25-8409_Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- South County Water Reclamation Facility Preliminary Treatment Influent Screens Replacement
- Solicitation number
- 25-8409
- Issued by
- Collier County, Florida
About this file
This is a bid tabulation schedule for Collier County Public Utilities' South County Water Reclamation Facility (SCWRF) Preliminary Treatment Screen Replacement project. The project encompasses comprehensive demolition and replacement of existing influent screening equipment at the 5600 Warren Street facility in Naples, Florida, with new Multi-Rake Bar Screens and Wash and Press units manufactured by Huber Technologies. Work includes demolition of existing screens, electrical components, gates, and aluminum decking; installation of new influent screens, electrical panels, wash presses, drop chutes, and level sensors; installation of new channel-mounted slide gates, actuators, and stainless steel stop logs; and fabrication and installation of 950 square feet of new aluminum decking. Electronic sealed bids were due by 3:00 P.M. local time on October 17, 2025, through the County's online bidding system at https://procurement.opengov.com/portal/collier-county-fl. A non-mandatory pre-bid conference and site visit was scheduled for September 17, 2025. The project requires substantial completion within 600 calendar days from the commencement date and final completion within 30 calendar days after punch list delivery.
The anticipated project budget is $3,214,000, with bidders required to submit a 5% bid bond and maintain comprehensive insurance coverage including $1,000,000 in commercial general liability. Bidders must hold either a State of Florida Underground Utility Contractor or General Contractor license, along with a Florida Licensed Electrical Contractor credential, and must be enrolled in the E-Verify program. No specific set-asides for disadvantaged enterprises are designated. Liquidated damages of $1,071.33 per calendar day will be assessed for failure to meet substantial completion timelines. The bid schedule reflects all line items with zero pricing fields, indicating this is a blank template for contractor pricing. An additional 10% Owner's Allowance is allocated for unforeseen conditions and can be used at the owner's discretion through documented change orders with supporting Time and Materials documentation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TAB
| COLLIER COUNTY PUBIC UTILITIES | |||||
| SCWRF - PRELIMINARY TREATMENT SCREEN REPLACEMENT | |||||
| BID TABULATION | |||||
| SECTION 1 - GENERAL CONDITIONS | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 1 | Mobilization/Demobilization | 1 | LS | $0.00 | |
| 2 | Preconstruction Audio/Video Recording | 1 | LS | $0.00 | |
| 3 | Survey Layout and Record Survey | 1 | LS | $0.00 | |
| 4 | Flow Bypass | 1 | LS | $0.00 | |
| SECTION 1 SUBTOTAL | $0.00 | ||||
| SECTION 2 - DEMOLITION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 5 | Existing Influent Screen Demolition | 1 | LS | $0.00 | |
| 6 | Existing Electrical Component Demolition | 1 | LS | $0.00 | |
| 7 | Existing Gate and Actuator Demolition | 1 | LS | $0.00 | |
| 8 | Existing Aluminum Decking Demolition | 1 | LS | $0.00 | |
| SECTION 2 - SUBTOTAL | $0.00 | ||||
| SECTION 3 - INFLUENT SCREENS INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 9 | Furnish and Install Influent Screens, Electrical Panels and Wash Presses | 1 | LS | $0.00 | |
| 10 | Furnish and Install Drop Chutes | 1 | LS | $0.00 | |
| 11 | Furnish and Install Level Sensors | 1 | LS | $0.00 | |
| 12 | Furnish and Install New Electrical Components | 1 | LS | $0.00 | |
| 13 | Screens Startup and Testing | 1 | LS | $0.00 | |
| 14 | Screens Electrical and Telemetry Startup and Testing | 1 | LS | $0.00 | |
| SECTION 3 - SUBTOTAL | $0.00 | ||||
| SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 15 | Furnish and Install New Channel Mounted Slide Gates | 1 | LS | $0.00 | |
| 16 | Furnish and Install New Actuators | 1 | LS | $0.00 | |
| 17 | Gate and Actuator Startup and Testing | 1 | LS | $0.00 | |
| 18 | Furnish and Install New Stainless Steel Stop Logs | 1 | LS | $0.00 | |
| SECTION 4 - SUBTOTAL | $0.00 | ||||
| SECTION 5 - NEW DECKING INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 19 | Furnish and Install New Aluminum Decking and Modifications | 950 | SF | $0.00 | |
| SECTION 5 - SUBTOTAL | $0.00 | ||||
| COST SUMMARY | |||||
| SECTION 1 - GENERAL CONDITIONS | $0.00 | ||||
| SECTION 2 - DEMOLITION | $0.00 | ||||
| SECTION 3 - INFLUENT SCREENS INSTALLATION | $0.00 | ||||
| SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION | $0.00 | ||||
| SECTION 5 - NEW DECKING INSTALLATION | $0.00 | ||||
| CONSTRUCTION TOTAL | $0.00 |
20 *Owners Allowance T&M 1 $0 $0
* Staff has allocated ten percent (10%) of the total items 1-19 in Owner’s Allowance – for Owners Use as Directed. This Allowance will be used only at the Owner’s direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.