This document is a Special Conditions attachment for a Tucson Water contract (Contract #202262) for the procurement of Disinfection Containment Vaults dated December 1, 2014. The project involves the fabrication and delivery of 10 disinfection spill containment vaults, with the first vault to be numbered 127, to be delivered to Tucson Water's Santa Cruz Lane A-Zone Reservoir at 2650 S. 12th Ave., Tucson, AZ. Tucson Water intends to order and receive 5 vaults within 60 days after contract award, with the successful bidder required to provide a proposed delivery schedule and recovery plan to meet the approximately 60-day delivery deadline.
The contract specifies detailed requirements for the vaults, including structural specifications such as structural steel, lifting lugs, fiberglass I-beam pockets, and I-beams. Each vault must be provided with a protective cover that encloses the top and extends down the sides at least 6 inches, capable of withstanding winds up to 50 mph and protecting the vault for a minimum of 6 months in Tucson weather. The successful bidder must ensure all materials are new, comply with the latest standards (AWWA, ASME, ASTM, SSPC), and submit shop drawings, samples, and documentation for engineering review. The contract emphasizes quality control, requiring all work to be done in a thorough, workmanlike manner and allowing the engineer to test and inspect materials at the point of origin or the work site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Disinfection_Containment_Vaults.pdf | ||
| 250141_Santa_Cruz_Lane_A-Zone_Reservoir.pdf | ||
| OFFER_AND_ACCEPTANCE_IFB.pdf | ||
| 250141_Design_Drawing.pdf | ||
| 5369-B.PDF | ||
| Attachment_C.pdf | ||
| COT_ARPA_Terms_and_Conditions.pdf | ||
| Attachment_A.pdf | ||
| Attachment_B.pdf | ||
| HUD-5370C.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
the fabrication of the spill containment vault to include structural steel as shown, lifting lugs, fiberglass Ibeam pockets, and I-beams. Each Disinfection Containment Vault shall be numbered consecutively with the first vault produced numbered l 27. 11,U -Iv o..sSjr, (.;,rsf 11tvnbu--
010012 PACKAGING/PROTECT/ON FROM WEATHER
The completed disinfection spill containment vault shall be provided with a protective cover to protect the fiberglass I-beams and I-beam pockets. This protective cover shall, at a minimum, enclose the entire top of the disinfection spill containment vault, down all the sides not less than 6".
The protective cover shall be secured to the vault so as to remain in place in winds up to 50 mph.
The protective covering shall be constrncted of mate1ial capable of protecting the disinfection spill containment vault for a minimum of 6 months when exposed to the Tucson weather.
010013 DELIVERY OF PRODUCT
Tucson Water intends to order, and receive, 5 disinfection spill containment vaults within 60 days after award of contract. The successful bidder shall be capable of delive1ing these quantities.
010014 DELIVERY LOCATION FOR PRODUCT
The completed disinfection spill containment vaults shall be delivered to Tucson Water's Santa Cruz Lane A-Zone Reservoir at 2650 S. 12th Ave., Tucson, AZ. A map showing the location of the site is attached as part of this Special Condition. Delivery shall be coordinated with the Tucson Water Contract Representative and no delivery shall be accepted without the approval of the Tucson Water Contract Representative. The containment vaults shall be placed along the inside of the east fence, approximately two feet from the fence.
010018 COORDINATION OF WORK
It shall be the responsibility of the successful bidder to maintain overall coordination of the work. With a possible need to "ramp up" to the ultimate delivery schedule, the successful bidder shall provide Tucson Water with a proposed delivery schedule. This schedule shall include a recovery plan, should there be a need for a "ramp up" time period, showing how the successful bidder proposes meeting the approximately 60 day from placement of order delivery deadline for the l 0 disinfection spill containment vaults.
010090 DEFINITIONS AND ABBREV/A TIONS
Whenever the following abbreviations or te1ms are used in these Contract Documents, the intent and meaning shall be interpreted as follows:
010091 DEFINITION AND TERMS
Bid Amendments: A supplement to any of the Contract Documents issued, in w1iting, after adve11isement of but prior to the opening of bids for a Contract.
Completion Time: The number of calendar days for completion of an act, including authmized time extensions. In case a calendar date of completion is shown in the proposal in lieu of the number of calendar days, the Contract shall be completed by that date. The time within which an