24-0708 RR462 BATHROOM MODIFICATION - SOW.pdf

PDF 111 KB Posted

Attached to
RR462 Bathroom Modification
Solicitation number
N4008524R2851
Issued by

About this file

This document is a Scope of Work (SOW) for the RR462 Bathroom Modification project, which is a solicitation issued by the Department of the Navy Naval Facilities Engineering Command (NAVFAC).

The SOW states that the project will convert Storage Room 104 into a bathroom similar to the existing Bathroom 105. The contractor shall provide and install all architectural, plumbing, mechanical, and electrical features that were not previously installed. The contractor is required to conduct a site visit, review existing conditions, and verify all items needed to complete the project. The new bathroom must match the finishes, fixtures, and color palette of the existing Bathroom 105. The contractor must submit all material and color selections, as well as new plumbing, mechanical, and electrical items, to the government for approval.

The related Federal Contract Opportunity is Solicitation Number N4008524R2851, titled "RR462 Bathroom Modification". This opportunity is limited to M&R MACC Contractors listed on the General Requirements cover page. The agency responsible is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RR462 Bathroom Modification Scope of Work

RR462 was originally designed with 2 bathrooms but due to budgetary constraints one of the bathrooms was removed and a storage room was provided. This project will convert Storage Room 104 into a bathroom similar to the adjacent Bathroom 105. The contractor is responsible to provide/install all architectural, plumbing, mechanical, and electrical features that were not previously installed. The contractor shall conduct a site visit to review the existing conditions and to verify/determine all items required to complete project. RR462 existing conditions/record drawings and RR462 new plans are attached for reference.

Reference Drawings

1. RR462 Floor Plan - Record Drawing

2. RR462 Floor Plan - New

a. The contractor shall provide/install all finishes and fixtures in room 104 to match the existing bathroom 105. Refer to sheets 2-5 for the full architectural scope of work. All new items shall be of equal, or better, quality than the items shown on these sheets. The color palette shall match the existing bathroom 105 color palette. Verify that the color palette on this sheet is consistent with the actual colors in bathroom 105. Submit all material and color selections to the government for approval.

3. RR462 Interior Elevations - Record Drawing

4. RR462 Interior Finish Schedule - Record Drawing

5. RR462 Reflected Ceiling Plan - Record Drawing

6. RR462 Plumbing Floor Plan - Record Drawing

7. RR462 Plumbing Floor Plan – New

a. The contractor shall provide/install all water supply, drain-waste, and vent piping to support new water closet, sink, shower, and water fountain as required. All new items shall be of equal, or better, quality than the existing items in bathroom 104 and as shown on supporting record drawings. Submit all new plumbing fixtures to the government for approval.

8. RR462 Plumbing Fixture Schedule - Record Drawing

9. RR462 Mechanical Plan - Record Drawing

10. RR462 Mechanical Plan – New

a. The contractor shall provide/install all mechanical related items consistent with the existing bathroom’s mechanical items as required. All new items shall be of equal, or better, quality than the existing items in bathroom 104 and as shown on supporting record drawings.

Submit all new mechanical items to the government for approval.

11. RR462 Mechanical Schedules and Legends – Record Drawing

12. RR462 Mechanical Schedules and Legends – New

13. RR462 Mechanical Details – Record Drawing

14. RR462 Mechanical Details – New

15. RR462 Electrical Symbols and Details – Record Drawing

16. RR462 Electrical Lighting Plan – Record Drawing

17. RR462 Electrical Lighting Plan – New

b. The contractor shall provide/install all electrical related items consistent with the existing bathroom’s electrical items as required. All new items shall be of equal, or better, quality than the existing items in bathroom 104 and as shown on supporting record drawings.

Submit all new electrical items to the government for approval.

18. RR462 Electrical Power Plan – Record Drawing

19. RR462 Electrical Power Plan – New