TRADES PRIOR TO DEMOLITION.

2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,

STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE

STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE

DRAWING AND SPECIFICATIONS.

4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.

5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY

KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.

6. PATCH AND REPAIR ALL ROOF AND WALL SURFACES LEFT DAMAGED OR

INCOMPLETE FROM REMOVAL OF EXISTING FIXED ACCESSORIES AND

EQUIPMENT WITH MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE

ARCHITECT.

7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL

ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE

DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE

REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR

RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE

NEW WORK AS SHOWN.

8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE

REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO

FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF

THIS WORK.

9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO

COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND

APPROVAL OF THE LOCAL CODE JURISDICTIONS.

10. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN

APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.

11. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED

IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE

CONTRACTOR.

12. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING

REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE

DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.

GENERAL DEMOLITION NOTES

1. CONTRACTOR TO INSTALL NEW 24-VOLT COMBINATION FIRE/SMOKE DDC DAMPER ACTUATORS (BASED ON BELIMO

FSNF24), CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. NEW DDC DAMPER ACTUATORS TO BE INSTALLED ON EXISTING FIRE/SMOKE DAMPERS. NEW DDC DAMPER ACTUATORS ARE TO MEET ALL UL REQUIREMENTS FOR THIS APPLICATION AND FAIL CLOSED. NEW DDC COMBINATION FIRE/SMOKE DAMPER ACTUATORS ARE TO BE TIED TO EACH BUILDING'S EXISTING FIRE ALARM SYSTEM AND EXISTING CONTROL SEQUENCE TO REMAIN (FIRE/SMOKE DAMPER ACTUATORS SHALL CLOSE TO THEIR NORMAL POSITION WHEN SIGNALED BY THE FIRE ALARM SYSTEM AFTER ANY FIRE/SMOKE DETECTION OR ALARM DEVICE IS ACTIVATED). CONTRACTOR TO PROVIDE ALL ASSOCIATED ACCESSORIES REQUIRED TO CONNECT TO THE EXISTING FIRE ALARM CONTROL PANEL LOCATED IN EACH CORRESPONDING BUILDING'S MECHANICAL ROOM. NEW 24-VOLT STEPDOWN TRANSFORMERS ARE TO BE INSTALLED NEAR FIRE ALARM CONTROL PANELS IN EACH BUILDING MECHANICAL ROOM TO SERVE NEW CORRESPONDING 24-VOLT COMBINATION FIRE/SMOKE DDC DAMPER ACTUATORS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ELECTRICAL CIRCUITS REQUIRED TO POWER ALL NEW 24-VOLT STEPDOWN

TRANSFORMERS.

1.1. CONTRACTOR TO PROVIDE (5) ADDITIONAL DDC SMOKE DAMPER ACTUATORS AS ATTIC STOCK.

2. CONTRACTOR TO PERFORM ALL REQUIRED CALCULATIONS FOR THE PROPER OPERATION AND CONNECTION TO THE EXISTING FIRE ALARM CONTROL PANEL. THE FIRE ALARM SHALL BE A DELEGATED DESIGN SYSTEM AND WILL BE

REVIEWED AND SUBMITTED IN ACCORDANCE WITH OTHER SYSTEMS ON THIS PROJECT.

3. COMPLY WITH NFPA 72, NFPA 101, AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION FOR INSTALLATION AND TESTING OF FIRE-ALARM EQUIPMENT. INSTALL ALL ELECTRICAL WIRING TO COMPLY WITH REQUIREMENTS IN NFPA 70

INCLUDING, BUT NOT LIMITED TO, ARTICLE 760, "FIRE ALARM SYSTEMS."

4. NEW 24-VOLT FIRE ALARM WIRING SERVING NEW COMBINATION FIRE/SMOKE DAMPER ACTUATORS IS TO BE SUPPORTED

AND ROUTED SEPARATE FROM OTHER LOW VOLTAGE WIRING.

5. ALL NEW FIRE ALARM COMPONENTS ARE TO MATCH/BE FULLY COMPATIBLE WITH EXISTING FIRE ALARM CONTROL PANEL

MANUFACTURER.

6. EXISTING FIRE ALARM SYSTEM IS A SILENT KNIGHT SYSTEM MANUFACTURED BY HONEYWELL. THE FIRE ALARM SYSTEM IS

TO BE RE-CERTIFIED AFTER THE COMPLETION OF NEW WORK.

COMBINATION FIRE/SMOKE DAMPER ACTUATORSGENERAL ELECTRICAL NOTES

1. ALL WALL AND FLOOR PENETRATIONS THROUGH FIRE RATED WALLS ARE TO BE

SEALED WITH FIRE CAULK TO MAINTAIN ORIGINAL RATING.

2. ALL NON-FIRE RATED WALLS ARE TO BE PATCHED WITH LIKE MATERIAL TO MAINTAIN

ORIGINAL RATING.

3. ALL CONDUITS SHALL BE FIELD ROUTED ALONG EXISTING PIPING AND STRUCTURAL

STEEL.

4. CONTRACTORS SHALL VISIT THE PROJECT SITE DURING PRE-BID WALK THROUGH TO

DETERMINE THE EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE

BIDDING THE PROJECT.

5. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED EQUIPMENT

WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.

6. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,

SURFACES SHALL BE PATCHED TO MATCH ADJACENT.

7. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN

CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED

NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH

SURFACE AND THEN PATCHED AND PAINTED TO MATCH, OR AS NOTED.

8. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED

TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND

PATCHING.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING WALLS TO

MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED EQUIPMENT.

10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AND LOADS PRIOR TO INSTALLING

SERVICE TO EQUIPMENT.

11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL FIELD

OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.

12. MINIMUM RACEWAY SIZE; 3/4" TRADE SIZE. REFER TO SPECIFICATION 260533 -

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS.

13. ALL CONDUIT ABOVE 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:

13.1. STRAP DISTANCE: 5 FEET.

13.2. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED- GRC.

13.3. FITTINGS: COMPRESSION.

13.4. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES.

14. ALL CONDUIT BELOW 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:

14.1. STRAP DISTANCE: 3 FEET.

14.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.

14.3. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED - GRC.

14.4. FITTINGS: COMPRESSION.

14.5. BELL BOXES: FS TYPE.

14.6. NO KNOCKOUTS.

14.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES

15. ALL EXPOSED WIRING SHALL BE IN CONDUIT. OPEN LOW VOLTAGE WIRING ABOVE

CEILINGS IS ACCEPTABLE.

16. CONDUITS SHALL BE INSTALLED STRAIGHT AND LEVEL AND SHALL BE PARALLEL OR

PERPENDICULAR TO THE BUILDING LINES.

17. CONTRACTOR SHALL VERIFY ALL VOLTAGES BEFORE CONNECTING ANY EQUIPMENT.

18. ALL LOCATIONS WHERE THE WALLS CAN'T BE FISHED SHALL BE SURFACE MOUNTED

CONDUIT FOLLOWING NOTES 11 AND 12 ABOVE.

19. ALL WALLS THAT ARE ACCESSIBLE SHALL BE FISHED AND DEVICE CUT INTO WALL.

20. ANY ELECTRICAL OUTAGE SHALL NOT LAST OVER 2 HOURS. FOR OUTAGES OVER 2

HOURS PORTABLE GENERATORS SHALL BE USED TO REPLACE ANY ELECTRICAL

SERVICE EXCEEDING THAT DURATION.

21. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED COMPONENTS,

RACEWAYS, WIRE, AND HARDWARE, AS INDICATED ON DRAWINGS.

22. ALL WORK DONE WITHOUT APPROVED SHOP DRAWINGS IS AT CONTRACTORS RISK.

23. UPON RELOCATING LIGHTS AND CAMERAS CONTRACTOR SHALL VERIFY THAT THE

LIGHTS AND CAMERAS AREA WORKING PROPERLY PRIOR TO LEAVING THE SITE.

24. All LOW VOLTAGE WIRING TO BE ROUTED IN ABOVE CEILING SPACE, IN

MECHANICAL/ELECTRICAL SPACES, OR IN EXISTING SOFFITS/CHASE SPACES.

2 2

M-100

DBP

CAT

MECHANICAL/ELECTRICAL

SYMBOLS, NOTES,

ABBREVIATIONS, AND

SCHEDULES

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

472SRFMAINTPROJ

X-RF-1

X-SF-1

M

X-UH-2

X-P-2

X-P-5

X-P-1

X-CHEMICAL POT FEEDER

X-DWH-1

X-7" VTR

X-UH-1

X-IH-1

(LOCATED

ON ROOF)

M

M

X-EH-2

(LOCATED

ON ROOF)M

X-EF-3

X-30x48 RA

X-240x72

LOUVER

X-32x108 EA UP

TO X-EH-1

X-36"

PLENUM

X-36x30

SA DN

X-40x40

SA DN

X-42x42 SA

X-36x50 SA

X-36x18 SA

M

X-44x24RA

X-48x24

RA DN

X-48x48 RA X-44x24 RA

X-AHU-1

UP

X-COND

X-CONCRETE

PAD

X-CONCRETE

PAD

X-P-3

M

M

M

T

T

X-SF-1

X-UH-2

T

X-UH-1

B-100-2

B-100-1

CU-100-1

6'' CA VTR

8'' VTR

CC-100-1

X-AHU-1 & X-RF-1 DDC

CONTROL PANEL

MISC. EQUIPMENT

DDC CONTROL PANEL

6'' CA VTR

8'' VTR

EPO SWITCH

EPO SWITCH

RA DAMPER ACTUATOR

(BELOW)

M

UP

UP

X-EF-4

M-301

T

M

X-LOUVER

(ABOVE CEILING)

DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY. DISCONNECT, REMOVE, AND SALVAGE

EXISTING DAMPER ACTUATOR, DDC CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

EXISTING LOUVER TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING OUTDOOR

AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT, WIRE, AND ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE AS REQUIRED

FOR DEMOLITION AND NEW INSTALL.

M-301

BUILDING 100 SECOND

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 100 SECOND FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

1 BUILDING 100 MECHANICAL ROOM - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

UP

X-EF-3

X-EF-1

X-EF-14

X-EF-5

X-EF-4

X-EF-6

X-EF-2

X-EF-15

X-EF-8

X-EF-13

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-CUH-14

X-CUH-3

X-CUH-2

X-CUH-18

X-CUH-8

X-CUH-7 X-CUH-4

X-CUH-1

X-CUH-13

X-CUH-11

X-CUH-12

X-UH-6

X-UH-5

X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTR X-FTRX-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTRX-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTRX-FTR

X-FTR X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-FTR

X-10x6 SA

X-14x6 SA

X-12x8 SA

X-16x6 SAX-10x6 SA

X-18x10 SA

X-10x6 SA

X-20x10 SA

X-16x6 SA

X-16x10 SA

X-12x6 SA

X-20x10 SA X-12x6 SA

X-16x10 SA

X-12x6 SA

X-18x10 SA

X-12x12 SA

X-12x6 SAX-8x6 SA X-16x10 SA

X-8x6 SA

X-14x6 SA

X-12x8 SA

X-8x6 SA

X-8x6 SA

X-10x8 SA

X-10x6 SA X-8x6 SA

X-8x6 SA

X-8x6 SAX-16x10 SA

X-14x10 SA X-8x6 SA

X-8x6 SA

X-12x8 SA X-8x6 SA X-8x6 SA

X-8x8 SA

X-12x6 SA

X-12x6 SA

X-12x6 SA X-8x6 SA

X-8x6 SA

X-18x16 SA

X-18x10 SA

X-10x6 SA

X-18x22 SA

X-18x10 SA

X-18x10 SA

X-26x22 SA

X-18x10 SA

X-45x22 SA

X-34x16 SA

X-18x10 SA

X-18x10 SA

X-30x16

SA

X-22x16 SA X-24x16 SA

X-22x12 SA

X-10x6 SA

X-10x6 SA

X-18x10 SA

X-18x10 SA

X-22x6 SA

X-28x12 SA

X-24x12 SA

X-14x8 SA

X-14x6 SA

X-12x6 SA

X-10x6 SA X-8x6

SA

X-20x6 SA

X-20x12 SA X-16x10 SA

X-8x6 SA

X-16x10 SA

X-12x10 SA

X-10x6 SA

X-14x8 SA

X-14x6 SA

X-8x6 SA

X-10x6 SA X-8x6 SA

X-16x6 SA

X-18x8 SA

X-14x6 SA

X-14x10 SA X-12x10 SA X-12x10 SA

X-34x12 SA

X-18x10 SAX-16x6 SA

X-20x12 SA X-18x12 SA X-16x12 SA X-16x10 SA X-16x8 SA X-16x6 SA

X-16x6 SA X-16x6 SA

X-16x6 SAX-16x6 SAX-16x6 SA

X-8x6

SA (TYP.)

X-8x6 EA

(TYP.)

X-10x10 SA X-8x8 SA X-8x6 SAX-10x8 SA X-8x6 SA

X-10x6 SA X-10x8 SA

X-8x6 EA X-8x8 EA X-10x8 EA X-12x8 EA X-12x10 EA X-12x8 EA

X-10x8 EA X-8x8 EA X-8x6 EA

X-16x12 RA

X-32x12 OPEN

END RA

X-20x18 RA

& SA UP

X-22x12 OPEN

END RA

X-22x6 RA

18x6 OPEN

END RA

X-12x6 RA

X-12x8 RA

X-12x12

OPEN

END RA

X-22x12 OPEN

END RA

X-30x12 OPEN

END RA

X-12X8 OPEN

END RA

X-12X6 OPEN

END RA

X-18X10

OPEN END RA X-34X12 OPEN

END RA

X-12X12

OPEN END RA

X-20x12 RA

X-28x18 RA

X-10x12 RA

X-34x18 RA

X-8x6 RA

X-8x6 RA

X-48X12 OPEN

END RA

X-22x6 RA (TYP)

X-10X10 UP

TO X-EF-7

X-8x6 EA

X-8x6 EA X-14x6 EA

X-12x6 EA

X-8x8 EA

X-8x6 EA

X-8x8

EA

X-8x6 EA

X-6x6 EA

X-8x6 EA

X-8x8 EA

X-SD 360

14" TYP. 2

X-SD 200

8" TYP. 2

X-SD 200

8" ---

X-SD 240

8" ---

X-SD320

14"---

X-SD 240

10" ---

X-SD 80

6" TYP. 2

X-SD 85

6" TYP. 2

X-SD 75

6" ---

X-SD 150

7" ---

X-SD 85

6" TYP. 3

X-SD 100

6" TYP. 2

X-SD 80

6" TYP. 2

X-SD 105

6" ---

X-SD 85

6" ---

X-SD 200

8" TYP. 2

X-SD 330

12" ---

X-SD 215

10" ---

X-SD 165

8" --- X-SD 165

8" ---

X-SD 130

6" ---

X-SD 320

12" ---

X-SD 75

6" TYP. 4 X-SD 75

6" ---

X-SD 170

8" ---

X-SD 65

6" ---

X-SD 115

6" TYP. 3

X-SD 145

10" ---

X-SD 310

10" ---

X-SD 245

10" ---

X-SD 50

6" ---

X-SD 50

6" ---

X-SD 140

6" ---

X-SD 230

10" ---

X-SD 285

--- TYP. 4 X-SD 260

--- TYP. 3

X-SD 50

--- TYP. 18

X-EG 50

--- TYP. 18

X-EG 50

--- TYP. 4

X-EG 75

--- TYP. 2X-EG 235

X-EG 75

X-EG 120

--- TYP. 2

X-EG 75

--- TYP. 2X-EG 75

--- TYP. 2

X-EG 75

X-EG 500

X-12X8 UP

TO EF-10

X-SD 200

8" ---

X-SD 180

8" ---

X-45x22

SA UP

X-SD 840

15" TYP. 4

X-SD 840

15" TYP. 6

X-EG 220

X-EG 220

X-EG 410

X-RG 180

--- ---X-RG 215

X-RG 290

X-RG 180

--- TYP. 2

X-RG 215

X-RG 220

X-EG 75

X-RG 130

X-RG 235

X-RG 150

--- TYP. 2

X-RG 85

X-RG 85

--- TYP. 2

X-RG 260

X-RG 90

X-RG 145

X-RG 180

X-RG 200

24X24 UP

TO X-EF-9

X-RG 290

--- --- X-RG 150

X-RG 115

X-RG 650

X-RG 205

X-RG 120

X-RG 290

X-RG 65

--- TYP. 2

X-RG 190

X-RG 1140

X-RG 780

X-8x6 SA

X-EG 50

--- TYP. 2 X-EG 50

--- TYP. 2

X-SD 50

--- TYP. 2

X-SD 50

--- TYP. 2

X-26x26

RA UP

X-FTRX-EF-8

X-CUH-5X-CUH-6

X-EF-16

F/S F/S

F/S

F/S F/S F/S

F/S

F/S

F/S F/SF/SF/SF/S

F/S

F/S

F/S F/S

T

T

T

T

T

T

X-AHU-2

X-AHU-4

AC-200-2

T

AC-200-1

T

AC-200-3

T

S

S

S

S

X-AHU-3

S

X-AHU-1

(ZONE 1)

S

X-AHU-1

(ZONE 2)

X-AHU-1

(ZONE 3)

X-AHU-1

(ZONE 5)

X-AHU-1 (ZONE 7)

S

S

SS

X-AHU-1

(ZONE 4)

S

S

S

S

S

S

S

S S

S

X-AHU-1

(ZONE 6)

X-AHU-1

(ZONE 8)

S

S

S

S

S

S

S

S

MANUAL SMOKE PURGE

KEYED SWITCH

DP11

1 1 1

DEMOLITION NOTES

1 DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC ACTUATOR, PNEUMATIC TUBING,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES

IN THE LOCATIONS SHOWN. EXISTING

COMBINATION FIRE AND SMOKE DAMPER TO

REMAIN.

EXISTING FIN TUBE, CONTROL VALVE, AND ALL

ASSOCIATED ACCESSORIES TO REMAIN.

DISCONNECT, REMOVE, AND DEMO EXISTING

CONTROL WIRING TO THE EXTENTS SHOWN.

CONNECT FIN TUBE AND CONTROL VALVE TO

NEW SENSOR SHOWN ON NEW DRAWING.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

THERMOSTAT, CONTROL WIRING, CONTROLS,

AND ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRELY. RE-INSTALL SALVAGED THERMOSTAT

IN THE LOCATION SHOW ON THE NEW DRAWINGS.

CONTRACTOR TO PATCH, PRIME, AND PAINT

WALL LOCATION AS REQUIRED TO MATCH

EXISTING WHERE THERMOSTAT IS REMOVED.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-302

BUILDING 200 FIRST FLOOR

PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 200 FIRST FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

X-SF-5

X-EF-12X-12x8 EA X-12x8

EA DN

X-UH-1

X-UH-4

X-EF-7

M

X-EH-5

(LOCATED

ON ROOF)

X-SF-411 X-SF-3 X-SF-2 X-SF-1X-XT-1

X-P-1

X-P-2

X-P-3

X-P-4

X-EF-11

X-16x8 EA

X-16x8

EA DN

X-UH-3

X-UH-2

X-8" VTRX-8" VTR

X-DWH-2 X-DWH-1

X-12x8 EA X-12x8

EA DN

X-EF-10

X-EF-9

M

X-EH-4

(LOCATED

ON ROOF)

X-DAC-1

M

X-708x152 OA

X-56" PLENUM

X-AHU-4

X-RF-3

EA UP

TO X-EH-3

X-20x18

RA DN

X-20x18

SA DN

X-20x18 RA

X-20x18 SA

X-AHU-3

X-30x30

SA DN

X-30x30 SA

M

X-AHU-2

EA UP

TO X-EH-2

X-46x34 RA

X-RF-2

X-50x38 RA

X-32x50

RA

X-32x50 RA

X-46x34

SA DN

X-30x16 SA

X-30x16 SAX-30x16 SA X-30x16 SAX-30x14 SA

X-46x34 SA

X-42x34 SA

X-46x34 SA

X-24x20

SA DN

X-24x20

SA DN

X-42x24 SAX-40x20 SA

X-24x20

SA DN

X-24x20

SA DN

X-20x20 SA

X-20x20

SA DN

X-RF-1

X-26x26 RA X-26x26 RA

X-26x26 RA

X-AHU-1

M

EA UP

TO X-EH-1

X-180x152 OA

X-56" PLENUM

X-26x26 RA X-14x22

SA DN,

ZONE 8

X-6x22 SA DN, ZONE 7

X-16x18

SA DN,

ZONE 1

X-8x18 SA DN, ZONE 5

X-8x22 SA DN, ZONE 2

X-8x22 SA DN, ZONE 4

X-6x22 SA DN, ZONE 3

X-8x22 SA DN, ZONE 6

X-680x56 LOUVER

X-LOUVER X-LOUVER

M

M

X-WATER

SOFTENER

X-8" VTRX-8" VTR

X-DWH-4 X-DWH-3

X-IT RACK

X-CONCRETE PAD

X-CONCRETE PAD

X-COND

X-CONDENSER RAIL

X-CONDENSER RAIL

M

M

M

X-P-6

X-P-6

X-LOUVER

M

M

M

1 1

MMM

B-200-1

M

M

M

M

M

M

T

X-SF-5 X-UH-4

T

T

X-UH-3

T X-SF-4

T

X-UH-2

T

X-SF-3

T

X-UH-1

CU-200-1

CU-200-1 CU-200-2

6" VTR

(TYP. 4)

4" CA VTR

(TYP. 4)

X-AHU-1 & X-RF-1

DDC CONTROL

PANEL

X-AHU-2 & X-RF-2

DDC CONTROL

PANEL

X-AHU-3 DDC

CONTROL PANEL

X-AHU-4 & X-RF-3 DDC

CONTROL PANEL

CC-200-1

M

EPO SWITCH

EPO SWITCH

M

M

M

MULTIZONE DAMPER

ACTUATOR(S), 8 ACTUATORS

M

M

MISC. EQUIPMENT

DDC CONTROL

PANEL

CU-200-3

4" CONCRETE

PAD (TYP.)

B-200-2

B-200-3 B-200-4

M 1 1

M

1 1 1 1

M

M

1 1

1 1

DEMOLITION NOTES

EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING DAMPER

ACTUATOR, DDC CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RE-USED ON NEW

DAMPER.

EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. DISCONNECT,

REMOVE, AND SALVAGE EXISTING DAMPER ACTUATOR,

DDC CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND SALVAGE EXISTING FIN TUBE

LOOP WATER TEMPERATURE SENSOR, CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES

TO BE RELOCATED IN LOCATION SHOWN ON NEW

DRAWING. MODIFY EXISTING PIPING AS REQUIRED TO

SALVAGE AND RELOCATE SENSOR.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING OUTDOOR

AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT, WIRE, AND

ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE AS

REQUIRED FOR DEMOLITION AND NEW INSTALL.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-303

BUILDING 200 SECOND

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 200 SECOND FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10

X-12x6

SA

X-SD 350

12"ø ---

X-22x18 SA X-24x18 SA

X-14x6

SA

X-RG ---

X-28x18 RA

X-FTR

X-RG 4600

X-VAV-301-29

T

DEMOLITION NOTES

1 EXISTING FIN TUBE, CONTROL VALVE, AND ALL

ASSOCIATED ACCESSORIES TO REMAIN.

DISCONNECT, REMOVE, AND DEMO EXISTING

CONTROL WIRING TO THE EXTENTS SHOWN.

CONNECT FIN TUBE AND CONTROL VALVE TO

NEW SENSOR SHOWN ON NEW DRAWING.

M-303.1

BUILDING 300 FIRST FLOOR

PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 300 FIRST FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

X-48x48 LOUVERX-UH-1

X-SF-2

X-30x48 LOUVER X-72x48 LOUVER

X-SF-1

M

X-IH-6

(LOCATED

ON ROOF)

X-EH-2

(LOCATED

ON ROOF)

M

M

M

X-RF-4

X-24x24 RA

X-33" RA

X-33"

RA

X-24x24 RA

X-26" RA

X-24x24 SA

X-AHU-4

X-24x24 SA

X-30x20 SA

X-26" SA

X-AHU-3

M

M X-96x40

RA

X-42x24 SA UP

TO X-IH-4

X-96x54 SA UP

TO X-IH-3

M

X-44x36

RA

M

X-44x40 EA

X-194x48 LOUVER

X-44x40

RA

X-RF-3

X-42x42 RA DN

X-42" RA

X-44x30

RA DN

M

X-EH-1

(LOCATED

ON ROOF)

X-AHU-5X-AHU-2

M

X-36x20 SA UP

TO X-IH-5

X-22x18

SA DN

X-22x18

RA DN

X-36x20 SA UP

TO X-IH-2

M

M

X-RF-2

X-22x18

SA DN

X-22x18 SA

X-22x18 RA

X-22x18

RA

X-30x48 LOUVER

M

X-22x18

SA DN

X-22x18

SA

X-22x18 EA

X-P-11X-P-10

X-7" VTR

X-DWH-2

X-7" VTR

X-DWH-1

X-UH-2

X-AHU-1

X-30x20 RA

X-26" SA

X-26" RA

X-24X24 RA

X-RF-1

X-30x48 LOUVER

X-33" RA

X-36x30 SA UP

TO X-IH-1

M

M

X-CHEMICAL

POT FEEDER

X-IT RACK X-CONCRETE

PAD

X-CONDENSOR RAIL X-CONDENSOR RAIL

M

X-P-1 X-P-2

M

M

M

M

M

M

M M

X-IH-6

(LOCATED

ON ROOF)

CU-300-1

T

X-SF-2

T

X-UH-2

T

X-SF-1

T

X-UH-1

T

X-SF-2

T

X-UH-2

T

X-SF-1

T

X-UH-1

X-SF-2

X-UH-2 X-SF-1

X-UH-1

6" VTR

(TYP. 4)

4" CA VTR

(TYP. 4)

X-AHU-1 & X-RF-1

CONTROL PANEL

X-AHU-2 & X-RF-2

CONTROL PANEL

X-AHU-5

CONTROL PANEL

X-AHU-3 & X-RF-3

CONTROL PANEL

MISC. EQUIPMENT

CONTROL PANEL

X-AHU-4 & X-RF-4

CONTROL PANEL

CC-300-1

CONCRETE

PAD

EPO SWITCH

EPO SWITCH

M

B-300-1

B-300-2

B-300-3

B-300-4

1 1

DEMOLITION NOTES

1 EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY. DISCONNECT, REMOVE, AND SALVAGE

EXISTING DAMPER ACTUATOR, DDC CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

FIN TUBE LOOP WATER TEMPERATURE SENSOR,

CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RELOCATED IN

LOCATION SHOWN ON NEW DRAWING. MODIFY

EXISTING PIPING AS REQUIRED TO SALVAGE AND

RELOCATE SENSOR.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING

OUTDOOR AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT,

WIRE, AND ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE

AS REQUIRED FOR DEMOLITION AND NEW INSTALL.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-304

BUILDING 300 SECOND

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 300 SECOND FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10

UP

UP

M-305

X-LOUVER

X-UH-1 X-EH-1

X-SF-1

T T

M

X-IT RACK

M

X-40x16 3

F/S

X-24x24 LOUVER

X-SF-2

X-8" VTR

X-DWH-1

X-8" VTR

X-DWH-2

X-UH-2

X-P-1X-P-2

X-52x32 LOUVER X-78x48 LOUVER

X-AHU-1

M

X-66x14 EA

UP TO X-EH-3

M

X-EH-2

X-RF-1

X-28x14 RA

M

X-24x24 SA, ZONE 2

X-11x10 SA, ZONE 1

X-12x8 SA, ZONE 3

X-12x6 SA, ZONE 4 X-18x12 SA, ZONE 5

X-20x12 SA, ZONE 8

X-12x10 SA, ZONE 7

X-16x8 SA, ZONE 6

X-CONCRETE PAD

M

M

X-P-4 X-P-9

M

T

T

X-UH-2

T

X-UH-2

X-SF-2 & X-EH-2

B-400-1

B-400-2

4'' CA VTR

(TYP.)

6'' VTR

(TYP.)

MISC. EQUIPMENT DDC

CONTROL PANEL

AHU-1 DDC CONTROL

PANEL

EPO SWITCH MULTIZONE DAMPER

ACTUATOR (8), 8

ACTUATORS

RELIEF & RA DAMPER

ACTUATOR (BELOW)

2 DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY. DISCONNECT, REMOVE, AND SALVAGE

EXISTING DAMPER ACTUATOR, DDC CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC ACTUATOR, PNEUMATIC TUBING,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES

IN THE LOCATIONS SHOWN. EXISTING

COMBINATION FIRE AND SMOKE DAMPER TO

REMAIN.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

FIN TUBE LOOP WATER TEMPERATURE SENSOR,

CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RELOCATED IN

LOCATION SHOWN ON NEW DRAWING. MODIFY

EXISTING PIPING AS REQUIRED TO SALVAGE AND

RELOCATE SENSOR.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING OUTDOOR

AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT, WIRE, AND ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE AS REQUIRED

FOR DEMOLITION AND NEW INSTALL.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-305

BUILDING 400 UPPER LEVEL

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 400 UPPER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

1 BUILDING 400 MECHANICAL ROOM - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

UP

UPUP

UP

M-306

M

X-LOUVER

X-SF-1

X-UH-1

X-EH-1

M

X-IT RACK

T T

X-TG 550

--- TYP. 2

X-TG 440

--- TYP. 2

X-TG 350

--- TYP. 2

X-22x10 SA X-22x8 SA X-18x10 SAX-22x10 SA3 3 3 F/S F/S F/S F/S

X-UH-2

X-DWH-1

X-8" VTR

X-DWH-2

X-8" VTR

X-78x48

LOUVER

M

X-24x24

LOUVER

X-SF-2

X-AHU-1

M X-42x18 SA

UPX-EH-2

X-P-1 X-P-2

M

X-18x10 SA, ZONE 1

X-10x8 SA, ZONE 2

X-10x10 SA, ZONE 4

X-CONCRETE

PAD

M

X-10x8 SA, ZONE 3

X-P-4

TX-UH-1

T

X-SF-2 & X-EH-2

B-500-2 B-500-1

MISC. EQUIPMENT DDC

CONTROL PANEL

X-AHU-1 DDC CONTROL

PANEL

4'' CA VTR

(TYP.)

6'' VTR (TYP.)

EPO SWITCH

MULTIZONE DAMPER

ACTUATOR(S), 4 ACTUATORS

1 1

DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY. DISCONNECT, REMOVE, AND SALVAGE

EXISTING DAMPER ACTUATOR, DDC CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC ACTUATOR, PNEUMATIC TUBING,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES

IN THE LOCATIONS SHOWN. EXISTING

COMBINATION FIRE AND SMOKE DAMPER TO

REMAIN.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

FIN TUBE LOOP WATER TEMPERATURE SENSOR,

CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RELOCATED IN

LOCATION SHOWN ON NEW DRAWING. MODIFY

EXISTING PIPING AS REQUIRED TO SALVAGE AND

RELOCATE SENSOR.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING OUTDOOR

AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT, WIRE, AND ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE AS REQUIRED

FOR DEMOLITION AND NEW INSTALL.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-306

BUILDING 500 UPPER LEVEL

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 500 UPPER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 201 BUILDING 500 MECHANICAL ROOM - MECHANICAL DEMOLITION

UP UP

M-307

X-10x18 SA

X-10x18 SA

X-24x18 SA

X-30x18

RA

X-26x20

RA

X-10x16 SA

X-10x24 SA

X-26x20 RA

X-24x18 SA

X-30x18 RA

F/S

F/S

F/S

F/S

F/S

F/S

F/S

X-SD 300

X-SD 50

4"ø ---

X-12x6 SA

X-6x4 SA2 F/S

X-12" VTR

X-DWH-1

X-DWH-2

X-12" VTR

X-24x24 LOUVER

X-EF-1

X-UH-2

X-24x24 LOUVER

X-EF-2

X-30"x18 SA

UP TO X-IH-7

M

X-48x48 LOUVER

X-48x48 LOUVER

X-48x48 LOUVER

X-UH-1

X-RF-1

X-26x20 RA

M

X-30x24 RA

X-RF-2

X-30x18 RA

M

X-30x24 RA

X-RF-3

X-26x20 RA MX-30x24 RA

X-20" VTR

X-30x24 SA

X-AHU-1

M

M X-48x48 SA UP

TO X-IH-1

X-30x24 SA

X-AHU-2

M

M X-48x48 SA UP

TO X-IH-2

X-24x18 SA

X-24x18 SA

X-30x18 DUCT

UP (CAPPED)

TO X-IH-4

M

X-30x24 RAX-AHU-3

M

X-36x48 SA UP

TO X-IH-3

X-10x16 SA, ZONE 5

X-10x24 SA, ZONE 4

X-10x24 SA, ZONE 1

X-10x14 SA, ZONE 2X-10x18 SA, ZONE 3

X-20x12 SA

M

X-24x30 SA UP

TO X-IH-5

M

X-12x30 CA DN

X-P-1

X-P-2 X-CONCRETE

PAD

X-IT RACK

M

X-24x18 SA

X-24x18 SA

X-HC-4

X-HC-3

X-HC-2

X-HC-1

X-P-9

MISC. EQUIPMENT DDC

CONTROL PANEL

X-AHU-2 DDC CONTROL

PANEL

T T

X-UH-2 X-EF-1

B-600-1

B-600-2

4'' CA VTR (TYP.)

6'' VTR (TYP.)

X-AHU-3 DDC CONTROL PANEL

X-AHU-1 DDC CONTROL

PANEL

T

T

MULTIZONE DAMPER

ACTUATOR(S), 5 ACTUATORS

EPO SWITCH

DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING INTAKE HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND DEMO EXISTING

DAMPER ACTUATOR, CONTROL WIRING,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES IN

THE LOCATIONS SHOWN. EXISTING COMBINATION

FIRE AND SMOKE DAMPER TO REMAIN.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

FIN TUBE LOOP WATER TEMPERATURE SENSOR,

CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RELOCATED IN

LOCATION SHOWN ON NEW DRAWING. MODIFY

EXISTING PIPING AS REQUIRED TO SALVAGE AND

RELOCATE SENSOR.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-307

BUILDING 600 UPPER LEVEL

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 600 UPPER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

1 BUILDING 600 MECHANICAL ROOM - MECHANICAL DEMOLITION

UPUP

UP

UP

UP

M-308

X-EH-1

X-UH-1 M

X-LOUVER

X-SF-1

X-IT RACK

M

T T

X-TG 800

--- TYP. 2

X-TG 500

--- TYP. 2

X-22x12 RA X-22x12 RA X-22x8 RA

X-TG 800

--- TYP. 2

3 3 3 3

F/S F/S F/S F/S

X-16x12 SA

2 2

X-CONCRETE

PAD

X-20x48

LOUVERM

X-20x24 SA

DN TO 6" AFF

M

X-AHU-1

X-EH-2

X-42x42

LOUVER

M X-12x42

LOUVER

X-14x18 SA, ZONE 4

X-12x8 SA, ZONE 2

X-16x12 SA, ZONE 1

X-UH-2

X-DWH-1

X-DWH-2

X-8" VTR

X-24x24

LOUVER

X-SF-2

X-P-2 X-P-1

M

X-8" VTR

X-14x18 SA, ZONE 3

X-P-4

1T

X-UH-2

T

X-SF-2 & X-EH-2

B-700-1 B-700-2

6'' VTR

4'' CA VTR 6'' VTR

4'' CA VTR

MISC. EQUIPMENT DDC

CONTROL PANEL

X-AHU-1 DDC CONTROL

PANEL

MULTIZONE DAMPER

ACTUATOR(S), 4 ACTUATORS

EPO SWITCH

M2

2 1

DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

DAMPER ACTUATOR, DDC CONTROLS, CONTROL

WIRING, AND ALL ASSOCIATED ACCESSORIES TO

BE RE-USED ON NEW DAMPER.

EXISTING SUPPLY FAN AND LOUVER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO DAMPER AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY. DISCONNECT, REMOVE, AND SALVAGE

EXISTING DAMPER ACTUATOR, DDC CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES TO BE RE-USED ON NEW DAMPER.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC ACTUATOR, PNEUMATIC TUBING,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES

IN THE LOCATIONS SHOWN. EXISTING

COMBINATION FIRE AND SMOKE DAMPER TO

REMAIN.

DISCONNECT, REMOVE, AND SALVAGE EXISTING

FIN TUBE LOOP WATER TEMPERATURE SENSOR,

CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES TO BE RELOCATED IN

LOCATION SHOWN ON NEW DRAWING. MODIFY

EXISTING PIPING AS REQUIRED TO SALVAGE AND

RELOCATE SENSOR.

ADD ALTERNATE DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY FAN, DAMPER, FILTER RACK, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING SUPPLY FAN CONTROL WIRING AND

CONTROLS TO REMAIN AND BE RE-USED. SALVAGE EXISTING DAMPER ACTUATOR, CONTROLS,

CONTROL WIRING AND ALL ASSOCIATED CONTROL ACCESSORIES. MODIFY EXISTING OUTDOOR

AIR PLENUM AS REQUIRED FOR DEMOLITION AND NEW INSTALL. EXISTING CONDUIT, WIRE, AND ALL ELECTRICAL ACCESSORIES TO REMAIN. MODIFY EXISTING CONDUIT AND WIRE AS REQUIRED

FOR DEMOLITION AND NEW INSTALL.

22030.01

472/22064.CTS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

KEY PLAN

SCALE: NTS

N

472SRFMAINTPROJ

1/22/2025 CD SET

M-308

BUILDING 700 UPPER LEVEL

FLOOR PLAN - MECHANICAL

DEMOLITION

DBP

CAT

N BUILDING 700 UPPER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

1 BUILDING 700 MECHANICAL ROOM - MECHANICAL DEMOLITION

UP

UP

UP

M-309

X-EH-1

X-UH-1 M

X-LOUVER

X-SF-1

X-IT RACK

M

T T

X-TG 800

--- TYP. 2

X-TG 500

--- TYP. 2

X-22x12 RA X-22x12 RA X-22x8 RA

X-TG 800

--- TYP. 2

3 3 3 3

F/S F/S F/S F/S

X-16x12 SA

2 2

X-CONCRETE

PAD

X-20x48

LOUVERM

X-20x24 SA

DN TO 6" AFF

M

X-AHU-1

X-EH-2

X-42x42

LOUVER

M X-12x42

LOUVER

X-14x18 SA, ZONE 4

X-12x8 SA, ZONE 2

X-16x12 SA, ZONE 1

X-UH-2

X-DWH-1

X-DWH-2

X-8" VTR

X-24x24

LOUVER

X-SF-2

X-P-2 X-P-1

M

X-8" VTR

X-14x18 SA, ZONE 3

X-P-4

1T

X-UH-2

T

X-SF-2 & X-EH-2

B-700-1 B-700-2

6'' VTR

4'' CA VTR 6'' VTR

4'' CA VTR

MISC. EQUIPMENT DDC

CONTROL PANEL

X-AHU-1 DDC CONTROL

PANEL

MULTIZONE DAMPER

ACTUATOR(S), 4 ACTUATORS

EPO SWITCH

M2

DEMOLITION NOTESDEMOLITION NOTES

1 EXISTING RELIEF HOOD TO REMAIN. DISCONNECT,

REMOVE, AND DEMO DAMPER AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND SALVAGE…