25-15 DWG Final Architect DWGS Technology Sheets,061125.pdf

PDF 6 MB Posted

Attached to
Terminal Audio Paging/Music System
Solicitation number
25-15
Issued by
Rock Island County, Illinois

About this file

These are technology sheet drawings for the Phase 2 renovation project at Chicago O'Hare International Airport, prepared by Jeffrey Fleming design firm. The drawings specifically detail technology infrastructure plans across multiple floors (basement, ground, and second floor), including comprehensive diagrams for technology systems like telecom room bonding, overhead paging system risers, controlled security scheme door details, and general technology equipment schedules. The documents include detailed technical symbols, view keys, abbreviation keys, and installation notes covering various technological components and infrastructure requirements.

The drawings provide intricate technical specifications for technology rough mounting details, copper riser diagrams, bonding bus bar configurations, and existing server and PBX room layouts. The plans are part of a systematic approach to technology integration, with detailed schematic representations showing proposed technology placements, connections, and infrastructure modifications across different building levels. The sheet set includes precise grid-based floor plans with annotation points, equipment placement markers, and technical notation systems that would guide contractors in implementing the technological components of the airport renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .