22438 Specs 1.pdf

PDF 5 MB Posted

Attached to
751/22438. ABG; Muskallonge Lake SP - Toilet and Shower Bldg.
Solicitation number
RFQ - 171 - 230000000616
Issued by
Luce County, Michigan

About this file

This document is a Project Advertisement for the Muskallonge Lake State Park West Campground Toilet Shower Building project in Newberry, Michigan. The project consists of the demolition of the existing toilet shower building and construction of a new toilet shower building including site, architectural, structural, mechanical, plumbing, electrical, and other associated work. Bids are due on August 2, 2023 at 2:00 p.m. ET and must be submitted electronically through the SIGMA VSS website. A mandatory pre-bid conference will be held on July 19, 2023 at 1:00 p.m. ET at the project site. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB). Bid security in the amount of 5% of the base bid is required. The contract times and associated liquidated damages are specified in the Agreement.

The Bid Prices must include Michigan sales and use taxes, and the cost of all permits, approvals, licenses, and fees necessary for the work. Payment for the work will be made based on the Schedule of Values and the Contractor's Requests for Payment. The Owner reserves the right to reject any or all Bids and to waive any irregularities.

View the file

Other files

File Type Posted
22438 Specs 2.pdf PDF
22438 Addendum 1 Part 1.pdf PDF
22438 Drawings 4.pdf PDF
22438 Advertisement.pdf PDF
22438 Addendum 4.pdf PDF
22438 Addendum 1 Part 2.pdf PDF
22438 Drawings 3.pdf PDF
22438 Drawings 1.pdf PDF
22438 Addendum 2.pdf PDF
22438 Specs 3.pdf PDF
22438 Drawings 5.pdf PDF
22438 Addendum 3.pdf PDF
22438 Drawings 2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

MUSKALLONGE LAKE

STATE PARK

WEST CAMPGROUND

TOILET SHOWER BUILDING

DEPARTMENT OF TECHNOLOGY,

MANAGEMENT AND BUDGET

DTMB FILE NO. 751/22438.ABG

PROJECT NO. 7136-22-0120

Date: July 7, 2023

DTMB-0415 (R 10/22)

PROJECT ADVERTISEMENT

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN & CONSTRUCTION DIVISION

This form is required for the advertisement of all construction projects. (1984 PA 431)

DTMB FILE NO. 751/22438.ABG

DATE

Friday, July 7, 2023

ADVERTISEMENT DATE

Friday, July 7, 2023

BID DUE DATE

August 2, 2023 @ 2:00 p.m. EASTERN time

PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)

Muskallonge Lake State Park West Campground Toilet and Shower Building 29881 Co Rd 407 Newberry, MI 49868

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION

Wednesday, July 19, 2023, 1:00 p.m.

Muskallonge Lake State Park West Campground Toilet and Shower Building 29881 Co Rd 407 Newberry, MI 49868

Mandatory Yes No

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

DESCRIPTION OF WORK: The project consists of demolition of the existing toilet shower building and construction of a new toilet shower building including site, architectural, structural, mechanical, plumbing, electrical, and other associated work as indicated in the Contract Documents.

Please NOTE:

• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.

• Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)

•• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.

SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.

•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Bid Responses should not be emailed to the Project Director.

5% Bid Security:

Required

Not Required

NIGP CODES: 90922, 90924, 90976, 91038, 91047, 91200, 91240, 91244, 91336, 91345, 91356, 91360, 91394, 91427, 91430, 91438, 91447, 91450, 91455, 91468, 91473, 98852

ACCEPTING QUESTIONS UNTIL: Wednesday, July 26, 2023

Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Louis Meyette at louis.meyette@ohm-advisors.com no later than 2:00 p.m., Eastern on July 26, 2023.

Documents may be obtained from:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce

PSC/Agency: OHM Advisors

Address: 424 Hancock, Street, Hancock, MI 49930

Phone: 906-482-0535

Email: courtney.babcock@ohm-advisors.com

Approved by:

mailto:louis.meyette@ohm-advisors.com https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:courtney.babcock@ohm-advisors.com

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition.

Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440

RELEASED ON NOVEMBER 1, 1997.

Developed from Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with

Bidding Requirements

File No. 751.22438.ABG

DTMB/MDNR

Muskallonge Lake State Park West Campground Toilet Shower Building

Newberry Michigan

July 7, 2023

1997 Edition/R 03/22 Version

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 1 (R 03/22)

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY .........................................................................................................................................................00020 - 1 SECTION 00030 ADVERTISEMENT ..............................................................................................................................................00030 - 1 SECTION 00100 INSTRUCTIONS TO BIDDERS ...........................................................................................................................00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS ..............................................................................................................00100 - 1 ARTICLE 2 QUALIFICATIONS OF BIDDERS.................................................................................................................................00100 - 1 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS...................................................00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA ................................................................................................................................00100 - 3 ARTICLE 5 BID SECURITY.............................................................................................................................................................00100 - 3 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES..............................................................................................................00100 - 4 ARTICLE 7 MATERIALS AND EQUIPMENT ..................................................................................................................................00100 - 4 ARTICLE 8 SUBCONTRACTORS...................................................................................................................................................00100 - 5 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS .............................................................................................................00100 - 5 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS .............................................................................................................00100 - 6 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ....................................................................................................................00100 - 6 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ............................................................................................................00100 - 7 ARTICLE 13 BIDS TO REMAIN OPEN ..............................................................................................................................................00100 - 7 ARTICLE 14 AWARD OF THE CONTRACT ......................................................................................................................................00100 - 7 ARTICLE 15 EXECUTION OF THE AGREEMENT............................................................................................................................00100 - 9 ARTICLE 16 MOBILIZATION PAY ITEM.......................................................................................................................................... 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .............................................00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST ...................................................................................................00110 - 1 SECTION 00120 SUPPLEMENTARY INSTRUCTIONS .................................................................................................................00120 - 1 SECTION 00210 INFORMATION FOR BIDDERS ..........................................................................................................................00210 - 1 SECTION 00300 BID SUMMARY ...................................................................................................................................00300 - SUMMARY SECTION 00300 BID FORM ...........................................................................................................................................................00300 - 1 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER")..............................................................00300 - 1 ARTICLE 2 THE BIDDER'S REPRESENTATIONS............................................................................................................................00300 - 1 ARTICLE 3 TIME OF COMPLETION .................................................................................................................................................00300 - 2 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID ................................................................................................................00300 - 2 ARTICLE 5 DEFINED TERMS ...........................................................................................................................................................00300 - 2 ARTICLE 6 BID SCHEDULE ..............................................................................................................................................................00300 - 3 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ..................................................................................................................00300 - 5 ARTICLE 8 BID SUBMITTED ON...................................................................................................................................................... 00300 - 6 SECTION 00310 BID BOND ...........................................................................................................................................................00310 - 1 SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................................00320 - 1 SECTION 00410 BID BREAKDOWN..............................................................................................................................................00410 - 1 SECTION 00420 QUESTIONNAIRE ...............................................................................................................................................00420 - 1 ARTICLE 1 ORGANIZATION ...........................................................................................................................................................00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES......................................................................................................................00420 - 1 ARTICLE 3 EXPERIENCE................................................................................................................................................................00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ..................................................................................................................................00420 - 2 ARTICLE 5 REFERENCES ..............................................................................................................................................................00420 - 2 REFERENCES ATTACHMENT.....................................................................................................................................00420 - 3 SECTION 00430 LIST OF SUBCONTRACTORS...........................................................................................................................00430 - 1 SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT ..............................................................................................00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED (NAMED OR SPECIFIED) ITEMS ......................................................00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN SPECIFICATIONS ...............................................................................00440 - 3 SECTION 00500 AGREEMENT ......................................................................................................................................................00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK ..........................................................................................................00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS...........................................................................................................................................00500 - 1 ARTICLE 3 CONTRACT PRICE.......................................................................................................................................................00500 - 2 ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES...............................................................................................................00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ..................................................................................................................................00500 - 3

MICHSPEC DTMB 00010 2 (R 03/22)

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR .....................................................................................................00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS......................................................................................................................00500 - 3 ARTICLE 8 MISCELLANEOUS ........................................................................................................................................................00500 - 3 ARTICLE 9 NOTICE AND SERVICE................................................................................................................................................00500 - 4 SECTION 00520 ATTACHMENT “A” TO AGREEMENT ...............................................................................................................00520 - 1 SECTION 00610 PERFORMANCE BOND ....................................................................................................................................00610 - 1 SECTION 00620 PAYMENT BOND ...............................................................................................................................................00620 - 1 SECTION 00700 GENERAL CONDITIONS ....................................................................................................................................00700 - 1 ARTICLE 1 INTERPRETATIONS .......................................................................................................................................................00700 - 1

1.1 Section 00020 Glossary: ...........................................................................................................................................................00700 - 1

1.2 Intent of the Contract Documents: ............................................................................................................................................00700 - 1

1.3 Priority of the Contract Documents: ..........................................................................................................................................00700 - 2

1.4 Interpretation of Indemnification Provisions: .............................................................................................................................00700 - 2

1.5 Additional Interpretations: .........................................................................................................................................................00700 - 2

1.6 Ownership and Use of the Contract Documents:.....................................................................................................................00700 - 3.

1.7 Copies of the Contract Documents: ...........................................................................................................................................00700 - 3

ARTICLE 2 THE OWNERGENERAL PROVISIONS ......................................................................................................................00700 - 3

2.1 Availability of Lands, Areas, Properties and Facilities: .............................................................................................................00700 - 3

2.2 Reference Points; Base Lines and Benchmarks:......................................................................................................................00700 - 3

2.3 Stop Work Order: .....................................................................................................................................................................00700 - 3.

2.4 Limitations on the Owner’s Responsibilities:............................................................................................................................00700 - 4

2.5 Additional General Provisions:..................................................................................................................................................00700 - 4

2.6 Partnering Charter: ..................................................................................................................................................................00700 - 4.

ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS......................................................................................................00700 - 4

3.1 Owner’s Representative:..........................................................................................................................................................00700 - 4

3.2 Clarifications and Interpretations: .............................................................................................................................................00700 - 4

3.3 Minor Variations and No-Cost Changes; Minor Delays: ...........................................................................................................00700 - 5

3.4 Determinations by the Professional: .......................................................................................................................................00700 - 5

3.5 Limitations on the Professional’s Responsibilities: ...................................................................................................................00700 - 5

ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS ......................................................................................................00700 - 5

4.1 Review of the Contract Documents: .........................................................................................................................................00700 - 5

4.2 Management, Supervision, and Personnel: ..............................................................................................................................00700 - 5

4.3 Materials and Equipment: .........................................................................................................................................................00700 - 6

4.4 Concerning Control of Work:....................................................................................................................................................00700 - 6.

4.5 Patent Fees and Royalties: .......................................................................................................................................................00700 - 7

4.6 Use of Premises:.......................................................................................................................................................................00700 - 7

4.7 Record Documents: ..................................................................................................................................................................00700 - 7

4.8 Emergencies: ............................................................................................................................................................................00700 - 8

4.9 Indemnification: .........................................................................................................................................................................00700 - 8

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS......................................................................................................................00700 - 8

5.1 Employment of Subcontractors: ................................................................................................................................................00700 - 8

5.2 "Or Equal" and Substitute Materials and Equipment: ...............................................................................................................00700 - 9

5.3 The Contractor’s Continuing Responsibilities: ........................................................................................................................00700 - 9

ARTICLE 6 SUBMITTALS ................................................................................................................................................................00700 - 9

6.1 Shop Drawing, Sample and Other Technical Submittals: .........................................................................................................00700 - 9

6.2 Review and Return of Technical Submittals: .........................................................................................................................00700 - 10.

6.3 Progress Schedule Submittals: ...............................................................................................................................................00700 - 10

6.4 Review and Return of Progress Schedule Submittals: ..........................................................................................................00700 - 10.

6.5 Additional Provisions Concerning Submittals: .......................................................................................................................00700 - 10.

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ....................................................................................................................00700 - 11

7.1 Laws; Permits (Which Include Approvals and Licenses): ......................................................................................................00700 - 11.

7.2 Sales and Use Tax and Other Similar Taxes:........................................................................................................................00700 - 12.

7.3 Safety and Protection:.............................................................................................................................................................00700 - 12

7.4 Bonds and Insurance - General Requirements:......................................................................................................................00700 - 12

7.5 The Contractor’s Liability Insurance:.....................................................................................................................................00700 - 12

7.6 Pollution Liability Insurance: ...................................................................................................................................................00700 - 13

7.7 Property Insurance (Builder's All Risk Insurance):..................................................................................................................00700 - 13

7.8 Waiver of Rights:.....................................................................................................................................................................00700 - 13

7.9 Receipt and Application of Proceeds: .....................................................................................................................................00700 - 13

MICHSPEC DTMB 00010 3 (R 03/22)

7.10 Unfair Labor Practice: .............................................................................................................................................................00700 - 13

7.11 Michigan Right-To-Know Law: ...............................................................................................................................................00700 - 13.

7.12 Nondiscrimination: ..................................................................................................................................................................00700 - 14

7.13 Michigan Residency for Employees:.......................................................................................................................................00700 - 14

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION .......................................................................................................00700 - 15

8.1 Starting the Work: ..................................................................................................................................................................00700 - 15.

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ...............................................................................................................00700 - 15

8.3 Compliance with Contract Time Requirements:......................................................................................................................00700 - 15

8.4 Substantial Completion: ..........................................................................................................................................................00700 - 15

8.5 Partial Use: .............................................................................................................................................................................00700 - 16

8.6 Division of Responsibilities: ....................................................................................................................................................00700 - 16

8.7 Suspension of Work: ...............................................................................................................................................................00700 - 16

8.8 Sharing of Total Float on Non-Critical Paths:..........................................................................................................................00700 - 16

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK...................................................................................................................00700 - 17

9.1 Warranty: ...............................................................................................................................................................................00700 - 17

9.2 Tests, Inspections and Approvals: .........................................................................................................................................00700 - 17

9.3 Uncovering Work: ..................................................................................................................................................................00700 - 17

9.4 Correction of Work: ................................................................................................................................................................00700 - 17

9.5 Special Correction Period Requirements:..............................................................................................................................00700 - 18

9.6 Special Maintenance Requirements: .....................................................................................................................................00700 - 18

ARTICLE 10 CHANGES .................................................................................................................................................................00700 - 19

10.1 Changes in the Work: ............................................................................................................................................................00700 - 19

10.2 Differing Subsurface or Physical Site Conditions:.................................................................................................................00700 - 19.

10.3 Responsibilities for Underground Utilities: .............................................................................................................................00700 - 20

10.4 Hazardous Material Conditions:.............................................................................................................................................00700 - 20

10.5 Incidents with Archaeological Features: ................................................................................................................................00700 - 20

10.6 Unit Price Work: .....................................................................................................................................................................00700 - 21

10.7 Cash Allowances; Provisionary Allowances: .........................................................................................................................00700 - 21

10.8 Change Orders; Change Authorizations: ...............................................................................................................................00700 - 21

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME .....................................................................................................................................................00700 - 22

11.1 General Provisions:................................................................................................................................................................00700 - 22

11.2 Changes in Contract Time: ....................................................................................................................................................00700 - 22

11.3 Methods for Making Adjustments in Contract Price: .............................................................................................................00700 - 22.

11.4 Labor, Subcontract and Material/Equipment Costs: ..............................................................................................................00700 - 23

11.5 Construction Equipment Costs: .............................................................................................................................................00700 - 23

11.6 Rented or Leased Construction Equipment: ..........................................................................................................................00700 - 23

11.7 Owned Construction Equipment: ...........................................................................................................................................00700 - 24

11.8 General Conditions Costs: .....................................................................................................................................................00700 - 24

11.9 Limitations on Allowable Costs: .............................................................................................................................................00700 - 24

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ..................................00700 - 24.

11.11 Limits on the Fee for the Work Involved: ...............................................................................................................................00700 - 25.

11.12 Fee for Unabsorbed Home Office Overhead: .........................................................................................................................00700 - 25

11.13 Changes in Contract Time for Early Completion:....................................................................................................................00700 - 25

11.14 Access to Records: .................................................................................................................................................................00700 - 26

11.15 Price Reduction for Defective Cost and Pricing Data: ............................................................................................................00700 - 26

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ...........................................................................................................00700 - 26

12.1. Schedule of Values: ...............................................................................................................................................................00700 - 26

12.2 Requests for Payment: ..........................................................................................................................................................00700 - 27

12.3 Review of Request for Payment; Intent of Review:................................................................................................................00700 - 27

12.4 Refusal to Make or to Recommend Payment: ......................................................................................................................00700 - 27.

12.5 Final Request for Payment: ...................................................................................................................................................00700 - 27

12.6 Final Payment and Acceptance: ............................................................................................................................................00700 - 28

12.7 Contractor’s Continuing Obligation: .....................................................................................................................................00700 - 28

12.8 Waiver of Claims:...................................................................................................................................................................00700 - 28

ARTICLE 13 OTHER WORK ..........................................................................................................................................................00700 - 28

13.1 Related Work at Site: .............................................................................................................................................................00700 - 28

13.2 Coordination Requirements: ..................................................................................................................................................00700 - 29

13.3 Claims Between the Contractor and Other Parties: .............................................................................................................00700 - 29

MICHSPEC DTMB 00010 4 (R 03/22)

ARTICLE 14 TERMINATION ..........................................................................................................................................................00700 - 29

14.1 Notice Requiring Assurance of Due Performance: ...............................................................................................................00700 - 29.

14.2 Contractor Default and Termination for Cause:....................................................................................................................00700 - 30

14.3 Surety Default: .......................................................................................................................................................................00700 - 31

14.4 Termination for Convenience of the Owner:..........................................................................................................................00700 - 31

14.5 The Contractor May Suspend Work: ..................................................................................................................................00700 – 31.

ARTICLE 15 DISPUTES.................................................................................................................................................................00700 - 31

15.1 Claims Under This Article: .....................................................................................................................................................00700 - 31

15.2 Requirement for Certification of Contractor Claims:.............................................................................................................00700 - 32

15.3 Recommendations or Decisions from the Professional: ......................................................................................................00700 - 32

15.4 Determinations by the Director-DCD: ...................................................................................................................................00700 - 32

15.5 Supplements to AAA Arbitration: ...........................................................................................................................................00700 - 33

15.6 Interest on a Judgment; Payment of Judgment: ....................................................................................................................00700 - 33

15.7 Venue; Flow-Through Provision:............................................................................................................................................00700 - 33

SECTION 00800 SUPPLEMENTARY CONDITIONS ...................................................................................................................00800 - 1

SUMMARY 011000

SUBSTITUTION PROCEDURES 012500

PROJECT MANAGEMENT AND COORDINATION 013100

SUBMITTAL PROCEDURES 013300

QUALITY REQUIREMENTS 014000

TEMPORARY FACILITIES AND CONTROLS 015000

TEMPORARY TREE AND PLANT PROTECTION 015639

PRODUCT REQUIREMENTS 016000

EXECUTION 017300

CLOSEOUT PROCEDURES 017700

OPERATION AND MAINTENANCE DATA 017823

PROJECT RECORD DOCUMENTS 017839

DEMONSTRATION AND TRAINING 017900

SECTION 01310 PROGRESS SCHEDULE ..................................................................................................................................01310 - 1

APPENDIX I: SPECIAL WORKING CONDITIONS

APPENDIX II: SPECIAL PROJECT PROCEDURES

APPENDIX III: WAGE RATE SCHEDULES

APPENDIX V: PERMITS

CLOSEOUT DOCUMENTS

Contractor Closeout Checklist Project Final Completion Checklist Guarantee and Indebtedness Statement Certificate of Substantial Completion

DRAWINGS - BOUND SEPARATELY

TITLE SHEETS THRU

COVER AND DRAWING INDEX G-000

NOTES C-001

LEGEND C-002

SOIL BORINGS C-003

SITE ACCESS AND LAYDOWN C-004

REMOVALS C-101

PROPOSED C-201

GRADING PLAN C-301

MICHSPEC DTMB 00010 5 (R 03/22)

DETAILS C-501

ABBREVIATIONS, SPECIAL INSPECTION REQUIREMENTS AND SYMBOLS S-001

STRUCTURAL NOTES S-002

FOUNDATION PLAN S-101

CONCRETE SLAB PLAN S-102

ROOF FRAMING PLAN S-111

STRUCTURAL DETAILS S-501

STRUCTURAL DETAILS S-502

STRUCTURAL DETAILS S-503

ARCHITECTURAL NOTES & SYMBOLS A-001

MOUNTING LOCATIONS AND TYPICAL RESTROOM DETAILS A-002

FIRST FLOOR PLAN A-101

ROOF PLAN A-111

EXTERIOR ELEVATIONS A-201

BUILDING SECTIONS A-301

WALL SECTIONS A-311

ENLARGED PLANS A-411

INTERIOR ELEVATIONS A-451

INTERIOR ELEVATIONS A-452

TYPICAL DETAILS A-501

SCHEDULES AND DETAILS A-601

PLUMBING NOTES AND SYMBOLS P-001

PLUMBING PLAN P-101

PLUMBING ISOMETRICS P-901

MECHANICAL NOTES AND SYMBOLS M-001

FIRST FLOOR MECHANICAL PLAN M-101

MECHANICAL SCHEDULES M-601

ELECTRICAL NOTES AND SYMBOLS E-001

FIRST FLOOR POWER PLAN EP101

FIRST FLOOR LIGHTING PLAN EL101

ELECTRICAL DETAILS E-501

ELECTRICAL SCHEDULES E-601

TECHNICAL SPECIFICATIONS

STRUCTURE DEMOLITION 024116

CONCRETE FORMING AND ACCESSORIES 031000

CONCRETE REINFORCING 032000

CAST-IN-PLACE CONCRETE 033000

POLISHED CONCRETE FINISHING 033543

UNIT MASONRY 042000

ROUGH CARPENTRY 061000

SHEATHING 061600

EXTERIOR FINISH CARPENTRY 062013

INTERIOR FINISH CARPENTRY 062023

THERMAL INSULATION 072100

FOAMED-IN-PLACE INSULATION 072119

WEATHER BARRIERS 072500

STANDING-SEAM METAL ROOF PANELS 074113.16

SHEET METAL FLASHING AND TRIM 076200

JOINT SEALANTS 079200

ALUMINUM-FRAMED ENTRANCES 084213

ALUMINUM WINDOWS 085113

DOOR HARDWARE 087100

INTERIOR PAINTING 099123

STAINING AND TRANSPARENT FINISHING 099300

ROOM-IDENTIFICATION PANEL SIGNAGE 101423.16

MICHSPEC DTMB 00010 6 (R 03/22)

PLASTIC TOILET COMPARTMENTS 102113.19

PLASTIC SHOWER AND DRESSING COMPARTMENTS 102116.19

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800

SOLID SURFACING COUNTERTOPS 123661.16

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517

ESCUTCHEONS FOR PLUMBING PIPING 220518

BALL VALVES FOR PLUMBING PIPING 220523.12

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553

PLUMBING PIPING INSULATION 220719

DOMESTIC WATER PIPING 221116

DOMESTIC WATER PIPING SPECIALTIES 221119

SANITARY WASTE AND VENT PIPING 221316

SANITARY WASTE PIPING SPECIALTIES 221319

FUEL-FIRED, DOMESTIC-WATER HEATERS 223400

COMMERCIAL WATER CLOSETS 224213.13

COMMERCIAL URINALS 224213.16

COMMERCIAL LAVATORIES 224216.13

COMMERCIAL SINKS 224216.16

COMMERCIAL SHOWERS 224223

DRINKING FOUNTAINS 224713

COMMON MOTER REQUIREMENTS FOR HVAC EQUIPMENT 230513

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553

TESTING, ADJUSTING, AND BALANCING FOR HVAC 230593

DUCT INSULATION 230713

FACILITY LIQUEFIED-PETROLEUM GAS PIPING 231126

METAL DUCTS 233113

AIR DUCT ACCESSORIES 233300

REGISTERS AND GRILLES 233713.23

GAS-FIRED FURNACES 235416.13

PACKAGED INDOOR FIXED PLATE ENERGY RECOVERY UNITS 237223.19

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 260533

IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553

LIGHTING CONTROL DEVICES 260923

PANELBOARDS 262416

WIRING DEVICES 262726

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816

MANUAL AND MAGNETIC MOTOR CONTROLLERS 262913.03

LED INTERIOR LIGHTING 265119

EMERGENCY AND EXIT LIGHTING 265213

LED EXTERIOR LIGHTING 265619

SITE CLEARING 311000

EARTH MOVING 312000

EROSION AND SEDIMENTATION CONTROLS 312500

CONCRETE PAVING 321313

SIDEWALKS 321623

PARKING BUMPERS 321713

PAVEMENT MARKINGS 321723

TACTILE WARNING SURFACING 321726

TURF AND GRASSES 329200

PLANTS 329300

DISINFECTION OF WATER UTILITY PIPING SYSTEMS 330110.58

AIR TESTING 330505.41

MICHSPEC DTMB 00010 7 (R 03/22)

THRUST RESTRAINT FOR UTILITY PIPING 330509.33

SITE WATER SERVICE UTILITY LATERALS 331417

SANITARY SEWERAGE PIPING 331000

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1 (R 03/22)

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in

Division 0 of the Specifications have these intent and meanings:

Activity An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents.

An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates.

Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a Rebid.

Bidder The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

Bidding Requirements The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board The Administrative Board of the State of Michigan.

Bonds Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently

MICHSPEC DTMB 00020 - 2 (R 03/22)

detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Co…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .