The document is a set of engineering plans (PID 25-0070-006310A) for the FY2025-2026 Countywide Pavement Preservation Program Local Group 135, prepared by Professional Engineer Jeffrey S. Thompson for Pinellas County, Florida. The project involves comprehensive road resurfacing and preservation across multiple neighborhood streets, including Mulberry Way, Cypress Trail, 92nd Street N, 102nd Avenue N, and several other local roads. The scope of work includes milling existing asphalt pavement to a depth of 1.5 inches and resurfacing with a Type SP 12.5 Structural Course, covering approximately 40,200 linear feet across various streets.
The project is part of Pinellas County's infrastructure maintenance program, with a focus on traffic safety and roadway efficiency. The engineering plans specify a 2% grade (with potential up to 4% as directed by the engineer) and include detailed typical section drawings and plan views across multiple sheets. The documentation suggests this is a systematic approach to pavement preservation, targeting neighborhood roads to maintain and improve local transportation infrastructure. While specific funding sources are not explicitly detailed in the file, the project appears to be part of the county's standard annual road maintenance and improvement budget.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0070-006310A
FY2025-2026 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
LOCAL GROUP 135
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORIDA
93254
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
TYPICAL SECTION
MULBERRY WAY, CYPRESS TRL, CYPRESS CIR, SHADY OAK LN,
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
TYPICAL SECTION
92ND ST N, 102ND AVE N STA. 25+10.59 - STA. 36+57.50
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
TYPICAL SECTION
102ND AVE N
106TH AVE LN, MYRTLE OAK LN, MAPLE CT, BIRCH DR, 92ND ST N,
BRYAN DAIRY RD, 107TH AVE N, 108TH AVE N, 109TH AVE N
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
TYPICAL SECTION
FRONTAGE RD,
Feet 40200 10
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES |
| 3 TYPICAL SECTION |
| 4 PW - Plan Only HOR20 |
| 5 PW - Plan Only HOR20 (2) |
| 6 PW - Plan Only HOR20 (3) |
| 7 PW - Plan Only HOR20 (4) |
| 8 PW - Plan Only HOR20 (5) |
| 9 PW - Plan Only HOR20 (6) |
| 10 PW - Plan Only HOR20 (7) |
| 11 PW - Plan Only HOR20 (8) |
| 12 PW - Plan Only HOR20 (9) |
| 13 PW - Plan Only HOR20 (10) |
| 14 PW - Plan Only HOR20 (11) |
| 15 PW - Plan Only HOR20 (12) |
| 16 PW - Plan Only HOR20 (13) |
| 17 PW - Plan Only HOR20 (14) |
| 18 PW - Plan Only HOR20 (15) |
| 19 PW - Plan Only HOR20 (16) |
| 20 PW - Plan Only HOR20 (17) |
| 21 PW - Plan Only HOR20 (18) |
| 22 PW - Plan Only HOR20 (19) |
| 23 PW - Plan Only HOR20 (20) |
| 24 PW - Plan Only HOR20 (21) |
| 25 PW - Plan Only HOR20 (22) |
| 26 PW - Plan Only HOR20 (24) |
| 27 PW - Plan Only HOR20 (25) |
| 28 PW - Plan Only HOR20 (26) |
| 29 PW - Plan Only HOR20 (27) |
| 30 PW - Plan Only HOR20 (28) |
| 31 PW - Plan Only HOR20 (29) |
| 32 CORE LOCATION MAP |
| 33 Typical Sections A_B |
| 34 Typical Section C |
| 35 LOOP DETAIL |