25-8409_Bid_Tab.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- South County Water Reclamation Facility Preliminary Treatment Influent Screens Replacement
- Solicitation number
- 25-8409
- Issued by
- Collier County, Florida
About this file
The document is a Bid Tabulation (Bid Tab) for Collier County Public Utilities, specifically for the South County Water Reclamation Facility (SCWRF) Preliminary Treatment Screen Replacement project in Florida. The bid is for electronic submission by 3:00 P.M. local time on October 17th through the county's online bidding system, with an anticipated project budget of $3,214,000. The project involves comprehensive replacement and modifications of the facility's preliminary treatment infrastructure, including demolition of existing screens and electrical components, installation of new influent screens, gates, actuators, stop logs, and decking.
The bid is structured into five sections: General Conditions, Demolition, Influent Screens Installation, Gate/Stop Log & Actuator Installation, and New Decking Installation. Each section includes line items for specific tasks such as mobilization, preconstruction recording, survey layout, flow bypass, equipment removal, and new equipment installation. An additional 10% Owner's Allowance is included for unforeseen conditions, which can be used at the owner's discretion through documented change orders. All line items in the bid tab are currently showing $0.00, indicating this is a template or preliminary document awaiting actual bid submissions from contractors.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TAB
| COLLIER COUNTY PUBIC UTILITIES | |||||
| SCWRF - PRELIMINARY TREATMENT SCREEN REPLACEMENT | |||||
| BID TABULATION | |||||
| SECTION 1 - GENERAL CONDITIONS | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 1 | Mobilization/Demobilization | 1 | LS | $0.00 | |
| 2 | Preconstruction Audio/Video Recording | 1 | LS | $0.00 | |
| 3 | Survey Layout and Record Survey | 1 | LS | $0.00 | |
| 4 | Flow Bypass | 1 | LS | $0.00 | |
| SECTION 1 SUBTOTAL | $0.00 | ||||
| SECTION 2 - DEMOLITION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 5 | Existing Influent Screen Demolition | 1 | LS | $0.00 | |
| 6 | Existing Electrical Component Demolition | 1 | LS | $0.00 | |
| 7 | Existing Gate and Actuator Demolition | 1 | LS | $0.00 | |
| 8 | Existing Aluminum Decking Demolition | 1 | LS | $0.00 | |
| SECTION 2 - SUBTOTAL | $0.00 | ||||
| SECTION 3 - INFLUENT SCREENS INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 9 | Furnish and Install Influent Screens, Electrical Panels and Wash Presses | 1 | LS | $0.00 | |
| 10 | Furnish and Install Drop Chutes | 1 | LS | $0.00 | |
| 11 | Furnish and Install Level Sensors | 1 | LS | $0.00 | |
| 12 | Furnish and Install New Electrical Components | 1 | LS | $0.00 | |
| 13 | Screens Startup and Testing | 1 | LS | $0.00 | |
| 14 | Screens Electrical and Telemetry Startup and Testing | 1 | LS | $0.00 | |
| SECTION 3 - SUBTOTAL | $0.00 | ||||
| SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 15 | Furnish and Install New Channel Mounted Slide Gates | 1 | LS | $0.00 | |
| 16 | Furnish and Install New Actuators | 1 | LS | $0.00 | |
| 17 | Gate and Actuator Startup and Testing | 1 | LS | $0.00 | |
| 18 | Furnish and Install New Stainless Steel Stop Logs | 1 | LS | $0.00 | |
| SECTION 4 - SUBTOTAL | $0.00 | ||||
| SECTION 5 - NEW DECKING INSTALLATION | |||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 19 | Furnish and Install New Aluminum Decking and Modifications | 950 | SF | $0.00 | |
| SECTION 5 - SUBTOTAL | $0.00 | ||||
| COST SUMMARY | |||||
| SECTION 1 - GENERAL CONDITIONS | $0.00 | ||||
| SECTION 2 - DEMOLITION | $0.00 | ||||
| SECTION 3 - INFLUENT SCREENS INSTALLATION | $0.00 | ||||
| SECTION 4 - GATE, STOP LOG & ACTUATOR INSTALLATION | $0.00 | ||||
| SECTION 5 - NEW DECKING INSTALLATION | $0.00 | ||||
| CONSTRUCTION TOTAL | $0.00 |
20 *Owners Allowance T&M 1 $0 $0
* Staff has allocated ten percent (10%) of the total items 1-19 in Owner’s Allowance – for Owners Use as Directed. This Allowance will be used only at the Owner’s direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
image1.png
File details come from the government source that posted it. Updated .