22438 Specs 1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 230000000616
- Issued by
- Luce County, Michigan
About this file
This document is a Project Advertisement for the Muskallonge Lake State Park West Campground Toilet Shower Building project in Newberry, Michigan. The project consists of the demolition of the existing toilet shower building and construction of a new toilet shower building including site, architectural, structural, mechanical, plumbing, electrical, and other associated work. Bids are due on August 2, 2023 at 2:00 p.m. ET and must be submitted electronically through the SIGMA VSS website. A mandatory pre-bid conference will be held on July 19, 2023 at 1:00 p.m. ET at the project site. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB). Bid security in the amount of 5% of the base bid is required. The contract times and associated liquidated damages are specified in the Agreement.
The Bid Prices must include Michigan sales and use taxes, and the cost of all permits, approvals, licenses, and fees necessary for the work. Payment for the work will be made based on the Schedule of Values and the Contractor's Requests for Payment. The Owner reserves the right to reject any or all Bids and to waive any irregularities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22438 Specs 2.pdf | ||
| 22438 Addendum 1 Part 1.pdf | ||
| 22438 Drawings 4.pdf | ||
| 22438 Advertisement.pdf | ||
| 22438 Addendum 4.pdf | ||
| 22438 Addendum 1 Part 2.pdf | ||
| 22438 Drawings 3.pdf | ||
| 22438 Drawings 1.pdf | ||
| 22438 Addendum 2.pdf | ||
| 22438 Specs 3.pdf | ||
| 22438 Drawings 5.pdf | ||
| 22438 Addendum 3.pdf | ||
| 22438 Drawings 2.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
MUSKALLONGE LAKE
STATE PARK
WEST CAMPGROUND
TOILET SHOWER BUILDING
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT AND BUDGET
DTMB FILE NO. 751/22438.ABG
PROJECT NO. 7136-22-0120
Date: July 7, 2023
DTMB-0415 (R 10/22)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
DTMB FILE NO. 751/22438.ABG
DATE
Friday, July 7, 2023
ADVERTISEMENT DATE
Friday, July 7, 2023
BID DUE DATE
August 2, 2023 @ 2:00 p.m. EASTERN time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Muskallonge Lake State Park West Campground Toilet and Shower Building 29881 Co Rd 407 Newberry, MI 49868
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
Wednesday, July 19, 2023, 1:00 p.m.
Muskallonge Lake State Park West Campground Toilet and Shower Building 29881 Co Rd 407 Newberry, MI 49868
Mandatory Yes No
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK: The project consists of demolition of the existing toilet shower building and construction of a new toilet shower building including site, architectural, structural, mechanical, plumbing, electrical, and other associated work as indicated in the Contract Documents.
Please NOTE:
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
• Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)
•• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% Bid Security:
Required
Not Required
NIGP CODES: 90922, 90924, 90976, 91038, 91047, 91200, 91240, 91244, 91336, 91345, 91356, 91360, 91394, 91427, 91430, 91438, 91447, 91450, 91455, 91468, 91473, 98852
ACCEPTING QUESTIONS UNTIL: Wednesday, July 26, 2023
Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Louis Meyette at louis.meyette@ohm-advisors.com no later than 2:00 p.m., Eastern on July 26, 2023.
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce
PSC/Agency: OHM Advisors
Address: 424 Hancock, Street, Hancock, MI 49930
Phone: 906-482-0535
Email: courtney.babcock@ohm-advisors.com
Approved by:
mailto:louis.meyette@ohm-advisors.com https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:courtney.babcock@ohm-advisors.com
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition.
Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with
Bidding Requirements
File No. 751.22438.ABG
DTMB/MDNR
Muskallonge Lake State Park West Campground Toilet Shower Building
Newberry Michigan
July 7, 2023
1997 Edition/R 03/22 Version
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 1 (R 03/22)
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY .........................................................................................................................................................00020 - 1 SECTION 00030 ADVERTISEMENT ..............................................................................................................................................00030 - 1 SECTION 00100 INSTRUCTIONS TO BIDDERS ...........................................................................................................................00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS ..............................................................................................................00100 - 1 ARTICLE 2 QUALIFICATIONS OF BIDDERS.................................................................................................................................00100 - 1 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS...................................................00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA ................................................................................................................................00100 - 3 ARTICLE 5 BID SECURITY.............................................................................................................................................................00100 - 3 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES..............................................................................................................00100 - 4 ARTICLE 7 MATERIALS AND EQUIPMENT ..................................................................................................................................00100 - 4 ARTICLE 8 SUBCONTRACTORS...................................................................................................................................................00100 - 5 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS .............................................................................................................00100 - 5 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS .............................................................................................................00100 - 6 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ....................................................................................................................00100 - 6 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ............................................................................................................00100 - 7 ARTICLE 13 BIDS TO REMAIN OPEN ..............................................................................................................................................00100 - 7 ARTICLE 14 AWARD OF THE CONTRACT ......................................................................................................................................00100 - 7 ARTICLE 15 EXECUTION OF THE AGREEMENT............................................................................................................................00100 - 9 ARTICLE 16 MOBILIZATION PAY ITEM.......................................................................................................................................... 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .............................................00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST ...................................................................................................00110 - 1 SECTION 00120 SUPPLEMENTARY INSTRUCTIONS .................................................................................................................00120 - 1 SECTION 00210 INFORMATION FOR BIDDERS ..........................................................................................................................00210 - 1 SECTION 00300 BID SUMMARY ...................................................................................................................................00300 - SUMMARY SECTION 00300 BID FORM ...........................................................................................................................................................00300 - 1 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER")..............................................................00300 - 1 ARTICLE 2 THE BIDDER'S REPRESENTATIONS............................................................................................................................00300 - 1 ARTICLE 3 TIME OF COMPLETION .................................................................................................................................................00300 - 2 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID ................................................................................................................00300 - 2 ARTICLE 5 DEFINED TERMS ...........................................................................................................................................................00300 - 2 ARTICLE 6 BID SCHEDULE ..............................................................................................................................................................00300 - 3 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ..................................................................................................................00300 - 5 ARTICLE 8 BID SUBMITTED ON...................................................................................................................................................... 00300 - 6 SECTION 00310 BID BOND ...........................................................................................................................................................00310 - 1 SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................................00320 - 1 SECTION 00410 BID BREAKDOWN..............................................................................................................................................00410 - 1 SECTION 00420 QUESTIONNAIRE ...............................................................................................................................................00420 - 1 ARTICLE 1 ORGANIZATION ...........................................................................................................................................................00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES......................................................................................................................00420 - 1 ARTICLE 3 EXPERIENCE................................................................................................................................................................00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ..................................................................................................................................00420 - 2 ARTICLE 5 REFERENCES ..............................................................................................................................................................00420 - 2 REFERENCES ATTACHMENT.....................................................................................................................................00420 - 3 SECTION 00430 LIST OF SUBCONTRACTORS...........................................................................................................................00430 - 1 SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT ..............................................................................................00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED (NAMED OR SPECIFIED) ITEMS ......................................................00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN SPECIFICATIONS ...............................................................................00440 - 3 SECTION 00500 AGREEMENT ......................................................................................................................................................00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK ..........................................................................................................00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS...........................................................................................................................................00500 - 1 ARTICLE 3 CONTRACT PRICE.......................................................................................................................................................00500 - 2 ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES...............................................................................................................00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ..................................................................................................................................00500 - 3
MICHSPEC DTMB 00010 2 (R 03/22)
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR .....................................................................................................00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS......................................................................................................................00500 - 3 ARTICLE 8 MISCELLANEOUS ........................................................................................................................................................00500 - 3 ARTICLE 9 NOTICE AND SERVICE................................................................................................................................................00500 - 4 SECTION 00520 ATTACHMENT “A” TO AGREEMENT ...............................................................................................................00520 - 1 SECTION 00610 PERFORMANCE BOND ....................................................................................................................................00610 - 1 SECTION 00620 PAYMENT BOND ...............................................................................................................................................00620 - 1 SECTION 00700 GENERAL CONDITIONS ....................................................................................................................................00700 - 1 ARTICLE 1 INTERPRETATIONS .......................................................................................................................................................00700 - 1
1.1 Section 00020 Glossary: ...........................................................................................................................................................00700 - 1
1.2 Intent of the Contract Documents: ............................................................................................................................................00700 - 1
1.3 Priority of the Contract Documents: ..........................................................................................................................................00700 - 2
1.4 Interpretation of Indemnification Provisions: .............................................................................................................................00700 - 2
1.5 Additional Interpretations: .........................................................................................................................................................00700 - 2
1.6 Ownership and Use of the Contract Documents:.....................................................................................................................00700 - 3.
1.7 Copies of the Contract Documents: ...........................................................................................................................................00700 - 3
ARTICLE 2 THE OWNERGENERAL PROVISIONS ......................................................................................................................00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities: .............................................................................................................00700 - 3
2.2 Reference Points; Base Lines and Benchmarks:......................................................................................................................00700 - 3
2.3 Stop Work Order: .....................................................................................................................................................................00700 - 3.
2.4 Limitations on the Owner’s Responsibilities:............................................................................................................................00700 - 4
2.5 Additional General Provisions:..................................................................................................................................................00700 - 4
2.6 Partnering Charter: ..................................................................................................................................................................00700 - 4.
ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS......................................................................................................00700 - 4
3.1 Owner’s Representative:..........................................................................................................................................................00700 - 4
3.2 Clarifications and Interpretations: .............................................................................................................................................00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays: ...........................................................................................................00700 - 5
3.4 Determinations by the Professional: .......................................................................................................................................00700 - 5
3.5 Limitations on the Professional’s Responsibilities: ...................................................................................................................00700 - 5
ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS ......................................................................................................00700 - 5
4.1 Review of the Contract Documents: .........................................................................................................................................00700 - 5
4.2 Management, Supervision, and Personnel: ..............................................................................................................................00700 - 5
4.3 Materials and Equipment: .........................................................................................................................................................00700 - 6
4.4 Concerning Control of Work:....................................................................................................................................................00700 - 6.
4.5 Patent Fees and Royalties: .......................................................................................................................................................00700 - 7
4.6 Use of Premises:.......................................................................................................................................................................00700 - 7
4.7 Record Documents: ..................................................................................................................................................................00700 - 7
4.8 Emergencies: ............................................................................................................................................................................00700 - 8
4.9 Indemnification: .........................................................................................................................................................................00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS......................................................................................................................00700 - 8
5.1 Employment of Subcontractors: ................................................................................................................................................00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment: ...............................................................................................................00700 - 9
5.3 The Contractor’s Continuing Responsibilities: ........................................................................................................................00700 - 9
ARTICLE 6 SUBMITTALS ................................................................................................................................................................00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals: .........................................................................................................00700 - 9
6.2 Review and Return of Technical Submittals: .........................................................................................................................00700 - 10.
6.3 Progress Schedule Submittals: ...............................................................................................................................................00700 - 10
6.4 Review and Return of Progress Schedule Submittals: ..........................................................................................................00700 - 10.
6.5 Additional Provisions Concerning Submittals: .......................................................................................................................00700 - 10.
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ....................................................................................................................00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses): ......................................................................................................00700 - 11.
7.2 Sales and Use Tax and Other Similar Taxes:........................................................................................................................00700 - 12.
7.3 Safety and Protection:.............................................................................................................................................................00700 - 12
7.4 Bonds and Insurance - General Requirements:......................................................................................................................00700 - 12
7.5 The Contractor’s Liability Insurance:.....................................................................................................................................00700 - 12
7.6 Pollution Liability Insurance: ...................................................................................................................................................00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance):..................................................................................................................00700 - 13
7.8 Waiver of Rights:.....................................................................................................................................................................00700 - 13
7.9 Receipt and Application of Proceeds: .....................................................................................................................................00700 - 13
MICHSPEC DTMB 00010 3 (R 03/22)
7.10 Unfair Labor Practice: .............................................................................................................................................................00700 - 13
7.11 Michigan Right-To-Know Law: ...............................................................................................................................................00700 - 13.
7.12 Nondiscrimination: ..................................................................................................................................................................00700 - 14
7.13 Michigan Residency for Employees:.......................................................................................................................................00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION .......................................................................................................00700 - 15
8.1 Starting the Work: ..................................................................................................................................................................00700 - 15.
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ...............................................................................................................00700 - 15
8.3 Compliance with Contract Time Requirements:......................................................................................................................00700 - 15
8.4 Substantial Completion: ..........................................................................................................................................................00700 - 15
8.5 Partial Use: .............................................................................................................................................................................00700 - 16
8.6 Division of Responsibilities: ....................................................................................................................................................00700 - 16
8.7 Suspension of Work: ...............................................................................................................................................................00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths:..........................................................................................................................00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK...................................................................................................................00700 - 17
9.1 Warranty: ...............................................................................................................................................................................00700 - 17
9.2 Tests, Inspections and Approvals: .........................................................................................................................................00700 - 17
9.3 Uncovering Work: ..................................................................................................................................................................00700 - 17
9.4 Correction of Work: ................................................................................................................................................................00700 - 17
9.5 Special Correction Period Requirements:..............................................................................................................................00700 - 18
9.6 Special Maintenance Requirements: .....................................................................................................................................00700 - 18
ARTICLE 10 CHANGES .................................................................................................................................................................00700 - 19
10.1 Changes in the Work: ............................................................................................................................................................00700 - 19
10.2 Differing Subsurface or Physical Site Conditions:.................................................................................................................00700 - 19.
10.3 Responsibilities for Underground Utilities: .............................................................................................................................00700 - 20
10.4 Hazardous Material Conditions:.............................................................................................................................................00700 - 20
10.5 Incidents with Archaeological Features: ................................................................................................................................00700 - 20
10.6 Unit Price Work: .....................................................................................................................................................................00700 - 21
10.7 Cash Allowances; Provisionary Allowances: .........................................................................................................................00700 - 21
10.8 Change Orders; Change Authorizations: ...............................................................................................................................00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME .....................................................................................................................................................00700 - 22
11.1 General Provisions:................................................................................................................................................................00700 - 22
11.2 Changes in Contract Time: ....................................................................................................................................................00700 - 22
11.3 Methods for Making Adjustments in Contract Price: .............................................................................................................00700 - 22.
11.4 Labor, Subcontract and Material/Equipment Costs: ..............................................................................................................00700 - 23
11.5 Construction Equipment Costs: .............................................................................................................................................00700 - 23
11.6 Rented or Leased Construction Equipment: ..........................................................................................................................00700 - 23
11.7 Owned Construction Equipment: ...........................................................................................................................................00700 - 24
11.8 General Conditions Costs: .....................................................................................................................................................00700 - 24
11.9 Limitations on Allowable Costs: .............................................................................................................................................00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ..................................00700 - 24.
11.11 Limits on the Fee for the Work Involved: ...............................................................................................................................00700 - 25.
11.12 Fee for Unabsorbed Home Office Overhead: .........................................................................................................................00700 - 25
11.13 Changes in Contract Time for Early Completion:....................................................................................................................00700 - 25
11.14 Access to Records: .................................................................................................................................................................00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data: ............................................................................................................00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ...........................................................................................................00700 - 26
12.1. Schedule of Values: ...............................................................................................................................................................00700 - 26
12.2 Requests for Payment: ..........................................................................................................................................................00700 - 27
12.3 Review of Request for Payment; Intent of Review:................................................................................................................00700 - 27
12.4 Refusal to Make or to Recommend Payment: ......................................................................................................................00700 - 27.
12.5 Final Request for Payment: ...................................................................................................................................................00700 - 27
12.6 Final Payment and Acceptance: ............................................................................................................................................00700 - 28
12.7 Contractor’s Continuing Obligation: .....................................................................................................................................00700 - 28
12.8 Waiver of Claims:...................................................................................................................................................................00700 - 28
ARTICLE 13 OTHER WORK ..........................................................................................................................................................00700 - 28
13.1 Related Work at Site: .............................................................................................................................................................00700 - 28
13.2 Coordination Requirements: ..................................................................................................................................................00700 - 29
13.3 Claims Between the Contractor and Other Parties: .............................................................................................................00700 - 29
MICHSPEC DTMB 00010 4 (R 03/22)
ARTICLE 14 TERMINATION ..........................................................................................................................................................00700 - 29
14.1 Notice Requiring Assurance of Due Performance: ...............................................................................................................00700 - 29.
14.2 Contractor Default and Termination for Cause:....................................................................................................................00700 - 30
14.3 Surety Default: .......................................................................................................................................................................00700 - 31
14.4 Termination for Convenience of the Owner:..........................................................................................................................00700 - 31
14.5 The Contractor May Suspend Work: ..................................................................................................................................00700 – 31.
ARTICLE 15 DISPUTES.................................................................................................................................................................00700 - 31
15.1 Claims Under This Article: .....................................................................................................................................................00700 - 31
15.2 Requirement for Certification of Contractor Claims:.............................................................................................................00700 - 32
15.3 Recommendations or Decisions from the Professional: ......................................................................................................00700 - 32
15.4 Determinations by the Director-DCD: ...................................................................................................................................00700 - 32
15.5 Supplements to AAA Arbitration: ...........................................................................................................................................00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: ....................................................................................................................00700 - 33
15.7 Venue; Flow-Through Provision:............................................................................................................................................00700 - 33
SECTION 00800 SUPPLEMENTARY CONDITIONS ...................................................................................................................00800 - 1
SUMMARY 011000
SUBSTITUTION PROCEDURES 012500
PROJECT MANAGEMENT AND COORDINATION 013100
SUBMITTAL PROCEDURES 013300
QUALITY REQUIREMENTS 014000
TEMPORARY FACILITIES AND CONTROLS 015000
TEMPORARY TREE AND PLANT PROTECTION 015639
PRODUCT REQUIREMENTS 016000
EXECUTION 017300
CLOSEOUT PROCEDURES 017700
OPERATION AND MAINTENANCE DATA 017823
PROJECT RECORD DOCUMENTS 017839
DEMONSTRATION AND TRAINING 017900
SECTION 01310 PROGRESS SCHEDULE ..................................................................................................................................01310 - 1
APPENDIX I: SPECIAL WORKING CONDITIONS
APPENDIX II: SPECIAL PROJECT PROCEDURES
APPENDIX III: WAGE RATE SCHEDULES
APPENDIX V: PERMITS
CLOSEOUT DOCUMENTS
Contractor Closeout Checklist Project Final Completion Checklist Guarantee and Indebtedness Statement Certificate of Substantial Completion
DRAWINGS - BOUND SEPARATELY
TITLE SHEETS THRU
COVER AND DRAWING INDEX G-000
NOTES C-001
LEGEND C-002
SOIL BORINGS C-003
SITE ACCESS AND LAYDOWN C-004
REMOVALS C-101
PROPOSED C-201
GRADING PLAN C-301
MICHSPEC DTMB 00010 5 (R 03/22)
DETAILS C-501
ABBREVIATIONS, SPECIAL INSPECTION REQUIREMENTS AND SYMBOLS S-001
STRUCTURAL NOTES S-002
FOUNDATION PLAN S-101
CONCRETE SLAB PLAN S-102
ROOF FRAMING PLAN S-111
STRUCTURAL DETAILS S-501
STRUCTURAL DETAILS S-502
STRUCTURAL DETAILS S-503
ARCHITECTURAL NOTES & SYMBOLS A-001
MOUNTING LOCATIONS AND TYPICAL RESTROOM DETAILS A-002
FIRST FLOOR PLAN A-101
ROOF PLAN A-111
EXTERIOR ELEVATIONS A-201
BUILDING SECTIONS A-301
WALL SECTIONS A-311
ENLARGED PLANS A-411
INTERIOR ELEVATIONS A-451
INTERIOR ELEVATIONS A-452
TYPICAL DETAILS A-501
SCHEDULES AND DETAILS A-601
PLUMBING NOTES AND SYMBOLS P-001
PLUMBING PLAN P-101
PLUMBING ISOMETRICS P-901
MECHANICAL NOTES AND SYMBOLS M-001
FIRST FLOOR MECHANICAL PLAN M-101
MECHANICAL SCHEDULES M-601
ELECTRICAL NOTES AND SYMBOLS E-001
FIRST FLOOR POWER PLAN EP101
FIRST FLOOR LIGHTING PLAN EL101
ELECTRICAL DETAILS E-501
ELECTRICAL SCHEDULES E-601
TECHNICAL SPECIFICATIONS
STRUCTURE DEMOLITION 024116
CONCRETE FORMING AND ACCESSORIES 031000
CONCRETE REINFORCING 032000
CAST-IN-PLACE CONCRETE 033000
POLISHED CONCRETE FINISHING 033543
UNIT MASONRY 042000
ROUGH CARPENTRY 061000
SHEATHING 061600
EXTERIOR FINISH CARPENTRY 062013
INTERIOR FINISH CARPENTRY 062023
THERMAL INSULATION 072100
FOAMED-IN-PLACE INSULATION 072119
WEATHER BARRIERS 072500
STANDING-SEAM METAL ROOF PANELS 074113.16
SHEET METAL FLASHING AND TRIM 076200
JOINT SEALANTS 079200
ALUMINUM-FRAMED ENTRANCES 084213
ALUMINUM WINDOWS 085113
DOOR HARDWARE 087100
INTERIOR PAINTING 099123
STAINING AND TRANSPARENT FINISHING 099300
ROOM-IDENTIFICATION PANEL SIGNAGE 101423.16
MICHSPEC DTMB 00010 6 (R 03/22)
PLASTIC TOILET COMPARTMENTS 102113.19
PLASTIC SHOWER AND DRESSING COMPARTMENTS 102116.19
TOILET, BATH, AND LAUNDRY ACCESSORIES 102800
SOLID SURFACING COUNTERTOPS 123661.16
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517
ESCUTCHEONS FOR PLUMBING PIPING 220518
BALL VALVES FOR PLUMBING PIPING 220523.12
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553
PLUMBING PIPING INSULATION 220719
DOMESTIC WATER PIPING 221116
DOMESTIC WATER PIPING SPECIALTIES 221119
SANITARY WASTE AND VENT PIPING 221316
SANITARY WASTE PIPING SPECIALTIES 221319
FUEL-FIRED, DOMESTIC-WATER HEATERS 223400
COMMERCIAL WATER CLOSETS 224213.13
COMMERCIAL URINALS 224213.16
COMMERCIAL LAVATORIES 224216.13
COMMERCIAL SINKS 224216.16
COMMERCIAL SHOWERS 224223
DRINKING FOUNTAINS 224713
COMMON MOTER REQUIREMENTS FOR HVAC EQUIPMENT 230513
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553
TESTING, ADJUSTING, AND BALANCING FOR HVAC 230593
DUCT INSULATION 230713
FACILITY LIQUEFIED-PETROLEUM GAS PIPING 231126
METAL DUCTS 233113
AIR DUCT ACCESSORIES 233300
REGISTERS AND GRILLES 233713.23
GAS-FIRED FURNACES 235416.13
PACKAGED INDOOR FIXED PLATE ENERGY RECOVERY UNITS 237223.19
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 260533
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553
LIGHTING CONTROL DEVICES 260923
PANELBOARDS 262416
WIRING DEVICES 262726
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816
MANUAL AND MAGNETIC MOTOR CONTROLLERS 262913.03
LED INTERIOR LIGHTING 265119
EMERGENCY AND EXIT LIGHTING 265213
LED EXTERIOR LIGHTING 265619
SITE CLEARING 311000
EARTH MOVING 312000
EROSION AND SEDIMENTATION CONTROLS 312500
CONCRETE PAVING 321313
SIDEWALKS 321623
PARKING BUMPERS 321713
PAVEMENT MARKINGS 321723
TACTILE WARNING SURFACING 321726
TURF AND GRASSES 329200
PLANTS 329300
DISINFECTION OF WATER UTILITY PIPING SYSTEMS 330110.58
AIR TESTING 330505.41
MICHSPEC DTMB 00010 7 (R 03/22)
THRUST RESTRAINT FOR UTILITY PIPING 330509.33
SITE WATER SERVICE UTILITY LATERALS 331417
SANITARY SEWERAGE PIPING 331000
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents.
An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates.
Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.
The term Bid includes a Rebid.
Bidder The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board The Administrative Board of the State of Michigan.
Bonds Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently
MICHSPEC DTMB 00020 - 2 (R 03/22)
detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Co…
This is the start of the file's text. The full file is on GovTribe.