250123_Price_Page.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Qualified Vendor List (QVL) for Green Stormwater Infrastructure (GSI) Landscape Maintenance
Solicitation number
250123
Issued by
Pima County, Tucson City, Arizona

About this file

The file is a Price Page Excel spreadsheet for a Qualified Vendor List (QVL) issued by the City of Tucson for Green Stormwater Infrastructure (GSI) Landscape Maintenance. The solicitation covers seven distinct service groups: Routine GSI Landscape Structure Maintenance, Certified Herbicide Application, Rainwater Harvesting Cistern Maintenance, Consultation/Outreach/Instruction/Data Collection, GSI Reconstruction, Manual or Truck Watering, and Irrigation System Oversight and Repair. Vendors can propose services for one or multiple groups, with the City reserving the right to award by individual group or combination of groups. The project is part of Tucson's Storm to Shade Program, administered by Tucson Water, and will follow procedures outlined in the City's GSI Maintenance Manual and Landscape Maintenance Manual.

The pricing document provides a standardized template for vendors to detail their costs across multiple categories, including labor/personnel rates, equipment rental fees, supplies, materials, transportation fees, and other contract-specific fees. All pricing sections are currently populated with zero values, indicating that actual cost submissions would be required during the proposal process. The contract emphasizes that contractors must supply and maintain necessary maintenance equipment and supplies to perform services. Transportation fees are to be calculated at the federal standard rate per mile, and the scope is based on anticipated needs and available funding, with the City retaining flexibility to adjust the scope on an as-needed basis.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group 1

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 1 - Routine GSI Landscape Structure Maintenance
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 2

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 2 - Certified Herbicide Application
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicleand/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 3

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 3 - Rainwater Harvesting Cistern Maintenance
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment you already own.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 4

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 4 - Consultation, Outreach, Instruction, and/or Data Collection
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
*Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 5

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 5 - GSI Reconstruction
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 6

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 6 - Manual or Truck Watering
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

Group 7

250123 GREEN STORMWATER INFRASTRUCTURE (GSI) LANDSCAPE MAINTENANCE QVL - PRICE PAGE
Group 7 - Irrigation System Oversight and Repair
Line ItemDescriptionQTYUnit of MeasureUnit CostTotal Cost
Labor/Personnel Rates
If they vary by position, list a line item for each.
11Hour0
21Hour0
31Hour0
Equipment Rental Fees
Only list costs for equipment your company needs to rent in order to perform the work. Do not list equipment already owned.
10
20
30
40
Supplies Required for Specific Jobs
*Do not list supplies your company already owns.
10
20
30
40
50
Materials
10
20
30
Transportation Fees
1Vehicle and/or trailer federal standard rate per mile1Mile0
2Dump Fees0
Other Contract Specific Fees
10
20
30
*Per Section A.2.5. Contractor must supply and maintain necessary maintenance equipment and supplies to perform services.

File details come from the government source that posted it. Updated .