This document is a comprehensive set of plumbing construction drawings for the A/E Construct Energy Center Garland project, a Department of Veterans Affairs facility located at 2300 Marie Boulevard in Garland, Texas. The drawings are marked as "Not for Progress Print" and dated April 10, 2024, with revision information dated August 29, 2023. The project features a complex multi-building medical facility with basement through sixth-floor plumbing systems, plus separate Garland Plaza and Shiloh buildings.
The plumbing plans encompass foundation and basement-level systems (Areas A through H), first through sixth-floor systems with detailed area breakdowns, fire suppression systems, and specialized medical gas distribution networks including zone valve boxes for recovery areas, catheterization labs, radiology, and special imaging. The drawings specify extensive piping systems using standard abbreviations (DCW for domestic cold water, DHW for domestic hot water, SAN for sanitary drain, ST for storm drain, V for vent lines, etc.) in various sizes ranging from half-inch to ten-inch diameter. Key mechanical components documented include water heaters, water softeners, pressure-reducing valve stations, sump pumps, recirculation pumps, and backflow prevention devices. The project consultants are Calibre and Farris Engineering, with construction administration by Tristone/HFC. The drawings are prepared by the VA's Office of Construction and Facilities Management with Project Number 222045 and represent a comprehensive design-level documentation package for a major federal healthcare construction project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLY TO ALL PLUMBING SHEETS
A. LIGHT LINE WEIGHT INDICATES EXISTING ITEMS AND ASSOCIATED MATERIALS TO REMAIN.
BOLD LINE WEIGHT INDICATES NEW WORK TO BE INSTALLED UNDER THIS CONTRACT.
B. ROUTING INDICATED ON DRAWINGS IS APPROXIMATE AND DOES NOT INCLUDE ALL OFFSETS, FITTINGS, VALVES, ETC. CONTRACTOR TO FIELD VERIFY PIPE SIZE AND SERVICE PRIOR TO
FINAL CONNECTION. COORDINATE LOCATION OF PLUMBING PIPING WORK WITH LIGHTING,
STRUCTURAL MEMBERS, HVAC, PIPING SYSTEMS, ETC. PROVIDE OFFSETS AND CLEARANCES
OR RELOCATE PLUMBING WORK AS REQUIRED TO AVOID CONFLICTS WITH WORK OF ALL
OTHER TRADES.
C. PLUMBING WORK SHALL NOT BE LOCATED OVER ELECTRICAL, DATA OR COMMUNICATION
EQUIPMENT ROOMS. PLUMBING WORK SHALL NOT BE LOCATED ABOVE ELECTRICAL / DATA /
COMMUNICATION EQUIPMENT OR PANELS.
D. SUPPORT ALL PLUMBING PIPING, EQUIPMENT, ETC. FROM BUILDING STRUCTURE. HOLD
PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF
POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT
SUPPORT PIPING FROM OTHER PIPING, DUCTWORK AND/OR ELECTRICAL CONDUITS. DO NOT
SUPPORT FROM BOTTOM OF CHORD OF BAR JOIST OR FROM METAL ROOF DECK.
E. ROUTE ABOVE GRADE DRAINAGE PIPING AS HIGH AS POSSIBLE AND COORDINATE WITH
OTHER TRADES.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY SEALING PENETRATIONS THROUGH A
FIRE RATED, SMOKE RATED OR COMBINATION FIRE & SMOKE RATED SEPARATIONS. SEE
SPECIFICATIONS FOR FIRE & SMOKE RATED SEALANTS. SEE ARCHITECTURAL PLANS FOR
RATED SEPARATIONS.
G. INSTALL ESCUTCHEON PLATES ON ALL WALL AND FLOOR PENETRATIONS SERVING EXPOSED
PLUMBING PIPING WALL PENETRATIONS.
H. ALL OPENINGS IN WALLS AND FLOORS FOR PIPING SHALL BE CORE DRILLED OR SAW CUT,
UNLESS OTHERWISE NOTED.
I. LOCATE AND INSTALL EQUIPMENT TO PROVIDE ALL CODE AND MANUFACTURER’S
RECOMMENDED CLEARANCES. KEEP HVAC PIPING, DUCTWORK, ETC. OUT OF CLEARANCE
AREAS.
J. ALL PLUMBING PIPING WORK SHALL BE LOCATED ABOVE CEILINGS, IN A PIPE CHASE, OR
OTHER CONCEALED LOCATIONS, UNLESS OTHERWISE NOTED. LOCATE AND ARRANGE
VALVES, DRAIN FITTINGS, ETC. TO BE ACCESSIBLE THROUGH LAY-IN CEILINGS, ACCESS
PANELS OR ACCESS DOORS. PROVIDE ACCESS PANEL OR ACCESS DOOR FOR ALL VALVES,
DRAIN FITTINGS, ETC. AT NON-ACCESSIBLE LOCATIONS.
K. INSTALL SECTIONAL VALVES ON EACH BRANCH AND/OR RISER SERVING TWO OR MORE
PLUMBING FIXTURES OR EQUIPMENT CONNECTIONS. INSTALL VALVES ADJACENT TO MAIN.
L. INSTALL SHUTOFF VALVES ON INLET AND OUTLET OF PLUMBING EQUIPMENT.
M. INSTALL STOPS AT EACH PLUMBING FIXTURE EXCEPT AT FLUSHOMETER LOCATIONS.
N. SEAL ALL PLUMBING PIPING PENETRATIONS. SEAL PENETRATIONS THROUGH RATED WALLS,
FLOORS OR CEILINGS WITH MATERIALS APPROPRIATE FOR RATING.
O. PIPING IN EXTERIOR WALLS SHALL BE LOCATED ON THE INTERIOR SIDE OF BUILDING
INSULATION AND VAPOR BARRIER.
P. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN
PIPING AND EXTERIOR WALL SURFACE.
Q. COORDINATE EXACT LOCATION OF FLOOR DRAINS AND FLOOR SINKS. TOP OF GRATE SHALL
BE 1/8" BELOW FINISHED FLOOR ELEVATION.
R. COMPLY WITH LOCAL UTILITY COMPANY RULES AND REGULATIONS FOR ALL GAS METER
INSTALLATIONS. COORDINATE EXACT LOCATION OF GAS CONNECTIONS WITH EQUIPMENT
SUPPLIED.
S. COPPER PIPING LOCATED ABOVE GRADE SHALL BE TYPE "L"; COPPER PIPING LOCATED
BELOW GRADE SHALL BE TYPE "K" AND RUN CONTINUOUS WITHOUT JOINTS BELOW GRADE.
TYPE "M" COPPER SHALL NOT BE USED ON PRESSURIZED PIPING SYSTEMS.
T. DRAINAGE PIPING 3 INCHES AND SMALLER SHALL SLOPE NO LESS THAN 1/4 INCH PER FOOT.
DRAINAGE PIPING 4 INCHES AND LARGER SHALL SLOPE NO LESS THAN 1/8 INCH PER FOOT.
U. INSTALL WALL CLEAN OUTS (WCO) WHEN LOCATED BEHIND A WATER CLOSET AT 30" A.F.F. OR
AT 42" A.F.F. ABOVE CABINETRY ON ALL SANITARY & STORM STACKS.
V. COORDINATE EXACT STORM PIPE CONNECTIONS WITH STORM DRAIN LOCATIONS SHOWN ON
ARCHITECTURAL ROOF PLAN.
W. INSTALL VENT-THRU-ROOF (VTR) A MINIMUM OF 10'-0" AWAY FROM ANY OUTSIDE AIR INTAKE.
X. REMOVE, REPAIR AND REPLACE WALLS, FLOORS, ROOFS AND CEILINGS TO MATCH EXISTING, WHERE NECESSARY FOR PIPING AND FIXTURE REMOVAL & INSTALLATION.
Y. KITCHEN EQUIPMENT FURNISHED BY KITCHEN EQUIPMENT CONTRACTOR - PLUMBING
CONTRACTOR SHALL ROUGH-IN AND MAKE FINAL CONNECTIONS TO UTILITIES REQUIRED AND
PROVIDE PIPING, STOPS, WATER HAMMER ARRESTERS, TRAPS AND FITTINGS FOR
EQUIPMENT TO BE IN OPERATIONAL ORDER. COORDINATE WITH KITCHEN EQUIPMENT
SUPPLIER FOR CONNECTIONS AND LOCATIONS. SEE KITCHEN EQUIPMENT CONNECTION
SCHEDULE FOR RESPONSIBILITY OF WHO FURNISHES VACUUM BREAKERS AND PRESSURE
REDUCING VALVES.
Z. PVC PIPING SHALL NOT BE INSTALLED IN ANY RETURN AIR PLENUM UNLESS THE PIPING IS
INSTALLED IN A PRE-APPROVED RATED ASSEMBLY.
AA. PROVIDE ACCESSIBLE SHUTOFF VALVE INSIDE THE BUILDING FOR EACH WALL HYDRANT.
BB. CONTRACTOR SHALL COORDINATE ALL CONNECTIONS OF PLUMBING SYSTEMS WITH
EXTERIOR SITE UTILITIES AND SERVICES PRIOR TO INSTALLING ANY PIPING ON THE INTERIOR.
CONTRACTOR SHALL CONFIRM THAT ALL INTERIOR PIPE INVERTS AND PIPE INVERTS AT THE
5' LINE MATCH EXTERIOR PIPE INVERTS, PRIOR TO INSTALLING ANY INTERIOR PIPING BELOW
FLOOR.
GENERAL PLUMBING NOTES
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
PG101
PLUMBING SYMBOLS LEGEND AND
GENERAL NOTES
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
NOTICE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND
CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SHOP AND OTHER APPROPRIATE DRAWINGS OR AT SITE.
LAY OUT AND COORDINATE ALL WORK PRIOR TO
INSTALLATION TO PROVIDE CLEARANCES REQUIRED
FOR OPERATION, MAINTENANCE, AND CODES. VERIFY
NON-INTERFERENCE WITH OTHER WORK. DO NOT
FABRICATE PRIOR TO VERIFICATION OF CLEARANCES
FOR ALL TRADES. THIS NOTICE APPLIES TO ALL
MECHANICAL / PLUMBING PLANS.
# Revision Date 04/10/2024 04/10/2024
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL000G
FOUNDATION PLUMBING PLAN - AREA
G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 FOUNDATION PLUMBING PLAN - AREA G
UP
DN
DN
DN
T
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100
COMPOSITE BASEMENT PLUMBING
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1" = 30'-0"
1 COMPOSITE BASEMENT PLUMBING PLAN
MATCHLINE
/2 PL100A
M A
T C
H L
IN
E
P L B
MATCHLINE
/1 PL100D
MATCHLINE
/1 PL100A
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100A
BASEMENT PLUMBING PLAN - AREAS
A AND AA
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREA A
SCALE: 1/8" = 1'-0"
2 BASEMENT PLUMBING PLAN - AREA AA
NORTH
expansion tank
LEVEL 1 (-2')
M A
T C
H L
IN
E
P L A
M A
T C
H
LI
N E
P L C
MATCHLINE
/1 PL100EMATCHLINE
/1 PL100D
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100B
BASEMENT PLUMBING PLAN - AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREA B
M A
T C
H
LI
N E
P L B
MATCHLINE
/1 PL100E
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100C
BASEMENT PLUMBING PLAN - AREA C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREA C
BFP
BFP
WATER METER
7'1"AFF
WATER
METER
BFP
RECIR
PUMP
AERCO
WATER
HEATER
16"x24" (aff)x78" tall (unit only) inline pump in verticaL
ST-1
MV-1
BASE MOUNTED
RECIRC PUMP
INLINE
RECIRC PUMP
22"DIA X 6'5"
WATER SOFTENERS
MOVE DOWN TO LINE
(DON'T MOVE FDs - only softener and piping) pressure reducing valve station dcw connection to condensate hose bibb (cw piping up to 1st fl) bfp pressure reducing valve expansion tank move hw & hwc to line hw heating station inline recirc pump san open stubbed into room at wall
NON FUNCTIONAL
SUMP PUMPS
CONNECT TO STORM
LINE HERE
NOT THROUGH FLOOR
MATCHLINE
/1 FX100B
M A
T C
H L
IN
E
P L E
MATCHLINE
/1 PL100G
MATCHLINE
/1 PL100A
MATCHLINE
/1 PL100G
2" SAN
4" DCW
3" DHW
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100D
BASEMENT PLUMBING PLAN - AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREA D
# Revision Date
1 Revision 1 Date 1
ABANDONED ACID WASTE
MATCHLINE
/1 PL100C
M A
T C
H L
IN
E
P L D
MATCHLINE
/1 PL100G
MATCHLINE
/1 PL100G
MATCHLINE
/1 PL100B
2" SAN
4" DCW
3" DHW
1/2" RHW
1" DHW
1 1/2" DCW 4" SAN
1/2" RHW
6" SAN
3" DHW
4" DCW
4" SAN
4" V
1 1/2" DCW
1" DHW
1/2" RHW
1/2" RHW
1" DHW
1 1/2" DCW
5" ST
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100E
BASEMENT PLUMBING PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREA E
UP
.0
.4
SEWAGE EJECTOR
MATCHLINE
/1 PL100E
A R
E A
G
MATCHLINE
/1 PL100D
MATCHLINE
/1 PL100E
A R
E A
H
2 1/2" DCW
3" V
3/4" DHW
1/2" DHW
10" ST
6" ST
1 1/2" DHW
3" DHW
4" DCW
4" SAN
4" V
6" ST UP
3" SAN
2" SAN
4" DCW
3" DHW
2" RHW
1/2" RHW
1" DHW
1 1/2" DCW
1 1/2" DCW 4" SAN
1/2" RHW
1" DHW
1 1/2" DCW
5" SAN
2" DCW
2" DHW
3/4" RHW
4" SAN
4" SAN
4" SAN
3/4" DHW
3/4" DCW
3/4" DCW
3/4" DHW
6" SAN
2" RHW
6" DCW
6" DCW
3" DHW
4" DCW
4" SAN
2" V
3/4" DCW
3/4" DHW
2" V
4" SAN
4" SAN
6" SAN
3" SAN
6" SAN
10" ST
10" ST
8" ST
2" SAN
4" SAN
4" SAN
2" SCW6" SAN
4" G 4" SAN
6" SAN
2" G
1" G
1" DHW
1" G
2 1/2" 140° DHW
1" SCW
4" V
1" DHW
2 1/2" 140° DHW
1" 140° DHW
1" DHW
1/2" DHW
1/2" DHW1/2" SCW
2 1/2" 140° DHW
2 1/2" SCW
2" DHW
1" 140° RHW
3/4" DCW
3/4" DHW
2" V
8" ST UP
6" SAN
4" SAN4" DCW
6" SAN
4" DCW
1" 140° RHW
2 1/2" 140° DHW
6" SAN
4" DCW
1" 140° RHW
2 1/2" 140° DHW
3" G
2 1/2" SCW
2" DHW
1" 140° RHW
4" V
2" V
8" ST UP
2" SCW
4" G
4" DCW
1" 140° RHW
2 1/2" 140° DHW
6" SAN
4" DCW
3" DHW
1 1/2" DHW
3/4" DCW
2" V
1/2" DCW
3" V
4" V
6" ST
3" SAN
2" SAN
2" SAN
6" SAN 4" SAN
4" SAN
3" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN2" SAN
2" SAN
1/2" DCW
1" DCW
1/2" DCW
1" DCW
3/4" DHW
3" V
1/2" DCW
4" G
4" DCW
3" DHW
1 1/2" DHW
1" 140° RHW
2 1/2" 140° DHW
10" ST
2" V
3" V
4" V DN
3/4" DHW
3/4" DCW
2" V
5" SAN
4" V
1/2" DCW
3" SAN
2" V
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL100G
BASEMENT PLUMBING PLAN - AREAS
G & H
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 BASEMENT PLUMBING PLAN - AREAS G & H
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101
COMPOSITE FIRST FLOOR PLUMBING
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 1ST LEVEL PLUMBING PLAN
ZONE VALVE
BOX -1-1
MATCHLINE
/2 PL101A
M A
T C
H L
IN
E
P L B
MATCHLINE
/1 PL101D
1E-114
Room
1E-113
BEDROOM
1E-113A
TOILET, PT
1E-114A
TOILET, PT
1E-115A
TOILET, PT
1E-115
Room
1E-116
BEDROOM
1E-117
BEDROOM
1E-118
BEDROOM
1E-119
BEDROOM
1E-120
BEDROOM
1E-121
BEDROOM
1E-106
BEDROOM
1E-107
BEDROOM
1E-108
BEDROOM
1E-109
BEDROOM
1E-110
BEDROOM
1E-111
BEDROOM
1E-112
BEDROOM
1E-122
COMMUNICATION
CLOSET
1E-123
NOURISHMENT
1E-124
UTILITY,
SOILED
1E-130
Room
1E-131
Room
1E-132
Room
1E-133
Room
1E-134
Room 1E-138
Room
1E-139
Room
1E-140
Room
1E-141
Room
1E-142
Room
1E-143
Room
1E-144
Room
1E-145
Room
1E-146
Room
1E-147
Room
1E-148
Room 1E-149
Room
1E-149A
Room
1E-148A
Room
1E-143A
Room
1E-143A1
Room
1E-140A
Room
1E-139A
Room
1E-138A
Room
1E-134A
Room
1E-133A
Room
1E-132A
Room
1E-131A
Room
1E-130A
Room
1E-100
VESTIBULE
1E-101
CONF. ROOM
1E-102
UTILITY,
CLEAN
1E-103
STORAGE
1E-104
MEDICATION
RM
1E-105
NURSE
STATION
1E-103A
TOILET, STAFF
UNISEX
1E-100A
POLICE
1E-101A
STORAGE
1E-106A
TOILET, PT
1E-107A
TOILET, PT
1E-108A
TOILET, PT
1E-109A
TOILET, PT
1E-110A
TOILET, PT
1E-111A
TOILET, PT
1E-112A
TOILET, PT
1E-116A
TOILET, PT
1E-117A
TOILET, PT
1E-118A
TOILET, PT
1E-119A
TOILET, PT
1E-120A
TOILET, PT
1E-121A
TOILET, PT
1E-179
Room
1E-180
Room
1E-181
Room
1E-182
Room
1E-183
Room
1E-184
Room 1E-185
Room
1E-186
Room
1E-187
Room 1E-188
Room
1E-146A
Room
1E-146B
Room
1E-146C
Room
1E-146D
Room
1E-146E
Room 1E-146F
Room
1E-146H
Room
1E-146I
Room
1E-146J
Room
1E-146K
Room 1E-146L
Room
1E-146O
Room
1E-146P
Room 1E-146Q
Room
1E-146R
Room
MATCHLINE
/1 PL101A1E-134
Room
1E-135
Room
1E-136
Room
1E-137
Room
1E-138
Room
1E-138A
Room
1E-136A
Room
1E-137A
Room
1E-135A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101A
1ST LEVEL PLUMBING PLAN - AREAS A
& AA
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA A
SCALE: 1/8" = 1'-0"
2 1ST LEVEL PLUMBING PLAN - AREA AA
WHA
RECOVERY ZONE VALVES BOX
(SERVING RECOVERY
PATIENT AREAS 1-4)
RECOVERY
GAS DISTRIBUTION
MONITOR
CATH LAB 1 GAS
DISTRIBUTION
MONITOR
CATH LAB 2 GAS DISTRIBUTION
MONITOR
ZONE VALVES
SERVING CATH LAB 1
M A
T C
H L
IN
E
P L A
M A
T C
H
LI
N E
P L C
MATCHLINE
/1 PL101E
MATCHLINE
/1 PL101D
1E-149
Room
1E-149A
Room
1E-176
Room
1E-177
Room
1E-178
Room
1E-179
Room
1E-146L
Room
1E-146M
Room
1E-146N
Room
1E-146O
Room
1E-146P
Room 1E-146Q
Room
1E-146R
Room
1E-170
Room
1E-171
Room
1E-172
Room
1E-173
Room1E-174
Room
1E-175
Room
NW131
Room
NW132
Room
NW133
Room
NW134
Room
NW135
Room
NW136
Room
NW137
Room
NW138
Room
NW139
Room
NW140
Room
NW141
Room
NW142
Room
NW143
Room
NW144
Room
NW146
Room
NW147
Room
NW148
Room
NW149
Room
NW150
Room
NW151
Room
NW152
Room
1D-115
Room 1D-116
Room 1D-117
Room
1D-119
Room 1D-120
Room 1D-121
Room
1D-121A
Room
1D-121B
Room
1D-121C
Room
1D-121D
Room
1D-121E
Room
1D-121F
Room
1D-121G
Room
1D-121H
Room
1D-121I
Room
1D-121J
Room
1D-121K
Room
1D-121L
Room
1D-121M
Room
1D-121M1
Room
1D-110A3A
Room
1D-110A3B
Room
1E-170A
Room
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101B
1ST LEVEL PLUMBING PLAN - AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA B
T C
H
LI
N E
P L B
MATCHLINE
/1 PL101E
M A
T C
H L
IN
E
1D-121M
Room
1D-121M1
Room
1C-187
Room
1C-177
Room
1C-178
Room
1C-179
Room
1C-180
Room
1C-181
Room
1C-183
Room
MATCHLINE
/1 PL101F
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101C
1ST LEVEL PLUMBING PLAN - AREA C
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA C
CEILING
OUTLETS
SPECIAL IMAGING
ZONE VALVES BOX
(NOT IN USE)
SPECIAL IMAGING
ZONE VALVES BOX
PIPING DOWN TO
MEDICAL ELECTRONIC
GAS ALARM
MATCHLINE
/1 PL101B
M A
T C
H L
IN
E
P L E
MATCHLINE
/1 PL101A
MATCHLINE
/1 PL101G
1D-106
Room
1D-110
Room
1D-111
Room
1D-109
Room
1D-110C
Room 1D-110C1
Room
1D-110C2
Room
1D-110C3
Room
1D-110C4
Room
1D-110C5
Room
1D-110C6
Room
1D-110C7
Room
1D-110C8
Room
1D-110C9
Room
1D-100
Room
1D-101
Room
1D-102
Room
1D-103
Room
1D-110A
Room
1D-110B
Room
1D-110A1
Room
1D-110A2
Room
1D-110A3
Room 1D-110A3A
Room
1D-110A3B
Room
4" ST
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101D
1ST LEVEL PLUMBING PLAN - AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA D
# Revision Date
1 Revision 1 Date 1
RADIOLOAGY
ZONE VALVES
BOX
MATCHLINE
/1 PL101C
M A
T C
H L
IN
E
P L D
MATCHLINE
/1 PL101H
MATCHLINE
/1 PL101G
M A
T C
H L
IN
E
P L F
1D-135
Room
1D-135A
Room
1D-135B
Room
1D-135C
Room
1D-135D
Room
1D-135E
Room
1D-135F
Room
1D-135G
Room
1D-135H
Room
1D-135I
Room
1D-135C1
Room
1D-135J
Room
1D-135K
Room1D-135L
Room
1D-135M
Room
1D-135N
Room
1D-135O
Room
1D-135P
Room
1B-126
Room
1B-127
Room
1B-128
Room
1B-129
Room
1B-130
Room
1B-131
Room
1B-132
Room
1B-133
Room
1B-134
Room
1B-140
Room
1B-141
Room 1B-142
Room
1B-143
Room
1B-144
Room
1B-145
Room
1B-146
Room
1B-147
Room
1C-152
Room
1C-153
Room
1C-154
Room
1C-155
Room
1C-156
Room
1C-157
Room
1C-159
Room
1C-160
Room
1B-134A
Room
1B-134B
Room
1B-134C
Room
1B-134D
Room
1B-134B1
Room
1B-126A
Room
1B-126B
Room
1B-126C
Room
1C-116
Room
1C-116A
Room
1C-116B
Room
1C-116C
Room
1C-116C1
Room
1C-116B1
Room
1C-118
Room
1C-120
Room
1C-122
Room
1C-123
Room
MATCHLINE
/1 PL101C
M A
T C
H L
IN
E
5" ST
1/2" CO2
3/4" DCW
3/4" DHW
1 1/2" V
1/2" CO2 (TYP)
2" WAGD (TYP)
2" DHW
1" WAGD
1/2" CO2
1/2" MXA
2" DHW
2" RHW
1 1/4" V
3/4" DCW
1" DCW
1 1/4" V
1 1/4" V
4" SAN
4" SAN UP
3/4" DCW
3/4" DHW
1 1/2" V
1/2" DCW
1/2" DCW
1/2" DHW 4" V
1 1/2" V
2" V
4" SAN
5" ST
5" ST DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101E
1ST LEVEL PLUMBING PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA E
NORTH
P L E
MATCHLINE
/1 PL101C
MATCHLINE
/1 PL101H
1B-160
Room
1B-161
Room
1B-162
Room
1B-163
Room
1B-164
Room
1B-165
Room
1B-166
Room
1B-167
Room
1B-168
Room
1B-169
Room
1B-170
Room
1B-171
Room
1B-172
Room
1B-173
Room
1B-174
Room
1B-175
Room
1B-176
Room
1B-177
Room
1B-178
Room
1B-180
Room
1B-181
Room
1B-182
Room
1B-183
Room
1B-184
Room
1B-185
Room
1B-187
Room
1B-188
Room
1B-189
Room
1B-190
Room
1B-106
Room
1B-107
Room
1B-108
Room
1B-109
Room
1B-110
Room
1B-111
Room
1B-112
Room
1B-113
Room
1B-114
Room 1B-115
Room 1B-116
Room
1B-117
Room
1B-118
Room
1B-119
Room
1B-117A
Room
1B-117B
Room
1B-117C
Room
1B-117D
Room
1B-117D1
Room
1B-120
Room
1B-121
Room
1B-126
Room
1B-127
Room
1B-145
Room
1B-146
Room
1B-147
Room
1B-148
Room
1B-149
Room 1B-150
Room
1B-151
Room
1B-152
Room
1B-153
Room
1B-154
Room
1B-155
Room
1B-156
Room
1B-158
Room
1B-152A
Room
1C-158
Room
1C-159
Room
M A
T C
H L
IN
E
1/2" CO2
3/4" DCW
3/4" DHW
1 1/2" V
1/2" CO2 (TYP)
2" WAGD (TYP)
2" DHW
1/2" DHW
1 1/2" V3/4" DHW
3/4" DCW
1/2" CO2
2" V3/4" DCW
2" LPR (TYP)
4" ST
3/4" DCW
2" DCW
2" DHW
1 1/2" DCW
1 1/2" DHW
4" ST DN
4" SO DN
4" SO
4" ST
4" ST UP
4" ST DN
1" WAGD
1/2" CO2
1/2" MXA
1" WAGD
1/2" CO2
1/2" MXA
4" ST DN
4" ST UP
4" ST UP
4" ST DN
1/2" DCW
1/2" RHW
3/4" DHW
3/4" DCW
2" V
3/4" RHW
2" V
1 1/4" V
4" V UP
4" SO4" ST
4" SO DN4" ST DN
2" DCW 1" DCW
3/4" DHW 3/4" DHW
2" DHW
2" DCW
2" DHW
2" RHW
1 1/4" V
3/4" DCW
1" DCW
1 1/4" V
1" DCW
1 1/4" V
3/4" DHW
2" DCW
2" DHW
1" RHW
1" DCW
3/4" DHW
1 1/2" V
2" V
3/4" DCW
2" V
3/4" DCW
4" DCW
3" DHW
2" RHW
2" SAN
4" SAN
4" SAN
4" SAN
2" V
4" SAN DN
4" SAN UP
4" SAN
4" SAN
4" SAN
2" RHW
3" DHW
4" DCW
1" DCW
3/4" DHW
3/4" DHW
1/2" MXA
3/4" CO2
3/4" CO2
1/2" MXA
3/4" DCW
3/4" CO2
1/2" MXA
1/2" CO2
1/2" MXA
4" SAN
4" SAN
4" SAN DN
4" SAN
4" SAN
2" RHW
3" DHW
4" DCW
4" SAN UP
4" DCW
2 1/2" RHW
2" RHW
2" V
3/4" DCW
3/4" DHW
2" DHW
2" DCW
1/2" DCW
1/2" DHW
4" ST DN
4" ST UP
4" SAN UP
4" ST UP
4" ST DN
4" SAN DN
4" ST DN
4" ST UP
4" SAN UP
4" SAN UP
4" SAN DN
4" V UP
4" VTR
4" V
2" V
4" V
1" RHW
1 1/2" DCW
1 1/2" DHW
2" DHW
1 1/2" DCW
1/2" DHW
1/2" DCW
1 1/2" DCW
2" DHW
4" SAN
4" ST UP
4" ST DN
4" SAN DN
4" V DN
FD-
FD-
AA
4" SO
2" V
2" DHW
2" V
1/2" DCW
1/2" DHW
2" DHW
2" DCW
2" DCW
2" DHW
1" RHW
2" DCW
2" DHW
1" RHW
1" RHW
1 1/2" DCW
1 1/2" DHW
1 1/2" DHW
1 1/2" DCW
1 1/2" DHW
1 1/2" V
4" V UP
4" V UP
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101F
1ST LEVEL PLUMBING PLAN - AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA F
T C
H L
IN
E
P L H
MATCHLINE
/1 PL101D
MATCHLINE
/1 PL101E
1A-145
Room1A-140B
Room
1A-140
Room
1A-140A
Room
1A-120
Room
1A-122
Room
M A
T C
H
LIN
E/
P L
6" SO
6" SO UP
6" ST UP
6" ST DN
2" V
2" V
3/4" DHW
3/4" DHW
3/4" DCW
4" V UP
4" SAN UP
1 1/2" DHW UP
2 1/2" DHW UP
3" DCW UP
3/4" DCW
3/4" DHW
3/4" DHW
6" ST DN
4" SAN UP
6" ST UP
6" ST DN
3" SAN
2" SAN
3" SAN
4" ST UP
4" SO UP
4" ST UP
4" SAN DN
4" ST DN
1 1/2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
1 1/2" SAN
1 1/2" SAN
4" SAN
4" SAN
1 1/2" SAN
4" SAN
4" ST
5" ST2" DCW
1 1/2" DHW
3/4" RHW
2" DCW
1 1/2" DHW
3/4" RHW
5" ST UP
2" DCW
1" DHW
3/4" RHW
4" SAN
2" V
2" SAN
2" V
4" SAN
3/4" DHW
2" SAN
3/4" DCW
1/2" RHW
4" SAN
2" SAN
2" V
3/4" DCW
3/4" DHW
1/2" DCW
6" ST
4" ST
4" ST UP
4" ST
4" SO UP
3" V
2 1/2" DCW
3" V
3/4" RHW
3/4" DHW
3/4" DCW
2" V
2" V
2" V
6" SO
3/4" RHW
3/4" DHW
3/4" DCW
6" SO
6" ST
4" ST
4" SO UP
6" SO
6" SO
6" ST
DSN-
6" ST
6" ST DN
4" ST UP
2" V
4" V
4" V UP
1" DHW
1" DCW
1/2" DCW
1/2" DHW
1/2" DHW
1/2" DCW
2" V
3/4" DHW
1" DCW
1 1/2" V
2" SAN
2" SAN
4" SAN
4" SAN
2" V
4" SAN
2" SAN
4" SAN
4" SAN
2" V
1" DCW
1/2" DHW
1/2" DCW
3/4" DCW
3/4" DHW
3/4" RHW
DSN-
4" SO UP
4" ST UP
4" SO DN
4" SO UP
4" ST UP
DSN-
DSN-
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101G
1ST LEVEL PLUMBING PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA G
MATCHLINE
/1 PL101E
M A
T C
H L
IN
E
P L G
MATCHLINE
/1 PL101F
1B-120
Room
1A-150
Room
1C-116C
Room
1C-116D
Room
1C-116C1
Room
4" ST UP
4" SO UP
DSN-
4" SAN UP
1 1/2" V
1/2" DCW
1/2" DCW
1/2" DHW 4" V
1 1/2" V
2" SAN
1 1/2" AV
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL101H
1ST LEVEL PLUMBING PLAN - AREA H
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 1ST LEVEL PLUMBING PLAN - AREA H
FD
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL102
COMPOSITE 2ND LEVEL PLUMBING
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 2ND LEVEL PLUMBING PLAN
SINK IS GONE,
PIPING CAPPED
MEDICAL MV
ZONE CONTROL BOX
MEDICAL MO/MA
ZONE CONTROL BOX
(2) STACKED MO/MV/MA
ALARM PANELS - EAST WING/
WEST WING
NO SINK
only one of these san drops is there
M A
T C
H L
IN
E
P L F
MATCHLINE
/1 PL102G
M A
T C
H L
IN
E
P L G
2A-131
Room
2A-128
Room
2B-201
Room
2B-201A
Room
2B-201B
Room
2B-103
Room
2A-158
Room
2A-202
Room
2A-157
Room
2A-159
Room 2A-161
Room
2A-163
Room
2A-165
Room
2A-160
Room 2A-162
Room 2A-164
Room
2A-166
Room
6" ST UP
4" SAN UP
2" SAN
1 1/2" SAN UP
4" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
1 1/2" V
2" V
1 1/2" DCW
3/4" DHW
1/2" RHW
1/2" RHW
1" DHW
1 1/2" DCW
4" SAN
1" DHW
1 1/4" DCW
1 1/2" DHW
1 1/4" DCW
1 1/2" DHW
1 1/4" DCW
1" DHW
1 1/2" DHW
4" V UP
2" V UP
4" SAN
2" V
1/2" DCW
1/2" DHW
1/2" DHW
1" DCW
4" SAN
4" SAN
6" SO
6" SO DN
2" SAN
4" V
4" SAN
4" V DN
2" SAN UP
4" SAN DN
4" SAN
2" SAN
2" SAN UP
2" SAN UP
5" ST
5" ST DN
2" SAN
4" SAN
2" SAN
1" DHW
1/2" DCW
1 1/2" DHW
2" DCW
3/4" RHW
1" RHW
2 1/2" DCW
2" DHW
2 1/2" DCW
1" RHW
1 1/2" DHW
1" DCW
1/2" DHW2" SAN
3" V
4" SAN UP/DN
3" V UP
2" DCW UP
1 1/2" DHW UP
1" RHW UP
2" V DN
3" SAN UP
3" SAN DN
3" V DN
3" V UP
3" V UP
4" SO UP/DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL102E
2ND LEVEL PLUMBING PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH SCALE: 1/8" = 1'-0"
1 2ND LEVEL PLUMBING PLAN - AREA E
T C
H L
IN
E
P L E
2B-171
Room
2B-147
Room
2B-145
Room
2B-143
Room
2B-105
Room
2B-105A
Room
2B-112
Room
2B-113
Room
2B-115
Room
2B-209
Room
2B-127
Room 2B-129
Room 2B-131
Room
2B-133
Room
2B-135
Room
2B-137
Room
2B-139
Room
2B-141
Room
2B-117
Room
2B-119
Room
2B-121
Room
2B-123
Room
2B-125
Room
2B-107
Room
2B-109
Room
2B-111
Room
2B-103
Room
2B-149
Room
2B-151
Room
2B-153
Room
2B-155
Room
2B-157
Room
2B-159
Room
2B-161
Room
2B-163
Room
4" ST DN
4" ST UP
4" SAN
OD-
SO-
SO-
SO-
OD-
4" VTR
4" VTR
4" VTR
4" VTR
4" VTR
4" DCW UP
2" DHW
3/4" RHW UP 4" DCW DN
2 1/2" RHW
2" RHW UP
2" DHW
3" DCW
3/4" RHW
3" DCW
3" DCW
1" DCW
1 1/2" V
2" DHW
2" DCW
2" DHW
1 1/2" DCW
2" V
1" DCW
3/4" DHW
4" ST UP
4" ST DN
2" DCW
2" DHW
3" DCW
4" SAN UP
4" V UP
4" ST UP
4" ST DN
4" V DN
4" SO UP
4" SO DN
4" V DN
4" SAN DN
4" SAN DN
4" SAN DN
1 1/2" DCW
3/4" DHW
1 1/4" RHW
2" DCW
2" DCW
1 1/2" V
3/4" RHW
1 1/4" RHW
2" DCW
3/4" RHW
1" DCW
1" DHW
2" DCW
2" DHW
4" SAN
4" SAN UP/DN
3" V UP
2" DCW UP
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL102F
2ND LEVEL PLUMBING PLAN - AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL PLUMBING PLAN - AREA F
NO SINK
only one of these san drops is there
P L E
/1 PL102E
MATCHLINE
M A
T C
H L
IN
E
2A-127
Room
2A-131
Room
2A-122
Room
2A-122A
Room
2A-122B
Room
2A-122C
Room
2A-122D
Room
2A-126
Room
2A-128
Room
2A-124
Room
2A-113
Room
2A-113A
Room
2B-187
Room
2B-187A
Room
2A-116
Room2A-115
Room
2A-118
Room
2A-117
Room
2A-109
Room
2A-112
Room
2A-111
Room
2A-114
Room
2A-120
Room
2A-119
Room
2A-121
Room
2A-123
Room
2A-114A
Room
2A-112A
Room
6" ST
6" ST DN
6" ST UP
4" SAN UP
4" SAN DN
2" SAN
1 1/2" SAN UP
4" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
1 1/2" V
2" V
1 1/2" DCW
3/4" DHW
1/2" RHW
1/2" RHW
1" DHW
1 1/2" DCW
2" V 1/2" DHW
1 1/2" DHW
3/4" DHW
1/2" DCW
6" ST UP/DN
6" SO UP/DN
4" SAN UP/DN
4" V UP/DN
3" DCW UP/DN
2 1/2" DHW UP/DN
1" DHW UP/DN
4" SAN UP/DN
4" V UP/DN
4" SAN UP 4" SAN UP
2" SAN UP
1 1/2" SAN
1 1/2" SAN
1 1/2" SAN
1" DCW
1/2" DHW
2" V
4" SAN
1" DHW
1 1/4" DCW
1 1/2" DHW
1 1/4" DCW
1 1/2" DHW
1 1/4" DCW
1" DHW
1 1/2" DHW
2" V UP/DN
4" SAN UP
4" SAN UP4" SAN UP
2" SAN
1 1/2" SAN UP
2" SAN
4" V UP
2" V UP
4" SAN
2" V
1/2" DCW
1/2" DHW
1/2" DHW
1" DCW
4" SAN
4" SAN
6" SO
6" SO DN
2" SAN
4" V
4" SAN
4" V DN
2" SAN UP
4" SAN DN
4" SAN
2" SAN
2" SAN UP
2" SAN UP
5" ST
5" ST DN
2" SAN
4" SAN
2" SAN
1" DHW
1/2" DCW
1 1/2" DHW
3/4" DHW
1/2" DCW
2 1/2" DCW 1 1/2" DHW
1 1/2" SAN
4" SAN
4" ST
4" SO
4" ST UP
4" SAN DN
4" ST DN
4" SO UP
4" SO UP
3/4" DHW
1" DCW
4" SAN
2" SAN
2" V
1" DCW1/2" DHW
2" V
2" SAN
4" SAN
4" SAN UP
2" V 4" SAN
1" DCW
4" SAN
2" SAN
4" SAN
1 1/2" DHW
1 1/4" DCW
2" V 2" V
2" SAN
1/2" DCW
1 1/2" DHW
2" V
1" DCW
3/4" DHW
6" ST DN
6" SO DN
6" ST UP
4" SAN UP
4" V UP
6" SO UP
4" V DN
4" SAN DN
1" DCW
3/4" DHW
4" SAN UP
4" SAN UP
4" SAN DN
3" SAN
2" V
4" SAN
3" SAN
4" SAN UP
2" SAN
4" SAN
4" SAN UP
2" V UP
1 1/2" DHW
2" SAN
4" SAN UP
4" SAN UP
2" V UP
1 1/2" DHW
2" SAN
2" SAN
2" V
2" SAN
1 1/2" V
1/2" DHW
1/2" DCW
1 1/2" SAN
1 1/2" SAN
1 1/2" DHW
4" SAN
2 1/2" DCW 2" SAN UP
1/2" DHW
4" SAN
2" SAN
1 1/2" SAN
1 1/2" SAN
4" SAN
1 1/2" SAN
4" SAN
2" SAN
1 1/2" SAN
1 1/2" SAN
2" SAN
4" SAN UP
2" V
2" V
1/2" DHW
1/2" DCW
1/2" DCW
1/2" DHW
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL102G
2ND LEVEL PLUMBING PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 2ND LEVEL PLUMBING PLAN - AREA G
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL103
COMPOSITE 3RD LEVEL PLUMBING
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 3RD LEVEL PLUMBING PLAN
T C
H L
IN
E
P L F
MATCHLINE
/1 PL103G
M A
T C
H L
IN
E
P L G
2 1/2" DHW
1 1/2" SAN
1 1/2" V
RP -
3/4" DCW
1/2" DHW
2 1/2" DHW
3" DCW
3" DCW
1 1/2" DCW
1 1/2" DHW
2" SAN
2" V
3/4" DHW
1" DCW
1 1/2" DHW
4" SAN
4" SAN
4" SAN
2" V UP
4" SAN
4" SAN DN
6" ST UP/DN
1 1/4" DCW
1 1/4" DHW
1/2" DCW
1/2" DHW
1" DCW
3/4" DHW
2" V
2" SAN
1 1/4" DCW1/2" DHW
1" DCW
1/2" DHW
1/2" DCW
4" V UP
4" SAN UP
4" SAN
4" V
1 1/2" DCW
1 1/4" DHW
1 1/2" DCW
3/4" DHW
2" V
4" SAN4" SAN
2" V
1 1/4" DCW
1/2" DCW
1/2" DHW
1" RHW UP
1" DHW UP
2" V
3/4" DCW
3/4" DCW
3/4" DCW
1/2" DCW
1/2" DCW
3/4" DCW
3/4" DHW
2" V
1 1/2" V
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL103E
3RD LEVEL PLUMBING PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL PLUMBING PLAN - AREA E
T C
H L
IN
E
P L E
4" SAN
4" SAN
4" SAN
4" V
4" SAN
4" SAN
4" SAN UP
4" SAN UP
4" SAN DN
4" SAN DN
4" V
4" V
4" V UP
4" V DN
4" SAN UP
4" SAN
4" SAN DN
4" SAN DN
4" SAN DN
2" V UP
4" SAN UP
4" SAN
4" SAN
4" SAN
2" V UP
2" SAN
3" DCW
2" DHW
1/2" DHW
1/2" DCW
1/2" DCW
3" DCW
2" DHW
4" DCW UP/DN
2 1/2" DHW UP/DN
2" V
4" SAN
4" V DN
4" SAN DN
4" SAN DN
4" SAN DN
4" V DN
4" SAN DN
4" SAN DN
4" V UP
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL103F
3RD LEVEL PLUMBING PLAN - AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL PLUMBING PLAN - AREA F
P L E
/1 PL103E
MATCHLINE
M A
T C
H L
IN
E
4" SAN
4" SAN
2" V
1 1/2" DCW
3/4" DHW 3" DCW
2 1/2" DHW
1/2" DCW
1/2" DHW
2" V
3" DCW
2 1/2" DHW
3/4" DHW
4" SAN
4" V
2" V
2" V
1 1/4" DHW
1 1/2" DCW
2" DCW
3" DCW
2" DCW
1 1/4" DHW
3" DCW
2 1/2" DHW
1 1/2" SAN
1 1/2" V
RP -
3/4" DCW
1/2" DHW
2 1/2" DHW
3" DCW
3" DCW
1 1/2" DCW
1 1/2" DHW
2" SAN
2" V
1/2" DHW
1/2" DCW
2" V
1/2" DHW
4" V UP
3/4" DHW
1 1/4" DHW
2" DCW
1 1/2" DCW1/2" DCW
1/2" DHW
2" DCW
1 1/4" DHW
1/2" DCW
1/2" DHW
4" V
2" V
3" SAN
4" SAN
4" SAN UP
2" V
3" SAN
6" ST
4" V
6" SO
4" SAN
4" SAN UP
4" SAN
2" V
1" DCW
1/2" DHW
1/2" DCW
1 1/4" DHW
2" V
1 1/4" SAN UP
2" SAN UP
4" SAN
1 1/2" DCW
3/4" DHW
2" SAN
1/2" DHW
1/2" DCW
1 1/2" DCW
1 1/4" DHW
4" SAN
4" SAN
4" SAN
4" V
4" SAN
6" ST
6" SO
1 1/4" DHW
2" DCW
2" FD
VB-
3" V
4" SAN
2" V
2" V
4" SAN
3" DCW
2 1/2" DHW
1" DHW
NPCW
4" SAN
4" V
1 1/4" DHW 2" DCW
1 1/2" DCW
3/4" DHW
1" DCW
4" SAN
4" SAN
1/2" DCW
4" SAN
3" DCW
1 1/4" DHW
1 1/2" DHW
4" SAN
4" SAN
2" V
4" SAN
2" DCW
1 1/4" DHW
2" V UP
4" SAN
4" SAN DN
6" ST UP/DN
1 1/4" DCW
1 1/4" DHW
1/2" DCW
1/2" DHW
1" DCW
3/4" DHW
2" V
2" SAN
1 1/4" DCW1/2" DHW
1" DCW
1/2" DHW
1/2" DCW
4" V UP
4" SAN UP
4" SAN
4" V
1 1/2" DCW
1 1/4" DHW
1 1/2" DCW
3/4" DHW
2" V
4" SAN4" SAN
2" V
1 1/4" DCW
1 1/4" DHW
2" DCW
2" DCW
1 1/4" DHW
3" V
3" V UP
4" SAN
1/2" DCW
1/2" DHW
1 1/4" DHW
2" DCW
1/2" DCW
1/2" DHW
2" V
1" DCW
4" V UP
1" DCW
1" DCW
1/2" DHW
1/2" DCW
4" SAN
2" V
4" SAN DN
1 1/2" DCW
1 1/2" DCW
1" DHW
3/4" DCW
3/4" DHW
1 1/4" DHW
1/2" DCW
1/2" DHW
4" SO UP/DN
4" ST UP/DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL103G
3RD LEVEL PLUMBING PLAN - AREA G
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 3RD LEVEL PLUMBING PLAN - AREA G
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL104
COMPOSITE 4TH LEVEL PLUMBING
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1" = 30'-0"
1 COMPOSITE 4TH LEVEL FIRE SUPPRESSION PLAN
T C
H L
IN
E
P L F
M A
T C
H L
IN
E
MATCHLINE
/1 PL104G
M A
T C
H L
IN
E
P L G
4A-149
Room
4A-151
Room
4A-153
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142B
Room
4A-142A
Room
4A-215
Room
4A-183
Room
4A-183A
Room
4A-183B
Room
3/4" DHW
1 1/2" DCW
1/2" RHW
1/2" DHW
1/2" DCW
2" DCW
1/2" RHW
1 1/2" DHW
4" V
1" RHW
2" V
1/2" DHW
1/2" DCW
3/4" DHW
3/4" DCW
2" V
1/2" DCW
1 1/2" V
1/2" DHW
2" V
1/2" DCW
1 1/2" DCW DN
1" DHW DN
2" V DN
1/2" DHW
2" V
3/4" DHW
1/2" DHW
1/2" DCW
2" DCW 1 1/2" V
1 1/2" V
1 1/2" V
1/2" DCW
1/2" DHW
1 1/4" V
1 1/2" V
1 1/2" DCW
3" V
3" V
6" SO
2 1/2" DCW
2 1/2" DHW
2" V
1/2" DCW 1/2" DHW
2" V
1/2" DCW
1/2" DHW
1 1/2" V
1/2" DHW
1" DCW
1/2" RHW
1/2" DCW
1 1/2" DCW
6" ST
6" ST
2" V
6" SO
6" ST UP
2 1/2" DCW2 1/2" DHW
2 1/2" DHW 4" V
2" V
2 1/2" DCW
2 1/2" DHW
2" V
1" DCW
1 1/4" DHW
2" DCW
3" DCW
1/2" DHW
1/2" DCW
2" V
6" ST
4" SO UP
2 1/2" DHW
1/2" DHW
2" V
3/4" DCW
1/2" DHW
4" V UP
2" V
4" SO
6" UP
6" ST UP
1 1/2" DCW
4" VTR
2" DCW
3/4" RHW
1" DHW
1 1/4" SAN
1/2" DHW
1/2" DCW
1" DHW
1/2" DCW
1/2" DHW
2" DCW
2" DHW
1/2" DCW
1/2" DHW
4" ST
3" DCW
2" V UP
1/2" DHW
1/2" DCW
2" DCW
1 1/2" DCW
3/4" DHW
4" SO UP
2" DCW1 1/4" DHW
2 1/2" RHW
4" VTR
2 1/2" DHW
2" DCW
3/4" DCW
3/4" DHW
2" SAN
1" RHW DN
1/2" DHW
1/2" DCW
1 1/2" DCW
2" V UP
1" RHW DN
4" VTR
4" VTR
4" VTR
4" VTR
4" VTR
3/4" RHW DN
1 1/4" DHW DN
2" DCW DN
1" RHW
2" DCW DN
2" DHW DN
4" ST UP/DN
1/2" DCW UP/DN
1" RHW
1/2" DHW
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL104E
4TH LEVEL PLUMBING PLAN - AREA E
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 4TH LEVEL PLUMBING PLAN - AREA E
T C
H L
IN
E
P L E
4B-149
Room
4B-150
Room
4B-151
Room
4B-152
Room
4B-153
Room
4B-154
Room
4B-130
Room
4B-133
Room
4B-135
Room
4B-137
Room
4B-139
Room
4B-141
Room
4B-143
Room
4B-145
Room
4B-147
Room
4B-131
Room
4B-129
Room
4B-127
Room
4B-125
Room
4B-123
Room
4B-121
Room
4B-119
Room
4B-117
Room
4B-115
Room
4B-113
Room
4B-111
Room
3/4" DHW
1 1/2" DCW
3/4" DHW
1 1/2" DCW
3/4" DHW
1 1/2" SAN
2" V
4" SAN
4" SAN
4" SAN
3/4" DHW
2" V
4" ST
4" SAN
1 1/2" SAN
4" V
3/4" DHW
1 1/2" DCW
1/2" DHW
1/2" DCW
1 1/2" V
4" V
4" V
4" V
4" SAN
1 1/2" SAN
4" V
4" V
1/2" DCW
2" V
3/4" DHW
1 1/2" DCW
3" DCW
2" V
4" SAN
2" V
1/2" DCW
1/2" DHW
3/4" DCW
3/4" DHW
1" DCW
2" V
2" V
1 1/2" V
1 1/2" V
1 1/4" DHW
3/4" DHW
1" DCW
1/2" DHW
1/2" DCW
2" DCW
1/2" DCW
1/2" DHW
2" V
1 1/2" DHW
2" DHW
1/2" DCW
1/2" DHW
1 1/2" V
4" V
4" V
4" V
1 1/2" SAN
4" SAN
1 1/2" SAN
1 1/2" SAN
1 1/2" SAN
1 1/2" SAN
4" ST
1 1/2" DCW
2" DHW
1/2" DCW
1/2" DHW
1 1/2" SAN
1 1/2" SAN
1 1/2" SAN
1 1/2" DCW
1 1/2" V
2" SAN
4" SAN
3" SAN
1 1/2" SAN
1 1/2" SAN
4" SAN
4" SAN
2" SAN2" V
4" SAN
2" DCW
2" DHW
2" DCW
2" DHW
3" DCW
1 1/2" SAN
2" V
3" SAN
4" SAN
4" SAN
3" DCW
4" V
4" V
2" DCW
1 1/4" DHW
1 1/4" DHW
1 1/2" DCW
4" SAN
4" SAN
1 1/4" SAN
2" SAN
2" DCW
2" DHW
2" V
2" DCW
3/4" RHW
1" DHW
1 1/4" SAN
1/2" DHW
1/2" DCW
4" DCW UP/DN
2" DHW UP/DN
2" RHW UP/DN
1/2" DHW
1 1/2" DCW
1/2" DHW
1 1/2" DCW
4" ST
2" V UP
2" SAN
4" SAN DN
2" SAN UP
4" SAN UP
4" SAN
2" V
3" DCW
2" DHW
2" DCW
4" SAN DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 08/29/2023
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
PL104F
4TH LEVEL PLUMBING PLAN - AREA F
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
08/29/2023
549-23-600
PROGRESS SET
AuthorChecker
KEYNOTES
NORTH
SCALE: 1/8" = 1'-0"
1 4TH LEVEL PLUMBING PLAN - AREA F
P L E
/1 PL104E
MATCHLINE
M A
T C
H L
IN
E
4A-158
Room
4A-149
Room
4A-151
Room
4A-153
Room
4A-155
Room
4A-157
Room
4A-159
Room
4A-161
Room
4A-163
Room
4A-165
Room
4A-167
Room
4A-143
Room
4A-145
Room
4A-147
Room
4A-142
Room
4A-142A
Room
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .