25-0427 BLDG 66 ADA RAMP - PROJECT DESCRIPTION.pdf
PDF 45 KB Posted
- Attached to
- Bldg 417& 66 ADA Ramp
- Solicitation number
- N4008526R9030
About this file
This is a Project Description and Scope of Work document for a federal construction project at Camp Lejeune, North Carolina. The contractor is required to install a new ADA-accessible ramp and handicapped-accessible door operator at Building 66 located on Holcomb Boulevard, with work to be performed in accordance with provided drawings. The project involves modifications to accommodate accessibility requirements for building tenants.
Key project constraints include maintaining facility operations throughout the entire construction period, with the contractor obligated to minimize interference with normal operations. Supervision requirements allow for a single qualified individual to serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification. The document is marked for DoW Community distribution only and does not specify contract award dates, pricing terms, or response deadlines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoW COMMUNITY ONLY
PROJECT DESCRIPTION
This scope of work is to be accomplished at Building 66 located on Holcomb BLVD. aboard, Camp Lejeune, North Carolina. The work includes installation of new ADA accessible ramp for the tenant and H.C. Door operator. To accomplish this the contractor will be required to build as indicated on drawings.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
File details come from the government source that posted it. Updated .