25-0138_Plans_Signed.pdf

PDF 3 MB Posted

Attached to
Federal Site Infrastructure Repair Work Order Contract
Solicitation number
25-0138-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a Federal Site Infrastructure Repair Work Order Contract issued by Pinellas County Public Works in Florida, reference number REFF # 25-0138. The contract covers infrastructure repair work, including pavement, sidewalk, and drainage structure repairs for a federal site. The project involves detailed engineering specifications for road and sidewalk improvements, with comprehensive plan sets detailing typical section details, sidewalk configurations, erosion and sediment control measures, and stormwater pollution prevention strategies. The contract includes multiple technical sheets covering key aspects such as curb and gutter details, soil tracking prevention, tree protection, and specific construction requirements.

The work order contract includes extensive technical specifications for implementation, with a focus on environmental compliance, erosion control, and precise infrastructure rehabilitation. The project involves careful management of existing site conditions, with specific guidelines for materials handling, soil disturbance, stormwater management, and site restoration. Utility coordination, safety protocols, and detailed engineering standards are integral to the contract, with provisions for soil tracking prevention, tree protection, and strict adherence to Pinellas County and Florida Department of Transportation (FDOT) standards. The contract appears to be a comprehensive infrastructure repair project with meticulous attention to environmental protection and engineering precision.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFF # 25-0138

FEDERAL SITE

INFRASTRUCTURE REPAIR

WORK ORDER CONTRACT

STATE OF

No.

P R O

FESS IONAL EN

GIN

EE

R

Y I

THIERRY KU

FLORI'A

88713

SECTION A

DETAIL A

TYPICAL SECTION

P.C. TYPE A CURB & GUTTER

A

SECTION B

DETAIL B

TYPICAL SECTION

FDOT TYPE F CURB & GUTTER

B

SECTION C

DETAIL C

TYPICAL SECTION

STABILIZED AGGREGATE SHOULDER

DETAIL D

TYPICAL SECTION

SHOULDER WITH SOD

C D

NOTES:

1. NO TRUCKS OR HEAVY EQUIPMENT ALLOWED WITHIN BARRIERS, ONLY HAND LABOR ALLOWED.

2. NO CONSTRUCTION MATERIALS, SOIL DEPOSITS, OR SOLVENTS SHALL BE ALLOWED WITHIN BARRIERS.

3. BARRIERS ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN TREE AREA.

4. BARRIERS ARE TO STAY IN PLACE UNTIL ALL PAVING, CONSTRUCTION, AND HEAVY EQUIPMENT IS REMOVED

FROM THE AREA.

LARGE TREES AND BUSHESPALMS AND SMALL TREES

1. A SOIL TRACKING PREVENTION DEVICE (STPD) SHALL BE CONSTRUCTED AT LOCATIONS DESIGNATED BY THE ENGINEER FOR POINTS OF EGRESS FROM UNSTABILIZED AREAS OF THE PROJECT TO PUBLIC ROADS WHERE OFF SITE TRACKING OF MUD COULD OCCUR. TRAFFIC FROM UNSTABILIZED AREAS OF THE CONSTRUCTION PROJECT SHALL BE DIRECTED THROUGH STPD BARRIERS. FLAGGING, OR OTHER POSITIVE MEANS SHALL BE USED AS REQUIRED TO LIMIT AND DIRECT VEHICULAR EGRESS ACROSS THE STPD.

2. THE CONTRACTOR MAY PROPOSE AN ALTERNATIVE TECHNIQUE TO MINIMIZE OFF SITE TRACKING OF SEDIMENT. THE ALTERNATIVE MUST

BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO ITS USE.

3. ALL MATERIALS SPILLED, DROPPED, OR TRACKED ONTO PUBLIC ROADS (INCLUDING THE STPD AGGREGATE AND CONSTRUCTION MUD)

SHALL BE REMOVED DAILY, OR MORE FREQUENTLY IF SO DIRECTED BY THE ENGINEER.

4. AGGREGATES SHALL BE DESCRIBED IN SECTION 901 EXCLUDING 901-2.3. AGGREGATES SHALL BE FDOT SIZE #1. IF THIS SIZE IS NOT AVAILABLE, THE NEXT AVAILABLE SMALLER SIZE AGGREGATE MAY BE SUBSTITUTED WITH THE APPROVAL OF THE ENGINEER. SIZES CONTAINING EXCESSIVE SMALL AGGREGATE WILL TRACK OFF THE PROJECT AND

ARE NOT SUITABLE.

5. THE SEDIMENT PIT SHOULD PROVIDE A RETENTION VOLUME OF 3600 CUBIC FEET/ACRE OF SURFACE AREA DRAINING TO THE PIT. WHEN THE STPD IS ISOLATED FROM OTHER DRAINAGE AREAS, THE FOLLOWING PIT VOLUMES WILL SATISFY THIS REQUIREMENT:

15'X50'=100 FT³

30'X50'=200 FT³

AS AN OPTION TO THE SEDIMENT PIT, THE WIDTH OF THE SWALE BOTTOM CAN BE INCREASED TO OBTAIN THE VOLUME.

WHEN THE SEDIMENT PIT OR SWALE VOLUME HAS BEEN REDUCED TO ONE HALF, IT SHALL BE CLEANED. WHEN A SWALE IS USED, SYNTHETIC BALES OR SILT FENCE SHALL BE PLACED ALONG THE ENTIRE LENGTH.

6. THE SWALE DITCH DRAINING THE STPD SHALL HAVE A 0.2% MINIMUM AND A 1.0% MAXIMUM GRADE ALONG THE STPD

AND TO THE SEDIMENT PIT.

7. MITERED END SECTIONS ARE NOT REQUIRED WHEN THE SIDE DRAIN PIPE SATISFIES THE CLEAR ZONE REQUIREMENTS.

8. THE STPD SHALL BE MAINTAINED IN A CONDITION THAT WILL ALLOW IT TO PERFORM ITS FUNCTION. TO PREVENT OFFSET TRACKING, THE STPD SHALL BE RINSED (DAILY WHEN IN USE) TO MOVE ACCUMULATED MUD DOWNWARD THROUGH THE STONE. ADDITIONAL STABILIZATION OF THE VEHICULAR ROUTE LEADING TO THE STPD MAY BE REQUIRED

TO LIMIT MUD TRACKED.

9. A STPD SHALL BE PAID FOR UNDER THE CONTRACT UNIT PRICE FOR SOIL TRACKING PREVENTION DEVICE, EA. THE UNIT PRICE SHALL CONSTITUTE FULL COMPENSATION FOR CONSTRUCTION, MAINTENANCE, REPLACEMENT OF MATERIALS, REMOVAL, AND RESTORATION OF THE AREA UTILIZED FOR THE STPD: INCLUDING BUT NOT LIMITED TO EXCAVATION, GRADING, TEMPORARY PIPE (INCLUDING M.E.S. WHEN REQUIRED), FILTER FABRIC, AGGREGATE, PAVED TURNOUT

(INCLUDING ASPHALT AND BASE CONSTRUCTION), DITCH STABILIZATION, APPROACH ROUTE STABILIZATION, SEDIMENT REMOVAL AND DISPOSAL, WATER, RINSING AND CLEANING OF THE STPD AND CLEANING OF PUBLIC ROADS, GRASSING AND SOD. SYNTHETIC BALES SHALL BE PAID FOR UNDER THE CONTRACT UNIT PRICE FOR HAY OR STRAW BALED, EA. SILT FENCE SHALL BE PAID FOR UNDER THE

CONTRACT UNIT PRICE FOR STAKED SILT FENCE, L.F.

10. THE NOMINAL SIZE OF A STANDARD STPD IS 15'X50' UNLESS OTHERWISE SHOWN IN THE PLANS. IF THE VOLUME OF ENTERING AND EXITING VEHICLES WARRANT, A 30' WIDTH STPD MAY BE USED IF APPROVED BY THE ENGINEER. WHEN A DOUBLE WIDTH (30')

STPD IS USED, THE PAY QUANTITY SHALL BE 2 FOR EACH LOCATION.

PALM TREES DECIDUOUS TREES CONIFEROUS TREES

TRANSITION DETAIL

SECTION A-A RURAL CONNECTION

DETAIL

SECTION B-B

EL. 10

EL. 15

EL. 20

EL. 25

EL. 30

DISTURBED AREA

PROTECTED AREA

10 L.F. PER END PLACED AT A 30° ANGLE

TO PREVENT END-AROUND FLOW

WOODEN STAKES

WOODEN STAKES

(4' O.C. FOR TYPE S,

6' O.C. FOR TYPE NS)DISTURBED AREA

PROTECTED AREA

1:1 MAX. SLOPE

COMPOST FILTER SOCK

(SEE PLAN FOR HEIGHT)

SECTION NTS

PLAN NTS

Sheets and Views
1 25-138-KEY - 01
2 25-138-DTL - General Notes
3 25-138-DTL - Roadway Typical Sections A-D
4 25-138-DTL - Sidewalk at Tree Detail and Notes
5 25-138-DTL - Details & Limits Clearing Grubbing Grading
6 25-138-GEN - 004973A SWPPP 1
7 25-138-GEN - 004973A SWPPP 2
8 25-138-GEN - 004973A EROSION CONTROL DETAILS
9 25-138-GEN - 004973A EROSION CONTROL NOTES