22438 Specs 2.pdf

PDF 6 MB Posted

Attached to
751/22438. ABG; Muskallonge Lake SP - Toilet and Shower Bldg.
Solicitation number
RFQ - 171 - 230000000616
Issued by
Luce County, Michigan

About this file

This file contains the specifications for the Muskallonge Lake State Park West Campground Toilet Shower Building project in Luce County, Michigan, being managed by the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Natural Resources (DNR).

The project involves the demolition of the existing toilet shower building and the construction of a new toilet shower building, including site, architectural, structural, mechanical, plumbing, electrical, and other associated work. The contract will be awarded as a single prime contract. Bid attachments must be uploaded to SIGMA VSS, Michigan's online procurement system, by the 2:00 pm deadline on the due date. Prospective bidders experiencing issues with SIGMA VSS may be allowed to email their proposals with prior approval. The project does not mention any incumbent contractor or set-asides. Funding sources and pricing terms are not specified in the document.

View the file

Other files

File Type Posted
22438 Addendum 1 Part 1.pdf PDF
22438 Drawings 4.pdf PDF
22438 Advertisement.pdf PDF
22438 Specs 1.pdf PDF
22438 Addendum 4.pdf PDF
22438 Addendum 1 Part 2.pdf PDF
22438 Drawings 3.pdf PDF
22438 Drawings 1.pdf PDF
22438 Addendum 2.pdf PDF
22438 Specs 3.pdf PDF
22438 Drawings 5.pdf PDF
22438 Addendum 3.pdf PDF
22438 Drawings 2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents Generated by SpecBuilder: 07/07/2023

Division

Section Title

Pages

DIVISION 01

GENERAL REQUIREMENTS

011000

SUMMARY

012500

SUBSTITUTION PROCEDURES

013100

PROJECT MANAGEMENT AND COORDINATION

013300

SUBMITTAL PROCEDURES

014000

QUALITY REQUIREMENTS

015000

TEMPORARY FACILITIES AND CONTROLS

015639

TEMPORARY TREE AND PLANT PROTECTION

016000

PRODUCT REQUIREMENTS

017300

EXECUTION

017700

CLOSEOUT PROCEDURES

017823

OPERATION AND MAINTENANCE DATA

017839

PROJECT RECORD DOCUMENTS

017900

DEMONSTRATION AND TRAINING

END OF TABLE OF CONTENTS

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties. It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

MI DTMB/DNR

Muskallonge Lake State Park West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUMMARY

011000 - Page 1 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Owner-furnished/Owner-installed (OFOI) products.

4. Contractor's use of site and premises.

5. Coordination with occupants.

6. Work restrictions.

7. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Muskallonge Lake State Park West Campground Toilet Shower Building.

1. Project Location: 299818 County Road 407 Newberry, Michigan.

B. Owner: MI DTMB/DNR.

1. Owner's Representative: James Dzelak.

C. Architect: OHM Advisors, 424 Hancock Street, Hancock, MI 49930.

1. Architect's Representative: OHM Advisors.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:

1. The project consists of demolition of the existing toilet shower building and construction of a new toilet shower building including site, architectural, structural, mechanical, plumbing, electrical, and other associated work as indicated in the Contract Documents.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUMMARY

011000 - Page 2 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

1.4 WORK PERFORMED BY OWNER

A. Cooperate fully with Owner, so work may be carried out smoothly, without interfering with or delaying Work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

1.5 CONTRACTOR'S USE OF SITE AND PREMISES

A. Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

B. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.6 COORDINATION WITH OCCUPANTS

A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.

2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.

1.7 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work to between 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise indicated. Work hours may be modified to meet Project requirements if approved by Owner and authorities having jurisdiction.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUMMARY

011000 - Page 3 of 3

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging for temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions.

D. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Owner's property is not permitted.

E. Employee Screening: Comply with Owner's requirements for background screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.8 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.

C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBSTITUTION

PROCEDURES

012500 - Page 1 of 3 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.3 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

1.4 ACTION SUBMITTALS

A. Substitution Requests: Submit documentation identifying product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use form provided in Project Manual.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBSTITUTION

PROCEDURES

012500 - Page 2 of 3 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408) features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

j. Cost information, including a proposal of change, if any, in the Contract Sum.

k. Contractor's certification that proposed substitution complies with requirements in the

Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

l. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution.

Architect will notify Contractor of acceptance or rejection of proposed substitution within 7 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's

Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.5 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.6 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.7 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBSTITUTION

PROCEDURES

012500 - Page 3 of 3 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012500

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

PROJECT MANAGEMENT AND

COORDINATION

013100 - Page 1 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project, including, but not limited to, the following:

1. General coordination procedures.

2. RFIs.

3. Project meetings.

4. Coordination Meetings.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

C. Related Requirements:

1. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

2. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract.

1.3 DEFINITIONS

A. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

PROJECT MANAGEMENT AND

COORDINATION

013100 - Page 2 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

1.5 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results, where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Preinstallation conferences.

6. Project closeout activities.

1.6 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return without response those RFIs submitted to Architect by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Owner name.

3. Owner's Project number.

4. Name of Architect.

5. Architect's Project number.

6. Date.

7. Name of Contractor.

8. RFI number, numbered sequentially.

9. RFI subject.

10. Specification Section number and title and related paragraphs, as appropriate.

11. Drawing number and detail references, as appropriate.

12. Field dimensions and conditions, as appropriate.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

PROJECT MANAGEMENT AND

COORDINATION

013100 - Page 3 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

13. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

14. Contractor's signature.

15. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Architect.

1. Attachments shall be electronic files in PDF format.

D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow seven seven days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m.

will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for interpretation of Architect's actions on submittals.

f. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt by Architect of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal.

a. If Contractor believes the RFI response warrants change in the Contract Time or the

Contract Sum, notify Architect in writing within 5 days of receipt of the RFI response.

E. On receipt of Architect's action, immediately distribute the RFI response to affected parties. Review response and notify Architect within seven days if Contractor disagrees with response.

1.7 PROJECT MEETINGS

A. General: Architect will schedule and conduct meetings and conferences at Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify subcontractors of scheduled meeting dates and times a minimum of seven days prior to meeting.

B. Progress Meetings: Architect will schedule and conduct progress meetings at regular intervals.

1. Coordinate dates of meetings with preparation of payment requests.

2. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

PROJECT MANAGEMENT AND

COORDINATION

013100 - Page 4 of 4 07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408) meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so.

Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site use.

8) Temporary facilities and controls.

9) Quality and work standards.

10) Status of correction of deficient items.

11) Field observations.

12) Status of RFIs.

13) Status of Bulletins.

14) Pending changes.

15) Status of Change Orders.

16) Pending claims and disputes.

17) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule prior to each progress meeting.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013100

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 1 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

B. Related Requirements:

1. Section 017700 "Closeout Procedures" for submitting closeout submittals and maintenance material submittals.

2. Section 017823 "Operation and Maintenance Data" for submitting operation and maintenance manuals.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements.

Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.4 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Project name.

2. Date.

3. Name of Architect.

4. Name of Contractor.

5. Name of firm or entity that prepared submittal.

6. Names of subcontractor, manufacturer, and supplier.

7. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier and alphanumeric suffix for resubmittals.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 2 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

8. Category and type of submittal.

9. Submittal purpose and description.

10. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.

11. Drawing number and detail references, as appropriate.

12. Indication of full or partial submittal.

13. Location(s) where product is to be installed, as appropriate.

14. Other necessary identification.

15. Remarks.

16. Signature of transmitter.

B. Options: Identify options requiring selection by Architect.

1. Highlight options proposed to meet project requirements.

C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by Architect on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

D. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number.

E. Submittals Utilizing Web-Based Project Software: Prepare submittals as PDF files or other format indicated by Project management software.

1.5 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Email: Prepare submittals as PDF package and transmit to Architect by sending via email or web-based project software as directed by the Architect. Include PDF transmittal form.

Include information in email subject line as requested by Architect.

a. Architect will return annotated file. Annotate and retain one copy of file as a digital

Project Record Document file.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of submittals for related parts of the Work specified in different Sections, so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 3 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 7 days for review of each resubmittal.

D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block, and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from Architect's action stamp.

E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.

1.6 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams that show factory-installed wiring.

b. Printed performance curves.

c. Operational range diagrams.

d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings.

5. Submit Product Data before Shop Drawings, and before or concurrently with Samples.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 4 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data unless submittal based on Architect's digital data drawing files is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

C. Samples: Submit Samples for review of type, color, pattern, and texture for a check of these characteristics with other materials.

1. Transmit Samples that contain multiple, related components, such as accessories together in one submittal package.

2. Identification: Permanently attach label on unexposed side of Samples that includes the following:

a. Project name and submittal number.

b. Generic description of Sample.

c. Product name and name of manufacturer.

d. Sample source.

e. Number and title of applicable Specification Section.

f. Specification paragraph number and generic name of each item.

3. Email Transmittal: Provide PDF transmittal. Include digital image file illustrating Sample characteristics and identification information for record.

4. Web-Based Project Management Software: Prepare submittals in PDF form, and upload to web-based Project software website. Enter required data in web-based software site to fully identify submittal.

5. Paper Transmittal: Include paper transmittal, including complete submittal information indicated.

6. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual

Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

7. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units, showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected.

D. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form:

1. Type of product. Include unique identifier for each product indicated in the Contract Documents or assigned by Contractor if none is indicated.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 5 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

2. Manufacturer and product name, and model number if applicable.

3. Number and name of room or space.

4. Location within room or space.

E. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

F. Design Data: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Number each page of submittal.

G. Certificates:

1. Certificates and Certifications Submittals: Submit a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. Provide a notarized signature where indicated.

2. Material Certificates: Submit written statements on manufacturer's letterhead, certifying that material complies with requirements in the Contract Documents.

3. Product Certificates: Submit written statements on manufacturer's letterhead, certifying that product complies with requirements in the Contract Documents.

H. Test and Research Reports:

1. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for substrate preparation and primers required.

2. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

3. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

4. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

5. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

6. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

Include the following information:

a. Name of evaluation organization.

b. Date of evaluation.

c. Time period when report is in effect.

d. Product and manufacturers' names.

e. Description of product.

f. Test procedures and results.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 6 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

g. Limitations of use.

1.7 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are insufficient to perform services or certification required, submit a written request for additional information to Architect.

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally signed PDF file, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.

1.8 CONTRACTOR'S REVIEW

A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform approval stamp. Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

1. Architect will not review submittals received from Contractor that do not have Contractor's review and approval.

1.9 ARCHITECT'S REVIEW

A. Action Submittals: Architect will review each submittal, indicate corrections or revisions required, and return.

1. PDF Submittals: Architect will indicate, via markup on each submittal, the appropriate action.

B. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Architect.

West Campground Toilet Shower Building DTMB File #751/22438.ABG OHM Project # 7136-22-0121

SUBMITTAL PROCEDURES

013300 - Page 7 of 7

07/07/2023

Copyright © 2023 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Muskallonge Lake State Park West Campground Toilet Shower Building ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(22408)

D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

E. Architect will discard submittals received from sources other than Contractor.

F. Submittals not required by the Contract Documents will be returned by Architect without action.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013300

SUBMITTAL ITEM CONTRACTOR DATE FIRM DUE DATE

SUBCONTRACTOR SENT DATE REC'D

031000 CONCRETE FORMING AND ACCESSORIES

Product Data

032000 CONCRETE REINFORCING

Product Data

Shop Drawings

033000 CAST-IN-PLACE CONCRETE

Product Data

Design Mixtures

Qualification Data

Material Certificates

Contractor to provide test breaks of all mix types prior to pouring

Material Test Reports

033543 POLISHED CONCRETE FINISHING

Product Data

Sustainable Design Submittals

Polishing Schedule

Samples for Initial Selection

Samples for Verification

Qualification Data

Material Certificates

042000 UNIT MASONRY

Product Data

Samples for Initial Selection

Samples for Verification

Material Certificates

Statement of Compressive Strength of Masonry

061000 ROUGH CARPENTRY

Product Data

Material Certificates

Evaluation Reports

061600 SHEATHING

Product Data

062013 EXTERIOR FINISH CARPENTRY

Product Data

Samples

062023 INTERIOR FINISH CARPENTRY

Product Data

Samples

072100 THERMAL INSULATION

Product Data

072119 FOAMED-IN-PLACE INSULATION

Product Data

072500 WEATHER BARRIERS

Product data

074113.16 STANDING-SEAM METAL ROOF PANELS

Product Data

Shop Drawings

Samples

Warranties

Maintenance data

076200 SHEET METAL FLASHING AND TRIM

Product Data

Shop Drawings

D A

T E

R E

T U

R N

E D

C O

N T

R A

C T

O R

O W

N E

R

F

IE

L D

F

IL

E

N O

T A

P P

'D

SUBMITTAL LOG

PROJECT: Muskallonge Lake State Park West Campground Toilet Shower Building

OWNER: MI DTMB/DNR

PROJECT NO: 7136-22-0120

CONTRACTOR:

OTHER REVIEWER ACTION COPIES TO

D A

T E

R E

C 'D

S P

E C

IF

A

T

IO

N S

E C

T

IO

N N

O

N O

R

E C

E

IV

E D

N O

C

O P

IE

S

A P

P R

O V

E D

A P

P R

O V

E D

A S

N O

T E

D

R E

V

IS

E

R E

S U

B M

IT

Samples

Sample warranty

Maintenance data

Special warranty

079200 JOINT SEALANTS

Product Data

Samples for Initial Selection

Samples for Verification

Test and Evaluation Reports

Field Quality-Control Submittals

Sample warranties

Warranty Documentation

084213 ALUMINUM-FRAMED ENTRANCES

Product data

Shop Drawings

Sample warranties

Operation and maintenance data

085113 ALUMINUM WINDOWS

Product Data

Shop Drawings

Sample warranties

087100 DOOR HARDWARE

Product Data

Samples

Door hardware schedule

Keying schedule

Schedules shall be kept current with all changes to the project If changes occur, project hardware schedules shall be maintained to reflect the changes as they are approved Omitted items shall be deleted from openings, added and replaced items shall be included Installation submittals shall be kept current as changes occur Upon request, a complete updated hardware schedule shall be provided to the contractor Supplemental submittals that include only the changed openings will not be acceptable

Prior to final payment, provide a record copy of hardware schedules, including all revisions and updates All openings shall be listed to reflect final installed configuration only

Sample warranty

Maintenance data

099123 INTERIOR PAINTING

Product Data

099300 STAINING AND TRANSPARENT FINISHING

Product Data

10142316 ROOM-IDENTIFICATION PANEL SIGNAGE

Product Data

Shop Drawings

Samples

Sample warranty

Maintenance data

102113.19 PLASTIC TOILET COMPARTMENTS

Product data

Shop Drawings

Samples

Operation and maintenance data

10211619 PLASTIC SHOWER AND DRESSING COMPARTMENTS

Product data

Shop Drawings

Samples

Operation and maintenance data

102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

Product data

Sample warranties

Maintenance data

123661.16 SOLID SURFACING COUNTERTOPS

Product Data

Shop Drawings

Samples

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

Product Data

22052312 BALL VALVES FOR PLUMBING PIPING

Product Data

220529

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

Shop Drawings

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

Product Data

220719 PLUMBING PIPING INSULATION

Shop Drawings

221116 DOMESTIC WATER PIPING

Product Data

System purging and disinfecting activities report

221119 DOMESTIC WATER PIPING SPECIALTIES

Shop Drawings

221316 SANITARY WASTE AND VENT PIPING

Product Data

Shop Drawings

221319 SANITARY WASTE PIPING SPECIALTIES

Shop Drawings

223400 FUEL-FIRED, DOMESTIC-WATER HEATERS

Product Data

224213.13 COMMERCIAL WATER CLOSETS

Product Data

224213.16 COMMERCIAL URINALS

Shop Drawings

224216.13 COMMERCIAL LAVATORIES

Product Data

224216.16 COMMERCIAL SINKS

Product Data

224223 COMMERCIAL SHOWERS

Product Data

224713 DRINKING FOUNTAINS

Product Data

Maintenance Data

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

Qualification Data

Examination Report

Certified TAB reports

230713 DUCT INSULATION

Product Data

231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING

Product Data

233113 METAL DUCTS

Product Data

233300 AIR DUCT ACCESSORIES

Product Data

233713.23 REGISTERS AND GRILLES

Product Data

235416.13 GAS-FIRED FURNACES

Product Data

23722319 INDOOR FIXED PLATE ENERGY RECOVERY UNITS

Product Data

Shop Drawings

260…