The file is a Bid Schedule for Collier County's North County Regional Water Treatment Plant (NCRWTP) Nanofiltration System Upgrades Construction Invitation to Bid (ITB), Project Number 71057.5. The solicitation seeks bids for 1,158 8-inch diameter by 40-inch long spiral-wound membrane elements, 6 sample panels with valves, fittings, and tubing, and includes installation, warranty, and startup supervision services. The bid is scheduled to be received by August 5, 2024, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting on June 27, 2024, at 10:00 a.m. at the North Collier Regional Water Treatment Plant in Naples, Florida.
The bid schedule includes a $50,000 Owner's Allowance to be used at the Owner's discretion for unforeseen conditions or directed work. Expenditures from this allowance will be processed through change orders with documented time and materials support. Prospective bidders are required to register on the Collier County procurement portal to obtain complete bid documents. The bid schedule does not specify the total project budget, contract term, or renewal options, focusing instead on the specific equipment and installation requirements for the nanofiltration system upgrades.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Collier NCRWTP NF System Upgrades | |||||
| Construction ITB | |||||
| Project Number: 71057.5 | |||||
| Bid Schedule | |||||
| Item No. | DESCRIPTION | UNIT | QTY | UNIT COST | TOTAL COST |
| 1 | 8-inch diameter by 40-inch long, spiral-wound membrane elements | EA | 1,158 | ||
| 2 | Sample Panels with Valves, Fittings and Tubing | EA | 6 | ||
| 3 | Installation, Warranty and Startup Supervision | EA | 6 | ||
| Total Bid Amount | $ - 0 | ||||
| * Staff has allocated $50,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change. |
Proposed membrane element type (manufacturer / model):