25-0070-Plans-006231A-LG142-SS.pdf

PDF 39 MB Posted

Attached to
FY 2026 Pavement Preservation Package 1
Solicitation number
25-0070-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a comprehensive pavement preservation project plan for Pinellas County, Florida, developed by Professional Engineer Jeffrey S. Thompson for Fiscal Years 2025-2026, specifically targeting Local Group 142. The project involves countywide pavement maintenance across multiple neighborhoods, including milling and resurfacing of existing asphalt pavements at various depths (primarily 1.5" and 2"), utilizing Type SP 12.5 Structural Course for Traffic C. The specific roadways included are Egret Lane, Egret Wood Circle, 144th Lane, 82nd through 85th Avenue and Terrace North, 140th through 143rd Street North, Oak Forest Boulevard, and several other neighborhood streets. The resurfacing will be performed with a typical section slope of 2% (with engineer discretion up to 4% maximum).

The project is part of Pinellas County's broader pavement preservation initiative, which aims to enhance traffic safety and roadway efficiency. The total project scope encompasses approximately 60,300 linear feet across multiple neighborhood locations, representing a significant infrastructure maintenance effort. While specific pricing details are not explicitly stated in the document, the project appears to be a structured, systematic approach to road maintenance funded through local government infrastructure budgets. The project is engineered with precise specifications for milling depth, resurfacing type, and grade, indicating a technical and methodical approach to road rehabilitation that prioritizes long-term road quality and performance.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 25-0070-006231A

FY2025-2026 COUNTYWIDE

PAVEMENT PRESERVATION PROGRAM

LOCAL GROUP 142

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORIDA

93254

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

EGRET LN, EGRET WOOD CIR,

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

144TH LN, 82ND TERR N, 83RD PL N, 84TH TERR N

143RD, LN N, 85TH AVE N

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

82ND TERR N, 83RD PL N, 141ST ST N, 140TH ST N

OAK FOREST BLVD S, OAK FOREST BLVD N, OAK FOREST BLVD W

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

82ND TERR N, 139TH LN N, 139TH ST N

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

82ND TERR N, 139TH LN N, 139TH ST N

138TH ST N, 137TH LN N, HARBOR GREENS WAY

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

83RD PL N, 84TH TERR N, 85TH TERR N

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (2")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

86TH AVE N

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5") TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

83RD PL N, 84TH TERR N, 85TH TERR N

RESURFACING

Feet 60300 15

37.6118.810 9.4

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES
3 TYPICAL SECTION
4 SHEET 4
5 SHEET 5
6 SHEET 6
7 SHEET 7
8 SHEET 8
9 SHEET 9
10 SHEET 10
11 SHEET 11
12 SHEET 12
13 SHEET 13
14 SHEET 14
15 SHEET 15
16 SHEET 16
17 SHEET 17
18 SHEET 18
19 SHEET 19
20 SHEET 20
21 SHEET 21
22 SHEET 22
23 CORE LOCATION MAP
24 Typical Sections A_B
25 Typical Section C
26 LOOP DETAIL
2025-02-19T15:47:15-0500
Jeffrey S Thompson

File details come from the government source that posted it. Updated .