About this file

This Environmental, Health and Safety Contractor Requirements document establishes mandatory compliance standards for all contractors performing construction work on Collier County projects. The requirements mandate that contractors understand and comply with applicable federal, state, and local regulations from agencies including OSHA, DOT, EPA, DHS, ANSI, FDEP, and NFPA, as well as Collier County's Environmental, Health and Safety Standard Operating Procedures and Job Safety Analysis protocols. Contractors must implement comprehensive site-specific safety plans addressing general safety, security, hurricane preparedness, pandemic safety, respirable crystalline silica, confined space entry, asbestos management, and environmental protection where applicable. When working in rights-of-way, contractors must adhere to FDOT and MUTCD requirements, including Class 2 or 3 hi-visibility safety garments compliant with ANSI/ISEA 107-2010, appropriate work zone signage, and traffic maintenance plans. Risk management must be integrated into all pre-activity, activity, and post-activity construction meetings, and all work must meet or exceed Collier County Vertical Construction Standards and Collier County IT Construction Standards unless formally exempted by the Facilities Management Division Director and Risk Management Director.

Contractors are required to provide vendor badges for all personnel on Collier County property and maintain certifications for powered industrial vehicle operation. Daily incident and accident reporting is mandatory, along with weekly internal safety inspections of equipment and worksites. All construction sites must be adequately safeguarded with appropriate barricading, signage, and protective measures to prevent public access to hazardous areas during non-working hours. These requirements apply to the South County Water Reclamation Facility Preliminary Treatment Screen Replacement project valued at $3,214,000, which requires contractors to possess Florida Underground Utility Contractor or General Contractor licenses, employ Florida Licensed Electrical Contractors, and carry $1,000,000 in commercial general liability insurance with a 5% bid bond.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental, Health and Safety

Contractor Requirements for all BCC Construction Projects

1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and

Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis

(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:

• Must wear a BCC provided Vendor Badge at all times while on BCC property.

• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)

• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.

• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.

• Weekly reporting of at least one internal safety inspection of equipment and worksite.

• Use of Personal Fall Protection Devices while working at heights above 6 feet.

• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.

• Proper use of Personal Protective Equipment. (PPE)

• Proper maintenance and use of ladders and other equipment.

• Guarding of wall and floor openings, open trenches, and excavations.

• Environmental Requirements (Permitting, Tanks, etc.)

2. Required Site EHS Plans for:

• Site Specific Safety Plan

• Site Specific Security Plan

• Site Specific Hurricane Plan

• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)

• Site Specific Respirable Crystalline Silica Plan (If Applicable)

• Site Specific Confined Space Entry Plan (If Applicable)

• Site Specific Asbestos Management Plan (If Applicable)

• Site Specific Mold Testing and Remediation Management Plan (If Applicable)

• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If

Applicable)

3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable

FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:

• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.

• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.

• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or

MUTCD designs on site.

4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and

Post Activity/Construction Meetings.

5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.

Specifics include but are not limited to:

• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.

• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.

• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).

6. Contractor must agree that all work must meet or exceed the standards set forth in the

Collier County Vertical Construction Standards and Collier County IT Construction Standards

(if applicable) unless specifically exempted in writing by Facilities Management Division

Director and Risk Management Director.