21_PW_THRESHOLD_LEVELS_-_OHIO_(2024.01.01).pdf

PDF 214 KB Posted

Attached to
Michael J. Zone Neighborhood Resource & Recreation Center Locker Room, Entrance Lobby, & Restroom Improvements
Solicitation number
AR2608
Issued by
Cuyahoga County, Ohio

About this file

This is a prevailing wage threshold notification document issued by the Ohio Department of Commerce, Division of Industrial Compliance, Bureau of Wage and Hour Administration, applicable to public authorities undertaking public improvement construction projects throughout Ohio. The document establishes mandatory wage rate thresholds that trigger prevailing wage requirements for construction work performed under contract or by public force. For building construction projects, prevailing wage determination is required for new construction at $250,000 and for reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting work at $75,000. For road and bridge-related construction including roads, streets, alleys, sewers, and ditches, the thresholds are adjusted to $98,974 for new construction and $29,653 for reconstruction and related work as of January 1, 2024. All prevailing wage determinations must be included in project specifications and printed on bidding blanks for contracted work.

The thresholds are adjusted biennially by the Director of the Ohio Department of Commerce based on the Building Cost for Skilled Labor Index published by McGraw-Hill's Engineering News-Record, with annual adjustments limited to a maximum of three percent increase or decrease. This prevailing wage threshold document is directly applicable to the Michael J. Zone Neighborhood Resource & Recreation Center Locker Room, Entrance Lobby, and Restroom Improvements project being managed by the City of Cleveland's Mayor's Office of Capital Projects. Contracting authorities must contact the Bureau of Wage and Hour Administration at the provided contact information to obtain required wage determinations before advertising for bids or commencing construction work on qualifying public improvement projects.

View the file

Other files

File Type Posted
Michael_J._Zone_Neighborhood_Resource_&_Recreation_Center_Locker_Room,_Entrance_Lobby,_&_Restroom_Improvements_(Addendum_#2_Revision).pdf PDF
Michael_J._Zone_Neighborhood_Resource_&_Recreation_Center_Locker_Room,_Entrance_Lobby,_&_Restroom_Improvements_(Addendum_#1_Revision).pdf PDF
27_Criteria_Documents_&_Specifications.pdf PDF
26_Zone_NRRC_Locker_Room_Impmts_D-B_Traditional_RFP_Request_Memo_&_Mailing_List.pdf PDF
25_Wage_Theft_PDF_Version.pdf PDF
24_PW_RATES_-_COVER_LETTER_(2024.12.27).pdf PDF
23_PW_CERTIFIED_PAYROLL_REPORT_-_OHIO_(2024.12.27).pdf PDF
22_PW_INSTRUCTIONS_FOR_PREPARING_CERTIFIED_REPORTS_-_OHIO_(2024.12.27).pdf PDF
20_PW_AFFIDAVIT_OF_COMPLIANCE_-_OHIO_(2024.12.27).pdf PDF
19_PW_NOTIFICATION_TO_EMPLOYEE_-_OHIO_(2024.12.27).pdf PDF
18_PW_CONTRACTOR_RESPONSIBILITY_-_OHIO_(2024.12.27).pdf PDF
17_Prev_Wage_Notification_(2024.12.27).pdf PDF
16_PW_NOTICE_-Valerie_Harvey_(2024.12.27).pdf PDF
15_PART_D_-_DETAIL_SPECIFICATIONS.pdf PDF
14_PART_C_-_SUPPLEMENTAL_GENERAL_CONDITIONS__2025_09_16.pdf PDF
13_PART_B_-_General_Conditions_(final_8-28-25).pdf PDF
11_FORM_CWM-8_CONSTRUCTION_WASTE.pdf PDF
10_FORM_CWM-7_DEMOLITION_WASTE.pdf PDF
09_017419_CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
08_City_of_Cleveland_Sustainable_Building_Policy_2013-04.pdf PDF
07_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).pdf PDF
06_2023_Reimbursables_Policy.pdf PDF
05_Design-Build_Agreement_Sample_for_MOCAP.pdf PDF
04_DASD_Minimum_Deliverables_(2026.06.04).pdf PDF
03_Subcontractor_Addition_and_Subtraction_Policy.pdf PDF
02_CCO_187-22.pdf PDF
01_NORTHERN_IRELAND_DISCLOSURE.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVAILING WAGE THRESHOLD LEVELS

IMPORTANT NOTICE

Before advertising for bids, contracting, or undertaking construction with its own forces, to construct a public improvement, the Public Authority shall have the Ohio Department of Commerce-Division of Industrial Compliance, Bureau of Wage and Hour Administration determine the prevailing rates of wages for workers employed on the public improvement. The wage determination must be included in the project specifications and printed on the bidding blanks where work is done by contract.

“New” construction threshold for Building Construction: $250,000

“Reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting” threshold level for Building Construction:

$75,000

A) Thresholds are to be adjusted biennially by the Director of the Ohio Department of Commerce.

B) Biennial adjustments to threshold levels are made according to the Building Cost for Skilled Labor Index published by McGraw-Hill’s Engineering News-Record, but may not increase or decrease more than 3% for any year.

If there are questions concerning this notification, please contact:

Bureau of Wage and Hour Administration

6606 Tussing Road, PO Box 4009 Reynoldsburg, Ohio 43068-9009

Phone: 614-644-2239 Fax: 614-728-8639 www.com.ohio.gov

As of January 1, 2024:

“New” construction that involves roads, streets, alleys, sewers, ditches and other works connected to road or bridge construction threshold level has been adjusted to:

$98,974

“Reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting” that involves roads, streets, alleys, sewers, ditches and other works connected to road or bridge construction threshold level has been adjusted to:

$29,653 http://www.com.ohio.gov/

File details come from the government source that posted it. Updated .