This is an Authorization to Advertise document from Collier County, Florida, prepared by the Procurement Services Division and signed by Procurement Director Sandra Srnka on August 11, 2025. The document authorizes the public advertisement of Bid No. 25-8400 for the Raw Water Booster Pump Station Improvements Project, a comprehensive infrastructure upgrade at the North County Regional Water Treatment Plant in Naples, Florida. The project includes flow meter replacement, office and restroom upgrades, construction of a pre-engineered metal building parking canopy, installation of a potable well and reverse osmosis system, and wastewater subsurface disposal system inspection and cleaning. A non-mandatory pre-bid meeting and site visit are scheduled for August 29, 2025, at 9:00 a.m., with sealed bids due electronically by October 3, 2025, at 3:00 p.m. local time. The anticipated project completion timeline is 365 consecutive calendar days from the Notice to Proceed.
The project has an estimated budget of $1,500,000 with a $100,000 Owner's Allowance for unforeseen conditions. Bidders must be registered on the county's procurement portal, comply with E-Verify requirements, possess appropriate licensing, and provide a 5% bid bond. Successful bidders will be required to furnish performance and payment bonds for 100% of the contract amount and maintain comprehensive insurance coverage. Liquidated damages are assessed at $610 per calendar day for failure to achieve Substantial Completion within the specified timeframe. Work is limited to 7:00 a.m. to 7:00 p.m., Monday through Friday. The procurement does not include specific set-asides for disadvantaged enterprises, is not grant-funded, and does not utilize local vendor preference. Collier County reserves the right to reject any bid and postpone contract award for up to 180 days from the bid opening date.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Authorization to Advertise Date: ______________
Solicitation No.: Title:
Due Date and Time:
Utilizing Local Vendor Preference: Yes No Grant Funded: Yes No
By signing, I am acknowledging that I have reviewed the above referenced solicitation prior to being released to advertisement, and that the approach, scope and specifications are acceptable.
I also acknowledge that a cost estimate or opinion of cost was obtained, and that budgetary resources have been identified to fund any resulting award within the budgeted or reasonable Threshold.
The approach being taken with this solicitation and intended end use of the contract is intended to support the management and operational needs of the Division and takes other potential using Divisions’ needs into consideration (when applicable).
Required Signatures
Design Professional:
Project Manager:
Division Director:
Procurement Strategist:
Grants Office: Required grantor conditions have been provided in the solicitation, grantor approvals have been obtained, and the package appears compliant with federal/state funding requirements.
Sandra Srnka, Procurement Director
Procurement Services Division
7/30/2025
25-8400 RAW WATER BOOSTER PUMP STATION IMPROVEMENTS
10/3/2025 3:00pm
N/A
N/A
Docusign Envelope ID: 5007FC80-FB81-45A8-8D6F-6EA3E0E6E738
8/11/2025
8/11/2025
8/11/2025
8/11/2025
| 2025-08-18T10:10:30-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .