South County Water Reclamation Facility Preliminary Treatment Influent Screens Replacement
Solicitation number
25-8409
Issued by
Collier County, Florida

About this file

This is a bid tabulation schedule for Collier County Public Utilities' South County Water Reclamation Facility (SCWRF) Preliminary Treatment Screen Replacement project. The project encompasses comprehensive demolition and replacement of existing influent screening equipment at the 5600 Warren Street facility in Naples, Florida, with new Multi-Rake Bar Screens and Wash and Press units manufactured by Huber Technologies. Work includes demolition of existing screens, electrical components, gates, and aluminum decking; installation of new influent screens, electrical panels, wash presses, drop chutes, and level sensors; installation of new channel-mounted slide gates, actuators, and stainless steel stop logs; and fabrication and installation of 950 square feet of new aluminum decking. Electronic sealed bids were due by 3:00 P.M. local time on October 17, 2025, through the County's online bidding system at https://procurement.opengov.com/portal/collier-county-fl. A non-mandatory pre-bid conference and site visit was scheduled for September 17, 2025. The project requires substantial completion within 600 calendar days from the commencement date and final completion within 30 calendar days after punch list delivery.

The anticipated project budget is $3,214,000, with bidders required to submit a 5% bid bond and maintain comprehensive insurance coverage including $1,000,000 in commercial general liability. Bidders must hold either a State of Florida Underground Utility Contractor or General Contractor license, along with a Florida Licensed Electrical Contractor credential, and must be enrolled in the E-Verify program. No specific set-asides for disadvantaged enterprises are designated. Liquidated damages of $1,071.33 per calendar day will be assessed for failure to meet substantial completion timelines. The bid schedule reflects all line items with zero pricing fields, indicating this is a blank template for contractor pricing. An additional 10% Owner's Allowance is allocated for unforeseen conditions and can be used at the owner's discretion through documented change orders with supporting Time and Materials documentation.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TAB

COLLIER COUNTY PUBIC UTILITIES
SCWRF - PRELIMINARY TREATMENT SCREEN REPLACEMENT
BID TABULATION
SECTION 1 - GENERAL CONDITIONS
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEEXTENDED PRICE
1Mobilization/Demobilization1LS$0.00
2Preconstruction Audio/Video Recording1LS$0.00
3Survey Layout and Record Survey1LS$0.00
4Flow Bypass1LS$0.00
SECTION 1 SUBTOTAL$0.00
SECTION 2 - DEMOLITION
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEEXTENDED PRICE
5Existing Influent Screen Demolition1LS$0.00
6Existing Electrical Component Demolition1LS$0.00
7Existing Gate and Actuator Demolition1LS$0.00
8Existing Aluminum Decking Demolition1LS$0.00
SECTION 2 - SUBTOTAL$0.00
SECTION 3 - INFLUENT SCREENS INSTALLATION
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEEXTENDED PRICE
9Furnish and Install Influent Screens, Electrical Panels and Wash Presses1LS$0.00
10Furnish and Install Drop Chutes1LS$0.00
11Furnish and Install Level Sensors1LS$0.00
12Furnish and Install New Electrical Components1LS$0.00
13Screens Startup and Testing1LS$0.00
14Screens Electrical and Telemetry Startup and Testing1LS$0.00
SECTION 3 - SUBTOTAL$0.00
SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEEXTENDED PRICE
15Furnish and Install New Channel Mounted Slide Gates1LS$0.00
16Furnish and Install New Actuators1LS$0.00
17Gate and Actuator Startup and Testing1LS$0.00
18Furnish and Install New Stainless Steel Stop Logs1LS$0.00
SECTION 4 - SUBTOTAL$0.00
SECTION 5 - NEW DECKING INSTALLATION
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEEXTENDED PRICE
19Furnish and Install New Aluminum Decking and Modifications950SF$0.00
SECTION 5 - SUBTOTAL$0.00
COST SUMMARY
SECTION 1 - GENERAL CONDITIONS$0.00
SECTION 2 - DEMOLITION$0.00
SECTION 3 - INFLUENT SCREENS INSTALLATION$0.00
SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION$0.00
SECTION 5 - NEW DECKING INSTALLATION$0.00
CONSTRUCTION TOTAL$0.00

20 *Owners Allowance T&M 1 $0 $0

* Staff has allocated ten percent (10%) of the total items 1-19 in Owner’s Allowance – for Owners Use as Directed. This Allowance will be used only at the Owner’s direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.