25-0070-Plans-006576A-Keene_Rd-SS.pdf

PDF 15 MB Posted

Attached to
FY 2026 Pavement Preservation Package 1
Solicitation number
25-0070-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

These engineering plans detail the Pinellas County Public Works FY2025-2026 Countywide Pavement Preservation Program for Keene Road, specifically covering the segment between East Bay Drive and Belleair Road. The project involves milling existing asphalt pavement to a depth of 2 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C) across approximately 7.62 lane miles. The project area encompasses 472,308 square yards with a total estimated cost of $1,110,216, and includes comprehensive roadway improvements such as pavement markings, drainage adjustments, and utility coordination.

The project documents indicate precise engineering specifications for road restoration, including detailed typical section views, core location mapping, and specific requirements for milling, resurfacing, and maintaining existing infrastructure. The plans show careful consideration of existing curbs, gutters, and base materials, with provisions for minor adjustments and corrections as directed by the engineer. The project will utilize standard Pinellas County construction practices, with specific attention to maintaining traffic flow, protecting utilities, and ensuring proper road surface elevation and drainage. Core samples have been taken to verify existing pavement and base conditions, and the project includes provisions for potential variations in actual site conditions.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 25-0070-006576A

FY2025-2026 COUNTYWIDE

PAVEMENT PRESERVATION PROGRAM

KEENE RD (E BAY DR - BELLEAIR RD)

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORIDA

93254

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (2")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")

KEENE RD (EAST BAY DR - BELLEAIR RD)

STA. 51+38.65 TO STA. 55+95.60

TYPICAL SECTION

* 2% (OR AS DIRECTED BY THE ENGINEER)

STA. 55+95.60 TO STA. 129+77.90

TYPICAL SECTION

* 2% (OR AS DETERMINED BY THE ENGINEER)

KEENE RD (EAST BAY DR - BELLEAIR RD)

NOTES: SEE SHEET 11 FOR CORE LOCATION MAP

Feet

40200 10

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES
3 ROAD TYPICAL SECTION
4 SH (50+00.00-56+20.00)
5 SH (62+40.00-68+60.00)
6 SH (74+80.00-81+00.00)
7 SH (87+20.00-93+40.00)
8 SH (99+60.00-105+80.00)
9 SH (112+00.00-118+20.00)
10 SH (124+40.00-130+60.00)
11 CORE LOCATION MAP
12 Typical Sections A_B
13 Typical Section C
14 LOOP DETAIL
2025-02-18T16:42:43-0500
Jeffrey S Thompson

File details come from the government source that posted it. Updated .