Responses to Questions on 2031ZA20R00003 27 January 2020 - Amendment 001.pdf

PDF 147 KB Posted

Attached to
U. S. Currency Paper
Solicitation number
2031ZA20R00003
Issued by

About this file

This document contains responses to questions on Solicitation Number 2031ZA20R00003 issued by the Bureau of Engraving and Printing for the manufacture of U.S. currency paper. The solicitation seeks proposals due by February 19, 2020 to supply currency paper for delivery to the Bureau's facilities in Washington, D.C. and Fort Worth, Texas. The minimum order quantity will be the first delivery order, with the maximum quantity over the life of the contract set at 2,100,000 sheets. Annual order volumes are dependent on yearly currency needs but minimum and maximum volumes per order period are to be determined. Pricing is firm fixed price as detailed in the cost instructions. Site visits must be approved in advance and non-disclosure of sensitive information is required. The document clarifies testing sample requirements and provides environmental health and safety documentation as appendices.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses for Clarifications ‐ U.S. Bureau of Engraving and Printing (BEP)

BEP‐RFP‐2031ZA20R00003

27 January 2020

Item Solicitation Section

Comment/Question Response

General

1 B.4.1

Contract Minimum: The FAR requires a stated minimum value to effect the award of an IDIQ contract (FAR 16.503-1).

That minimum may be stated as a single quantity or a single dollar amount for the entire contract, or it may be stated as an annual quantity or an annual dollar amount. Our organization feels that stating the minimum order quantity as “the first Delivery Order (DO)” does not adequately express the required values.

What is the minimum value for this contract?

This procurement is an Indefinite-quantity contract under FAR 16.504. As stated in Section B.4.1. page 3 of the Solicitation, the minimum value is the first delivery order.

Furthermore, as also stated under section B.4.3, the maximum quantity stated over the life of the contract is 2,100,000 sheets.

2 B.4.3

Ordering Period Minimum – Annual Order Period Minimums and Maximums are stated as “TBD”. What are the intended minimum and maximum volumes per Ordering Period?

The minimum and maximum volumes per order against a future Indefinite-quantity contract cannot be provided at this time.

Annual orders depends on Yearly Currency Order (YCO).

3 B.5.3

Paragraph three (3) of this section states “The Contractor shall provide a breakdown of all related cost, not limited to, quantity amount, materials, services….”

Given that this is a Firm Fixed Price contract, what does this breakdown of cost refer to?

Contractor shall provide pricing information in accordance with the pricing instructions stated in Volume IV, Factor 5, Cost/Price Preparation Instructions

4 H.9

Paragraph (b) – Non-BEP Personnel Site Visits.

Non-BEP Personnel Site Visits

The written consent of the Contracting Officer shall be required prior to authorizing any visitor to a Contractor manufacturing facilities who have not received a BEP favorably adjudicated background investigation or be exposed to, U.S.

Which non-BEP personnel does the government propose will visit the facility?

securities as defined in Section H.14 and 15 or the BEP proprietary, non-public information defined in Section H.6.

Examples of visitors to the Contractor facility could include consultants or suppliers to the Contractor, third party auditors of the Contractor operations and programs engaged by the Contractor, other Contractor employees not in the possession of a BEP favorably adjudicated background investigation, or local public officials.

5 H.31

Paragraphs (a - c); Is the “paper for testing and evaluation” specified in H.31 the same as the Distinctive Currency Test Samples outlined in LIN No. 0015 to 0027 of the Schedule B pricing attachment?

The paper for testing and evaluation specified in H.31 and the LINs 0015 through 0027 of Schedule B pricing attachment are the same. However, BEP may also utilize the LINs 0015 through 0027 to support other testing or evaluation needs of the BEP, such as testing new equipment or processes.

6 H.34

Paragraph H.2; There appears to be a formatting issue here.

Should “H.2” be renumbered as H.34 (e)?

Yes, this is an error in the paragraph numbering within Section H.34. H2 should read, H.34 (e) followed by H.34 (f) and H.34 (g).

7 RFP-

2031ZA20R000

03 Schedule B – Attachment

Schedule B Pricing Schedule

“Location” column

The Pricing Schedule indicates a delivery location of BEP’s District of Columbia Currency Facility (DCF) only. Does the BEP intend to receive pricing separately for DCF and Western Currency Facility (WCF), or should pricing include delivery to either location?

It is the intent of the BEP to place orders against the Contract for receipt at either the DCF or the WCF facility for all LINs as indicated in Section F.3 of the Solicitation.

In reference to pricing each facility delivery location separately, as indicated in Section L.9 of the Solicitation, the Offeror’s cost/price shall clearly delineate proposed prices, rates and explain its pricing strategy.

The cost/price shall include supporting rationale and assumptions in terms of its advantage(s) to the Government. The cost/price proposal must contain sufficient information to allow the government to perform an analysis of the proposed cost/price. The Offeror shall complete schedule provided in Section B, Supplies or Services and Prices/Costs.

8 SF 1019A

Subcontracting Plan - Attachment S

Contract years listed as 1 year base with 4 option years. This does not match the contract years in the RFP, 5 year base with 5 option years. Should the Subcontracting Plan contract years match the RFP?

At this time, if subcontracting plan is contemplated, we are requesting a Master subcontracting plan for the entire period of the proposed contract. This is a Standard Form (SF), in the event, any individual subcontracting plan is contemplated per period, the Contractor (and applicable subcontractor(s)) is required to submit a Small Business Subcontracting Plan Report pursuant to FAR 19.704 (a)(10) if any subcontracting is contemplated. See FAR

19.704 (a)(10) for specific details for submission of the required report. If subcontracting is applicable, the report should submitted following the delivery schedule at FAR 19.704 (a)(10)(iii)(A) and should be formatted/amended for each period accordingly.

9 EHS

Requirement for Purchase Materials – Attachment J

Our organization requests the following lists: Restricted Materials at DCF 75D-07.0-07 and Restricted Materials at

WCF 75W-08.0-04).

BEP internal documents, Restricted Materials at DCF, 75D-07.0-07 and Restricted Materials at WCF, 75W-08.0-04 are incorporated with this Amendment.

10 EHS

Requirement for Purchase Materials – Attachment J -

Section 4.4.1, bullet 13 and Section 4.7

EO 13693, “Planning for Federal Sustainability in the Next Decade” (3/19/15) was revoked by EO 13834 (April 2019). Please confirm that EO 13834 should be specified?

All clauses not incorporated or regulation outdate are invoke by operation of law on the basis of the Christina Doctrine. BEP supplemental policies are updated yearly as applicable.