24-8279_-_Exhibit_M_-_20240516_NCRWTP_NF_Upgrades_Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- 24-8279
- Issued by
- Collier County, Florida
About this file
The documents are bid drawings for the North County Regional Water Treatment Plant Nanofiltration System Upgrades project in Collier County, Florida, prepared by Jacobs engineering firm. The drawings, dated May 2024 with project number D3514007, detail a comprehensive upgrade of the existing nanofiltration (NF) system, including removal and replacement of 1,152 membrane elements across six trains (32 vessels with 6 elements each). The project involves demolishing existing first-stage nanofiltration elements, installing new membrane elements, replacing sample panels and tubing, and modifying associated infrastructure while maintaining existing support structures.
The bid documents indicate this is a municipal infrastructure improvement project funded by Collier County, with a non-mandatory pre-bid meeting scheduled for June 27, 2024, at 10:00 a.m. at the North Collier Regional Water Treatment Plant. Sealed bids will be received until August 5, 2024, at 3:00 p.m. local time. Prospective bidders are required to register on the county's procurement portal to access complete bidding documents. The drawings provide detailed technical specifications for the upgrade, including site plans, demolition plans, installation instructions, and specific requirements for sample panel modifications, tubing replacements, and system configuration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
NORTH COUNTY REGIONAL WATER
TREATMENT PLANT
NANOFILTRATION SYSTEM UPGRADES
INDEX OF DRAWINGS
000 COVERSHEET AND INDEX OF DRAWINGS
M-101 SITE PLAN
M-102 NF TRAIN OVERALL PLAN
M-201 DEMOLITION PLAN AND SECTION
M-202 INSTALLATION PLAN AND SECTION
M-301 DETAIL VIEWS
JOE ELARDE, P.E.
5811 PELICAN BAY BLVD
SUITE 305
NAPLES, FLORIDA 34108
(239) 431-9225
MAY 2024
JACOBS PROJECT NO. D35140075811 PELICAN BAY BLVD SUITE 305
NAPLES, FLORIDA 34108
STATE OF FLORIDA
ARCHITECTURAL BUSINESS NO. AA001992
ENGINEERING BUSINESS NO. EB0000072
DRAWINGS
For information regarding this project contact:
NANOFILTRATION
TRAINS (SEE M102)N
FILENAME: PLOT DATE: PLOT TIME:5/16/2024 10:38 AM
C H
M
H
IL
L A
N D
IS
N
O T
T O
B E
U S
E D
IN
W H
O
LE
O R
IN
P
A R
T , F
O R
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H O
U T
T H
E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N
O F
C H
M
H
IL
L.
T
H
IS
D O
C U
M E
N T
, A N
D T
H E
ID
E
A S
A N
D D
E S
IG
N
S
IN
C O
R P
O R
A T
E D
H E
R E
IN
, A
S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N
A L
S E
R V
IC
E
, I S
T H
E P
R O
P E
R T
Y O
F R
E U
S E
O F
D O
C U
M E
N T
S
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
N O
R T
H C
O U
N T
Y R
E G
IO
N
A L
W
T E
R T
R E
A T
M E
N T
P L
A N
T
N O
F
IL
T R
A T
IO
N
S Y
S T
E M
U P
G R
A D
E S of
D3514007
M-101
MAY 2024
P R
O C
E S
S M
E C
H A
N
IC
A L
S
IT
E P
LA
N
JA
C
O B
S
A
LL
R
IG
H
T S
R E
S E
R V
E D
20240516 NCRWTP NF Upgrades Drawings.vsdx
B
C
D
A
1 2 3 4 5 6
B
ID
D O
C U
M E
N T
S
P
E L
IC
A
N B
A Y
B L
V D
S U
IT
E
N
A P
L E
S
F L
O R
ID
A
E
B
C
C
NANOFILTRATION
TRAIN 1 (NOTE 1)
NANOFILTRATION
TRAIN 2 (NOTE 1)
NANOFILTRATION
TRAIN 3 (NOTE 1)
NANOFILTRATION
TRAIN 4 (NOTE 1)
NANOFILTRATION
TRAIN 5 (NOTE 1)
NANOFILTRATION
TRAIN 6 (NOTE 1)
GENERAL NOTE
1. THE NF TRAINS SHOWN HERE ARE FOR GENERAL AREA ARRANGEMENT PURPOSES.
N
FILENAME: PLOT DATE: PLOT TIME:5/16/2024 10:38 AM
C H
M
H
IL
L A
N D
IS
N
O T
T O
B E
U S
E D
IN
W H
O
LE
O R
IN
P
A R
T , F
O R
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H O
U T
T H
E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N
O F
C H
M
H
IL
L.
T
H
IS
D O
C U
M E
N T
, A N
D T
H E
ID
E
A S
A N
D D
E S
IG
N
S
IN
C O
R P
O R
A T
E D
H E
R E
IN
, A
S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N
A L
S E
R V
IC
E
, I S
T H
E P
R O
P E
R T
Y O
F R
E U
S E
O F
D O
C U
M E
N T
S
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
of
D3514007
M-102
MAY 2024
P R
O C
E S
S M
E C
H A
N
IC
A L
N F
T R
A
IN
O V
E R
A L
L P
LA
N
JA
C
O B
S
A
LL
R
IG
H
T S
R E
S E
R V
E D
20240516 NCRWTP NF Upgrades Drawings.vsdx
B
C
D
A
1 2 3 4 5 6
B
ID
D O
C U
M E
N T
S
N O
R T
H C
O U
N T
Y R
E G
IO
N
T E
R T
R E
A T
M E
N T
P L
A
N O
F
IL
T R
A T
IO
N
S Y
S T
E M
U P
G R
A D
E S
P
E L
IC
A
N B
A Y
B L
V D
S U
IT
E
N
A P
L E
S
F L
O R
ID
A
E
B
C
GRATING ON WEST SIDE OF THE NF TRAINS
IS NOT TRAFFIC RATED. USE OF A LIFT
DURING INSTALLATION IS NOT ALLOWED.
M304
NF TRAIN PANEL SIDE ELEVATION
(LOOKING SOUTH)
FILENAME: PLOT DATE: PLOT TIME:5/16/2024 10:38 AM
C H
M
H
IL
L A
N D
IS
N
O T
T O
B E
U S
E D
IN
W H
O
LE
O R
IN
P
A R
T , F
O R
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H O
U T
T H
E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N
O F
C H
M
H
IL
L.
T
H
IS
D O
C U
M E
N T
, A N
D T
H E
ID
E
A S
A N
D D
E S
IG
N
S
IN
C O
R P
O R
A T
E D
H E
R E
IN
, A
S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N
A L
S E
R V
IC
E
, I S
T H
E P
R O
P E
R T
Y O
F R
E U
S E
O F
D O
C U
M E
N T
S
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
of
D3514007
M-201
MAY 2024
P R
O C
E S
S M
E C
H A
N
IC
A L
D E
M O
L
IT
IO
N
P
LA
N A
D
S
E C
T
IO
N
JA
C
O B
S
A
LL
R
IG
H
T S
R E
S E
R V
E D
20240516 NCRWTP NF Upgrades Drawings.vsdx
C
D
1 2 3 4 5 6
B
ID
D O
C U
M E
N T
S
EXISTING NF SAMPLE PANEL
B
A
EXISTING FRP SUPPORTS TO REMAINEXISTING FRP SUPPORTS TO REMAIN
REMOVE AND DISPOSE OF EXISTING FIRST STAGE NANOFILTRATION ELEMENTS
(32 VESSELS X 6-ELEMENTS EACH FOR 6-TRAINS – 1,152 ELEMENTS TOTAL)
N O
R T
H C
O U
N T
Y R
E G
IO
N
T E
R T
R E
A T
M E
N T
P L
A
N O
F
IL
T R
A T
IO
N
S Y
S T
E M
U P
G R
A D
E S
P
E L
IC
A
N B
A Y
B L
V D
S U
IT
E
N
A P
L E
S
F L
O R
ID
A
E
B
C
ROUTE TO DRAIN
PANEL SIDE ELEVATION
(LOOKING SOUTH)
FILENAME: PLOT DATE: PLOT TIME:5/16/2024 10:38 AM
C H
M
H
IL
L A
N D
IS
N
O T
T O
B E
U S
E D
IN
W H
O
LE
O R
IN
P
A R
T , F
O R
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H O
U T
T H
E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N
O F
C H
M
H
IL
L.
T
H
IS
D O
C U
M E
N T
, A N
D T
H E
ID
E
A S
A N
D D
E S
IG
N
S
IN
C O
R P
O R
A T
E D
H E
R E
IN
, A
S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N
A L
S E
R V
IC
E
, I S
T H
E P
R O
P E
R T
Y O
F R
E U
S E
O F
D O
C U
M E
N T
S
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
of
D3514007
M-202
MAY 2024
P R
O C
E S
S M
E C
H A
N
IC
A L
IN
S
T A
L L
A T
IO
N
P
LA
N A
D
S
E C
T
IO
N
JA
C
O B
S
A
LL
R
IG
H
T S
R E
S E
R V
E D
20240516 NCRWTP NF Upgrades Drawings.vsdx
B
A
B
ID
D O
C U
M E
N T
S
NEW SAMPLE PANEL SHALL BE
MOUNTED TO EXISTING SUPPORTS.
C
D
1 2 3 4 5
INSTALL NEW PVC PIPE CONNECTED
TO EXISTING TRENCH DRAIN
EXISTING SAMPLE PANEL
(LOOKING SOUTH)
EXISTING FRP SUPPORTS TO REMAIN
NEW SAMPLE PANEL SHALL BE
MOUNTED TO EXISTING SUPPORTS.
N O
R T
H C
O U
N T
Y R
E G
IO
N
T E
R T
R E
A T
M E
N T
P L
A
N O
F
IL
T R
A T
IO
N
S Y
S T
E M
U P
G R
A D
E S
P
E L
IC
A
N B
A Y
B L
V D
S U
IT
E
N
A P
L E
S
F L
O R
ID
A
E
B
C
INSTALL NEW MEMBRANE ELEMENTS INTO EXISTING FIRST STAGE
(32 VESSELS X 6-ELEMENTS EACH FOR 6-TRAINS – 1,152 ELEMENTS TOTAL)
KEY NOTES
1. MEMBRANE SYSTEM SUPPLIER SHALL REMOVE THE EXISTING SAMPLE PANEL AND SAMPLE TUBING.
2. SUPPLY NEW TUBING RATED FOR 150 PSI FOR PERMEATE CONNECTIONS AND 250 PSI FOR FEED, INTERSTAGES, AND CONCENTRATE CONNECTIONS.
EXISTING PERMEATE TUBING
ROUTING
DETAIL
NTS
SAMPLE PANEL CONNECTIONS
DETAIL
NTS
EXISTING BACK OF PANEL TUBING
CONNECTIONS
DETAIL
NTS
EXISTING SAMPLE PANEL
DETAIL
NTS
EXISTING PERMEATE
CONNECTIONS
DETAIL
NTS
FILENAME: PLOT DATE: PLOT TIME:5/16/2024 10:38 AM
C H
M
H
IL
L A
N D
IS
N
O T
T O
B E
U S
E D
IN
W H
O
LE
O R
IN
P
A R
T , F
O R
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H O
U T
T H
E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N
O F
C H
M
H
IL
L.
T
H
IS
D O
C U
M E
N T
, A N
D T
H E
ID
E
A S
A N
D D
E S
IG
N
S
IN
C O
R P
O R
A T
E D
H E
R E
IN
, A
S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N
A L
S E
R V
IC
E
, I S
T H
E P
R O
P E
R T
Y O
F R
E U
S E
O F
D O
C U
M E
N T
S
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
of
D3514007
M-301
MAY 2024
P R
O C
E S
S M
E C
H A
N
IC
A L
D E
T A
IL
V
IE
W
S
JA
C
O B
S
A
LL
R
IG
H
T S
R E
S E
R V
E D
20240516 NCRWTP NF Upgrades Drawings.vsdx
B
C
D
A
1 2 3 4 5 6
B
ID
D O
C U
M E
N T
S
BOLT NEW PANEL TO EXISTING SUPPORTSBOLT NEW PANEL TO EXISTING SUPPORTS
REPLACE EXISTING DRAIN PIPE AND CONNECTOR.
CONNECT TROUGH DRAINS TO NEW DRAIN PIPE.
CONNECT NEW DRAIN PIPE TO EXISTING DRAIN
REPLACE ALL SAMPLE TUBING AND ASSOCIATED
CONECTORS TO SAMPLE VALVES AND PRESSURE
VESSELS
PROVIDE NEW SAMPLE VALVES AND VALVE
LABELS SIMILAR TO EXISTING LABELS
PROVIDE TWO NEW TROUGHS OF SIMILAR
DIMENSIONS AND FUNCTIONALITY.
TROUGHS WILL DRAIN INTO DRAIN PIPE.
PROVIDE TWO NEW TROUGHS OF SIMILAR
DIMENSIONS AND FUNCTIONALITY.
TROUGHS WILL DRAIN INTO DRAIN PIPE.
REPLACE COMPRESSION TYPE FITTING THAT IS THREADED TO THE
SADDLE CLAMP ALONG WITH SAMPLE TUBING. FIELD VERIFY EXISTING
FITTING TYPE BEFORE PROCURING EQUIVALENT REPLACEMENTS.
PROVIDE NEW BULKHEAD FITTINGS TO
SECURE NEW VALVES AND TUBING TO THE
NEW PANEL
PROVIDE NEW BULKHEAD FITTINGS WITH 90-
DEGREE DOWNTURNED 316 SST ELBOWS
TO SECURE NEW VALVES IN VERTICAL
POSITION TO THE NEW PANEL
PROVIDE NEW 316 SST DISCHARGE TUBES
ON THE DISCHARGE OF EACH VALVE
ADD LABEL ON EACH SAMPLE TUBE (4-5 INCHES FROM PANEL).
LABEL TO INDICATE VALVE NUMBER AND SAMPLE TYPE. LABEL
ORIENTED TO ALLOW EASY VISIBILITY.
N O
R T
H C
O U
N T
Y R
E G
IO
N
T E
R T
R E
A T
M E
N T
P L
A
N O
F
IL
T R
A T
IO
N
S Y
S T
E M
U P
G R
A D
E S
P
E L
IC
A
N B
A Y
B L
V D
S U
IT
E
N
A P
L E
S
F L
O R
ID
A
E
B
C
ADD LABEL ON EACH SAMPLE TUBE (4-5 INCHES
FROM PERMEATE CONNECTION). LABEL TO
INDICATE VESSEL NUMBER AND SAMPLE TYPE.
File details come from the government source that posted it. Updated .