2200109 Baird BID Schedule 2-20-2025.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Smithsonian institution's National Museum of Natural History Renovate Baird Auditorium
Solicitation number
33330225RT0010018
Issued by

About this file

The file is a Bid Schedule for the Smithsonian Institution's National Museum of Natural History project to Renovate Baird Auditorium (Project Number 2200109). The bid document is a detailed breakdown of construction costs by division, though all line items currently show $0.00, suggesting this is a template or preliminary document.

The related federal contract opportunity provides comprehensive details about the renovation project, which includes upgrading infrastructure, modifying building systems, improving accessibility, and preserving historical elements. The project scope involves extensive restoration of the Baird Auditorium, including replacing floor slabs, upgrading mechanical/electrical/plumbing systems, installing fire sprinklers, updating audio/visual equipment, and restoring historic Guastavino tile ceilings. Key project parameters include a 730-calendar day construction period, a budget over $10M, subcontracting goals of 40% with small businesses (including 7% Service-Disabled Veteran-owned), and Davis-Bacon wage requirements. The proposal is due May 23, 2025, at 3:00 PM EST, with questions accepted until April 25, 2025. The project aims to achieve LEED Gold certification and is located at 10th Street & Constitution Ave NW, Washington, DC.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid

TitleRenovate Baird AuditoriumPrepared byXXXX
FacilityNMNHDateXXXX
Project Number2200109
Base Bid
BASE BID: All work associated with Renovate Baird Auditorium as described in the specifications and drawings both dated Nov. 11, 24.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Prot.$ - 0$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0$ - 0
Div. 11. Equipment$ - 0$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0$ - 0
Div. 23 HVAC$ - 0$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0$ - 0
Div. 31. Earthwork$ - 0$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0$ - 0

BASE BID SUBTOTAL $ - 0

Overhead and Profit- 0
Performance Bond- 0

Total $ - 0

BASE BIDTotal $ - 0

B-&P

File details come from the government source that posted it. Updated .