222045 - EXISTING HOSPITAL - ELEC AS-BUILT - SD04.pdf
PDF 5 MB Posted
- Attached to
- Y1NB--336C25726R0025 C549-23-600 Construct Garland Energy Center Design-Build Construction Sources Sought 2
- Solicitation number
- 36C25726R0025_4
About this file
This document is a set of electrical construction drawings and diagrams for the VA/Construct Energy Center Garland facility in Garland, Texas, prepared by A/E Construct Energy and Calibre consultants.
The drawings comprehensively cover electrical power distribution systems across multiple buildings and levels, including the main Hospital Central Pavilion, Women's Center (Garland Plaza Building), and Shiloh Building. The scope encompasses basement through penthouse-level power plans at scales of 1/8" = 1'-0" to 1" = 30'-0", composite basement and level-specific power distribution plans, and existing one-line riser diagrams for emergency and normal power systems. Key electrical infrastructure documented includes main switchboards (MSA, MSB, MSC, MSBP), emergency distribution panels (EMDP, EMDP-1, EMDP-B, EMDP-C), equipment and critical distribution panels across multiple voltage systems (277/480V and 120/208V configurations), automatic transfer switches (ATS), transformers, motor control centers, and lighting/appliance panelboards. The drawings detail extensive conductor sizing, conduit specifications, equipment locations by room number, and interconnections throughout the facility's multi-story structure. General electrical notes address demolition requirements, raceway installation standards, fire-rated ceiling coordination, emergency luminaire wiring for generator transfer devices, and integration with mechanical systems. The document revision date is 04/10/2024, with the progress set dated 08/29/2023, indicating this represents construction-phase electrical design documentation for a major healthcare facility modernization project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL SYMBOLS LEGEND
(AS APPLICABLE)
DESCRIPTIONSYMBOLDESCRIPTIONSYMBOL
TRANSFORMER
LIGHTING & APPLIANCE PANELBOARD
POWER DISTRIBUTION EQUIPMENT
CABINET (TYPE INDICATED)
MOTOR STARTER, LIGHTING CONTACTOR
COMBINATION MOTOR STARTER & SAFETY SWITCH
SAFETY SWITCHT
ENCLOSED CIRCUIT BREAKER
POWER DEVICES
TELEPHONE CABINET
X
XXX
XX
X EQUIPMENT IDENTIFICATION TAG
SHEET REFERENCE
DETAIL REFERENCE
FIRE ALARM CONTROL PANEL
HAND-OFF-AUTO
ABOVE FINISHED FLOOR
WEATHER-PROOF
FACP
HOA
AFF
WP
RATED AMPACITY/NO. POLES/FUSING REQ'D/NEMA ENCL. NO.30/3/10/3RFIRE ALARM ANNUNCIATOR PANELFAAP
WIRE GUARDWG
EXPLOSION PROOFXP
CIRCUITCCT.
PARTIAL CIRCUITPART. CCT. DARK/DASHED LINEWORK = DEMOLITION
DARK LINEWORK = NEW
MISCELLANEOUS
LIGHT LINEWORK = EXISTING
NON-FUSEDNF
MANUFACTURER'S RECOMMENDATIONMR
NURSE CALL DOME LIGHT EMERGENCY CALLS ONLY
NURSE CALL DOME LIGHT EMERGENCY/NORMAL CALLS
EMERGENCY CALL SWITCH
SINGLE BED NURSE CALL STATION (1 CORD SET)
DOUBLE BED NURSE CALL STATION (2 CORD SETS)
NURSE CALL ANNUNCIATOR & POWER SUPPLY
NURSE CALL DUTY STATION
CODE BLUE STATION
NURSE CALL STAFF STATION
NURSE CALL
N2
NC
ND
NS
E
N
E
B
N
APPLY TO ALL ELECTRICAL SHEETS
A. COMPLETELY REMOVE ALL ELECTRICAL WIRING, CONDUIT, SWITCHES, DISCONNECTS,
LUMINAIRES, AND ASSOCIATED ANCILLARY EQUIPMENT INDICATED BY BOLD, DASHED LINES
OR IDENTIFIED BY NOTES. ITEMS INDICATED FOR REMOVAL ARE ONLY SUGGESTIVE OF THE
AMOUNT OF DEMOLITION WORK INVOLVED. PERFORM A SITE INVESTIGATION TO AID IN
DETERMINING THE COMPLETE EXTENT OF DEMOLITION WORK.
B. COORDINATE AND SCHEDULE ALL NECESSARY POWER OUTAGES WITH THE OWNER'S
REPRESENTATIVE PRIOR TO PROCEEDING WITH SUCH WORK SO OPERATIONS IN ADJACENT
OCCUPIED PORTIONS OF THE BUILDING ARE NOT INTERRUPTED OR RESTRICTED WITHOUT
PRIOR APPROVAL.
C. REMOVE ALL EXISTING BRANCH CIRCUITS INDICATED AS COMPLETELY AS POSSIBLE. REMOVE
EXISTING CONDUCTORS COMPLETELY FROM THEIR RACEWAYS AND DO NOT REUSE EXCEPT
WHERE SPECIFICALLY INDICATED. WHERE AN EXISTING DEVICE IS REMOVED FROM AN
EXISTING CIRCUIT, PROVIDE NEW WIRING AND MAINTAIN CONTINUITY OF EXISTING CIRCUIT.
D. REMOVE EXISTING LUMINAIRES, LAMPS, BALLASTS, AND RELATED COMPONENTS INDICATED
AS COMPLETELY AS POSSIBLE. DELIVER EQUIPMENT CONSIDERED SALVAGEABLE BY THE
OWNER'S REPRESENTATIVE AND NOT SHOWN FOR REUSE TO THE OWNER'S STORAGE
LOCATION. REMOVE NON-SALVAGEABLE EQUIPMENT FROM THE SITE. PROPERLY DISPOSE
OF LAMPS AND BALLASTS CONSIDERED HAZARDOUS WASTE.
E. REMOVE EXISTING SURFACE MOUNTED BOXES, CONDUIT, SURFACE METAL RACEWAY,
WIREWAY, ETC. INDICATED AS COMPLETELY AS POSSIBLE. PATCH ABANDONED
PENETRATIONS FROM REMOVED FASTENERS. ABANDON IN PLACE NON-ACCESSIBLE BOXES
SHOWN REMOVED AND COVER WITH STAINLESS STEEL COVER PLATES. ABANDON IN PLACE
NON-ACCESSIBLE CONDUIT SHOWN REMOVED AND CAP OFF IN A SUITABLE MANNER PER
LOCAL INSPECTOR'S REQUIREMENTS. CHISEL RACEWAYS STUBBED FROM A CONCRETE
FLOOR OR WALL 2 INCHES BELOW ADJACENT SURFACE, GROUT, AND SCREED.
F. COORDINATE REUSED EXISTING BOX AND CONDUIT LOCATIONS WITH NEW WORK LOCATIONS.
G. REMOVE ELECTRICAL WORK AT ALL MECHANICAL EQUIPMENT SHOWN REMOVED.
COORDINATE EQUIPMENT REMOVAL LOCATIONS WITH MECHANICAL DRAWINGS.
GENERAL ELECTRICAL DEMOLITION NOTES
APPLY TO ALL ELECTRICAL SHEETS
A. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF ROUGH-IN ABOVE FINISHED FLOOR
(AFF).
B. INSTALL ALL CONDUCTORS IN CONTINUOUS RACEWAY. PROVIDE INSULATED EQUIPMENT
GROUNDING CONDUCTOR.
C. PROVIDE DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT PHASE
CONDUCTOR. EXCEPTION: WHERE AN EQUIPMENT MANUFACTURER REQUIRES A
MULTIWIRE BRANCH CIRCUIT FOR ONLY ONE UTILIZATION EQUIPMENT AND WHERE ALL
UNGROUNDED CONDUCTORS OF THAT CIRCUIT ARE OPENED SIMULTANEOUSLY BY THE
BRANCH CIRCUIT OVERCURRENT DEVICE.
D. CONCEAL ALL CONDUITS IN NEW WALLS, EXISTING STUD WALLS, OR ABOVE SUSPENDED
CEILINGS.
E. WHERE CONDUIT CANNOT BE CONCEALED IN EXISTING WALL OR CEILING CAVITIES,
INSTALL CONDUCTORS IN SURFACE METAL RACEWAYS; SURFACE CONDUIT OR METAL
SURFACE RACEWAY AT ENGINEER'S DISCRETION.
F. PAINT SURFACE CONDUIT IN FINISHED AREAS, WHEN ALLOWED, TO MATCH SURROUNDING
SURFACES. COORDINATE FINISHES WITH ARCHITECT.
G. METAL SURFACE RACEWAYS SHALL BE WIREMOLD #V500, #V700, OR #V2400 SERIES WITH
FACTORY IVORY FINISH OR APPROVED EQUIVALENT. METAL SURFACE RACEWAYS FOR
TELEVISION CABLE SHALL BE WIREMOLD #V700 OR LARGER. METAL SURFACE RACEWAYS
FOR TELECOMMUNICATIONS CABLES SHALL BE #V2400 OR LARGER. COMPLY WITH EIA/TIA
STANDARDS FOR CABLE BENDING RADIUS.
H. INSTALL EXPOSED OR CONCEALED RACEWAY NEAR METAL CORRUGATED SHEET ROOF
DECKING SO NEAREST OUTER RACEWAY SURFACE IS NOT LESS THAN 6 INCHES FROM THE
NEAREST SURFACE OF THE ROOF DECKING. EXCEPTION: RIGID METAL CONDUIT AND
INTERMEDIATE METAL CONDUIT SHALL NOT BE REQUIRED TO MAINTAIN THIS CLEARANCE.
I. PATCH, PAINT, REPAIR OR REPLACE ALL WALLS, CEILINGS, OR OTHER BUILDING ELEMENTS
DISTURBED DURING INSTALLATION OF ELECTRICAL WORK.
J. USE ROOM NUMBERS ASSIGNED BY OWNER AND NOT ROOM NUMBERS LISTED ON DRAWINGS
FOR LABELING OF PANELBOARD DIRECTORIES, FIRE ALARM PANEL PROGRAMMING, ETC.
INCLUDE A DESCRIPTION OF LOAD SUCH AS LIGHTS, RECEPTACLES, MECHANICAL UNIT
LOCATIONS, ETC. ON TYPED PANELBOARD DIRECTORIES.
K. LOCATIONS AND QUANTITIES OF OCCUPANCY SENSORS ON THE DRAWINGS ARE
DIAGRAMMATIC AND INDICATE ONLY THE ROOM/AREA CONTROLLED BY THE SENSORS.
PROVIDE ADDITIONAL SENSORS AND RELATED EQUIPMENT FOR COMPLETE COVERAGE
AND SWITCHING ARRANGEMENTS INDICATED.
L. REFER TO MECHANICAL/ELECTRICAL COORDINATION SCHEDULE SHEET M__ FOR
ADDITIONAL REQUIREMENTS ON DISCONNECTS, MOTOR STARTERS, ETC.
M. CONNECT SMOKE AND FIRE/SMOKE DAMPERS TO 120V POWER AND CONTROL WITH FIRE
ALARM SYSTEM. VERIFY EXACT QUANTITY AND LOCATION OF DAMPERS WITH MECHANICAL
DRAWINGS.
N. CONNECT ALL FIRE SPRINKLER SYSTEM FLOW, TAMPER, AND SITE PIV SWITCHES TO THE
FIRE ALARM SYSTEM. COORDINATE EXACT LOCATION AND QUANTITY OF DEVICES WITH
FIRE PROTECTION DRAWINGS AND FIRE SPRINKLER INSTALLER.
O. COORDINATE LOCATION OF RECESSED LUMINAIRES, SPEAKERS, ETC. WITH FIRE RATED
CEILINGS. PROVIDE ENCLOSURES TO MAINTAIN THE FIRE INTEGRITY RATING OF THE
CEILING. COORDINATE EXACT LOCATIONS OF FIRE RATED CEILINGS WITH ARCHITECTURAL
DRAWINGS.
P. PROVIDE MULTIPLE WIRING CONNECTIONS AT EMERGENCY LUMINAIRES WITH GENERATOR
TRANSFER DEVICE (GTD) SUCH AS: NORMAL POWER UNSWITCHED FOR SENSING, NORMAL
POWER SWITCHED, AND EMERGENCY POWER UNSWITCHED. UPON NORMAL POWER
FAILURE, FORCE THE EMERGENCY LUMINAIRE TO FULL ILLUMINATION VIA THE GTD
UNSWITCHED EMERGENCY POWER CIRCUIT.
Q. IN AREAS WITH PRECAST PANELS, COORDINATE INSTALLATION OF FLUSH MOUNTED
DEVICE BOXES AND CONCEALED CONDUITS WITH PRECAST PANEL SUPPLIER SO ALL
CONDUIT, BOXES, ETC. ARE CAST WITHIN EACH WALL SECTION. FURNISH CONDUIT AND
BOXES TO PRECAST SUPPLIER FOR EMBEDMENT INTO WALLS.
GENERAL ELECTRICAL NOTES
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
EG101
ELECTRICAL SYMBOLS LEGEND AND
GENERAL NOTES
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NOTICE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND
CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SHOP AND OTHER APPROPRIATE DRAWINGS OR AT
SITE. LAY OUT AND COORDINATE ALL WORK PRIOR TO
INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR
OPERATION, MAINTENANCE, AND CODES.
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT
FABRICATE PRIOR TO VERIFICATION OF CLEARANCES
FOR ALL TRADES. THIS NOTICE APPLIES TO ALL
ELECTRICAL PLANS.
# Revision Date 04/10/2024 04/10/2024
UP
DN
DN
DN
T
DISTRIBUTION PANEL 'BDPCB'
DISTRIBUTION PANEL 'BDPC'
DISTRIBUTION PANEL 'EMDP-C'
DISTRIBUTION PANEL 'EMDP'
DISTRIBUTION PANEL 'MDPB'
PANEL 'XRAY DP'
PANEL 'O'
PANEL 'O'
PANEL 'OFP'
ATS #10
ATS #9
PANEL 'BWHA'
DISTRIBUTION PANEL 'BDPA'
MAIN SWITCHBOARD 'MSA'
DISTRIBUTION PANEL 'DPA'
ATS (CHILLER)
DISTRIBUTION PANEL 'PE1'
PANEL 'PE1-A'
PANEL 'BAL'
PANEL 'DP-1'
MAIN SWITCHBOARD 'MS'
TRANSFORMER 'XRAY'
PANEL 'EA'
PANEL 'PB'
PANEL 'A'
PANEL 'EJ'
ATS #3
DISTRIBUTION PANEL 'DP'
DISTRIBUTION PANEL 'EDC'
ATS #5 (EMERGENCY)
PANEL 'EM'
EXISTING MOTOR CONTROL CENTER 'MCCA'
EXISTING MOTOR CONTROL CENTER 'MCCD'
PANEL 'EEBPA'
PANEL 'BWPA-1'
PANEL 'BWPA-2'
EXISTING MOTOR CONTROL CENTER 'MCA'
PANEL 'MSA'
DISTRIBUTION PANEL 'P-1'
ATS #2
DISTRIBUTION PANEL 'EDLS'
DISTRIBUTION PANEL 'S2'
DISTRIBUTION PANEL 'EMDP'
ATS #4
ATS #1
MAIN SWITCHBOARD 'MSB'
PANEL 'SL'
DISTRIBUTION PANEL 'EDPCA'
DISTRIBUTION PANEL 'MDPA'
ATS #5
ATS #6
ATS #7
DISTRIBUTION PANEL 'EMDP-B'
DISTRIBUTION PANEL 'EDPLS'
DISTRIBUTION PANEL 'EDPEE'
DISTRIBUTION PANEL 'EDPEE'
ATS #8
PANEL 'HA'
PANEL 'B2A'
PANEL 'TEL'
PANEL 'LM'
PANEL 'DPHBPB'
PANEL 'DPHBPA'
PANEL 'EQLBP'
PANEL 'EQHBP'
PANEL 'CLBP'
PANEL 'CHBP'
PANEL 'HBP'
PANEL 'T-EQLBP'
PANEL 'LBP'
PANEL 'HBPL'
PANEL 'LSHBP'
PANEL 'LSLBP'
PANEL 'HKBP'
TRANSFORMER 'TLKBP'
PANEL 'TLS1/BP'
PANEL 'LKBP-3'
PANEL 'LKBP-1'
PANEL 'LKBP-2'
TRANSFORMER 'TBP/1L'
DISTRIBUTION PANEL 'MSBP'
PANEL 'P-2'
TRANSFORMER 'T1'
PANEL 'PE-1 A'
PANEL 'PE-2 B'
PANEL 'PE-3'
TRANSFORMER 'T-51'
TRANSFORMER 'T-LC'
PANEL 'BMH'
PANEL 'BMP'
TRANSFORMER 'T-BMP'
PANEL 'OFM'
PANEL 'OFL'
PANEL 'PE-4'
TRANSFORMER 'T-PE-4'
200A
75KVA
200A
75KVA
TRANSFORMER 'CIAL'
TRANSFORMER 'TIAL'
MAIN SWITCHBOARD 'MSB' PANEL 'XAH'
TRANSFORMER '50 KVA'
PANEL 'XBHA'
DISTRIBUTION PANEL 'DPA'
PANEL 'TDPA'
PANEL 'LBAL'
PANEL 'TLBAL'
PANEL 'LBAH'
PANEL 'BAL'
PANEL 'BAH'
TRANSFORMER 'TBAL'
DISTRIBUTION PANEL 'EDPA'
ATS-A
ATS-E
PANEL 'BA'
PANEL 'BB'
PANEL 'BNPA'
PANEL 'PPE'
PANEL 'T-1SLA2'
PANEL 'X-1'
PANEL 'X-2'
PANEL 'B'
DISTRIBUTION PANEL 'PF'
PANEL 'EB'
PANEL 'BEQL'
PANEL 'BEQH'
TRANSFORMER 'BEQL'
MOTOR CONTROL CENTER 'MCCA'
MOTOR CONTROL CENTER 'MCC MSA'
PANEL 'tegg 0158'
PANEL 'tegg 0161'
PANEL 'tegg 0160'
PANEL 'T-1'
PANEL 'T-LC2'
TRANSFORMER 'T-??'
PANEL 'EEBHA'
PANEL 'B2'
PANEL 'EBCLA'
PANEL 'EBCHA'
PANEL 'EBLSHA'
TRANSFORMER 'T-EB'
PANEL 'EMB'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP100
COMPOSITE BASEMENT POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE BASEMENT POWER PLAN
PANEL 'B'
PANEL 'EB'
PANEL 'B2'
PANEL 'PPE'
PANEL 'EMDP-C'
PANEL 'BDPCB'
PANEL 'BDPC'
ATS #10
DISTRIBUTION PANEL 'PF'
M A
T C
H L
IN
E
A R
E A
B
A R
E A
A
N O
W O
R K
CRITICAL
CRITICAL
CRITICAL
BC-140
Room
BC-166
Room
BC-167
Room
BC-135
Room
BC-135A
Room
BC-135B
Room
BD-150
Room
BD-151
Room
BD-152
Room
BD-153
Room
BD-154
Room
BD-155
Room
BD-156
Room
BD-159
Room
BD-161
Room
BD-165
Room
BD-152A
Room
BD-150A
Room
BD-132
Room
BD-133
Room
BD-141
Room
BD-142
Room
BD-143
Room
BD-131A
Room
BD-131B
Room
BD-131D
Room
CRITICAL
TRANSFORMER 'BEQL'
TRANSFORMER 'T-??'
A R
E A
C
PANEL 'OFP'
PANEL 'BEQL'
PANEL 'BEQH'
TRANSFORMER 'T-1SLA2'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP100B
BASEMENT POWER PLAN - AREAS B &
C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH SCALE: 1/8" = 1'-0"
1 BASEMENT POWER PLAN - AREAS B & C
DISTRIBUTION PANEL 'DPA'
DISTRIBUTION PANEL 'P-1'
DISTRIBUTION PANEL 'DP-1'
DISTRIBUTION PANEL 'BDPA'
DISTRIBUTION PANEL 'EDPEE'
DISTRIBUTION PANEL 'EDPLS'
PANEL 'EEBPA'
PANEL 'PE1-A'
PANEL 'BAL'
PANEL 'TEL'
PANEL 'B2A'
PANEL 'EJ'
PANEL 'A'
DISTRIBUTION PANEL 'MSA'
DISTRIBUTION PANEL 'MCA'
DISTRIBUTION PANEL 'EM'
DISTRIBUTION PANEL 'EMDP'
DISTRIBUTION PANEL 'EDC'
DISTRIBUTION PANEL 'DP'
DISTRIBUTION PANEL 'EDLS'
ATS #2
ATS #1
ATS #4
ATS #3
ATS #5 (EMERGENCY)
TRANSFORMER 'XRAY'
ATS (CHILLER)
TRANSFORMER 'T-BWPB'
MOTOR CONTROL CENTER 'MCCA'
DISTRIBUTION PANEL 'EDPCA'
DISTRIBUTION PANEL 'EMDP-B'
DISTRIBUTION PANEL 'EDPEE'
DISTRIBUTION PANEL 'MDPB'
TRANSFORMER 'T-1'
DISTRIBUTION PANEL 'PE1'
MAIN DISTRIBUTION PANEL 'MSA'
TRANSFORMER 'tegg 0158'
TRANSFORMER 'tegg 0160'
TRANSFORMER 'tegg 0161'
PANEL 'LM'
TRANSFORMER 'T-LC'
TRANSFORMER 'T-LC2'
PANEL 'BWHA'
PANEL 'BWPA-2'
PANEL 'BWPA-1'
MAIN SWITCHBOARD 'MS'
TRANSFORMER 'T-EEBPA'
PANEL 'O'
PANEL 'O'
PANEL 'HA'
PANEL 'EA'
PANEL 'PB'
MOTOR CONTROL CENTER 'MCCD'
EXISTING MAIN SWITCHBOARD 'MSB'
45KVA, 5.5%
FEEDS ROOF PANEL 200A, (2)200A FUSES
3#6,1#6G. TO 100A BREAKER IN DP-1
ATS #5
ATS #6
ATS #7
ATS #8
PANEL 'EEBHA'
MATCHLINE
/1 EP100B
M A
T C
H L
IN
E
E P
E
MATCHLINE
/1 EP100G
BA-120
Room
BA-121
Room
BA-122
Room
BA-124
Room
BA-125
Room
BA-126
Room
BA-128
Room
BA-129
Room
BA-130
Room
BA-131
Room
BA-133
Room
BA-133A
Room
BA-140
Room
BD-110
Room
BD-111
Room
BD-112
Room
BD-113
Room
BD-115
Room
BD-117
Room
BD-101
Room
BD-102
Room
BD-103
Room
BD-104
Room
BD-105
Room
BD-106
Room
BD-107
Room
BD-113A
Room
BD-113B
Room
BD-113B1
Room
BD-115A
Room
BD-117A
Room
BA-150
Room
BA-151
Room
BA-152
Room
BA-152A
Room
BA-152B
Room
BA-152C
Room
BA-152D
Room
BA-152D1
Room
BA-121A
Room
BD-130
Room
BD-131
Room
BD-131C
Room
BD-131D1
Room
BD-106A
Room
BD-106B
Room
(SEC. 1)
(SEC. 2)
(SEC. 1)
(SEC. 2)
600A DISC.
SWITCH
(LIFE
SAFETY)
(EQUIPMENT)
(EQUIPMENT)
(CRITICAL
DISCONNECT SWITCH
(LP-1 & LPDP)
500A DISC. SWITCH
TO FIRE PUMP
AREA A - NO WORK
PANEL 'SL'
DISTRIBUTION PANEL 'MDPA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP100D
BASEMENT POWER PLAN - AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT POWER PLAN - AREA D
T
DISTRIBUTION PANEL 'P-2'
PANEL 'OFM'
PANEL 'OFL'
PANEL 'PE-4'
TRANSFORMER 'T-51'
DISTRIBUTION PANEL 'PE-2'
DISTRIBUTION PANEL 'PE-3'
MAIN DISTRIBUTION PANEL 'PE-1 A'
DISTRIBUTION PANEL 'PE-2 B'
PANEL 'BA'
PANEL 'BB'
PANEL 'BNPA'
PANEL 'EBCLA'
PANEL 'EBCHA'
TRANSFORMER 'T-EB'
PANEL 'EBLSHA'
DISTRIBUTION PANEL 'XRAY DP'
PANEL 'BMP'
TRANSFORMER 'T-BMP'
PANEL 'BMH'
PANEL 'EMB'
TRANSFORMER 'T-PE-4'
MATCHLINE
MATCHLINE
/1 EP100B
/1 EP100B
M A
T C
H L
IN
E
E P
D
MATCHLINE
MATCHLINE
/1 EP100G
BA-133
Room
BA-134
Room
BA-135
Room
BA-135A
Room
BA-133A
Room
BA-140
Room
BC-100
Room
BC-101
Room
BC-110
Room
BD-117
Room
BD-118
Room
BD-120
Room
BD-170
Room
BC-168
Room
BC-169
Room
BC-120
Room
BC-125
Room
BC-130
Room
BC-135C
Room
/1 EP100G
PANEL 'X-1'
PANEL 'X-2'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP100E
BASEMENT POWER PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT POWER PLAN - AREA E
UP
T
DISTRIBUTION PANEL 'S2'
TRANSFORMER 'T1'
PANEL 'LKBP-3'
PANEL 'LKBP-2'
PANEL 'LKBP-1'
PANEL 'HBP'
PANEL 'LBP'
PANEL 'HBPL'
PANEL 'LSHBP'
PANEL 'LSLBP'
TRANSFORMER 'TLKBP'
PANEL 'HKBP'
PANEL 'EQHBP'
PANEL 'EQLBP'
TRANSFORMER 'TLS1/BP'
TRANSFORMER 'T-EQLBP'
DISTRIBUTION PANEL 'DPHBPA'
PANEL 'CLBP'
MAIN SWITCHBOARD 'MSBP'
DISTRIBUTION PANEL 'DPHBPB'
400A/3 DISC. SW. FEEDS L1P,
FED FROM TBP/1L 120/208V
TRANSFORMER 'TBP/1L'
PANEL 'CHBP'
400A/3 DISC. SW. FEEDS LKBP,
FED FROM TLKBP 120/208V
A R
E A
G
MATCHLINE
/1 EP100D
MATCHLINE
/1 EP100E
BA-100
Room
BA-101
Room
BA-102
Room
BA-103
Room
BA-104
Room
BA-106
Room
BA-107
Room
BA-108
Room
BA-109
Room
BA-110
Room
BA-111
Room
BA-112
Room
BA-113
Room
BA-114
Room
BA-115
Room
BA-136
Room
BA-141
Room
BA-142
Room
BA-143
Room
BA-144
Room
BA-145
Room
BA-146
RoomBA-146A
Room
BA-103A
Room
BA-103B
Room
BA-103C
Room
BA-103D
Room
BA-103E
Room
BA-103F
Room
BA-103G
Room
BA-103H
Room
BA-148
Room
BA-148A
Room
BA-148A1
Room
BA-148A2
Room
BA-100A
Room
BC-100
Room
BA-115A
Room BA-115B
Room
BA-113B
Room
BA-113A
Room
BA-110A
Room
BA-110B
Room
BA-110C
Room
A R
E A
H
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP100G
BASEMENT POWER PLAN - AREAS G &
H
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT POWER PLAN - AREAS G & H
G
T T
T
T T
T
G G
PANEL '1IPJ'
PANEL '1SIPN2'
PANEL '1IPI'
PANEL '1IPH'
PANEL '1IPG'
PANEL '1IPF'
PANEL '1IPE'
PANEL '1SIPN1'
PANEL 'U7'
PANEL 'EK'
PANEL '1EEPA'
PANEL '1ELSPA'
PANEL '1ECHA'
PANEL '1ECPA'
PANEL '1WHA'
PANEL '1WPC'
PANEL '1WPA'
PANEL '1EEHA'
PANEL '1ELSHA'
PANEL 'DPWHA'
PANEL 'EMDP'
PANEL 'CH1P'
PANEL 'CL1P'
DISTRIBUTION PANEL 'ELSDP'
PANEL '1SHA'
PANEL 'T1SLA'
PANEL 'DPSHA'
PANEL '1SLA'
PANEL '1SLSLA'
PANEL 'T1SLSLA'
PANEL '1SLA2'
PANEL '1SCLA'
PANEL 'HB'
PANEL 'LB'
PANEL 'CLB'
TRANSFORMER 'T-CLB'
PANEL 'EHB'
PANEL 'ELB'
TRANSFORMER 'T-EB'
PANEL '1SHB'
PANEL '1SCHB'
PANEL 'T-1SCLB'
PANEL '1SCLB'
PANEL '1EDPHA'
PANEL '1CDPHA'
PANEL '1DPHA'
PANEL 'CHA'
PANEL 'T-EK'
TRANSFORMER 'T-CLA'
PANEL 'CLA'
PANEL '1CLL'
PANEL '1NLL-A'
PANEL 'T-1CLL'
PANEL 'T-1NLL'
PANEL '1CLL'
ATS-05D
ATS-05C
ATS-05B
ATS-05A
NEW
DATA
RM
PANEL '1IPLB'
PANEL '1IPKB'
PANEL '1IPLA'
PANEL '1IPKA'
PANEL '1SIPN'
PANEL '1SCIP'
TRANSFORMER 'T-LB'
PANEL 'MSC'
PANEL 'EQLGEN'
PANEL 'T-EQLGEN'
PANEL 'EMDS'
PANEL 'HP1'
PANEL 'LP1'
PANEL 'H1R'
TRANSFORMER 'T-H1R'
PANEL 'L1R'
PANEL 'CH1R'
PANEL 'CL1R'
PANEL 'X-RAY DP'
PANEL 'IP-CL2'
PANEL 'CIP-CL2'
PANEL 'IPCL1'
PANEL 'CIP-CL1'
PANEL '1CLD'
PANEL '1CHD'
PANEL '1LD'
PANEL '1HD'
PANEL '1IPA'
PANEL '1IPB'
PANEL 'EQH1P'
PANEL 'EQL1P'
TRANSFORMER 'T-EQL1P'
TRANSFORMER 'T-L1P2'
PANEL 'L1P2'
PANEL 'L1P'
PANEL 'ECDP'
TRANSFORMER 'T-CL/EP'
PANEL 'CRL'
PANEL 'HA'
PANEL 'LA'
TRANSFORMER 'T-LA'
PANEL 'T1SCLA'
PANEL '1SCLA'
PANEL 'DPSCHA'
TRANSFORMER 'T1SEQLA'
PANEL '1SEQHA'
PANEL 'LC2'
PANEL 'TLC2'
PANEL 'LP1A'
PANEL 'LC'
PANEL 'DPECA'
DISTRIBUTION PANEL '1DPCX'
DISTRIBUTION PANEL 'EQDPB'
GENERATOR CONTROL
TRANSFORMER 'T-1EEPA'
TRANSFORMER 'T-ELSHA'
TRANSFORMER 'T-1ECPA'
TRANSFORMER 'T-WPA'
PANEL '1SEQLA'
PANEL '1XHA'
PANEL 'LSHA'
TRANSFORMER 'T-1SLB'
PANEL '1SLB'
TRANSFORMER 'T-LA'
PANEL 'TLSLA'
PANEL 'LSLA'
PANEL 'HA'
PANEL 'LA'
PANEL 'LA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101
COMPOSITE 1ST LEVEL POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 1ST LEVEL POWER PLAN
PANEL '1ECHB'
PANEL '1CHB'
PANEL '1WHB'
PANEL '1WPB'
PANEL '1ELSHB'
PANEL '1ELSPB'
PANEL '1EEPB'
TRANSFORMER 'T-1ECPB'
TRANSFORMER 'T-1EEPB'
TRANSFORMER 'T-WPB'
MATCHLINE
M A
T C
H L
IN
E
E P
B
MATCHLINE
/1 EP101D
1E-114
Room
1E-113
BEDROOM
1E-113A
TOILET, PT
1E-114A
TOILET, PT
1E-115A
TOILET, PT
1E-115
Room
1E-116
BEDROOM
1E-117
BEDROOM
1E-118
BEDROOM
1E-119
BEDROOM
1E-120
BEDROOM
1E-121
BEDROOM
1E-106
BEDROOM
1E-107
BEDROOM
1E-108
BEDROOM
1E-109
BEDROOM
1E-110
BEDROOM
1E-111
BEDROOM
1E-112
BEDROOM
1E-122
COMMUNICATION
CLOSET
1E-123
NOURISHMENT
1E-124
UTILITY,
SOILED
1E-130
Room
1E-131
Room
1E-132
Room
1E-133
Room
1E-134
Room 1E-138
Room
1E-139
Room
1E-140
Room
1E-141
Room
1E-142
Room
1E-143
Room
1E-144
Room
1E-145
Room
1E-146
Room
1E-147
Room
1E-148
Room 1E-149
Room
1E-149A
Room
1E-148A
Room
1E-143A
Room
1E-143A1
Room
1E-140A
Room
1E-139A
Room
1E-134A
Room
1E-133A
Room
1E-132A
Room
1E-131A
Room
1E-130A
Room
1E-100
VESTIBULE
1E-101
CONF. ROOM
1E-102
UTILITY,
CLEAN
1E-103
STORAGE
1E-104
MEDICATION
RM
1E-105
NURSE
STATION
1E-103A
TOILET, STAFF
UNISEX
1E-100A
POLICE
1E-101A
STORAGE
1E-106A
TOILET, PT
1E-107A
TOILET, PT
1E-108A
TOILET, PT
1E-109A
TOILET, PT
1E-110A
TOILET, PT
1E-111A
TOILET, PT
1E-112A
TOILET, PT
1E-116A
TOILET, PT
1E-117A
TOILET, PT
1E-118A
TOILET, PT
1E-119A
TOILET, PT
1E-120A
TOILET, PT
1E-121A
TOILET, PT
1E-180
Room
1E-181
Room
1E-182
Room
1E-183
Room
1E-184
Room 1E-185
Room
1E-186
Room
1E-187
Room 1E-188
Room
1E-146A
Room
1E-146B
Room
1E-146C
Room
1E-146D
Room
1E-146E
Room 1E-146F
Room
1E-146H
Room
1E-146I
Room
1E-146J
Room
1E-146K
Room 1E-146L
Room
1E-146O
Room
1E-146P
Room
AREA AA - NO WORK
TRANSFORMER 'T-1ELSPB'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101A
1ST LEVEL POWER PLAN - AREA A
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA A
PANEL '1ECPA'
PANEL '1ECHA'
PANEL '1ELSPA'
PANEL '1ELSHA'
DISTRIBUTION PANEL 'DPECA'
DISTRIBUTION PANEL 'DPWHA'
PANEL '1WHA'
PANEL '1WPC'
PANEL '1WPA'
TRANSFORMER 'T-WPA'
PANEL '1EEHA'
TRANSFORMER 'T-1ECPA'
TRANSFORMER 'T-ELSHA'
PANEL '1LD'
PANEL '1CHD'
MAIN DISTRIBUTION PANEL '1DPCX'
PANEL '1CLD'
PANEL '1HD'
PANEL 'CIP-CL2'
PANEL 'IP-CL2'
PANEL 'IPCL1'
PANEL 'CIP-CL1'
TRANSFORMER 'T-LA'
PANEL 'HA'
PANEL 'CRL'
PANEL 'LA'
M A
T C
H L
IN
E
E P
A
M A
T C
H
LI
N E
E P
C
MATCHLINE
/1 EP101E
MATCHLINE
/1 EP101D
1E-149
Room
1E-149A
Room
1E-176
Room
1E-177
Room
1E-178
Room
1E-179
Room
1E-146L
Room
1E-146M
Room
1E-146N
Room
1E-146O
Room
1E-146P
Room 1E-146Q
Room
1E-146R
Room
1E-170
Room
1E-171
Room
1E-172
Room
1E-173
Room1E-174
Room
1E-175
Room
NW131
Room
NW132
Room
NW133
Room
NW134
Room
NW135
Room
NW136
Room
NW137
Room
NW138
Room
NW139
Room
NW140
Room
NW141
Room
NW142
Room
NW143
Room
NW144
Room
NW146
Room
NW147
Room
NW148
Room
NW149
Room
NW150
Room
NW151
Room
NW152
Room
1D-115
Room 1D-116
Room 1D-117
Room
1D-119
Room 1D-120
Room 1D-121
Room
1D-121A
Room
1D-121B
Room
1D-121C
Room
1D-121D
Room
1D-121E
Room
1D-121F
Room
1D-121G
Room
1D-121H
Room
1D-121I
Room
1D-121J
Room
1D-121K
Room
1D-121L
Room
1D-121M
Room
1D-121M1
Room
1D-110A3
Room 1D-110A3A
Room
1D-110A3B
Room
1E-170A
Room
PANEL '1EEPA'
TRANSFORMER 'T-1EEPA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101B
1ST LEVEL POWER PLAN - AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA B
PANEL '1IPF'
PANEL '1IPG'
PANEL '1SCIP'
TRANSFORMER 'T1SLA'
PANEL '1SHA'
PANEL '1SLA'
PANEL '1SCLA'
PANEL '1SCHA'
TRANSFORMER 'T1SCLA'
PANEL '1SLSLA'
PANEL '1SLSHA'
PANEL '1SEQLA'
PANEL '1SEQHA'
PANEL '1SEQDP'
PANEL '1IPJ'
PANEL '1IPI'
PANEL '1IPH'
PANEL '1SIPN2'
TRANSFORMER 'T1SEQLA'
PANEL 'DPSCHA'
PANEL 'DPSHA'
TRANSFORMER 'T1SLSLA'
PANEL '1SLA2'
PANEL '1SCLA'
PANEL '1SIPN'
M A
T C
H
LI
N E
E P
B
MATCHLINE
/1 EP101E
MATCHLINE
/1 EP101F
1D-121M
Room
1D-121M1
Room
1C-187
Room
1C-177
Room
1C-178
Room
1C-179
Room
1C-180
Room
1C-181
Room
1C-183
Room
(2 SECTION)
(2 SECTION)
(SECTION 3)
PANEL '1IPKA'
PANEL '1IPKB' PANEL '1IPLB'
PANEL '1IPLA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101C
1ST LEVEL POWER PLAN - AREA C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA C
T T
T
T T
T
G G
PANEL '1WHA'
PANEL '1WPC'
PANEL '1WPA'
PANEL 'LP1'
PANEL 'HP1'
MAIN SWITCHBOARD 'EMDS'
MAIN SWITCHBOARD 'MSC'
PANEL 'EQLGEN'
FEEDS TEQLGEN FROM PE-1 480V
GENERAC
POWER
SYSTEM
800KW GENERATOR
800KW GENERATOR
800KW GENERATOR
GENERATOR
NOT IN
SERVICE
MSB-1 UTILITY
TRANSFORMER
987-1
MSB-1 UTILITY
TRANSFORMER
987-2
MSB-1,2
UTILITY
TAP BOX
MSC UTILITY
TRANSFORMER
878-1
MS UTILITY
TRANSFORMER
878-2
MSA-1 UTILITY
TRANSFORMER
878-4
MSA-2 UTILITY
TRANSFORMER
878-3
MSA-1,2
UTILITY
TAP BOX
MS
UTILITY
TAP BOX
MSC AND
PLAZA
UTILITY
TAP BOX
350KW GENERATOR FOR
PLAZA BIULDING
MATCHLINE
/1 EP101B
M A
T C
H L
IN
E
E P
E
MATCHLINE
/1 EP101A
MATCHLINE
/1 EP101G
1D-106
Room
1D-110
Room
1D-111
Room
1D-109
Room
1D-110C
Room 1D-110C1
Room
1D-110C2
Room
1D-110C3
Room
1D-110C4
Room
1D-110C5
Room
1D-110C6
Room
1D-110C7
Room
1D-110C8
Room
1D-110C9
Room
1D-100
Room
1D-101
Room
1D-102
Room
1D-103
Room
1D-110A
Room
1D-110B
Room
1D-110A1
Room
1D-110A2
Room
1D-110A3
Room 1D-110A3A
Room
1D-110A3B
Room
TRANSFORMER 'T-EQLGEN'
PANEL 'LP1A'
PANEL 'LC'
PANEL 'LC2'
EXISTING TRANSFORMER 'TLC2'
GENERATORS DIESEL
FUEL TANK
G
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101D
1ST LEVEL POWER PLAN - AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA D
PANEL '1IPE'
PANEL '1SIPN1'
PANEL '1SCHB'
PANEL '1SCLB'
PANEL '1SHB'
PANEL '1SLB'
TRANSFORMER 'T-1SCLB'
TRANSFORMER 'T-1SLB'
PANEL 'HA'TRANSFORMER 'T-LA'
PANEL 'CLA'
TRANSFORMER 'T-EK'
PANEL 'LA'
PANEL 'LSHA'
PANEL 'LSLA'
TRANSFORMER 'TLSLA'
PANEL '1XHA'
PANEL '1NLL'
PANEL '1CLL'
TRANSFORMER 'T-1NLL'
TRANSFORMER 'T-1CLL'
PANEL 'H1R'
TRANSFORMER 'T-H1R'
PANEL 'L1R'
PANEL 'CH1R'
TRANSFORMER 'T-CH1R'
PANEL 'CL1R'
PANEL 'X-RAY DP'
LOCKED
PANEL 'EK'
PANEL 'U7'
TRANSFORMER 'T-CLA'
PANEL 'LA'
PANEL 'CHA'
150A,480V,3P
PUT IN WALL AT THIS LOCATION
PANEL '1NLL-A'
PNL SILP,120V,12P
ISOLATION XFMR 5KVA,2P
MATCHLINE
/1 EP101C
M A
T C
H L
IN
E
E P
D
MATCHLINE
/1 NUEP101H
MATCHLINE
/1 EP101G
E P
F
1D-135
Room
1D-135A
Room
1D-135B
Room
1D-135C
Room
1D-135D
Room
1D-135E
Room
1D-135F
Room
1D-135G
Room
1D-135H
Room
1D-135I
Room
1D-135C1
Room
1D-135J
Room
1D-135K
Room1D-135L
Room
1D-135M
Room
1D-135N
Room
1D-135O
Room
1D-135P
Room
1B-126
Room
1B-127
Room
1B-128
Room
1B-129
Room
1B-130
Room
1B-131
Room
1B-132
Room
1B-133
Room
1B-134
Room
1B-140
Room
1B-141
Room 1B-142
Room
1B-143
Room
1B-144
Room
1B-145
Room
1B-146
Room
1B-147
Room
1C-152
Room
1C-153
Room
1C-154
Room
1C-155
Room
1C-156
Room
1C-157
Room
1C-159
Room
1C-160
Room
1B-134A
Room
1B-134B
Room
1B-134C
Room
1B-134D
Room
1B-134B1
Room
1B-126A
Room
1B-126B
Room
1B-126C
Room
1C-116
Room
1C-116A
Room
1C-116B
Room
1C-116C1
Room
1C-116B1
Room
1C-118
Room
1C-120
Room
1C-122
Room
1C-123
Room
M A
T C
H L
IN
E
(2 SECTION)
DISTRIBUTION
PANEL '1EDPHA'
DISTRIBUTION
PANEL '1CDPHA'
DISTRIBUTION
PANEL '1DPHA'
(SEC. 2)
(SEC. 1)
ELEC.
ROOM
1C-104
MATCHLINE
/1 EP101B
PANEL '1IPB'
PANEL '1IPA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101E
1ST LEVEL POWER PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA E
PANEL '1IPE'
PANEL '1IPF'
TRANSFORMER 'T-CLB'
PANEL 'CLB'
PANEL 'LB'
PANEL 'HB'
PANEL 'ELB'
PANEL 'EHB'
TRANSFORMER 'T-EB'
TRANSFORMER 'T-LB'
M A
T C
H L
IN
E
E P
E
MATCHLINE
/1 EP101C
MATCHLINE
MATCHLINE
1B-160
Room
1B-161
Room
1B-162
Room
1B-163
Room
1B-164
Room
1B-165
Room
1B-166
Room
1B-167
Room
1B-168
Room
1B-169
Room
1B-170
Room
1B-171
Room
1B-172
Room
1B-173
Room
1B-174
Room
1B-175
Room
1B-176
Room
1B-177
Room
1B-178
Room
1B-180
Room
1B-181
Room
1B-182
Room
1B-183
Room
1B-184
Room 1B-185
Room
1B-187
Room
1B-188
Room
1B-189
Room
1B-190
Room
1B-106
Room
1B-107
Room
1B-108
Room
1B-109
Room
1B-110
Room
1B-111
Room
1B-112
Room
1B-113
Room
1B-114
Room 1B-115
Room 1B-116
Room
1B-117
Room
1B-118
Room
1B-119
Room
1B-117A
Room
1B-117B
Room
1B-117C
Room
1B-117D
Room
1B-117D1
Room
1B-120
Room
1B-121
Room
1B-126
Room
1B-127
Room
1B-145
Room
1B-146
Room
1B-147
Room
1B-148
Room
1B-149
Room 1B-150
Room
1B-151
Room
1B-152
Room
1B-153
Room
1B-154
Room
1B-155
Room
1B-156
Room
1B-158
Room
1B-152A
Room
1C-158
Room
1C-159
Room
AREA H - NO WORK
TCLB 100A,277V,3P
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101F
1ST LEVEL POWER PLAN - AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA F
PANEL 'L1P'
PANEL 'L1P2'
TRANSFORMER 'T-L1P2'
PANEL 'EQL1P'
TRANSFORMER 'T-EQL1P'
PANEL 'CL1P'
PANEL 'CH1P'
TRANSFORMER 'T-CL/EP'
ATS-ELSDP
ATS-ECDP
ATS-EQDPB
ATS EQDPA
PANEL 'EQH1P'
MAIN DISTRIBUTION PANEL 'EMDP'
PANEL 'H1P'
PANEL 'LSH1P'
DISTRIBUTION PANEL 'EQDPB'
PANEL 'ECDP'
M A
T C
H L
IN
E
MATCHLINE
/1 EP101D
MATCHLINE
/1 EP101E
M A
T C
H
LIN
E
1A-145
Room1A-140B
Room
1A-140
Room
1A-140A
Room
1A-120
Room
1A-122
Room
A R
E A
H
N O
W O
R K
FEEDS CLDP,100A, 3P
FEEDS CL1P,400A,3P
(3 SECTION)
F
IR
S T
LE
V E
L P
LA
Z A
B
LD
G
N O
W O
R K
DISTRIBUTION PANEL 'ELSDP'
ELEC.
ROOM
1A-105
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP101G
FIRST FLOOR POWER PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL POWER PLAN - AREA G
PANEL '2AH'
PANEL '2BL'
PANEL '3BL'
TRANSFORMER 'T2AL'
TRANSFORMER 'T-2CLC'
TRANSFORMER 'T-2CLB'
PANEL '2HB'
PANEL '2LC'
PANEL '2CLC'
PANEL '2LB'
PANEL '2CLB'
PANEL '2DPHA'
PANEL '2CLA'
TRANSFORMER 'T-2CLA'
PANEL '2CHA'
TRANSFORMER 'T2LA'
PANEL '2HA'
NC
PANEL 'CL2P'
PANEL 'CH2P'
PANEL 'LSH2P'
PANEL 'LSL2P'
PANEL 'EQH2P'
PANEL 'EQL2P'
PANEL 'L2P'
TRANSFORMER 'T-EQL2P'
TRANSFORMER 'T-P2L'
PANEL 'H2P'
TRANSFORMER 'T-LSL2P'
TRANSFORMER 'T-CL2P'
PANEL '2LA'
PANEL '3CLC'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP102
COMPOSITE 2ND LEVEL POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
NORTH SCALE: 1" = 30'-0"
1 COMPOSITE 2ND LEVEL POWER PLAN
TRANSFORMER 'T-2CLC'
TRANSFORMER 'T-2CLB'
PANEL '2HB'
PANEL '2LC' PANEL '2CLC'
PANEL '2LB'
PANEL '2CLB'
PANEL '2DPHA'
PANEL '2CLA'
TRANSFORMER 'T-2CLA'
PANEL '2CHA'
PANEL '2LA'
TRANSFORMER 'T2LA'
PANEL '2HA'
NC
PANEL '3CLC'
A R
E A
E
MATCHLINE
/1 EP102G
M A
T C
H L
IN
E
E P
G
2A-131
Room
2A-128
Room
2B-201
Room
2B-201A
Room
2B-201B
Room
2B-105
Room
2B-105A
Room
2B-107
Room
2B-103
Room
2B-157
Room
2B-159
Room
2B-161
Room
2B-163
Room
2A-158
Room
2A-202
Room
2A-157
Room
2A-159
Room 2A-161
Room
2A-163
Room
2A-165
Room
2A-160
Room 2A-162
Room 2A-164
Room
2A-166
Room
TELEPHONE
TERMINATION
PANEL
150A, PNL 2CLC
150A TO PNL 2CLB
A R
E A
F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP102E
2ND LEVEL POWER PLAN - AREAS E &
F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL POWER PLAN - AREA E
DISTRIBUTION PANEL 'CH2P'
TRANSFORMER 'T-CL2P'
PANEL 'CL2P' PANEL 'LSH2P'
PANEL 'LSL2P'
PANEL 'EQH2P'
PANEL 'EQL2P'
PANEL 'L2P'
TRANSFORMER 'T-P2L'
PANEL 'H2P'
TRANSFORMER 'T-LSL2P'
E P
E
/1 EP102E
MATCHLINE
M A
T C
H L
IN
E
2A-127
Room
2A-131
Room
2A-122
Room
2A-122A
Room
2A-122B
Room
2A-122C
Room
2A-122D
Room
2A-126
Room
2A-128
Room
2A-124
Room
2A-113
Room
2A-113A
Room
2B-187
Room
2B-187A
Room
2A-116
Room2A-115
Room
2A-118
Room
2A-117
Room
2A-109
Room
2A-112
Room
2A-111
Room
2A-114
Room
2A-120
Room
2A-119
Room
2A-121
Room
2A-123
Room
2A-114A
Room
2A-112A
Room
200A,3P,FEEDS CL3P
200A,3P FEEDS L3P
TRANSFORMER 'T-EQL2P'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP102G
2ND LEVEL POWER PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL POWER PLAN - AREA G
PANEL '3EHA'
PANEL '3HB'
PANEL '3LB1&2'
PANEL '3LC1&2'
PANEL '3CLB'
PANEL '3CLC'
PANEL '3LSLA'
PANEL '3HA'
PANEL '3LSHA'
PANEL '3CLA'
PANEL '3LA'
PANEL '3LD'
TRANSFORMER 'T-3LSA'
TRANSFORMER 'T-3CLA'
TRANSFORMER 'T-3LA'
TRANSFORMER 'T-3CLC'
N
CN
D
N C
5-METER CABINET
PANEL '3AH'
PANEL '3AL'
PANEL 'H3P'
PANEL 'L3P'
PANEL '3CL'
5.1IMPFED FROM 2CHA
PANEL 'EQH3P'
PANEL 'EQL3P'
PANEL 'CL3P'
TRANSFORMER 'TEQL3P'
PANEL 'LSH3P'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP103
COMPOSITE 3RD LEVEL POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 3RD LEVEL POWER PLAN
PANEL '3EHA'
PANEL '3HB'
PANEL '3LB1&2'
PANEL '3LC1&2'
PANEL '3CLB' PANEL '3CLC'
PANEL '3LSLA'
PANEL '3HA'
PANEL '3LSHA'
PANEL '3CLA'
PANEL '3LA'
PANEL '3LD'
TRANSFORMER 'T-3LSA'
TRANSFORMER 'T-3CLA'
TRANSFORMER 'T-3LA'
TRANSFORMER 'T-3CLC'
N C
N D
A R
E A
E
MATCHLINE
/1 EP103G
M A
T C
H L
IN
E
E P
G
A R
E A
F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP103E
3RD LEVEL POWER PLAN - AREAS E &
F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL POWER PLAN - AREAS E & F
PANEL 'H3P'
PANEL 'L3P'
PANEL 'LSH3P'
PANEL 'CL3P'
PANEL 'EQL3P'
PANEL 'EQH3P'
TRANSFORMER 'TEQL3P'
PANEL 'LSL4P'
E P
E
/1 EP103E
MATCHLINE
M A
T C
H L
IN
E
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP103G
3RD LEVEL POWER PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL POWER PLAN - AREA G
TRANSFORMER 'T-4CLA'
PANEL '4CHA'
PANEL '4LA'
TRANSFORMER 'T-4LA'
PANEL '4HA'
PANEL '4LA (WEST)'
PANEL '4LB'PANEL '4HC'
PANEL 'EM5'
PANEL '4D'
PANEL 'EQH4P'
PANEL 'H4P'
PANEL 'L4P'
TRANSFORMER 'T-P4L'
PANEL 'CL4P'
PANEL 'LSH4P'
PANEL 'CH4P'
PANEL 'EQL4P'
TRANSFORMER 'T-EQL4P'
TRANSFORMER 'T-LSL4P'
TRANSFORMER 'T-CL4P'
PANEL '4CLA'
TRANSFORMER 'T-4CLA west'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP104
COMPOSITE 4TH LEVEL POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 4TH LEVEL POWER PLAN
# Revision Date
1 Revision 1 Date 1
PANEL '4CLA'
TRANSFORMER 'T-4CLA'
PANEL '4CHA'
PANEL '4LA'
TRANSFORMER 'T-4LA'
PANEL '4HA'
PANEL '4LA (WEST)'
PANEL '4LB'PANEL '4HC'
PANEL 'EM5'
PANEL '4D'
A R
E A
E
MATCHLINE
/1 EP104G
M A
T C
H L
IN
E
E P
G
4A-149
Room
4A-151
Room
4A-153
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142B
Room
4A-142A
Room
4A-215
Room
4A-183
Room
4A-183A
Room
4A-183B
Room
A R
E A
F
EXISTING TRANSFORMER 'T-4CLA west'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP104E
4TH LEVEL POWER PLAN - AREAS E &
F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 4TH LEVEL POWER PLAN - AREAS E & F
PANEL '4D'
PANEL 'EQH4P'
PANEL 'H4P'
PANEL 'L4P'
TRANSFORMER 'T-P4L'
PANEL 'CL4P'
PANEL 'LSH4P'
PANEL 'CH4P'
PANEL 'EQL4P'
TRANSFORMER 'T-EQL4P'
TRANSFORMER 'T-LSL4P'
TRANSFORMER 'T-CL4P'
E P
E
/1 EP104E
MATCHLINE
M A
T C
H L
IN
E
4A-158
Room
4A-149
Room
4A-151
Room
4A-153
Room
4A-155
Room
4A-157
Room
4A-159
Room
4A-161
Room
4A-163
Room
4A-165
Room
4A-167
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP104G
4TH LEVEL POWER PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 4TH LEVEL POWER PLAN - AREA G
F A
A P
PANEL '5CLA'
PANEL '5CHA'
PANEL '5LSLA'
PANEL '5HA'
PANEL '5LSHA'
PANEL '5LA'
TRANSFORMER 'T-5LA'
TRANSFORMER 'T-5CLA'
PANEL 'SIEMENS'
TRANSFORMER 'T-5SLA'
PANEL '5LAK'
NC
DISTRIBUTION PANEL 'PHDPHA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP105F
5TH & 6TH LEVEL POWER PLANS -
AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 5TH LEVEL POWER PLAN - AREA F
SCALE: 1/8" = 1'-0"
2 6TH LEVEL POWER PLAN - AREA F
NORTH
TRANSFORMER '50 KVA'
DISTRIBUTION PANEL 'DPA'
PANEL 'XAH'
PANEL 'XBHA'
PANEL 'BAH'
PANEL 'BAL'
PANEL 'LBAH'
PANEL 'LBAL'
TRANSFORMER 'TLBAL'
TRANSFORMER 'TDPA'
DISTRIBUTION PANEL 'EDPA'
MAIN SWITCHBOARD 'MSB'
TRANSFORMER 'CIAL'
TRANSFORMER 'TIAL'
MOTOR CONTROL CENTER 'MCCA'
TRANSFORMER 'TBAL'
ATS-A
ATS-E
MOTOR CONTROL CENTER 'MCC MSA'
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP200
GARLAND PLAZA BUILDING -
BASEMENT POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
SCALE: 1/8" = 1'-0"
1 GARLAND PLAZA BUILDING - BASEMENT POWER PLAN
NORTH
PANEL '2AH'
PANEL '2BL'
PANEL '3BL'
TRANSFORMER 'T2AL'
TELEPHONE TERMINATION PANEL
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
EP202
GARLAND PLAZA BUILDING - 2ND
LEVEL POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
BELBAS
SCALE: 1/8" = 1'-0"
1 GARLAND PLAZA BUILDING - 2ND LEVEL POWER PLAN
NORTH
T
MAIN DISTRIBUTION PANEL 'MS'
DISTRIBUTION PANEL 'DP'
PANEL 'I'
PANEL 'J'
PANEL 'C'
PANEL 'K'
PANEL 'F'
PANEL 'E'
PANEL 'D'
PANEL 'A'
PANEL 'B'
PANEL 'C'
PANEL 'L'
PANEL 'G'
TRANSFORMER 'T-?'
30KVA
480 DELTA/240 DELTA
PANEL 'H'
AHU
P235
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .