The document provides the technical specifications for the Muskallonge Lake State Park West Campground Toilet Shower Building project in Luce County, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Natural Resources (DNR). The specifications cover general requirements, demolition, concrete work, masonry, and various other construction components. Key details include the project description, table of contents, divisions covered, and performance and quality requirements.

The pricing and contract details indicate this is a state and local government contract opportunity. The project is located in Luce County, Michigan. The contract has set completion date requirements, with the contractor responsible for coordinating with the state and local agencies. Funding for the project will come from state sources, with specific details on budget and allowances not provided in the document.

View the file

Other files

File Type Posted
22438 Specs 2.pdf PDF
22438 Addendum 1 Part 1.pdf PDF
22438 Drawings 4.pdf PDF
22438 Advertisement.pdf PDF
22438 Specs 1.pdf PDF
22438 Addendum 4.pdf PDF
22438 Addendum 1 Part 2.pdf PDF
22438 Drawings 3.pdf PDF
22438 Drawings 1.pdf PDF
22438 Addendum 2.pdf PDF
22438 Drawings 5.pdf PDF
22438 Addendum 3.pdf PDF
22438 Drawings 2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE

C

H N

IC

A

L

SP

EC

IF

IC

A

TI

O

N S

Table of Contents Generated by SpecBuilder: 7/7/2023 Division Section Title Pages

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

012500 SUBSTITUTION PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013300 SUBMITTAL PROCEDURES

014000 QUALITY REQUIREMENTS

015000 TEMPORARY FACILITIES AND CONTROLS

015639 TEMPORARY TREE AND PLANT PROTECTION

016000 PRODUCT REQUIREMENTS

017300 EXECUTION

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017839 PROJECT RECORD DOCUMENTS

017900 DEMONSTRATION AND TRAINING

DIVISION 02 - EXISTING CONDITIONS

024116 STRUCTURE DEMOLITION

DIVISION 03 - CONCRETE

031000 CONCRETE FORMING AND ACCESSORIES

032000 CONCRETE REINFORCING

033000 CAST-IN-PLACE CONCRETE

033543 POLISHED CONCRETE FINISHING

DIVISION 04 - MASONRY

042000 UNIT MASONRY

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY

061600 SHEATHING

062013 EXTERIOR FINISH CARPENTRY

062023 INTERIOR FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

072100 THERMAL INSULATION

072119 FOAMED-IN-PLACE INSULATION

072500 WEATHER BARRIERS

074113.16 STANDING-SEAM METAL ROOF PANELS

076200 SHEET METAL FLASHING AND TRIM

079200 JOINT SEALANTS

DIVISION 08 - OPENINGS

084213 ALUMINUM-FRAMED ENTRANCES

085113 ALUMINUM WINDOWS

087100 DOOR HARDWARE

DIVISION 09 - FINISHES

099123 INTERIOR PAINTING

099300 STAINING AND TRANSPARENT FINISHING

DIVISION 10 - SPECIALTIES

101423.16 ROOM-IDENTIFICATION PANEL SIGNAGE

102113.19 PLASTIC TOILET COMPARTMENTS

102116.19 PLASTIC SHOWER AND DRESSING COMPARTMENTS

102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

DIVISION 12 - FURNISHINGS

123661.16 SOLID SURFACING COUNTERTOPS

DIVISION 22 - PLUMBING

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

220518 ESCUTCHEONS FOR PLUMBING PIPING

220523.12 BALL VALVES FOR PLUMBING PIPING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

221116 DOMESTIC WATER PIPING

221119 DOMESTIC WATER PIPING SPECIALTIES

221316 SANITARY WASTE AND VENT PIPING

221319 SANITARY WASTE PIPING SPECIALTIES

223400 FUEL-FIRED, DOMESTIC-WATER HEATERS

224213.13 COMMERCIAL WATER CLOSETS

224213.16 COMMERCIAL URINALS

224216.13 COMMERCIAL LAVATORIES

224216.16 COMMERCIAL SINKS

224223 COMMERCIAL SHOWERS

224713 DRINKING FOUNTAINS

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING (HVAC)

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233713.23 REGISTERS AND GRILLES

235416.13 GAS-FIRED FURNACES

237223.19 PACKAGED INDOOR FIXED PLATE ENERGY RECOVERY UNITS

DIVISION 26 - ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 LIGHTING CONTROL DEVICES

262416 PANELBOARDS

262726 WIRING DEVICES

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

265119 LED INTERIOR LIGHTING

265213 EMERGENCY AND EXIT LIGHTING

265619 LED EXTERIOR LIGHTING

DIVISION 31 - EARTHWORK

311000 SITE CLEARING

312000 EARTH MOVING

312500 EROSION AND SEDIMENTATION CONTROLS

DIVISION 32 - EXTERIOR IMPROVEMENTS

321313 CONCRETE PAVING

321623 SIDEWALKS

321713 PARKING BUMPERS

321723 PAVEMENT MARKINGS

321726 TACTILE WARNING SURFACING

329200 TURF AND GRASSES

329300 PLANTS

DIVISION 33 - UTILITIES

330110.58 DISINFECTION OF WATER UTILITY PIPING SYSTEMS

330505.41 AIR TESTING

330509.33 THRUST RESTRAINT FOR UTILITY PIPING

331417 SITE WATER SERVICE UTILITY LATERALS

333100 SANITARY SEWERAGE PIPING

END OF TABLE OF CONTENTS

MI DTMB/DNR

Muskallonge Lake State Park West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 1 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 024116 - STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of buildings and site improvements.

2. Removing below-grade construction.

3. Disconnecting, capping or sealing, and abandoning in-place site utilities.

4. Salvaging items for reuse by Owner.

B. Related Requirements:

1. Section 011000 "Summary" for use of the premises and phasing requirements.

2. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade site improvements not part of building demolition.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse . Include fasteners or brackets needed for reattachment elsewhere.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.4 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site or zoom meeting.

1. Inspect and discuss condition of construction to be demolished.

2. Review structural load limitations of existing structures.

3. Review and finalize building demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 2 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

4. Review and finalize protection requirements.

5. Review procedures for noise control and dust control.

6. Review procedures for protection of adjacent buildings.

7. Review items to be salvaged and returned to Owner.

1.5 INFORMATIONAL SUBMITTALS

A. Schedule of Building Demolition Activities: Indicate the following:

1. Detailed sequence of demolition work, with starting and ending dates for each activity.

2. Temporary interruption of utility services.

3. Shutoff and capping or re-routing of utility services.

1.6 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

1.7 FIELD CONDITIONS

A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.

B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.

1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.

2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.

a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.

C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before building demolition, Owner will remove the following items:

a. Sink fixtures.

b. Shower fixtures.

c. Restroom partitions may be salvaged by the Owner. If still in place, contractor shall remove and dispose of restroom partitions.

D. Hazardous Materials: Present in buildings and structures to be demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 3 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

3. Owner will provide material safety data sheets for materials that are known to be present in buildings and structures to be demolished because of building operations or processes performed there.

E. On-site storage or sale of removed items or materials is not permitted.

1.8 COORDINATION

A. Arrange demolition schedule so as not to interfere with Owner's on-site operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

2.2 SOIL MATERIALS

A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."

PART 3 - EXECUTION

3.1 DEMOLITION CONTRACTOR

3.2 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Inventory and record the condition of items to be removed and salvaged.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 4 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

3.3 PREPARATION

A. Salvaged Items: Comply with the following:

1. Transport items to storage area designated by Owner.

3.4 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.

1. Arrange to shut off utilities with utility companies.

2. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.

3. Cut off pipe or conduit a minimum of 48 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction.

4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.

3.5 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.

B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of demolition.

C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations.

1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.

2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and authorities having jurisdiction.

a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service is required during changeover.

D. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 5 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

3.6 DEMOLITION, GENERAL

A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.

2. Maintain fire watch during and for at least 4 hours after flame-cutting operations.

3. Maintain adequate ventilation when using cutting torches.

4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

C. Explosives: Use of explosives is not permitted.

3.7 DEMOLITION BY MECHANICAL MEANS

A. Proceed with demolition of structural framing members systematically, from higher to lower level.

Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.

B. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

1. Remove structural framing members and lower to ground by method suitable to minimize ground impact and dust generation.

C. Salvage: Items to be removed and salvaged are indicated on Drawings.

D. Below-Grade Construction: Demolish foundation walls and other below-grade construction that are within footprint of new construction and extending 5 feet outside footprint indicated for new construction. Abandon below-grade construction outside this area.

1. Remove below-grade construction, including basements, foundation walls, and footings, completely.

E. Existing Utilities: Demolish and remove existing utilities and below-grade utility structures.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

STRUCTURE DEMOLITION

024116 - Page 6 of 6

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

F. Hydraulic Elevator Systems: Demolish and remove elevator system, including cylinder, plunger, well assembly, steel well casing and liner, oil supply lines, and tanks.

3.8 SITE RESTORATION

A. Below-Grade Areas: Rough grade below-grade areas ready for further excavation or new construction.

B. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

3.9 REPAIRS

A. Promptly repair damage to adjacent buildings caused by demolition operations.

3.10 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Do not burn demolished materials.

3.11 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.

1. Clean roadways of debris caused by debris transport.

END OF SECTION 024116

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE FORMING AND

ACCESSORIES

031000 - Page 1 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 031000 - CONCRETE FORMING AND ACCESSORIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Form-facing material for cast-in-place concrete.

2. Shoring, bracing, and anchoring.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For each of the following:

1. Exposed surface form-facing material.

2. Concealed surface form-facing material.

3. Form ties.

4. Form-release agent.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.

1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."

2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.

2.2 FORM-FACING MATERIALS

A. As-Cast Surface Form-Facing Material:

1. Provide continuous, true, and smooth concrete surfaces.

2. Furnish in largest practicable sizes to minimize number of joints.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE FORMING AND

ACCESSORIES

031000 - Page 2 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete, and as follows:

a. Plywood, metal, or other approved panel materials.

B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.

1. Provide lumber dressed on at least two edges and one side for tight fit.

2.3 RELATED MATERIALS

A. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

B. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

C. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.

3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.

PART 3 - EXECUTION

3.1 INSTALLATION OF FORMWORK

A. Comply with ACI 301.

B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes.

C. Limit concrete surface irregularities as follows:

1. Surface Finish-1.0: ACI 117 Class D, 1 inch.

2. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.

3. Surface Finish-3.0: ACI 117 Class A, 1/8 inch.

D. Construct forms tight enough to prevent loss of concrete mortar.

1. Minimize joints.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE FORMING AND

ACCESSORIES

031000 - Page 3 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

2. Exposed Concrete: Symmetrically align joints in forms.

E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.

1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.

2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

3. Install keyways, reglets, recesses, and other accessories, for easy removal.

F. Do not use rust-stained, steel, form-facing material.

G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.

1. Provide and secure units to support screed strips.

2. Use strike-off templates or compacting-type screeds.

H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.

1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.

2. Locate temporary openings in forms at inconspicuous locations.

I. Chamfer exterior corners and edges of permanently exposed concrete.

J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.

K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.

1. Determine sizes and locations from trades providing such items.

2. Obtain written approval of Architect prior to forming openings not indicated on Drawings.

L. Construction and Movement Joints:

1. Construct joints true to line with faces perpendicular to surface plane of concrete.

2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

3. Place joints perpendicular to main reinforcement.

4. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

5. Space vertical joints in walls as indicated on Drawings.

M. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.

1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.

2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE FORMING AND

ACCESSORIES

031000 - Page 4 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

N. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

O. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

P. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.

3. Clean embedded items immediately prior to concrete placement.

3.3 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Inspect formwork for shape, location, and dimensions of the concrete member being formed.

2. Inspect formwork for proper preparation and cleanliness prior to concrete placement.

END OF SECTION 031000

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE REINFORCING

032000 - Page 1 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 032000 - CONCRETE REINFORCING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel reinforcement bars.

2. Welded-wire reinforcement.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For the following:

1. Each type of steel reinforcement.

2. Bar supports.

B. Shop Drawings: Comply with ACI SP-066:

1. Include placing drawings that detail fabrication, bending, and placement.

2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A615/A615M, Grade 60, deformed.

B. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.

2.2 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE REINFORCING

032000 - Page 2 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.

B. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch in diameter.

1. Finish: Plain.

2.3 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

PART 3 - EXECUTION

3.1 PREPARATION

A. Protection of In-Place Conditions:

1. Do not cut or puncture vapor retarder.

2. Repair damage and reseal vapor retarder before placing concrete.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

3.2 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

D. Provide concrete coverage in accordance with ACI 318.

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Splices: Lap splices as indicated on Drawings.

G. Install welded-wire reinforcement in longest practicable lengths.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CONCRETE REINFORCING

032000 - Page 3 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."

a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed

12 inches.

2. Lap edges and ends of adjoining sheets at least one full mesh spacing plus 2 inches for plain wire and 8 inches for deformed wire.

3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.

4. Lace overlaps with wire.

3.3 JOINTS

A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

1. Place joints perpendicular to main reinforcement.

2. Continue reinforcement across construction joints unless otherwise indicated.

3. Do not continue reinforcement through sides of strip placements of floors and slabs.

3.4 INSTALLATION TOLERANCES

A. Comply with ACI 117.

3.5 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Steel-reinforcement placement.

END OF SECTION 032000

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 1 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Section 031000 "Concrete Forming and Accessories" for form-facing materials.

2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.

3. Section 033543 "Polished Concrete Finishing" for concrete floors scheduled to receive a polished concrete finish.

4. Section 321313 "Concrete Paving" for concrete pavement and walks.

1.2 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following:

blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.

B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Ready-mix concrete manufacturer.

c. Concrete Subcontractor.

2. Review the following:

a. Special inspection and testing and inspecting agency procedures for field quality control.

b. Construction joints, control joints, isolation joints, and joint-filler strips.

c. Vapor-retarder installation.

d. Anchor rod and anchorage device installation tolerances.

e. Cold and hot weather concreting procedures.

f. Concrete finishes and finishing.

g. Curing procedures.

h. Forms and form-removal limitations.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 2 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

i. Concrete repair procedures.

j. Concrete protection.

k. Initial curing of field test cylinders (ASTM C31/C31M.).

1.4 ACTION SUBMITTALS

A. Product Data: For each of the following.

1. Portland cement.

2. Fly ash.

3. Slag cement.

4. Blended hydraulic cement.

5. Silica fume.

6. Aggregates.

7. Admixtures:

a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.

8. Vapor retarders.

9. Curing materials.

10. Joint fillers.

11. Repair materials.

B. Design Mixtures: For each concrete mixture, include the following:

1. Mixture identification.

2. Minimum 28-day compressive strength.

3. Durability exposure class.

4. Maximum w/cm.

5. Slump limit.

6. Air content.

7. Nominal maximum aggregate size.

8. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.

9. Intended placement method.

10. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For the following:

1. Installer: Include copies of applicable ACI certificates.

2. Ready-mixed concrete manufacturer.

B. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Curing compounds.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 3 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

4. Bonding agents.

5. Vapor retarders.

6. Joint-filler strips.

7. Repair materials.

C. Contractor to provide test breaks of all mix types prior to pouring.

D. Material Test Reports: For the following, from a qualified testing agency:

1. Portland cement.

2. Fly ash.

3. Slag cement.

4. Blended hydraulic cement.

5. Silica fume.

6. Aggregates.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs Project personnel qualified as an ACI-certified Flatwork Technician and Finisher and a supervisor who is a certified ACI Flatwork Concrete Finisher/Technician or an ACI Concrete Flatwork Technician.

1. Post-Installed Concrete Anchors Installers: ACI-certified Adhesive Anchor Installer.

B. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.

1. Manufacturer certified in accordance with NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

1.7 DELIVERY, STORAGE, AND HANDLING

A. Comply with ASTM C94/C94M and ACI 301.

1.8 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1 and as follows.

1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

2. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

3. Do not use frozen materials or materials containing ice or snow.

4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.

5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 4 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:

1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.

2.2 CONCRETE MATERIALS

A. Source Limitations:

1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.

2. Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.

3. Obtain aggregate from single source.

4. Obtain each type of admixture from single source from single manufacturer.

B. Cementitious Materials:

1. Portland Cement: ASTM C150/C150M, Type I, gray.

2. Fly Ash: ASTM C618, Class C or F.

3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.

4. Blended Hydraulic Cement: ASTM C595/C595M, Type IL, portland-limestone cement.

5. Silica Fume: ASTM C1240 amorphous silica.

C. Normal-Weight Aggregates: ASTM C33/C33M, 4S coarse aggregate or better, graded. Provide aggregates from a single source.

1. Alkali-Silica Reaction: Comply with one of the following:

a. Expansion Result of Aggregate: Not more than 0.04 percent at one-year when tested in accordance with ASTM C1293.

b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567.

c. Alkali Content in Concrete: Not more than 4 lb./cu. yd. for moderately reactive aggregate or 3 lb./cu. yd. for highly reactive aggregate, when tested in accordance with ASTM C1293 and categorized in accordance with ASTM C1778, based on alkali content being calculated in accordance with ACI 301.

2. Maximum Coarse-Aggregate Size: 1 inch nominal except at areas to be polished. At areas designated for polishing provide natural pea gravel (compliant with MDOT 34R).

3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 5 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

D. Air-Entraining Admixture: ASTM C260/C260M.

E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C494/C494M, Type A.

2. Retarding Admixture: ASTM C494/C494M, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.

6. Plasticizing and Retarding Admixture: ASTM C1017/C1017M, Type II.

F. Water and Water Used to Make Ice: ASTM C94/C94M, potable.

2.3 VAPOR RETARDERS

A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A; not less than 10 mils thick. Include manufacturer's recommended adhesive or pressure-sensitive tape.

2.4 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

C. Water: Potable or complying with ASTM C1602/C1602M.

D. Clear, Waterborne, Membrane-Forming, Dissipating Curing Compound: ASTM C309, Type 1, Class B.

2.5 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber.

B. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

2.6 REPAIR MATERIALS

A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 6 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand, as recommended by underlayment manufacturer.

4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with

ASTM C109/C109M.

B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.

4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with

ASTM C109/C109M.

2.7 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

2. Slag Cement: 40 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use water-reducing,high-range water-reducing or plasticizing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete, and concrete with a w/cm below 0.50.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

CAST-IN-PLACE CONCRETE

033000 - Page 7 of 17

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

2.8 CONCRETE MIXTURES

A. Class A : Normal-weight concrete used for footings.

1. Exposure Class: ACI 318 F3 C2.

2. Minimum Compressive Strength: 5000 psi at 28 days.

3. Maximum w/cm: 0.40.

4. Slump Limit: 4 inches, plus or minus 1 inch, or 8 inches, plus or minus 1 inch for concrete with verified slump of 3 inches plus or minus 1 inch before adding high-range water-reducing admixture or plasticizing admixture at Project site.

5. Air Content:

a. Exposure Classes F2 and F3: 6 percent, plus or minus 1.5 percent at point of delivery for concrete containing 1-inch nominal maximum aggregate size.

6. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

B. Class B : Normal-weight concrete used for foundation walls.

1. Exposure Class: ACI 318 F3 C2.

2. Minimum Compressive Strength: 5000 psi at 28 days.

3. Maximum w/cm: 0.40.

4. Slump Limit: 4 inches, plus or minus 1 inch, or 8 inches, plus or minus 1 inch for concrete with verified slump of 3 inches plus or minus 1 inch before adding high-range water-reducing admixture or plasticizing admixture at Project site.

5. Air Content:

a. Exposure Classes F2 and F3: 6 percent, plus or minus 1.5 percent at point of delivery for concrete containing 1-inch nominal maximum aggregate size.

6. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

C. Class C : Normal-weight concrete used for interior slabs-on-ground.

1. Exposure Class: ACI 318 F2 C1.

2. Minimum Compressive Strength: 4000 psi at 28 days.

3. Maximum w/cm: 0.45.

4. Coarse Aggregate: Limit maximum size of coarse aggregate in all floors intended to be ground and polished to 3/8" maximum size (compliant with MDOT 34R).

5. Minimum Cementitious Materials Content: 611 lb/cu yd.

6. Slump Limit: 4 inches, plus or minus 1 inch, or 8 inches, plus or minus 1 inch for concrete with verified slump of 3 inches plus or minus 1 inch before adding high-range water-reducing admixture or plasticizing admixture at Project site.

7. Air Content:

a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.

8. Limit water-soluble, chloride-ion content…