250123_Price_Page.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Qualified Vendor List (QVL) for Green Stormwater Infrastructure (GSI) Landscape Maintenance
Solicitation number
250123
Issued by
Pima County, Tucson City, Arizona

About this file

This is a price page template for the City of Tucson's Qualified Vendor List (QVL) for Green Stormwater Infrastructure (GSI) Landscape Maintenance, a specialized procurement covering seven distinct service groups. The solicitation requests proposals for landscape and maintenance services supporting the City's Storm to Shade Program administered by Tucson Water. The seven service groups include: Routine GSI Landscape and Structure Maintenance, Certified Herbicide Application, Rainwater Harvesting Cistern Maintenance, Consultation/Outreach/Instruction/Data Collection, GSI Reconstruction, Manual or Truck Watering, and Irrigation System Oversight and Repair. Contractors may respond for one or multiple service groups. The initial proposal period opens March 13, 2025, with continuous submissions accepted through May 22, 2025, and subsequent reviews conducted every three months. The contract period runs from April 10, 2025, through April 10, 2030. The City maintains approximately 500 GSI assets and will issue work orders through the Hexagon Enterprise Asset Management System based on vendor qualifications and proposed service groups.

The price page template requires vendors to submit hourly labor rates for personnel positions, equipment rental fees, supplies costs, materials expenses, transportation fees calculated at the federal standard mileage rate, dump fees, and other contract-specific fees. Vendors are instructed not to list equipment or supplies they already own, as contractors must supply and maintain all necessary maintenance equipment and supplies per contract requirements. The City's Storm to Shade Program is funded through a consumption-based fee on Tucson Water customers, with total maintenance program expenditures of $723,146 in fiscal years 2023 and 2024 and a fund balance of $9,522,576 as of June 30, 2024. No specific incumbent vendors or set-aside designations are identified in this procurement document. Contractors must follow procedures outlined in the City Storm to Shade Program GSI Maintenance Manual and the City Landscape Maintenance Manual, and will be required to report work using a digital application.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group 1

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 1 - Routine GSI Landscape Structure Maintenance
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 2

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 2 - Certified Herbicide Application
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicleand/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 3

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 3 - Rainwater Harvesting Cistern Maintenance
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 4

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 4 - Consultation, Outreach, Instruction, and/or Data Collection
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 5

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 5 - GSI Reconstruction
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 6

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 6 - Manual or Truck Watering
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 7

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 7 - Irrigation System Oversight and Repair
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

File details come from the government source that posted it. Updated .