25-0070-Plans-006576A-Keene_Rd-SS.pdf
PDF 15 MB Posted
- Attached to
- FY 2026 Pavement Preservation Package 1
- Solicitation number
- 25-0070-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
These engineering plans detail the Pinellas County Public Works FY2025-2026 Countywide Pavement Preservation Program for Keene Road, specifically covering the segment between East Bay Drive and Belleair Road. The project involves milling existing asphalt pavement to a depth of 2 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C) across approximately 7.62 lane miles. The project area encompasses 472,308 square yards with a total estimated cost of $1,110,216, and includes comprehensive roadway improvements such as pavement markings, drainage adjustments, and utility coordination.
The project documents indicate precise engineering specifications for road restoration, including detailed typical section views, core location mapping, and specific requirements for milling, resurfacing, and maintaining existing infrastructure. The plans show careful consideration of existing curbs, gutters, and base materials, with provisions for minor adjustments and corrections as directed by the engineer. The project will utilize standard Pinellas County construction practices, with specific attention to maintaining traffic flow, protecting utilities, and ensuring proper road surface elevation and drainage. Core samples have been taken to verify existing pavement and base conditions, and the project includes provisions for potential variations in actual site conditions.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0070-006576A
FY2025-2026 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
KEENE RD (E BAY DR - BELLEAIR RD)
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORIDA
93254
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
KEENE RD (EAST BAY DR - BELLEAIR RD)
STA. 51+38.65 TO STA. 55+95.60
TYPICAL SECTION
* 2% (OR AS DIRECTED BY THE ENGINEER)
STA. 55+95.60 TO STA. 129+77.90
TYPICAL SECTION
* 2% (OR AS DETERMINED BY THE ENGINEER)
KEENE RD (EAST BAY DR - BELLEAIR RD)
NOTES: SEE SHEET 11 FOR CORE LOCATION MAP
Feet
40200 10
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES |
| 3 ROAD TYPICAL SECTION |
| 4 SH (50+00.00-56+20.00) |
| 5 SH (62+40.00-68+60.00) |
| 6 SH (74+80.00-81+00.00) |
| 7 SH (87+20.00-93+40.00) |
| 8 SH (99+60.00-105+80.00) |
| 9 SH (112+00.00-118+20.00) |
| 10 SH (124+40.00-130+60.00) |
| 11 CORE LOCATION MAP |
| 12 Typical Sections A_B |
| 13 Typical Section C |
| 14 LOOP DETAIL |
| 2025-02-18T16:42:43-0500 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .