This document contains Special Provisions for Landscaping for a Federal Site Infrastructure Repair Work Order Contract (Contract No. 25-0138) issued by Pinellas County. The specifications detail comprehensive landscaping requirements, focusing on the procurement, planting, and maintenance of various plant materials, with specific emphasis on Sabal Palmetto trees and landscaping shell. The document provides detailed guidelines for plant selection, inspection, transportation, planting techniques, staking, guying, mulching, and 90-day maintenance requirements for installed vegetation.

The contract includes two primary pay items: L-1 Sabal Palmetto trees (12'-16' height) and L-2 Landscaping Shell, which will be paid at contract unit prices per Each (EA) and Cubic Yard (CY) respectively. The landscaping shell specifications require white seashells that are washed, crushed, and mostly whole, with pieces up to a half-inch in size. The shell must allow water percolation, be installed at a 6-inch depth, and not exceed the height of adjacent curbs, driveways, or sidewalks. The contractor is responsible for maintaining planted areas and ensuring plant health for 90 days from substantial completion, with strict requirements for watering, staking, weed control, and overall plant vigor.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS FOR LANDSCAPING

Contract No. 25-0138

Federal Site Infrastructure Repair WO Contract

LANDSCAPING

DESCRIPTION:

The work specified under this Section, consists of furnishing all labor, equipment, materials and planting of all trees and shrubs of the species, size, and quality as indicated in the pricing table. The Engineer reserves the right to adjust the number and location of any of the designated types and species to be used at any of the locations shown, in order to provide for any unanticipated effects which might become apparent after the substantial completion of other phases of the project, or for other causes. All work specified below is supplemental to the Pinellas County Standard Details (February 2022) section 1100.

1. MATERIALS

1.1 Plants:

1.1.1 Authority for Nomenclature; Species, etc.: The designated authorities for the identification of all plant materials are publications of L.H. Bailey: “Hortus III” and “Manual of Cultivated Plants,” and ensure that all specimens are true to type, name, etc., as described therein. Refer to the publication of the American Joint Committee on Horticultural Nomenclature, “Standardized Plant Names” for standard nomenclature. Where there is a conflict between the two (2) authorities for identification of plant materials, the Engineer shall decide the higher authority.

1.1.2 Grade Standards and Conformity with Type and Species: Only use nursery grown plant material except where specified as Collected Material. Use nursery grown plant material that complies with all required inspection, grading standards, and plant regulations in accordance with the latest edition of the Florida Department of Agriculture’s “Grades and Standards for Nursery Plants”. Except where a lesser grade is specifically specified in the plans, ensure that the minimum grade for all trees and shrubs is Florida No. 1.

Ensure that all plants are the proper size and grade at the time of delivery to the site, throughout the project construction period and during any designated plant establishment period.

Ensure that plant materials are true to type and species and that any plant materials not specifically covered in Florida Department of Agriculture’s “Grades and Standards for Nursery Plants” conform in type and species with the standards and designations in general acceptance by Florida nurseries.

1.1.3 Inspection and Transporting: Move nursery stock in accordance with all Federal and State regulations and accompany each shipment with the required inspection certificates for filing with the Engineer. Ensure that plant materials are shipped with tags stating the botanical and common name of the plant.

1.2 Water: Water used in landscaping operations may be obtained from any approved source. Ensure that water is free of any substance which might be detrimental to plant growth. The use of effluent water is subject to approval and must meet all Federal, State and Local requirements.

2. SPECIFIC REQUIREMENTS FOR THE VARIOUS PLANT DESIGNATIONS

2.1 Balled-and-Burlapped Plants (B&B), and Wired Balled-and-Burlapped (WB & B:)

2.1.1 General: Properly protect the root ball of these plants until planting them. The Engineer will reject any plant which shows evidence of having been mishandled. Set the B&B and WB&B plants, then remove the top 2/3 of all wire, rope, and binding surrounding the plant. Remove the burlap from the top 4 inches of the root ball. Do not disturb the root ball in any way. Bare root material is not allowed.

At least 90 days before digging out B & B and WB & B plants, root-prune those plants 1½ inches or greater in diameter and certify such fact on accompanying invoices.

2.1.2 Provisions for Wiring: For plants grown in soil of a loose texture, which does not readily adhere to the root system (and especially in the case of large plants or trees), the Engineer may require WB & B plants. For WB & B plants, before removing the plant from the excavated hole, place sound hog wire around the burlapped ball, and loop and tension it until the tightened wire netting substantially packages the burlapped ball such as to prevent disturbing of the loose soil around the roots during handling.

2.2 Container-Grown Plants (CG): The Engineer will not accept any CG plants with roots which have become pot-bound or for which the top system is too large for the size of the container. Fully cut and open all containers in a manner that will not damage the root system. Do not remove CG plants from the container until immediately before planting to prevent damage to the root system.

2.3 Collected Plants (Trees and Shrubs) (C): Use C plants which have a root ball according to “Florida Grades and Standards for Nursery Plants”. Do not plant any C plant before the Engineer’s inspection and acceptance at the planting site.

2.4 Collected Plants (Herbaceous) (HC): The root mass and vegetative portions of collected herbaceous plants shall be as large as the specified container-grown equivalent. Do not plant any collected plant before inspection and acceptance by the

Engineer.

2.5 Specimen Plants (Special Grade): When Specimen (or Special Grade) plants are required, label them as such on the plant list, and tag the plant to be furnished.

2.6 Palms: Wrap the roots of all plants of the palm species before transporting, except if they are CG plants, and ensure that they have an adequate root ball structure and mass for healthy transplantation as defined in “Florida Grades and Standards for Nursery Plants”.

The Engineer will not require burlapping if the palm is carefully dug from marl or heavy soil that adheres to the roots and retains its shape without crumbling. During transporting and after arrival, carefully protect root balls of palms from wind and exposure to the sun. Muck grown palms are not allowed. After delivery to the job site, palms which are not intended to be or are not planted within 24 hours, shall have the root ball covered with a moist material. Plant all palms within 48 hours of delivery to the site. Move sabal palms in accordance with the “Florida Grades and Standards for Nursery Plants.”

2.7 Substitution of Container-Grown (CG) Plants: With the Engineer’s approval, the Contractor may substitute CG plants for any other root classification types, if all other requirements of the Contract Documents are met.

3. PLANTING REQUIREMENTS

3.1 Layout: Prior to any excavation or planting, mark all planting beds and individual locations of palms, trees, large shrubs and proposed art and architectural structures, as shown in the plans. Marking shall be on the ground with a common bright orange colored spray paint, or with other approved methods within the project limits. Obtain the Engineer’s approval of marked locations and make necessary utility clearance requests.

3.2 Excavation of Plant Holes: Excavate plant holes after an area around the plant three times the size of the root ball has been tilled to a depth matching the root ball. Ensure that the

(2) plant hole is made in the center of the tilled area only to the depth of the plant root ball. Where excess material has been excavated from the plant hole, use the excavated material to backfill to proper level.

3.3 Setting of Plants: Center plants in the plant hole. Lower the plant into the hole so that it rests on a prepared hole bottom such that the roots are level with, or slightly above, the level of their previous growth and so oriented such as to present the best appearance. Backfill with native soil, unless otherwise specified on the plans. Firmly rod and water-in the backfill so that no air pockets remain.

Apply a sufficient quantity of water immediately upon planting to thoroughly moisten all of the backfilled earth. Keep plants in a moistened condition for the duration of the planting period. When directed by the Engineer, form a water ring 6 inches in width to make a water collecting basin with an inside diameter equal to the diameter of the excavated hole. Maintain the water ring in an acceptable condition as determined by the Engineer.

3.4 Special Bed Preparation: Where multiple or mass plantings are to be made in extended bedding areas, and the plans specify Special Bed Preparation, prepare the planting beds as follows: Remove all vegetation from within the area of the planting bed and excavate the surface soil to a depth of 6 inches.

Backfill the excavated area with peat, sand, finish soil layer material or other material to the elevation of the original surface. Till the entire area to provide a loose, friable mixture to a depth of at least 8 inches. Level the bed only slightly above the adjacent ground level. Then mulch the entire bedding area, in accordance with No. 7- Mulching.

4. STAKING AND GUYING

4.1 General: When specified in the plans, or as directed by the Engineer, stake plants in accordance with the following:

- Follow the requirements in Pinellas County Standard Engineering Details (Feb. 2022 version) Index No.1108, Sabal Planting Detail.

- Use wide plastic, rubber or other flexible strapping materials to support the tree to stakes or ground anchors that will give as the tree moves in any direction up to thirty (30) degrees. Do not use rope or wire through a hose. Use guy chords, hose or any other thin bracing or anchorage material which has a minimum of 12 inches in length of high visibility flagging tape secured to guys, midway between the tree and stakes for safety.

- Stake trees larger than 1 inch diameter and smaller than 2 inches diameter with a 2 x 2 inch stake, set at least 2 feet in the ground and extending to the crown of the plant. Firmly fasten the plant to the stake with flexible strapping materials as noted above.

4.2 Trees of 2 to 3 1/2 inches [50 to 90 mm] Caliper: Stake all trees, other than palm trees, larger than 2 inches caliper and smaller than 3 1/2 inches caliper with two (2), 2 x 4 inch stakes, 8feet long, set 2 feet in the ground. Place the tree midway between the stakes and hold it firmly in place by flexible strapping materials as noted above.

4.3 Large Trees: Guy all trees, other than palm trees, larger than 3 1/2 inches caliper, from at least three (3) points, with flexible strapping materials as noted above. Anchor flexible strapping to 2 x 4 x 24 inch stakes, driven into the ground such that the top of the stake is at least three

(3) inches below the finished ground.

4.4 Special Requirements for Palm Trees: Brace palms which are to be staked with three 2 x 4 inch wood braces, toe-nailed to cleats which are securely banded at two points to the palm, at a point one third the height of the trunk, 5 foot minimum. Pad the trunk with five (5) layers of burlap under the cleats. Place braces approximately 120 degrees apart and secure them underground by 2 x 4 x 16 inch stake pads.

5. TREE PROTECTION AND ROOT BARRIERS

Install tree barricades when called for in the Plans and Specifications or by the Engineer to protect existing trees from damage during project construction. Place barricades at the drip line of the tree foliage or as far from the base of the tree trunk as possible. Barricades shall be able to withstand bumps by heavy equipment and trucks.

Maintain barricades in good condition. When called for in the Plans and Specifications, install root barriers or fabrics in accordance with the details shown.

6. PRUNING

Prune all broken or damaged roots and limbs in accordance with established arboriculture practices. When pruning is completed, ensure that all remaining wood is alive. Do not reduce the size or quality of the plant below the minimum specified.

7. MULCHING

Uniformly apply mulch material, consisting of wood chips (no Cypress Mulch is allowed), pine straw, compost, or other suitable material approved by the Engineer, to a minimum loose thickness of three (3) inches over the entire area of the backfilled hole or bed within two days after the planting. Maintain the mulch continuously in place until the time of final inspection.

8. DISPOSAL OF SURPLUS MATERIALS AND DEBRIS

Dispose of surplus excavated material from plant holes by scattering or otherwise as directed by the Engineer so that it is not readily visible or conspicuous to the passing motorist or pedestrian. Remove all debris and other objectionable material from the site and clean up the entire area and leave it in neat condition.

9. CONTRACTOR’S RESPONSIBILITY FOR CONDITION OF THE PLANTINGS

Ensure that the plants are kept watered, that the staking and guying is kept adjusted as necessary, that all planting areas and beds are kept free of weeds and undesirable plant growth and that the plants are maintained so that they are healthy, vigorous, and undamaged at the time of acceptance. Plants shall be maintained as specified above for a period of 90 days from substantial completion.

Measurement and Payment:

The work includes all labor, material, and equipment required to install Sabal Palmetto trees.

The work specified in this Section will be paid for at the contract unit price per Each (EA).

Pay Item No. L-1 Sabal Palmetto, 12’-16’ height

Landscaping Shell

Description:

The work includes all labor, material, and equipment required to install landscaping shell in accordance with specifications and locations as noted on the work order plans. Shell shall be white seashells, washed, crushed, small and mostly whole pieces up to a half inch in size.

Shell shall be of high quality to allow percolation. Water must gradually filter through the voids. An impervious liner between the soil and shell is prohibited. Shell shall not be placed higher than the adjacent curb, driveway, or sidewalk.

Shell be installed at a depth of 6- inches thick.

Measurement and Payment:

The work specified in this Section will be paid for at the contract unit price per Cubic Yard

(CY).

Pay Item No. L-2 Landscaping Shell

LANDSCAPING
DESCRIPTION:
Measurement and Payment:
Landscaping Shell
Description:
Measurement and Payment: