25-0426 BLDG 417 ADA RAMP - PROJECT DESCRIPTION.pdf

PDF 46 KB Posted

Attached to
Bldg 417& 66 ADA Ramp
Solicitation number
N4008526R9030
Issued by

About this file

This is a Project Description and Scope of Work document for a construction project at Building 417, Camp Lejeune, North Carolina. The work involves installation of a new ADA-accessible ramp for the USO, new handicap parking spaces, and a handicap door operator. The contractor must also restripe a portion of the parking lot per drawings, remove sections of curb and sidewalk as indicated on drawings, and install new ADA-compliant sidewalk.

The facility will remain operational throughout the entire construction period, requiring the contractor to minimize interference with normal operations. Supervision requirements allow a single qualified individual to serve as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications defined in the project specification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION: DoW COMMUNITY ONLY

PROJECT DESCRIPTION

This scope of work is to be accomplished at Building 417 located on L St. aboard, Camp Lejeune, North Carolina. The work includes installation of new ADA accessible ramp for the USO as well as new Handicap Parking and H.C. Door operator. To accomplish this the contractor will be required to restripe portion of parking lot as indicated on drawings, remove portion of curb and sidewalk as indicated on drawings and install new ADA compliant sidewalk.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.