About this file

This document is Addendum 2 to the construction bid documents for the Muskallonge Lake State Park West Campground Toilet Shower Building project, issued by the Michigan Department of Technology, Management and Budget (DTMB). The addendum updates the Davis-Bacon wage rates and adds an acceptable roofing product to the specifications. The project involves the construction of a new toilet and shower building at Muskallonge Lake State Park. The bid date remains Wednesday, August 2, 2023.

The wage rates in the addendum reflect the current Davis-Bacon requirements, including the applicable Executive Order minimum wage rates. The project is located in Luce County, Michigan. No other significant changes to the bid documents are included in this addendum.

View the file

Other files

File Type Posted
22438 Specs 2.pdf PDF
22438 Addendum 1 Part 1.pdf PDF
22438 Drawings 4.pdf PDF
22438 Advertisement.pdf PDF
22438 Specs 1.pdf PDF
22438 Addendum 4.pdf PDF
22438 Addendum 1 Part 2.pdf PDF
22438 Drawings 3.pdf PDF
22438 Drawings 1.pdf PDF
22438 Specs 3.pdf PDF
22438 Drawings 5.pdf PDF
22438 Addendum 3.pdf PDF
22438 Drawings 2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 2

ADDENDUM NO. 2

DATE: 7/27/2023

PROJECT: Muskallonge Lake State Park West Campground Toilet Shower Building

OWNER: MI DTMB

BID DATE: Wednesday, August 2, 2023**This Addendum Does Not Change the Bid Date**

The following shall be incorporated into the Contract Documents dated 2023 JUL 7.

GENERAL

Updated Davis Bacon Wage Rates are attached and shall replace the Wage Rates included in Appendix

III.

PROJECT MANUAL

APPENDIX III – FEDERAL PROVISIONS ADDENDUM AND WAGE RATE SCHEDULES

Replace Davis Bacon Wage Rate Schedule with attached Davis Bacon Wage Rate Schedule.

SECTION 074113.16 – STANDING-SEAM METAL ROOF PANELS

2.2.B.1.a Add Inter-Lock IL20 by Dimensional Metals, Inc. as an acceptable product

DRAWINGS

G-000 – COVER & DRAWING INDEX - Attached Re-issued indicating Addendum 2 sheets issued.

S-101 – FOUNDATION PLAN - Attached Corrected detail callout on Foundation Plan.

End of Addendum No. 2

"General Decision Number: MI20230132 07/21/2023

Superseded General Decision Number: MI20220132

State: Michigan

Construction Type: Building

County: Luce County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 04/07/2023 2 05/26/2023 3 06/02/2023 4 07/21/2023

ASBE0047-005 07/01/2022

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 34.62 18.58

BOIL0169-002 01/01/2021

Rates Fringes

BOILERMAKER......................$ 35.95 34.52

BRMI0006-001 05/01/2022

Rates Fringes

BRICKLAYER.......................$ 29.66 22.83

TILE SETTER......................$ 29.66 22.83

CARP1510-005 06/01/2020

Rates Fringes

MILLWRIGHT.......................$ 30.00 21.48

CARP1510-006 06/01/2020

Rates Fringes

CARPENTER (Including Acoustical Ceiling

Installation, Drywall Finishing/Taping, Drywall Hanging, Form Work, and Soft Floor Layer - Carpet)............$ 25.15 20.90

ENGI0324-031 05/01/2023

Rates Fringes

POWER EQUIPMENT OPERATOR:

Crane operator, main boom & jib 120' or longer........$ 39.01 25.00 Crane operator, main boom & jib 140' or longer........$ 39.83 25.00 Crane operator, main boom & jib 220' or longer........$ 40.12 25.00

GROUP 1.....................$ 35.71 25.00

GROUP 2.....................$ 32.46 25.00

GROUP 3.....................$ 31.28 12.50

Premium rate: main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft.

boom and jib rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: backhoe, bulldozer; crane, front end loader, excavator, paver, roller, and scraper (self-propelled and tractor drawn) GROUP 2: fork truck GROUP 3: oiler

IRON0008-008 06/01/2022

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL

Contracts $10,000,000 or greater.....................$ 32.83 27.95 Contracts less than $10,000,000.................$ 32.83 27.95

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

LABO1329-005 05/01/2023

Rates Fringes

LABORER

Common or General; Mason Tender - Brick; Mason Tender - Cement/Concrete;

and Sandblaster.............$ 31.99 12.95 Pipelayer...................$ 30.09 12.95

PAIN1011-001 06/02/2019

Rates Fringes

PAINTER (Insulator Foam Only)....$ 27.54 13.33

PAIN1011-004 06/02/2022

Rates Fringes

PAINTER (Brush and Spray Only)...$ 24.66 14.99

PLAS0016-037 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.17 10.13

PLUM0111-002 05/27/2022

Rates Fringes

PIPEFITTER (Excludes HVAC Pipe & System Installation)......$ 39.54 26.83 PIPEFITTER (HVAC Pipe Installation Only)...............$ 36.39 26.25 PLUMBER (Excluding HVAC Pipe & System Installation)...........$ 34.48 25.18

ROOF0149-014 05/01/2021

Rates Fringes

ROOFER...........................$ 26.50 15.95

* SHEE0007-006 07/01/2023

Rates Fringes

SHEET METAL WORKER (Excluding

HVAC Duct & System Installation)....................$ 32.74 29.85 SHEET METAL WORKER (HVAC Duct & System Installation)...........$ 27.24 29.85

* SUMI2011-057 02/14/2011

Rates Fringes

GLAZIER..........................$ 17.50 2.27

LABORER: Landscape & Irrigation.......................$ 14.95 ** 0.00

OPERATOR: Grader/Blade..........$ 24.04 6.03

OPERATOR: Tractor...............$ 19.60 7.31

PAINTER: Roller.................$ 16.58 2.84

TRUCK DRIVER: Flatbed Truck.....$ 17.44 4.51

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

PROJECT LOCATION MAP

PROJECT LOCATION

MUSKALLONGE LAKE STATE PARK

29881 County Road 407 Newberry, MI 49868

WEST CAMPGROUND TOILET SHOWER BUILDING

ISSUED: 2023/07/07

CONSTRUCTION DOCUMENTS

OHM PROJECT No. 7136-22-0120

DTMB File No. 751.22438.ABG

DRAWING INDEX

N U

M B

E R

SHEET NAME 2

/0

/0

B

ID

S

/0

/2

A

D D

E N

D U

M

/0

/2

A

D D

E N

D U

M

GENERAL

G-000 COVER & DRAWING INDEX • • •

CIVIL

C-001 NOTES •

C-002 SITE ACCESS AND LAYDOWN •

C-010 LEGEND •

C-090 SOIL BORINGS •

C-120 REMOVAL PLAN • •

C-130 SITE PLAN • •

C-170 GRADING PLAN •

C-510 DETAILS • •

STRUCTURAL

S-001 ABBREVIATIONS, SPECIAL INSPECTION REQUIREMENTS AND SYMBOLS •

S-002 STRUCTURAL NOTES • •

S-101 FOUNDATION PLAN • •

S-102 CONCRETE SLAB PLAN •

S-111 ROOF FRAMING PLAN •

S-501 STRUCTURAL DETAILS •

S-502 STRUCTURAL DETAILS •

S-503 STRUCTURAL DETAILS •

ARCHITECTURAL

A-001 ARCHITECTURAL NOTES & SYMBOLS •

A-002 MOUNTING LOCATIONS AND TYPICAL RESTROOM DETAILS • •

A-101 FIRST FLOOR PLAN •

A-111 ROOF PLAN •

A-201 EXTERIOR ELEVATIONS •

A-301 BUILDING SECTIONS •

A-311 WALL SECTIONS •

A-411 ENLARGED PLANS •

A-451 INTERIOR ELEVATIONS • •

A-452 INTERIOR ELEVATIONS •

A-501 TYPICAL DETAILS •

A-601 SCHEDULES AND DETAILS •

PLUMBING

P-001 PLUMBING NOTES AND SYMBOLS • •

P-101 PLUMBING PLAN • •

P-901 PLUMBING ISOMETRICS • •

MECHANICAL

M-001 MECHANICAL NOTES AND SYMBOLS •

M-101 FIRST FLOOR MECHANICAL PLAN •

M-601 MECHANICAL SCHEDULES •

ELECTRICAL

E-001 ELECTRICAL NOTES AND SYMBOLS •

EP101 FIRST FLOOR POWER PLAN •

EL101 FIRST FLOOR LIGHTING PLAN • •

E-501 ELECTRICAL DETAILS •

E-601 ELECTRICAL SCHEDULES • •

Muskallonge Lake State Park 29881 Co Rd 407 Newberry, MI 49868 906-658-3338

OWNER

OHM Advisors Zane Hyrkas, P.E.

424 Hancock Street Hancock, MI 906-482-0535 zane.hyrkas@ohm-advisors.com

PROJECT MANAGER

PERMIT SUBMISSIONS

APPLICATION

DATE PERMITS

APPROVAL

DATE

[YYYY/MM/DD] BUILDING [YYYY/MM/DD]

[YYYY/MM/DD] MECHANICAL [YYYY/MM/DD]

[YYYY/MM/DD] PLUMBING [YYYY/MM/DD]

[YYYY/MM/DD] ELECTRICAL [YYYY/MM/DD]

[YYYY/MM/DD] DTMB SESC SOIL EROSION [YYYY/MM/DD]

[YYYY/MM/DD] EGLE HAZARDOUS MATERIAL ABATEMENT NOTIFICATION [YYYY/MM/DD]

[YYYY/MM/DD] EGLE CAMPGROUND GROUP PERMIT [YYYY/MM/DD]

I Certify That The Civil Plans Were Prepared Under My Direct Supervision

I Certify That The Structural Plans Were Prepared Under My Direct Supervision

I Certify That The Architectural Plans Were Prepared Under My Direct Supervision

I Certify That The Plumbing & Mechanical Plans Were Prepared Under My Direct Supervision

I Certify That The Electrical Plans Were Prepared Under My Direct Supervision

S T

A T

E O

F M

IC

H

IG

A

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

LO

G

Y , M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

C O

P Y

R

IG

H T

O

H M

A

LL

D R

A W

IN

G

S A

N D

W R

IT

T

E N

M A

T E

R

IA

LS

A

P P

E A

R

IN

G H

E R

E

IN

C O

N S

T

IT

U T

E T

H E

O R

IG

IN

A L

A N

D U

N P

U B

LI

S

H E

D W

O R

K O

F O

H M

A N

D T

H E

S A

M E

M A

Y N

O T

B E

D U

P

LI

C A

T E

D , D

IS

T

R

IB

U T

E D

, O R

D

IS

C

LO

S E

D W

IT

H

O U

T P

R

IO

R W

R

IT

T E

N C

O N

S E

N T

O F

O H

M

IS

S

U E

D F

O R

P

R O

JE

C

T N

U M

B E

R P

M D

IS

C

IP

LI

N E

L E

A D

A D

A M

P . L

A C

H , R

A , D

IR

E

C T

O R

7/

/2

:0 3:

A

M B

IM

-2 2-

M us ka llo ng e

S ta te P ar k/

_A

_M S

P _A

2W es tC G

B ld g_

_C

E N

.r vt

G-000

C O

V E

R

D R

A W

IN

G

IN

D

E X

C ou nt y R oa d

N ew be rr y, M

I 4

M U

S K

A

LL

O N

G E

L A

K E

S T

A T

E P

A R

K

W E

S T

C A

M P

G R

O U

N D

T O

IL

E

T S

H O

W E

R B

U

IL

D

IN

G

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

-2 2-

Z H

/0 7/

1.

8.

A

B G

D T

M B

F ile

N o.

STATE OF MICHIGAN

DESIGN AND CONSTRUCTION DIVISION

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

PARKS AND RECREATION DIVISION

MUSKALLONGE LAKE STATE PARK

JAMES DZELAK, UNIT SUPERVISOR

STATE OF MICHIGAN

DEPARTMENT OF NATURAL RESOURCES

ADAM P. LACH, RA, DIRECTOR

A

D D

E N

D U

M

/0 7/

2 1

A

D D

E N

D U

M

/0 7/

2 7

1'-4" x 1'-4" TYP

25'-4"

'-4

12'-8" 12'-8" 7'-2 1/2"

25'-4"

9' -6

9'

-4

'-6

'-4

9' -6

5'

-0

6' -4

'-6

'-4

8'-6" 8'-4" 8'-6"

10'-2" 5'-0" 10'-2"

7'-10" 4'-10" 4'-10" 7'-10"

8'-6"

'-6

1'-8"1'-8"

'-6

S-501

TYP

S-501

TYP

F3

P1

TOF 96'-8" TYP

A

B

B

C

E

D

F F

G

WF2

WC1

P1 P1

F3 F3

P1

F3

P1

F3

P1

F3

F3F3F3

P1P1 P1

1'-0 1/2" 11'-7 1/2" 11'-7 1/2" 1'-0 1/2"

7' -2

/2

'-0

/2

'-7

/2

'-7

/2

1' -0

/2

7'

-2

/2

1'-0 1/2" 11'-7 1/2" 11'-7 1/2" 1'-0 1/2"

WF1

OR WM1

WC2 OR WM2

MARK

MASONRY PIER SCHEDULE

REINFORCING

P1

PIER SIZE NOTES

1'-4"x1'-4" (4) #8s VERT. w/ #3 TIES @ 12" OC

MARK

FOOTING SCHEDULE

REINFORCING

WF1

PIER SIZE NOTES

2'-8" W x 1'-0" D (4) #4 CONT. LONG.

WF2 2'-0" W x 1'-0" D (3) #4 CONT. LONG.

F3 3'-0"x3'-0"x12" (4) #5 EW TOP AND BOTTOM

SCHEDULE NOTES:

1. PROVIDE STANDARD HOOKS AT BOTTOM OF ALL VERTICAL BARS/DOWELS.

2. REFER TO SECTIONS/DETAILS FOR BAR PLACEMENT

TYP AT EXTERIOR WALLS

TYP AT INTERIOR WALLS

MARK

FOUNDATION WALL SCHEDULE

REINFORCING

WM1

SIZE NOTES

1'-8" #5 @ 48" O.C. VERT AND (4) 0.148" Ø @ 16" OC HORIZ.

WM2 1'-0" #5 @ 48" O.C. VERT AND (2) 0.148" Ø @ 16" OC HORIZ.

WC1 1'-8" #5 @ 12" O.C. EW EF

WC2 1'-0" #4 @ 12" O.C. EW EF

TYP EXTERIOR FDN WALLS

TYP INTERIOR FDN WALLS

ALT. EXTERIOR FDN WALLS

ALT. INTERIOR FDN WALLS

S T

A T

E O

F M

IC

H

IG

A

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

LO

G

Y , M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

N

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

C O

P Y

R

IG

H T

O

H M

A

LL

D R

A W

IN

G

S A

N D

W R

IT

T

E N

M A

T E

R

IA

LS

A

P P

E A

R

IN

G H

E R

E

IN

C O

N S

T

IT

U T

E T

H E

O R

IG

IN

A L

A N

D U

N P

U B

LI

S

H E

D W

O R

K O

F O

H M

A N

D T

H E

S A

M E

M A

Y N

O T

B E

D U

P

LI

C A

T E

D , D

IS

T

R

IB

U T

E D

, O R

D

IS

C

LO

S E

D W

IT

H

O U

T P

R

IO

R W

R

IT

T E

N C

O N

S E

N T

O F

O H

M

IS

S

U E

D F

O R

P

R O

JE

C

T N

U M

B E

R P

M D

IS

C

IP

LI

N E

L E

A D

A D

A M

P . L

A C

H , R

A , D

IR

E

C T

O R

7/

/2

9:

:3

A

M B

IM

-2 2-

M us ka llo ng e

S ta te P ar k/

_S

_M S

P _A

2W es tC G

B ld g_

_C

E N

.rv t

S-101

F O

U N

D A

T

IO

N P

LA

N

C ou nt y R oa d

N ew be rr y, M

I 4

M U

S K

A

LL

O N

G E

L A

K E

S T

A T

E P

A R

K

W E

S T

C A

M P

G R

O U

N D

T O

IL

E

T S

H O

W E

R B

U

IL

D

IN

G

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

-2 2-

Z H

/0 7/

1.

8.

A

B G

D T

M B

F ile

N o.

JE

R

1/4" = 1'-0"1

FOUNDATION PLAN

A

D D

E N

D U

M

/0 7/

2 7

File details come from the government source that posted it. Updated .