This document is a set of pre-design mechanical, electrical, and fire suppression drawings for a new Central Energy Center at a Veterans Affairs facility in Garland, Texas. The drawings were prepared by Calibre and Farris Engineering for the Department of Veterans Affairs Office of Construction and Facilities Management, dated April 8-10, 2024, with project number 549-23-600.
The mechanical design includes basement piping plans for chilled water systems (12" CWS), condenser water returns (12" CWR), hot water returns (8" HWR), makeup piping systems (12" MPS), and pressurized condensate lines (2½" PC) distributed across multiple basement areas. The central utility plant incorporates five chilled water units (CH1-CH5), six chilled water pumps (CWP1-CWP6), three condensing water pumps (CP1-CP3), and three cooling towers (CT1-CT3). The heating system utilizes four steam boilers (B1-B3 plus future capacity) with deaerators, heat recovery exchangers, and steam piping flow schematics. Fuel oil systems include underground storage tanks (UST-1, UST-2), day tanks, and fuel conditioning systems serving three generators (G-1, G-2, G-3) rated at 2000 kW each. The electrical design specifies a new main switchgear (MSG1) at 12,470V 600A with dual utility connections, new distribution panels, transformers (TSB1, TSB2, TLDP), and backup power generation with automatic transfer capability. Fire suppression design provides dry pipe system coverage with ordinary hazard group 2 occupancy designation, 0.20 GPM design density, double-check backflow prevention, fire department connection, and nitrogen generation systems. All drawings are marked "NOT FOR PROGRESS PRINT" and are pre-design level documents.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
DN
DN
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
MP000
COMPOSITE BASEMENT NEW WORK
MECHANICAL PIPING PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
AuthorChecker
SCALE: 1" = 30'-0"
1 COMPOSITE BASEMENT NEW WORK MECHANICAL PIPING PLAN
# Revision Date 04/10/2024 04/10/2024
M A
T C
H L
IN
E
MATCHLINE
MATCHLINE
/1 MP000D
BD-134
Room
AREA AA - NO WORK
M P
B
12" CWS
12" CWR
8" HWR
12" MPS
2 1/2" PC
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
MP000A
BASEMENT NEW WORK MECHANICAL
PIPING PLAN - AREA A
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
AuthorChecker
SCALE: 1/8" = 1'-0"
1 BASEMENT NEW WORK MECHANICAL PIPING PLANS - AREA A
NORTH
M A
T C
H L
IN
E
M P
A
M
ATC
H
LI
N E
M P
0C
MATCHLINE
/1 MP000E
MATCHLINE
/1 MP000D
BC-140
Room
BC-166
Room
BC-167
Room
BD-150
Room
BD-151
Room
BD-152
Room
BD-153
Room
BD-154
Room
BD-155
Room
BD-156
Room
BD-159
Room
BD-161
Room
BD-165
Room
BD-152A
Room
BD-150A
Room
BD-132
Room
BD-133
Room
BD-141
Room
BD-142
Room
BD-143
Room
BD-131A
Room
BD-131B
RoomBD-131D
Room
12" CWS
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
MP000B
BASEMENT NEW WORK MECHANICAL
PIPING PLAN - AREA B
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
AuthorChecker
SCALE: 1/8" = 1'-0"
1 BASEMENT NEW WORK MECHANICAL PIPING PLANS - AREA B
NORTH
MATCHLINE
/1 MP000B
M A
T C
H L
IN
E
M P
E
MATCHLINE
/1 MP000A
MATCHLINE
/1 MP000G
BA-120
Room
BA-121
Room
BA-122
Room
BA-124
Room
BA-125
Room
BA-126
Room
BA-128
Room
BA-129
Room
BA-130
Room
BA-131
Room
BA-133
Room
BA-133A
Room
BA-140
Room
BD-110
Room
BD-111
Room
BD-112
Room
BD-113
Room
BD-115
Room
BD-117
Room
BD-101
Room
BD-102
Room
BD-103
Room
BD-104
Room
BD-105
Room
BD-106
Room
BD-107
Room
BD-113A
Room
BD-113B
Room
BD-113B1
Room
BD-115A
Room
BD-117A
Room
BA-150
Room
BA-151
Room
BA-152
Room
BA-152A
Room
BA-152B
Room
BA-152C
Room
BA-152D
Room
BA-152D1
Room
BA-121A
Room
BD-130
Room
BD-131
Room
BD-131C
Room
BD-131D1
Room
BD-106A
Room
BD-106B
Room
12" CWS
12" MPS
2 1/2" PC
CST
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
A
AA
B C
D E F
G H
PLAZA
J
KEYPLAN
NTS
MP000D
BASEMENT NEW WORK MECHANICAL
PIPING PLAN - AREA D
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
AuthorChecker
SCALE: 1/8" = 1'-0"
1 BASEMENT NEW WORK MECHANICAL PIPING PLANS - AREA D
NORTH
G
G
G
CWP
CWP
CWP
CWP
CWP
CWP
CH
CH
CH
CH
CH
B
FUTURE
COOLING
AREA
GENERATOR
AREA106
SWGR AREA
CONTROL
ROOM
MEN'S
LCKR/RR
OFFICE
BREAKROOM
STORAGE
ROOM
VEST.
HW PUMPS
AREA
WATER
CHEMISTRY
STORAGE
ROOM
CLOSET
OFFICE
IT 109
WOMEN'S
LCKR/RR112
JANITORIAL
B
B
B
DFH
AST
12" HPS
WS-1
CST
AST
AST
AST
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP009
CENTRAL PLANT - NEW WORK
MECHANICAL EQUIPMENT LAYOUT
PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NORTH
SCALE: 1/8" = 1'-0"
1 NEW WORK MECHANICAL EQUIPMENT LAYOUT PLAN
KEYNOTES
1 COMBUSTION AIR REQUIREMENTS TO MEET NFPA 54-9.3.
CT
CT
CT
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP010
CENTRAL PLANT - NEW WORK
MECHANICAL EQUIPMENT LAYOUT
ROOF PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NORTH
SCALE: 1/8" = 1'-0"
1 NEW WORK MECHANICAL EQUIPMENT LAYOUT ROOF PLAN
CHILLED WATER
STORAGE TANK
AS-1
ET-1
CH
CH
CH
CH
CH
CWP
CWP
CWP
CFP
CFP
CWP
CHEMICAL
TREATMENT
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP501
CENTRAL UTILITY PLANT - CHILLED
WATER SCHEMATIC
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NOT TO SCALE
1 CENTRAL UTILITY PLANT - CHILLED WATER SCHEMATIC
CH
CH
CH
CH
CH
FILTERS
CH
CH
CH
HWS HWR
TO HOT WATER SYSTEM
CP
CP
CP
CHEMICAL TREATMENT
M M
M
M
M
M M
M
M
M
M M
M
M
M
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP502
CENTRAL UTILITY PLANT -
CONDENSATE WATER SCHEMATIC
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NOT TO SCALE
1 CENTRAL UTILITY PLANT - CONDENSER WATER SCHEMATIC
B
B
B
B
FUTURE
(SIM.) (SIM.) (SIM.)
DEAERATOR
HX
STEAM
SILENCER
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP503
CENTRAL UTILITY PLANT - STEAM
PIPING FLOW SCHEMATIC
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NOT TO SCALE
1 CENTRAL UTILITY PLANT - HEATING WATER SCHEMATIC
ECONOMIZER
B
B
B
B
FUTURE
FLUE
BFW
MAKE-UP WATER
BLOWDOWN
HEAT
RECOVERY
STEAM
CONDENSATE
STORAGE TANK
PC FROM
HOSPITAL
DEAERATOR
BD(SIM.) (SIM.) (SIM.)
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP504
CENTRAL UTILITY PLANT - STEAM
BOILER ACCESSORIES SCHEMATIC
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NOT TO SCALE
1 CENTRAL UTILITY PLANT - STEAM BOILER ACCESSORIES SCHEMATIC
UST-1
UST-2
FUEL CONDITIONING SYSTEM
DAY
TANK
DAY
TANK
DAY
TANK
G-1
G-2
G-3
TO B-1/2/3/4/5/6
FROM B-1/2/3/4/5/6
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
MP505
CENTRAL UTILITY PLANT - FUEL OIL
SCHEMATIC
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJERER
NOT TO SCALE
1 CENTRAL UTILITY PLANT - FUEL OIL FLOW SCHEMATIC
COOLING
AREA
GENERATOR
AREA
SWGR AREA
CONTROL
ROOM
MEN'S
LCKR/RR110
OFFICE
BREAKROOM
STORAGE
ROOM
VEST.
HW PUMPS
AREA
WATER
CHEMISTRY
STORAGE
ROOM
CLOSET
OFFICE
IT 109
WOMEN'S
LCKR/RR112
JANITORIAL
FIRE ENTRY
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
FX001
CENTRAL PLANT - NEW WORK FIRE
SUPPRESSION PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
DGKDGK
SCALE: 1/8" = 1'-0"
1 NEW WORK FIRE SUPPRESSION PLAN
KEYNOTES
1 PROVIDE FIRE ENTRY FOR NEW, DRY PIPE FIRE SUPPRESSION SYSTEM TO SERVE ENTIRE FACILITY.
SYSTEM SHALL PRIMARILY BE DESIGNED FOR AN ORDINARY HAZARD GROUP 2 OCCUPANCY WITH A DESIGN DENSITY OF 0.20 GPM PER SQUARE FOOT OVER 1950 SQUARE FEET. A 6" FIRE MAIN SHALL
BE PROVIDED TO SERVE THE BUILDING'S FIRE SUPPRESSION SYSTEM. IMMEDIATELY UPON
ENTRANCE INTO FACILITY, A DOUBLE-CHECK BACKFLOW PREVENTION ASSEMBLY WITH A
SUPERVISED GATE VALVE ON EACH SIDE OF THE DOUBLE CHECK VALVE ASSEMBLY SHALL BE
PROVIDED. A TAP OF THE FIRE HEADER SHALL BE PROVIDED AFTER THE BACKFLOW THAT SHALL
SERVE BOTH THE FULL FORWARD FLOW TEST HEADER AND THE FIRE DEPARTMENT CONNECTION
(FDC). THIS LINE SHALL BE SIZED FOR THE LARGEST DEMAND REQUIREMENT. A SUPERVISED
SHUT-OFF VALVE SHALL BE PROVIDED THAT IS IN THE NORMALLY CLOSE POSITION PRIOR TO
ROUTING TO THE TEST HEADER. A SWING CHECK VALVE SHALL BE PROVIDED PRIOR TO ROUTING TO THE FLUSH WALL-MOUNTED FDC THIS COMBINED TAP SHALL BE FOLLOWED BY A DRY DELUGE
VALVE THAT IS EXTERNALLY RESETTABLE WITH A COMPLETE TRIM PACKAGE. A NITROGEN
GENERATION SYSTEM SHALL BE PROVIDED IN LIEU OF A STANDARD AIR COMPRESSOR IN
ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL. A MAIN DRAIN TEST ASSEMBLY
SHALL BE PROVIDED THAT ROUTES TO THE BUILDING EXTERIOR WITH A SPLASH BLOCK INSTALLED
BENEATH THE DRAIN OUTLET.
2 FLUSH-WALL MOUNTED FIRE DEPARTMENT CONNECTION, TEST HEADER, AND SYSTEM MAIN DRAIN SHALL ALL ROUTE THROUGH THIS EXTERNAL WALL. AN OUTSIDE COMBINATION AUDIO, VISUAL, SIGN SHALL BE INSTALLED CENTERED ABOVE THE FDC. THE AUDIO/VISUAL DEVICE SHALL BE
CONNECTED TO THE PRESSURE SWITCH OF THE DRY RISER AND TO THE BUILDING'S FIRE ALARM
SYSTEM.
3 AREA WITHIN BOLD DASHED LINE SHALL BE DESIGNED FOR A LIGHT HAZARD OCCUPANCY WITH A
DESIGN DENSITY OF 0.10 GPM PER SQUARE FOOT OVER 1950 SQUARE FEET.
4 ELECTRICAL ROOM. SPRINKLERS SERVING THIS ROOM SHALL BE INTERMEDIATE TEMPERATURE RATED. DO NOT ROUTE THROUGH THIS ROOM TO SERVE OTHER AREAS OF THE BUILDING. DO NOT INSTALL SPRINKLERS OR SPRINKLER PIPING DIRECTLY OVER THE TOP OF ELECTRICAL EQUIPMENT.
PROVIDE PROTECTIVE WIRE GUARDS ON ALL SPRINKLERS LOCATED WITHIN THIS ROOM.
5 PROTECT BENEATH STAIR LANDING IN ACCORDANCE WITH NFPA 13 DESIGN GUIDELINES. INSTALL
PIPING AS CLOSE TO STRUCTURE AS POSSIBLE.
NORTH
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
FX002
CENTRAL PLANT - NEW WORK FIRE
SUPPRESSION ROOF PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
DGKDGK
SCALE: 1/8" = 1'-0"
1 CENTRAL PLANT - 2ND LEVEL NEW WORK FIRE SUPPRESSION PLAN
KEYNOTES
1 PROTECT STAIR LANDING TO ROOF ACCESS IN ACCORDANCE WITH NFPA DESIGN GUIDELINES.
NORTH
BATTERY ROOM
GENERATOR G-1 GENERATOR G-2 GENERATOR G-3NEW SWITCHBOARD 'SB2'
NEW SWITCHBOARD 'SB1'
NEW MAIN SWITCHGEAR 'MSG1'
12,470V 600A
NEW DISTRIBUTION PANEL 'LDP'
SWITCHGEAR CONTROL PANEL
NEW PANEL 'L1'
NEW PANEL 'L2'
T
XFMR TSB1
T
XFMR TSB2
T
XFMR TLDP
CH
CH
CH
CH
CH
CWP
CWP
CWP
CWP
CWP
CWP
COOLING
AREA
GENERATOR
AREA
SWGR AREA
CONTROL
ROOM
MEN'S
LCKR/RR110
OFFICE
BREAKROOM
STORAGE
ROOM
VEST.
HW PUMPS
AREA
WATER
CHEMISTRY 128
STORAGE
ROOM
CLOSET
OFFICE
IT 109
WOMEN'S
LCKR/RR112
JANITORIAL
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
EP001
CENTRAL PLANT - NEW WORK
MECHANICAL EQUIPMENT LAYOUT
POWER PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJEBDH
NORTH SCALE: 1/8" = 1'-0"
1 CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT POWER PLAN
CT
CT
CT
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 04/08/2024
EP002
CENTRAL PLANT - NEW WORK
MECHANICAL EQUIPMENT LAYOUT
POWER ROOF PLAN
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
MJEBDH
NORTH
SCALE: 1/8" = 1'-0"
1 CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT POWER ROOF PLAN
TRANS.
TLDP
TRANS
TSB2
TRANS
TSB1
SWBD
SB1
SWBD
SB2
DIST
PANEL
LDP
PANEL
L1
PANEL
L2
TRANS.
MSB-1
TRANS.
MSB-2
TRANS.
MS
TRANS.
MSC
TRANS.
MSA-1
TRANS.
MSA-2
TRANS.
SHILOH
BLDG
BIG CHILLER BIG CHILLER
COOLING
TOWER
COOLING
TOWER
COOLING
TOWER
BOILER FEED
PUMP
BOILER FEED
PUMP
BOILER FEED
PUMP
CONDENSER
WATER PUMP
CONDENSER
WATER PUMP
CONDENSER
WATER PUMP
CHILLED
WATER PUMP
CHILLED
WATER PUMP
CHILLED
WATER PUMP
SMALL
CHILLER
SMALL
CHILLER
SMALL
CHILLER
BOILERS BOILERS BOILERS BOILERS
12,470V TO 480/27712,470V TO 480/27712,470V TO 208/120V
M
MAIN SPARE GEN. GEN. TIE
OVER
GEN. GENERATOR
CONTROLS
SPARE MAIN
XFMR
LOOP
SB1
(VIA
TSB1)
SB2
(VIA
TSB1)
LDP
(VIA
TLDP)
XFMR
LOOP
SPARE
(LOAD BANK
G-1 G-2 G-3
MT
GARLAND POWER
AND LIGHT
(UTILITY A)
EXTERIOR INTERIOR
208V, 800A480V, 4000A480V, 3000A
GARLAND POWER
AND LIGHT
(UTILITY B)
NEW MAIN
SWITCHGEAR 'MSG1'
12,470V, 600A
MAIN HOSPITAL OUTDOOR
SERVICE YARD
2000 KW 2000 KW 2000 KW
CONSTRUCTION
NOT FOR
PROGRESS PRINT
DATE:BY:
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
117 PIERCE STEET
SIOUX CITY, IOWA 51101
712.252.4014
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
FE#: 222045
9090 S RIDGELINE BLVD. SUITE 105
HIGHLANDS RANCH, CO 80129
303.730.0434
RER 07/28/2023
E-601
CENTRAL PLANT - ELECTRICAL
DIAGRAM
A/E CONSTRUCT ENERGY
CENTER GARLAND
2300 MARIE BLVD. GARLAND, TX 75042
04/08/2024
549-23-600
PRE DESIGN
AuthorChecker
# Revision Date
NOT TO SCALE
1 CENTRAL PLANT - ELECTRICAL ONE-LINE DIAGRAM
| Sheets |
| MP000 - COMPOSITE BASEMENT NEW WORK MECHANICAL PIPING PLAN |
| MP000A - BASEMENT NEW WORK MECHANICAL PIPING PLAN - AREA A |
| MP000B - BASEMENT NEW WORK MECHANICAL PIPING PLAN - AREA B |
| MP000D - BASEMENT NEW WORK MECHANICAL PIPING PLAN - AREA D |
| MP009 - CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT PLAN |
| MP010 - CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT ROOF PLAN |
| MP501 - CENTRAL UTILITY PLANT - CHILLED WATER SCHEMATIC |
| MP502 - CENTRAL UTILITY PLANT - CONDENSATE WATER SCHEMATIC |
| MP503 - CENTRAL UTILITY PLANT - STEAM PIPING FLOW SCHEMATIC |
| MP504 - CENTRAL UTILITY PLANT - STEAM BOILER ACCESSORIES SCHEMATIC |
| MP505 - CENTRAL UTILITY PLANT - FUEL OIL SCHEMATIC |
| FX001 - CENTRAL PLANT - NEW WORK FIRE SUPPRESSION PLAN |
| FX002 - CENTRAL PLANT - NEW WORK FIRE SUPPRESSION ROOF PLAN |
| EP001 - CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT POWER PLAN |
| EP002 - CENTRAL PLANT - NEW WORK MECHANICAL EQUIPMENT LAYOUT POWER ROOF PLAN |
| E-601 - CENTRAL PLANT - ELECTRICAL DIAGRAM |