222045 - EXISTING HOSPITAL - FIRE AS-BUILT - SD04.pdf
PDF 7 MB Posted
- Attached to
- Y1NB--336C25726R0025 C549-23-600 Construct Garland Energy Center Design-Build Construction Sources Sought 2
- Solicitation number
- 36C25726R0025_4
About this file
This document is a comprehensive set of fire suppression system construction drawings for a multi-level medical facility (A/E Construct Energy Center Garland) located at 2300 Marie Boulevard, Garland, Texas 75042. The drawings are architectural/engineering plans prepared by Calibre, Farris Engineering, and Tristone/HFC, with project number FE# 222045 and revision date of April 10, 2024.
The fire suppression system designs cover basement through fifth-floor levels plus a separate Garland Plaza Building, with detailed floor plans showing sprinkler head locations, pipe sizing (ranging from 2-inch to 8-inch piping), isolation valves, hose cabinets, standpipes, FDC (Fire Department Connection) locations, flow switches, and zone control valves. Key system components include wet sprinkler systems, dry systems with air compressors, pre-action systems, anti-freeze systems, and standpipe systems with 2.5-inch and 1.5-inch hose cabinets distributed throughout occupied spaces. The plans indicate multiple control zones, central pavilion sprinkler zones with dedicated control valves, and connection points for fire department operations. Specifications use standard notation (SM for sprinkler main, FDC for fire department connection, SP&H for schedule pipe and hangers) and reference general fire suppression notes included on the legend pages. The drawings are marked "Not for Construction Progress Print," indicating these are preliminary or planning documents rather than final construction specifications.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLY TO ALL FIRE SUPPRESSION SHEETS
FIRE PROTECTION WORK SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING:
A. PROVIDE A COMPLETE AND OPERABLE SYSTEM IN COMPLIANCE WITH ALL APPLICABLE
STATE AND LOCAL CODES, LAWS AND REGULATIONS. SYSTEM SHALL INCLUDE ALL
REQUIRED SPRINKLERS, PIPING, SUPPORTS, VALVES, SWITCHES, OUTSIDE AUDIO/VISUAL
NOTIFICATION DEVICE, FIRE DEPARTMENT CONNECTION (FDC), COMBINATION MAIN DRAIN
AND INSPECTOR'S TEST CONNECTION AND ALL VALVES, ETC.
B. ALL AREAS OF THE BUILDING INDICATED SHALL BE SPRINKLERED ACCORDING TO THE
LATEST STATE ADOPTED EDITION OF APPLICABLE NFPA STANDARDS, SPECIFICALLY NFPA
13 AND 24. ENTIRE SYSTEM SHALL BE INSTALLED PER ??? STATE FIRE MARSHAL
REQUIREMENTS AND REQUIREMENTS OF THE CITY OF ??? FIRE DEPARTMENT.
C. DESIGN SHALL BE BASED ON HYDRAULIC CALCULATIONS PER NFPA 13, WITH SHOP
DRAWINGS PREPARED ACCORDING TO THE REQUIREMENTS OF THE ??? STATE FIRE
MARSHAL. CALCULATIONS SHALL BEGIN WITH THE REMOTE SPRINKLER AND END AT THE
TEST HYDRANT NEAREST PLANNED TAP OF THE EXISTING DOMESTIC WATER SUPPLY.
D. COORDINATE ALL FIRE ALARM CONNECTION REQUIREMENTS WITH THE FIRE ALARM
INSTALLING CONTRACTOR.
E. COORDINATE WATER SUPPLY REQUIREMENTS WITH THE PLUMBING INSTALLING
CONTRACTOR. UNDERGROUND INSTALLING CONTRACTOR SHALL FLUSH THE
UNDERGROUND FIRE MAIN IN ACCORDANCE WITH NFPA 24 GUIDELINES AND PROVIDE THE
UNDERGROUND PIPING MATERIALS AND TESTING CERTIFICATE TO THE FIRE SPRINKLER
INSTALLING CONTRACTOR FOR INCLUSION IN THE FINAL FIRE SUPPRESSION O&M MANUAL.
F. DRAWINGS ARE DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENT OF THE SYSTEM. COORDINATE THE SPRINKLER SYSTEM LAYOUT
WITH ALL ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING AND ELECTRICAL
COMPONENTS. PROVIDE OFFSETS AS NECESSARY TO AVOID CONFLICTS.
G. THE LAYOUT SHOWN IS TO DEPICT THE APPROXIMATE ROUTING OF PIPE AND THE GENERAL
AREAS TO BE SERVED. THE EXACT NUMBER, TYPE, COVERAGE, ETC., OF SPRINKLERS
SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE SUBJECT TO APPROVAL BY
ALL AUTHORITIES HAVING JURISDICTION.
H. SIZE PER NFPA AND ROUTE FIRE DEPARTMENT CONNECTION (FDC) PIPE THROUGH WALL
FOR FLUSH, WALL-MOUNTED FDC. FDC SHALL BE INSTALLED WITH CENTER OF HOSE
CONNECTION LOCATED 3'-0" ABOVE FINAL EXTERNAL GRADE. PROVIDE HOSE CONNECTION
THREADS TO MATCH LOCAL FIRE DEPARTMENT REQUIREMENTS. PROVIDE FLUSH WALL-
MOUNTED FDC WITH BRONZE FINISH. SEE PLANS FOR LOCATION OF FDC.
I. REFER TO ARCHITECTURAL PLANS FOR CEILING TYPES AND HEIGHTS, AND LOCATIONS OF
EXPOSED STRUCTURE. COORDINATE ALL SPRINKLER LOCATIONS IN AS AESTHETIC
SPACING AS POSSIBLE. CONTRACTOR SHALL ALSO CONFIRM EXISTING CEILING LOCATIONS
THAT ARE TO REMAIN. REVIEW SPRINKLER PLANS WITH ARCHITECT/ENGINEER BEFORE
INSTALLATION.
J. ALL PIPING AND SPRINKLERS IN EXPOSED AREAS SHALL BE CLOSELY COORDINATED WITH
ARCHITECTURAL AND STRUCTURAL FEATURES, DUCTWORK AND LIGHTS. EXPOSED
SPRINKLERS SHALL BE UPRIGHT UNLESS SPECIFICALLY SHOWN OTHERWISE ON THE
DRAWINGS. PROVIDE ADDITIONAL SPRINKLERS AS NECESSARY TO OVERCOME ANY
OBSTRUCTIONS TO THE SPRINKLER SPRAY PATTERNS AS REQUIRED BY NFPA 13.
K. ALL SPRINKLERS IN GYP. BOARD AND LAY-IN CEILINGS SHALL BE RECESSED PENDENT TYPE
WITH WHITE FINISH, UNLESS NOTED OTHERWISE. ALL SPRINKLERS IN SOFFITS SHALL BE
RECESSED SIDEWALLS WITH WHITE FINISH, UNLESS NOTED OTHERWISE.
L. PROVIDE AUXILIARY DRAINS FOR ALL LOW SPOTS, TYPICAL.
M. SPRINKLER TYPES AND LOCATIONS, AND SPRINKLER PIPING SHOWN FOR AESTHETIC AND
COORDINATION PURPOSES. ACTUAL SYSTEM LAYOUT SHALL BE BASED ON HYDRAULIC
DESIGN AND SHOP DRAWINGS. SPRINKLERS SHOWN ADJACENT TO AIR OUTLETS/INLETS
AND LIGHT FIXTURES SHALL BE LOCATED 6" MINIMUM FROM BOTH. ALL SPRINKLERS IN LAY-
IN CEILINGS SHALL BE INSTALLED WITHIN 3" OF THE CENTER OF CEILING TILE. NOTIFY
ARCHITECT/ENGINEER OF CONFLICTS.
N. SEE SPECIFICATION SECTIONS 21 00 00 AND 21 05 00 FOR ADDITIONAL REQUIREMENTS.
O. SPRINKLER CONTRACTOR TO DETERMINE AVAILABLE WATER PRESSURES AND FLOW FROM
LOCAL WATER DEPARTMENT. CONTRACTOR SHALL SUBMIT HYDRANT FLOW TEST DATA
THAT IS NOT MORE THAN ONE YEAR OLDER THAN THE DATE OF SHOP DRAWING
SUBMITTAL.
P. PROVIDE A COMBINED MAIN DRAIN AND INSPECTOR'S TEST CONNECTION VALVE FOR ALL
WET PIPE SPRINKLER SYSTEMS AND ROUTE COMBINED DRAIN THROUGH EXTERIOR WALL.
LOCATE COMBINED DRAIN 0'-6" ABOVE FINAL EXTERNAL GRADE. PROVIDE A CONCRETE
SPLASH BLOCK BELOW OUTLET ON GRADE. OUTLET SHALL BE A THREADED 45 DEGREE
ELBOW. ALL DRAIN PIPING SHALL BE GALVANIZED.
Q. SPRINKLER CONTRACTOR SHALL COORDINATE ALL CEILING HEIGHTS WITH GENERAL
CONTRACTOR BEFORE MAKING FINAL PIPE DROPS TO SPRINKLERS. A COST EXTRA IS NOT
ACCEPTED IF CEILING HEIGHTS CHANGE AFTER DROPS HAVE BEEN INSTALLED AND
COORDINATION DID NOT OCCUR PRIOR TO INSTALLATION.
R. COORDINATE INSTALLATION OF ALL PIPING SYSTEMS WITH GENERAL CONTRACTOR TO
PREVENT PIPING FREEZEUPS. NOTIFY ARCHITECT AND ENGINEER OF AREAS FOR
POTENTIAL FREEZEUP CONCERNS.
S. PROVIDE DRY TYPE SPRINKLERS DESIGNED TO BE INSTALLED ON WET PIPE SPRINKLER
SYSTEMS AT ALL VESTIBULE ENTRANCE LOCATIONS.
T. ALL EXPOSED PIPING IN ALL PUBLIC AND STORAGE SPACES SHALL BE PAINTED. SPRINKLER
INSTALLER SHALL BE RESPONSIBLE FOR THE PROTECTION OF THE SPRINKLERS DURING
THE PAINTING OF ALL EXPOSED PIPING. SPRINKLER CONTRACTOR SHALL INSPECT ALL
SPRINKLERS UPON COMPLETION OF PAINTING TO VERIFY NO OVERSPRAY. SPRINKLER
CONTRACTOR SHALL CLEAN ANY OVER-SPRAY OR REPLACE AFFECTED SPRINKLERS
WHERE OVER-SPRAY CANNOT BE REMOVED. PAINT COLOR TO MATCH CEILING FINISH IN
AREA OF PIPE UNLESS NOTED OTHERWISE ON DRAWING. PROVIDE PIPE MATERIAL
ACCEPTABLE FOR PAINTING.
U. APPLICABLE UL CONSTRUCTION DETAILS SHALL BE USED WHERE RATED ASSEMBLIES ARE
PENETRATED BY SPRINKLER PIPING SYSTEM.
V. PIPE OPENINGS THROUGH FIRE RATED WALLS SHALL BE CAULKED WITH A FIRE RETARDANT
INTUMESCENT MATERIAL. SEE SPECIFICATIONS.
W. PROVIDE SPRINKLER PROTECTION BELOW ALL EXPOSED MECHANICAL AND ELECTRICAL
EQUIPMENT AND HVAC DUCTS 4'-0" AND GREATER, AS REQUIRED BY THE LATEST EDITION
OF NFPA 13.
X. COORDINATE WITH MECHANICAL AND ELECTRICAL WORK. DO NOT INSTALL SPRINKLER
PIPING BELOW SUSPENDED EQUIPMENT, EXCEPT AS REQUIRED TO BE IN ACCORDANCE
WITH NFPA 13 DESIGN GUIDELINES FOR EXPOSED CONSTRUCTION. DO NOT INSTALL
SPRINKLER PIPING WITHIN CLEARANCE SPACES FOR MECHANICAL OR ELECTRICAL
EQUIPMENT.
