24-8279_Bidder_Checklist.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
North County Regional Water Treatment Plant Nanofiltration System Upgrades
Solicitation number
24-8279
Issued by
Collier County, Florida

About this file

The document is a Bidder Checklist for Collier County's North County Regional Water Treatment Plant (NCRWTP) Nanofiltration System Upgrades Construction Invitation to Bid (ITB), Project Number 71057.5. The bid solicitation, issued on June 21, 2024, seeks sealed bids for system upgrades, with submissions due by August 5, 2024, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for June 27, 2024, at 10:00 a.m. at the North Collier Regional Water Treatment Plant in Naples, Florida. Prospective bidders must register on the county's procurement portal to access complete bidding documents.

The bidder checklist outlines eight critical submission requirements, including five installer references, membrane element data sheets, water quality membrane performance projections, NSF 61 approval certification, membrane manufacturer compatibility certification, and warranty documentation. Bidders must demonstrate technical compliance with specific specification sections, particularly Section 3.02 for membrane performance and Section 1.03 for warranty terms. Interested parties are required to complete a comprehensive documentation package that validates their technical capabilities and proposed solution for the nanofiltration system upgrades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Collier NCRWTP NF System Upgrades
Construction ITB
Project Number: 71057.5
Bid Checklist Showing Conformance with Section 1.04.A of the Specification
Item No.DESCRIPTIONINCLUDED
1Bid Schedule / Checklist
2Five INSTALLER References
3Supplemental Qualifications (see attached supplemental sheet)
4Membrane Element Data Sheets
5Design WQ Membrane Performance Projections at 0 & 5 Years showing compliance with Section 3.02 of the Specification
6Membrane Element NSF 61 Approval Certification
7Membrane Manufacturer Certification of Compatibiliy with AWC A-111
8Membrane Element Warranty Complies with Section 1.03 of the Specification