Y. ROUTE SPRINKLER PIPING AS HIGH AS POSSIBLE THROUGHOUT STRUCTURE, UNLESS
SPECIFICALLY NOTED OTHERWISE ON DRAWINGS.
Z. SUPPORT ALL PIPING FROM STRUCTURE. SEE DETAIL 4 ON SHEET ?.
AA. ALL HOLES FOR PIPING AND CONDUIT SHALL BE DRILLED OR CORE DRILLED, NO BREAKING
OF CONCRETE OR C.M.U. SHALL BE PERMITTED.
BB. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING, PAINTING, REPAIRING OR
REPLACEMENT OF ALL WALLS, CEILINGS, OR OTHER BUILDING ELEMENTS WHICH ARE
DISTURBED AS PART OF THE DEMOLITION OR INSTALLATION OF FIRE SPRINKLER WORK.
CC. REMOVE AND RE-INSTALL LAY-IN CEILINGS AS NECESSARY FOR INSTALLATION OF PIPING
AND SPRINKLERS. WHERE CEILING MATERIALS ARE DAMAGED DURING INSTALLATION OF
SPRINKLER PIPE OR SPRINKLER HEADS, NEW MATERIALS SHALL BE INSTALLED. NEW
MATERIALS SHALL MATCH EXISTING MATERIALS.
DD. SPRINKLER CONTRACTOR SHALL REVIEW AREAS WHERE NEW CEILINGS OCCUR. PROVIDE
SPRINKLING OF THE AREA ABOVE THESE CEILINGS AS REQUIRED BY REFERENCED CODES.
EE. ROUTE SPRINKLER PIPING AROUND ELECTRICAL, DATA, IT, COMM AND ALL OTHER ROOMS
DESIGNATED TO ELECTRICAL COMPONENTS AND/OR PANELS. PROTECT THESE AREAS
WITH SIDEWALL SPRINKLERS WHEN POSSIBLE WITHOUT ROUTING PIPE EXPOSED IN PUBLIC
AREAS.
GENERAL FIRE SUPPRESSION NOTES
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
FG101
FIRE SUPPRESSION SYMBOLS
LEGEND AND GENERAL NOTES
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
SCTSCT
NOTICE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND
CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SHOP AND OTHER APPROPRIATE DRAWINGS OR AT
SITE. LAY OUT AND COORDINATE ALL WORK PRIOR TO
INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR
OPERATION, MAINTENANCE, AND CODES.
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT
FABRICATE PRIOR TO VERIFICATION OF CLEARANCES
FOR ALL TRADES. THIS NOTICE APPLIES TO ALL
FIRE SUPPRESSION PLANS.
# Revision Date 04/10/2024 04/10/2024
UP
DN
DN
DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100
COMPOSITE BASEMENT FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
SCALE: 1" = 30'-0"
1 COMPOSITE BASEMENT FIRE SUPPRESSION PLAN
KEYNOTES
NORTH
WOMEN'S CENTER FIRST
FLOOR AND BASEMENT
ISOLATION VALVE
WOMEN'S
CENTER
BASEMENT
ISOLATION
VALVE
4" SM UP
3"SM
4"SM 4"SM 4"SM
2-1/2" SM
4"SM
"S
M
"S
M "S
M "S
M
33"SM
"S
M
"S
M
"S
M
"S
M
BC-140
Room
BC-166
Room
BC-167
Room
BD-150
Room
BD-151
Room
BD-152
Room
BD-153
Room
BD-154
Room
BD-155
Room
BD-156
Room
BD-159
Room
BD-161
Room
BD-165
Room
BD-152A
Room
BD-150A
Room
BD-132
Room
BD-133
Room
BD-141
Room
BD-142
Room
BD-143
Room
BD-131A
Room
BD-131B
RoomBD-131D
Room
M A
T C
H L
IN
E
M A
T C
H
LI
N E
F X C
MATCHLINE
/1 FX100E
MATCHLINE
/1 FX100D
A R
E A
A
N O
W O
R K
MATCHLINE
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100B
BASEMENT FIRE SUPPRESSION PLAN -
AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE SERVES BASEMENT WOMEN'S CENTER ZONE
OF SPRINKLERS.
2 4" SUPERVISED GATE VALVE.
3 3" SUPERVISED BUTTERFLY ZONE CONTROL VALVE SERVES BACK DOCK ANTIFREEZE SYSTEM
ZONE OF SPRINKLERS.
4 4" SUPERVISED BUTTERFLY VALVE.
5 4" CAPPED SPRINKLER MAIN.
NORTH SCALE: 1/8" = 1'-0"
1 BASEMENT FIRE SUPPRESSION PLAN - AREA B
"S
M
"S
M
"S
M
"S
M
"S
M
"S
M
4"SM
4"SM
4"SM
"S
M
BC-140
Room
BC-135
Room
BC-135A
Room
BC-135B
Room
BC-135C
Room
M A
T C
H
LI
N E
F X
B
MATCHLINE
/1 FX100E
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100C
BASEMENT FIRE SUPPRESSION PLAN -
AREA C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 4" SUPERVISED BUTTERFLY VALVE.
2 ABANDONED 4" SPRINKLER MAIN.
3 4" CAPPED SPRINKLER MAIN.
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT FIRE SUPPRESSION PLAN - AREA C
MEDICAL RECORDS ISOLATION
VALVE W/ FLOW SWITCH
INSPECTORS TEST
1.5" HOSE CABINET
LABELED "FIRE STANDPIPE"
"S
M "S
M "S
M
"S
M
4"SM 4"SM
4"SM
"S
M "S
M "S
M
"S
M
"S
M
"S
M
"S
M "S
M
6"SM
"S
M "S
M "S
M "S
M
"S
M
"S
M "S
M "S
M "S
M "S
M "S
M "S
M "S
M "S
M
"S
M "S
M "S
M "S
M "S
M "S
M "S
M
4"SM
4"SM 4"SM 4"SM 4"SM 4"SM 4"SM
4"SM 4"SM 4"SM 4"SM
"S
M
"S
M
4"STD PIPE 4"SP&H 4"SP&H
4"SP&H
6"SM6"SM6"SM6"SM6"SM6"SM6"SM
8"SM
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
"F
D C
4"FDC
4"FDC 4"FDC
4"FDC4"FDC4" FDC UP
FX100D
2___
2.5"SM
4"FM 4"SM 4"SM 4"SM 4"SM
4"SM
3"SM3"SM
2"SM
"S
M
2"SM
4" SM UP
BA-120
Room
BA-121
Room
BA-122
Room
BA-124
Room
BA-125
Room
BA-126
Room
BA-128
Room
BA-129
Room
BA-130
Room
BA-131
Room
BA-133
Room
BA-133A
Room
BA-140
Room
BD-110
Room
BD-111
Room
BD-112
Room
BD-113
Room
BD-115
Room
BD-117
Room
BD-101
Room
BD-102
Room
BD-103
Room
BD-104
Room
BD-105
Room
BD-106
Room
BD-107
Room
BD-113A
Room
BD-113B
Room
BD-113B1
Room
BD-115A
Room
BD-117A
Room
BA-150
Room
BA-151
Room
BA-152
Room
BA-152A
Room
BA-152B
Room
BA-152C
Room
BA-152D
Room
BA-152D1
Room
BA-121A
Room
BD-130
Room
BD-131
Room
BD-131C
Room
BD-131D1
Room
BD-106A
Room
BD-106B
Room
MATCHLINE
/1 FX100B
M A
T C
H L
IN
E
F X
E
MATCHLINE
MATCHLINE
/1 FX100G
AREA A - NO WORK
1ST LEVEL
100'-0"
1ST LEVEL
100'-0"
1ST LEVEL
100'-0"
J3
"S
M
6"SM
2-1/2"SM
4"SM
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100D
BASEMENT FIRE SUPPRESSION PLAN -
AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 8" CAPPED SPRINKLER MAIN.
2 8" SUPERVISED GATE VALVE.
3 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE.
4 FLOW SWITCH CONNECTED TO THE BUILDING'S FIRE ALARM SYSTEM.
5 6" SUPERVISED GATE VALVE.
6 6" CAPPED SPRINKLER MAIN.
7 4" CAPPED STANDPIPE & HOSE FIRE MAIN.
8 STANDPIPE HOSE VALVE CABINET.
9 4" CHECK VALVE
10 4" SUPERVISED GATE VALVE.
11 4" SUPERVISED GATE VALVE WITH FLOW SWITCH. ZONE CONTROL FOR MEDICAL RECORDS ZONE
OF SPRINKLERS.
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT FIRE SUPPRESSION PLAN - AREA D
SCALE: 1/4" = 1'-0"
2 SECTION 'A'
T
BASEMENT ISOLATION
VALVE
FLOW SWITCH - NO VALVE
OPEN-ENDED
ABANDONED
PIPING
UP TO SERVE WEST
TOWER ZONES
"S
M
"S
M "S
M "S
M
4"SM 4"SM
"S
M "S
M
"S
M "S
M
"S
M "S
M
"S
M
"S
M
4"SM 4"SM 4"SM 4"SM 4"SM 3"SM
4"SM 4"SM 4"SM 4"SM 4"SM
"S
M "S
M "S
M "S
M "S
M
"S
M "S
M "S
M
"S
M
"S
M
"S
M
"S
M "S
M
6"SM
6"SM 6"SM 6"SM 6"SM 6"SM
6"SM 6"SM 6"SM 6"SM
6"SM 6"SM
4"SM 4"SM 4"SM 4"SM 4"SM
4"SM
4"SM
4"SM
4"SM
4"SM
4"SM
"S
M "S
M
"S
M "S
M "S
M "S
M "S
M
4"SM 4"SM 4"SM
4"SM4"SM
4"SM UP
"S
M "S
M
6"SM
-1
/2 "S
M
3-1/2"SM
-1
/2 "S
M
"S
M "S
M
"S
M "S
M "S
M
"S
M
6"SM
6" SM UP IN CHASE
3"SM
"S
M "S
M
4"SM
6"SM
"S
M
"S
M
6"SM UP
4"SM 4"SM 4"SM
BA-133
Room
BA-134
Room
BA-135
Room
BA-135A
Room
BA-133A
Room
BA-140
Room
BC-101
Room
BC-110
Room
BD-117
Room
BD-118
Room
BD-120
Room
BD-170
Room
BC-167
Room
BC-168
Room
BC-169
Room
BC-120
Room
BC-125
Room
BC-130
Room
BC-135
Room
BC-135C
Room MATCHLINE
/1 FX100C
M A
T C
H L
IN
E
F X
D
MATCHLINE
/1 FX100G
MATCHLINE
/1 FX100G
EXPECT THIS CONNECTS, CAN'T VERIFY
MATCHLINE
/1 FX100B
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100E
BASEMENT FIRE SUPPRESSION PLAN -
AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 4" CHECK VALVE
2 4" CAPPED SPRINKLER MAIN.
3 ABANDONED 4" SPRINKLER MAIN.
4 6" SUPERVISED GATE VALVE SERVES AS BASEMENT ZONE CONTROL VALVE.
5 6" CHECK VALVE
6 6" SUPERVISED GATE VALVE.
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT FIRE SUPPRESSION PLAN - AREA E
UP
T
EAST TOWER ISOLATION
VALVE
EAST FIREHOSE
SHUT-OFF VALVE
BASEMENT
CENTRAL
PAVILION
SPRINKLERS
ZONE
CONTROL
VALVE
"S
M6 "S
M
"S
M 6 "S
M
6"SM 6"SM 6"SM
6"SM6"SM6"SM6"SM
6"
SM
6"
SM
6"
SM
6"
SM
6"
SM
6"
SM
6"
SM
6"
SM
"S
M
6"S M
6"S M
2-1/2"SM
6"SM UP
"S
M
"S
M
6"SM UP
FIRE PUMP
CONNECT TO ORIGINAL ENTRY
4"FDC UP
PUMP OUTLET
PUMP INLET
8"FM 8"FM
"F
M
8"FM
4"FDC
"F
D C
"F
M
"F
M
"S
M
"S
M "S
M
"S
M
6"SM 6"SM 6"SM 6"SM
6"SM
6"SM
BA-100
Room
BA-101
Room
BA-102
Room
BA-103
Room
BA-104
Room
BA-106
Room
BA-107
Room
BA-108
Room
BA-109
Room
BA-110
Room
BA-111
Room
BA-112
Room
BA-113
Room
BA-114
Room
BA-115
Room
BA-136
Room
BA-141
Room
BA-142
Room
BA-143
Room
BA-144
Room
BA-145
Room
BA-146
RoomBA-146A
Room
BA-103A
Room
BA-103B
Room
BA-103C
Room
BA-103D
Room
BA-103E
Room
BA-103F
Room
BA-103G
Room
BA-103H
Room
BA-148
Room
BA-148A
Room
BA-148A1
Room
BA-148A2
Room
BA-100A
Room
BA-115A
Room
BA-115B
Room
BA-113B
Room
BA-113A
Room
BA-110A
Room
BA-110B
Room
BA-110C
Room
MATCHLINE
/1 FX100E
A R
E A
G
MATCHLINE
/1 FX100D
A R
E A
H
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX100G
BASEMENT FIRE SUPPRESSION PLAN -
AREAS G & H
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 6" SUPERVISED GATE VALVE.
2 2-1/2" ZONE CONTROL VALVE ASSEMBLY.
3 2" TEST AND ZONE DRAIN VALVE. COMBINED DRAIN LINE FOR ENTIRE STAIR TOWER.
4 6" FIRE PUMP BYPASS.
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT FIRE SUPPRESSION PLAN - AREAS G & H
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101
COMPOSITE 1ST LEVEL FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1" = 30'-0"
1 COMPOSITE 1ST LEVEL FIRE SUPPRESSION PLAN
4"SM4"SM4"SM4"SM4"SM
2-1/2"SM2-1/2"SM2-1/2"SM2-1/2"SM2-1/2"SM
HOSE VALVE
CABINET
-1
/2 "S
M -1
/2 "S
M
-1
/2 "S
M -1
/2 "S
M -1
/2 "S
M
MATCHLINE
/2 FX101A
M A
T C
H L
IN
E
F X
B
MATCHLINE
/1 FX101D
1E-114
Room
1E-113
BEDROOM
1E-113A
TOILET, PT
1E-114A
TOILET, PT
1E-115A
TOILET, PT
1E-115
Room
1E-116
BEDROOM
1E-117
BEDROOM
1E-118
BEDROOM
1E-119
BEDROOM
1E-120
BEDROOM
1E-121
BEDROOM
1E-106
BEDROOM
1E-107
BEDROOM
1E-108
BEDROOM
1E-109
BEDROOM
1E-110
BEDROOM
1E-111
BEDROOM
1E-112
BEDROOM
1E-122
COMMUNICATION
CLOSET
1E-123
NOURISHMENT
1E-124
UTILITY,
SOILED
1E-130
Room
1E-131
Room
1E-132
Room
1E-133
Room
1E-134
Room 1E-138
Room
1E-139
Room
1E-140
Room
1E-141
Room
1E-142
Room
1E-143
Room
1E-144
Room
1E-145
Room
1E-146
Room
1E-147
Room
1E-148
Room 1E-149
Room
1E-149A
Room
1E-148A
Room
1E-143A
Room
1E-143A1
Room
1E-140A
Room
1E-139A
Room
1E-134A
Room
1E-133A
Room
1E-132A
Room
1E-131A
Room
1E-130A
Room
1E-100
VESTIBULE
1E-101
CONF. ROOM
1E-102
UTILITY,
CLEAN
1E-103
STORAGE
1E-104
MEDICATION
RM
1E-105
NURSE
STATION
1E-103A
TOILET, STAFF
UNISEX
1E-100A
POLICE
1E-101A
STORAGE
1E-106A
TOILET, PT
1E-107A
TOILET, PT
1E-108A
TOILET, PT
1E-109A
TOILET, PT
1E-110A
TOILET, PT
1E-111A
TOILET, PT
1E-112A
TOILET, PT
1E-116A
TOILET, PT
1E-117A
TOILET, PT
1E-118A
TOILET, PT
1E-119A
TOILET, PT
1E-120A
TOILET, PT
1E-121A
TOILET, PT
1E-180
Room
1E-181
Room
1E-182
Room
1E-183
Room
1E-184
Room 1E-185
Room
1E-186
Room
1E-187
Room 1E-188
Room
1E-146A
Room
1E-146B
Room
1E-146C
Room
1E-146D
Room
1E-146E
Room 1E-146F
Room
1E-146H
Room
1E-146I
Room
1E-146J
Room
1E-146K
Room 1E-146L
Room
1E-146O
Room
1E-146P
Room
HOSE VALVE CABINET
-1
/2 "S
M
HOSE VALVE CABINET
MATCHLINE
/1 FX101A1E-134
Room
1E-135
Room
1E-136
Room
1E-137
Room
1E-138
Room
1E-138A
Room
1E-136A
Room
1E-137A
Room
1E-135A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101A
1ST LEVEL FIRE SUPPRESSION PLAN -
AREAS A AND AA
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA A
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
2 1ST LEVEL FIRE SUPPRESSION PLAN - AREA AA
NORTH
2-1/2" SP&H
W/ FLOW SWITCH
3"SM3"SM
"S
M "S
M
3"SM3"SM3"SM3"SM3"SM
3"SM
3"SM
"S
M "S
M
"S
M "S
M
"S
M
4"SM4"SM
4"SM
4"SM
"S
M
3"SM
3"SM
4"SM 4"SM 4"SM 4"SM
3"SM 3"SM
"S
M "S
M "S
M "S
M "S
M
"S
M "S
M
"S
M "S
M "S
M
4"SM 4"SM 4"SM
"S
M
3"SM
"S
M "S
M "S
M
M A
T C
H L
IN
E
M A
T C
H L
IN
E
F X
A
M A
T C
H
LI
N E
F X C
MATCHLINE
/1 FX101E
MATCHLINE
/1 FX101D
1E-149
Room
1E-149A
Room
1E-176
Room
1E-177
Room
1E-178
Room
1E-179
Room
1E-146L
Room
1E-146M
Room
1E-146N
Room
1E-146O
Room
1E-146P
Room 1E-146Q
Room
1E-146R
Room
1E-170
Room
1E-171
Room
1E-172
Room
1E-173
Room 1E-174
Room
1E-175
Room
NW131
Room
NW132
Room
NW133
Room
NW134
Room
NW135
Room
NW136
Room
NW137
Room
NW138
Room
NW139
Room
NW140
Room
NW141
Room
NW142
Room
NW143
Room
NW144
Room
NW146
Room
NW147
Room
NW148
Room
NW149
Room
NW150
Room
NW151
Room
NW152
Room
1D-115
Room 1D-116
Room 1D-117
Room
1D-119
Room 1D-120
Room 1D-121
Room
1D-121A
Room
1D-121B
Room
1D-121C
Room
1D-121D
Room
1D-121E
Room
1D-121F
Room
1D-121G
Room
1D-121H
Room
1D-121I
Room
1D-121J
Room
1D-121K
Room
1D-121L
Room
1D-121M
Room
1D-121M1
Room
1D-110A3
Room 1D-110A3A
Room
1D-110A3B
Room
1E-170A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101B
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA B
KEYNOTES
1 4" SUPERVISED BUTTERFLY ZONE CONTROL VALVE WITH FLOW SWITCH.
NORTH
2.5" HOSE CABINET
4"SM 3"SM 3"SM
"S
M "S
M "S
M
M A
T C
H
LI
N E
M A
T C
H
LI
N E
F X
B
MATCHLINE
/1 FX101E
1D-121M
Room
1D-121M1
Room
1C-187
Room
1C-177
Room
1C-178
Room
1C-179
Room
1C-180
Room
1C-181
Room
1C-183
Room
MATCHLINE
/1 FX101F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101C
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA C
WALL-
MOUNTED
STANDPIPE
FDC
SIAMESE
PRE-
ACTION
SYSTEM
3" ANTI-FREEZE
SYSTEM
4"SM4"SM4"SM4"SM4"SM4"SM4"SM
"S
M
"S
M
"S
M
"S
M "S
M "S
M "S
M "S
M "S
M
4"SM
4"SM4"SM3"SM
2"SM
"S
M "S
M
"S
M "S
M
2.5" HOSE
VALVE
CABINET
M A
T C
H L
IN
E
F X
E
MATCHLINE
/1 FX101B
MATCHLINE
/1 FX101G
1D-106
Room
1D-110
Room
1D-111
Room
1D-109
Room
1D-110C
Room 1D-110C1
Room
1D-110C2
Room
1D-110C3
Room
1D-110C4
Room
1D-110C5
Room
1D-110C6
Room
1D-110C7
Room
1D-110C8
Room
1D-110C9
Room
1D-100
Room
1D-101
Room
1D-102
Room
1D-103
Room
1D-110A
Room
1D-110B
Room
1D-110A1
Room
1D-110A2
Room
1D-110A3
Room 1D-110A3A
Room
1D-110A3B
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101D
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA D
KEYNOTES
NORTH
2.5" HOSE
CABINET
4"SM
"S
M "S
M "S
M "S
M "S
M "S
M "S
M "S
M "S
M
"S
M
"S
M
"S
M "S
M "S
M "S
M "S
M "S
M
4"SM
4"SM
2"SM
"S
M
6"SM
"S
M
"S
M
"S
M "S
M
4"SM
"S
M "S
M "S
M "S
M "S
M
4"SM 4"SM4"SM
2"SM
4"SM DOWN
"S
M
"S
M
"S
M "S
M
4"SM 4"SM 4"SM
4"SM
"S
M "S
M
6"SM
"S
M
6"SM 6"SM 6"SM 6"SM6"SM6"SM
6"SM DOWN
"S
M
2.5" HOSE VALVE AND
FIRE EXTINGUISHER
CABINET - NO HOSE
MATCHLINE
/1 FX101B
M A
T C
H L
IN
E
F X
D
MATCHLINE
/1 FX101H
MATCHLINE
/1 FX101G
1D-135
Room
1D-135A
Room
1D-135B
Room
1D-135C
Room
1D-135D
Room
1D-135E
Room
1D-135F
Room
1D-135G
Room
1D-135H
Room
1D-135I
Room
1D-135C1
Room
1D-135J
Room
1D-135K
Room1D-135L
Room
1D-135M
Room
1D-135N
Room
1D-135O
Room
1D-135P
Room
1B-126
Room
1B-127
Room
1B-128
Room
1B-129
Room
1B-130
Room
1B-131
Room
1B-132
Room
1B-133
Room
1B-134
Room
1B-140
Room
1B-141
Room 1B-142
Room
1B-143
Room
1B-144
Room
1B-145
Room
1B-146
Room
1B-147
Room
1C-152
Room
1C-153
Room
1C-154
Room
1C-155
Room
1C-156
Room
1C-157
Room
1C-159
Room
1C-160
Room
1B-134A
Room
1B-134B
Room
1B-134C
Room
1B-134D
Room
1B-134B1
Room
1B-126A
Room
1B-126B
Room
1B-126C
Room
1C-116
Room
1C-116A
Room
1C-116B
Room
1C-116C1
Room
1C-116B1
Room
1C-118
Room
1C-120
Room
1C-122
Room
1C-123
Room
M A
T C
H L
IN
E
F X
F
MATCHLINE
/1 FX101C
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101E
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA E
KEYNOTES
NORTH
DRY SYSTEM WITH
AIR COMPRESSOR
"S
M "S
M "S
M "S
M
6"S M
6"S M
3"S M
3"S M
"S
M "S
M
6"SM 4"SM6"SM6"SM
"S
M "S
M "S
M
6"SM6"SM
"S
M "S
M "S
M "S
M
"S
M
"S
M "S
M "S
M "S
M "S
M 4"S M
4"S M
4"S M
4"S M
4" SM UP
1B-160
Room
1B-161
Room
1B-162
Room
1B-163
Room
1B-164
Room
1B-165
Room
1B-166
Room
1B-167
Room
1B-168
Room
1B-169
Room
1B-170
Room
1B-171
Room
1B-172
Room
1B-173
Room
1B-174
Room
1B-175
Room
1B-176
Room
1B-177
Room
1B-178
Room
1B-180
Room
1B-181
Room
1B-182
Room
1B-183
Room
1B-184
Room
1B-185
Room
1B-187
Room
1B-188
Room
1B-189
Room
1B-190
Room
1B-106
Room
1B-107
Room
1B-108
Room
1B-109
Room
1B-110
Room
1B-111
Room
1B-112
Room
1B-113
Room
1B-114
Room 1B-115
Room 1B-116
Room
1B-117
Room
1B-118
Room
1B-119
Room
1B-117A
Room
1B-117B
Room
1B-117C
Room
1B-117D
Room
1B-117D1
Room
1B-120
Room
1B-121
Room
1B-126
Room
1B-127
Room
1B-145
Room
1B-146
Room
1B-147
Room
1B-148
Room
1B-149
Room 1B-150
Room
1B-151
Room
1B-152
Room
1B-153
Room
1B-154
Room
1B-155
Room
1B-156
Room
1B-158
Room
1B-152A
Room
1C-158
Room
1C-159
Room
M A
T C
H L
IN
E
F X
E
/1 FX101C
MATCHLINE
/1 FX101H
MATCHLINE
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101F
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA F
1ST FLOOR
CENTRAL
PAVILION
SPRINKLERS ZONE
CONTROL VALVE
4"SM UP
"S
M
1 6" SM UP AND DOWN
M A
T C
H L
IN
E
F X
H
MATCHLINE
/1 FX101D
MATCHLINE
/1 FX101E
1A-145
Room1A-140B
Room
1A-140
Room
1A-140A
Room
1A-120
Room
1A-122
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101G
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE. ASSEMBLY SERVES THE CENTRAL PAVILION
ZONE OF SPRINKLERS.
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA G
MAIN CONTROL
VALVE - "EAST
TOWER
SPRINKLER
RISER"
"S
M
6"SM 6" SM DOWN
6" SM UP
"S
M
"S
M
MATCHLINE
/1 FX101E
M A
T C
H L
IN
E
F X
G
1B-120
Room
1A-150
Room
1C-116C
Room
1C-116D
Room
1C-116C1
Room
MATCHLINE
/1 FX101F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX101H
1ST LEVEL FIRE SUPPRESSION PLAN -
AREA H
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL FIRE SUPPRESSION PLAN - AREA H
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX102
COMPOSITE 2ND LEVEL FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 2ND LEVEL FIRE SUPPRESSION PLAN
2 WEST SPRINKLERS
WITH FLOW SWITCH
2.5" HOSE CABINET
2.5" HOSE
CABINET
6"SM 6"SM
"S
M
6"SM UP
6"SM DOWN IN CHASE
-1
/2 "S
P
H
"S
P
H "S
P
H 6 "S
P
H
6" SP&H DOWN
M A
T C
H L
IN
E
F X
F
2A-131
Room
2B-201
Room
2B-201A
Room
2B-201B
Room
2B-103
Room
2A-158
Room
2A-202
Room
2A-157
Room
2A-159
Room 2A-161
Room
2A-163
Room
2A-165
Room
2A-160
Room 2A-162
Room 2A-164
Room
2A-166
Room
MATCHLINE
/1 FX102G
M A
T C
H L
IN
E
F X
G
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX102E
2ND LEVEL FIRE SUPPRESSION PLAN -
AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY FLOOR ZONE CONTROL VALVE AND FLOW SWITCH.
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL FIRE SUPPRESSION PLAN - AREA E
NOT ON ANY ORIG.
DWGS. THAT WE HAVE.
4"S P&H
4"S P&H
4"S P&H
4"S P&H
4"S P&H
"S
P
H
4"SP&H UP
2-1/2" HOSE
VALVE CONNECTION
M A
T C
H L
IN
E
F X
E
2B-171
Room
2B-147
Room
2B-145
Room
2B-143
Room
2B-105
Room
2B-105A
Room
2B-112
Room
2B-113
Room
2B-115
Room
2B-209
Room
2B-127
Room 2B-129
Room 2B-131
Room
2B-133
Room
2B-135
Room
2B-137
Room
2B-139
Room
2B-141
Room
2B-117
Room
2B-119
Room
2B-121
Room
2B-123
Room
2B-125
Room
2B-107
Room
2B-109
Room
2B-111
Room
2B-103
Room
2B-149
Room
2B-151
Room
2B-153
Room
2B-155
Room
2B-157
Room
2B-159
Room
2B-161
Room
2B-163
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX102F
2ND LEVEL FIRE SUPPRESSION PLAN -
AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL FIRE SUPPRESSION PLAN - AREA F
2ND CENTRAL
PAVILION
SPRINKLERS ZONE
CONTROL VALVE
2A-127
Room
2A-131
Room
2A-122
Room
2A-122A
Room
2A-122B
Room
2A-122C
Room
2A-122D
Room
2A-126
Room
2A-128
Room
2A-124
Room
2A-113
Room
2A-113A
Room
2B-187
Room
2B-187A
Room
2A-116
Room2A-115
Room
2A-118
Room
2A-117
Room
2A-109
Room
2A-112
Room
2A-111
Room
2A-114
Room
2A-120
Room
2A-119
Room
2A-121
Room
2A-123
Room
2A-114A
Room
2A-112A
Room
F X
E
/1 FX102E
MATCHLINE
M A
T C
H L
IN
E
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX102G
2ND LEVEL FIRE SUPPRESSION PLAN -
AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE. ASSEMBLY SERVES THE CENTRAL PAVILION
ZONE OF SPRINKLERS.
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL FIRE SUPPRESSION PLAN - AREA H
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX103
COMPOSITE 3RD LEVEL FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1" = 30'-0"
1 COMPOSITE 3RD LEVEL FIRE SUPPRESSION PLAN
3 WEST SPRINKLERS
2.5" HOSE
CABINET
2.5" HOSE
CABINET
BUILT-OUT WALL -
BACKGROUND
OFF
"S
T
H
6"ST&H DOWN
6"ST&H UP
6"SM
"S
M
6"SM UP
6"SM DOWN
A R
E A
E
MATCHLINE
/1 FX103G
M A
T C
H L
IN
E
F X
G
A R
E A
F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX103E
3RD LEVEL FIRE SUPPRESSION PLAN -
AREAS E & F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL FIRE SUPPRESSION PLAN - AREAS E & F
# Revision Date
1 Revision 1 Date 1
THIRD FLOOR
CENTRAL
PAVILION
SPRINKLERS ZONE
CONTROL VALVE
F X
E
/1 FX103E
MATCHLINE
M A
T C
H L
IN
E
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX103G
3RD LEVEL FIRE SUPPRESSION PLAN -
AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE. ASSEMBLY SERVES THE CENTRAL PAVILION
ZONE OF SPRINKLERS.
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL FIRE SUPPRESSION PLAN - AREA G
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX104
COMPOSITE 4TH LEVEL FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 4TH LEVEL FIRE SUPPRESSION PLAN
4 WEST
SPRINKLERS
FLOW
SWITCH
CAPPED AUX.
DRAIN W/
PRESSURE
GAUGE AT 130 PSI
2.5" HOSE
CABINET
2.5" HOSE
CABINET
THIS 6" STANDPIPE HOSE FEEDS CABINET AND CONTINUES UP
6"SM DOWN
"S
M
6"SM6"SM
6"SM UP
TO PENTHOUSE
2-1/2"SM
A R
E A
E
MATCHLINE
/1 FX104G
M A
T C
H L
IN
E
F X
G
4A-149
Room
4A-151
Room
4A-153
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142B
Room
4A-142A
Room
4A-215
Room
4A-183
Room
4A-183A
Room
4A-183B
Room
A R
E A
F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX104E
4TH LEVEL FIRE SUPPRESSION PLAN -
AREAS E & F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY FLOOR ZONE CONTROL VALVE AND FLOW SWITCH.
2 6" SUPERVISED GATE VALVE.
3 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE.
NORTH
SCALE: 1/8" = 1'-0"
1 4TH LEVEL FIRE SUPPRESSION PLAN - AREAS E & F
4TH CENTRAL
PAVILION
SPRINKLERS ZONE
CONTROL VALVE
MATCHLINE/1 FX104E
MATCHLINE
4A-158
Room
4A-149
Room
4A-151
Room
4A-153
Room
4A-155
Room
4A-157
Room
4A-159
Room
4A-161
Room
4A-163
Room
4A-165
Room
4A-167
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142B
Room
4A-142A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX104G
4TH LEVEL FIRE SUPPRESSION PLAN -
AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
1 2-1/2" SUPERVISED BUTTERFLY ZONE CONTROL VALVE. ASSEMBLY SERVES THE CENTRAL PAVILION
ZONE OF SPRINKLERS.
SCALE: 1/8" = 1'-0"
1 4TH LEVEL FIRE SUPPRESSION PLAN - AREA G
NORTH
2.5" HOSE CONNECTION
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX105F
5TH LEVEL FIRE SUPPRESSION PLAN -
AREAS E AND F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 5TH LEVEL FIRE SUPPRESSION PLAN - AREA F
SCALE: 1/8" = 1'-0"
2 5TH LEVEL FIRE SUPPRESSION PLAN - AREA E
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX200
PLAZA BUILDING - BASEMENT FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 GARLAND PLAZA BUILDING - BASEMENT FIRE SUPPRESSION PLAN
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
FX201
GARLAND PLAZA BUILDING - 1ST
LEVEL FIRE SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/17/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 GARLAND PLAZA BUILDING - 1ST LEVEL FIRE SUPPRESSION PLAN
T
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
FX301
SHILOH BUILDING - FIRST FLOOR FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
NORTH SCALE: 1/8" = 1'-0"
1 SHILOH BUILDING - FIRST FLOOR FIRE SUPPRESSION PLAN
| Sheets |
| FG101 - FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL NOTES |
| FX100 - COMPOSITE BASEMENT FIRE SUPPRESSION PLAN |
| FX100B - BASEMENT FIRE SUPPRESSION PLAN - AREA B |
| FX100C - BASEMENT FIRE SUPPRESSION PLAN - AREA C |
| FX100D - BASEMENT FIRE SUPPRESSION PLAN - AREA D |
| FX100E - BASEMENT FIRE SUPPRESSION PLAN - AREA E |
| FX100G - BASEMENT FIRE SUPPRESSION PLAN - AREAS G & H |
| FX101 - COMPOSITE 1ST LEVEL FIRE SUPPRESSION PLAN |
| FX101A - 1ST LEVEL FIRE SUPPRESSION PLAN - AREAS A AND AA |
| FX101B - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA B |
| FX101C - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA C |
| FX101D - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA D |
| FX101E - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA E |
| FX101F - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA F |
| FX101G - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA G |
| FX101H - 1ST LEVEL FIRE SUPPRESSION PLAN - AREA H |
| FX102 - COMPOSITE 2ND LEVEL FIRE SUPPRESSION PLAN |
| FX102E - 2ND LEVEL FIRE SUPPRESSION PLAN - AREA E |
| FX102F - 2ND LEVEL FIRE SUPPRESSION PLAN - AREA F |
| FX102G - 2ND LEVEL FIRE SUPPRESSION PLAN - AREA G |
| FX103 - COMPOSITE 3RD LEVEL FIRE SUPPRESSION PLAN |
| FX103E - 3RD LEVEL FIRE SUPPRESSION PLAN - AREAS E & F |
This is the start of the file's text. The full file is on GovTribe.